Manage groups Access in Project Server 2013

I am currently set up as Administrator and Project Manager in the Project Server 2013 Account, however  when trying to access the section Manage groups, I get the below error, can you please help me?
Sorry,
something went wrong
You do not have sufficient
permissions to view the specified page. Please contact your administrator for
permissions to view this page.
Many thanks,

Hi,
Clear browser cache and ensure the browser has compatibility mode on and the PWA site is trusted. Also you can verify issue with In private browsing mode.
If Issue still persist re-sync your user profile by open and save thru Manage user and verify issue in different machine too.
Hope it will be useful.
Raushan Kumar |LinkedIn

Similar Messages

  • Configure Workflow Manager 1.0 in Project Server 2013 with FBA

    Hi,
    Please suggest the ways to configure Workflow manger in Project server 2013 where PWA using FBA
    we have tried for below situation, but no luck!!
    The workflow manager configured using windows login account, we are associating a FBA site with workflow manager which is 
    Register-SPWorkflowService -SPSite 'http://FBAsite' -WorkflowHostUri 'http://workflowmanagerapplication:12291'
    Following steps are taken care while creating workflow.
    We have added users to the user service profile services
    User profile synchronization is started
    The user by whom we are logged is available in User Profile list
    we are not running workflow with share point system account
    Final step full synchronization of User Profile Application
    Below the error we are getting when workflow run
    Resume this workflow  
     RequestorId: 879e36f9-9db0-3c16-0000-000000000000. Details: An unhandled exception occurred during the execution of the workflow instance. Exception details: System.ApplicationException: HTTP 401 {"Transfer-Encoding":["chunked"],"X-SharePointHealthScore":["0"],"SPClientServiceRequestDuration":["440"],"SPRequestGuid":["879e36f9-9db0-3c16-a91c-356d29becb34"],"request-id":["879e36f9-9db0-3c16-a91c-356d29becb34"],"X-FRAME-OPTIONS":["SAMEORIGIN"],"MicrosoftSharePointTeamServices":["15.0.0.4605"],"X-Content-Type-Options":["nosniff"],"X-MS-InvokeApp":["1;
    RequireReadOnly"],"Cache-Control":["max-age=0, private"],"Date":["Sun, 15 Jun 2014 12:44:03 GMT"],"Server":["Microsoft-IIS\/7.5"],"WWW-Authenticate":["NTLM"],"X-AspNet-Version":["4.0.30319"],"X-Powered-By":["ASP.NET"]}
    at Microsoft.Activities.Hosting.Runtime.Subroutine.SubroutineChild.Execute(CodeActivityContext context) at System.Activities.CodeActivity.InternalExecute(ActivityInstance instance, ActivityExecutor executor, BookmarkManager bookmarkManager) at System.Activities.Runtime.ActivityExecutor.ExecuteActivityWorkItem.ExecuteBody(ActivityExecutor
    executor, BookmarkManager bookmarkManager, Location resultLocation)

    Hi Mafeer,
    Since this issue is related to Project Server, I would like to recommend you to post there for more effective support:
    Project Server General Questions and Answers
    Thanks for your understanding.

  • Wrong Database Access Account (Project Server 2013)

    Hi,
    After “Connect to a server farm – Create a new server farm”...
    In the Specify Configuration Database Setting page of the
    SharePoint Products Configuration Wizard, in the Specify Database Access Account section, I entered a wrong
    User Name.
    How and where can I correct it?
    Thanks for your help

    Hello,
    The Database access account is basically the "Farm Admin account" of your farm. It's possible to change it, however it's not a good idea doing that and it's not pretty, If this is a
    very new farm then I'll recommend re-creating a farm using correct account. Below are the steps.
    1) Run the SharePoint Config wizard and disconnect the servers from the farm.
    2) Run the SharePoint Config wizard and create new farm >> give correct user name for Database Access Account.
    However if you decide to change it, here is the instructions, they are provided without any guarantee!
    Go to Central Administration -> Security, click the Configure Service Accounts link under General Security head. Then select Farm Account from the doprdown list. Make sure the account you use have all the permissions. You need those permissions.
    Hope this helps!
    Thank you,
    Kiran K.

  • Project Server 2013 - Remove user from resource pool via sync

    Hello everyone,
    has anyone managed to configure their Project Server 2013 box with a resource pool sync that will actually remove user from the resource pool (disable "User can be assigned as resource" or deactivate users) when the user is removed from the AD
    group(s)?
    Setup: Single box, SQL 2012 SP1, SharePoint/Project Server 2013 + PU March + CU April. 2 PWA instances, 1 in SharePoint and 1 in Project permission mode. Tried on 2 different machines (different setup, accounts, domains).
    Proceedings:
    Create AD user U, AD group G. Add U to G.
    Go to PWA, setup resource pool sync with G, sync.
    U is now in the resource pool, has no PWA permissions.
    Remove U from G. Resync resoure pool.
    U is still in resource pool, still a resource, still active, can still be assigned as resource.
    Adding U back to G an repeating the whole spiel with a resource pool and a PWA group sync of G will result in U being added and removed from the user list (as expected), and U being added but not removed from the resource pool.
    Having read
    http://technet.microsoft.com/en-us/library/gg982985.aspx and
    http://technet.microsoft.com/en-us/library/gg750243.aspx, there does not seem to be an omission on my part.
    The first article states:
    Note:
    The corresponding Project Server User Account is not deactivated based on this synchronization. If the same Active Directory user is configured to synchronize with a Project Server security group, the Project Server user account will be inactivated when
    that synchronization occurs. For more information, see
    Best practices to configure Active Directory groups for Enterprise Resource Pool synchronization in Project Server 2013.
    Unfortunately, this deactivation either does not seem to occur even with a PWA group sync or I misunderstood the article.
    So, did anyone manage to setup their resource pool sync in a way, that new resource will be added, but also be removed from the resource pool?
    Kind regards,
    Adrian

    Hi Adrian,
    you tried to sync the same AD group that you used for the resource pool sync also with a Project Server permission group?
    And on removal of the user of the AD group the project user/resource is not deactivated? Only removed from the group
    Regards
    Christoph
    Hi  Christoph,
    even though I might have tried that before, I tried it again in several constellations. It didn't change anything. The the user will be properly added to and removed from the PWA group whenever I remove them from the AD group, the use will also stay active
    (but cannot logon without permissions). However, the user will always remain in the resource pool, i.e. the "User can be assigned as resource." checkbox will remain unless it is cleared manually.
    Having re-read the technet articles, none of the scenarios actually seem to descibe or address the process that I require, or maybe I'm just misunderstanding. Let me just try to outline the core issue:
    Add user to AD group. Sync AD group with resource pool. User is now a PWA resource and PWA user.
    Remove user from AD group, but do not deactivate/delete user from AD.
    (Magic happens!)
    User cannot be assigned as ressource in PWA.
    So, is there anything to make this step 3 happen, or is it just not possible to sync users out of the resource pool anymore unless they are deleted/deactivated in AD?
    Kind regards,
    Adrian

  • Security Groups when in 'Project Server Permissions Mode' - Project Online

    Hi All,
    We have Project Online up and running, by default the PWA instance we added to O365 was in "SharePoint Permissions" Mode, we changed to "Project Server Permissions" Mode because of some complex security we need to configure. For some
    reason (different from Project Server 2013) Project Online creates a number of Security Groups by default that seem to be duplicates. For example for Administrators there are:
    - Administrators
    - Administrators for Project Web App
    - Web Administrators (Project Web App Synchronized)
    For Project Managers:
    - Project Managers
    - Project Managers (Project Web App Synchronized)
    - Project Managers for Project Web App
    And there is something similar for all the groups (compared to Project Server 2013):
    I have looked online, with no luck, for some guidance on what all these groups are and if I can delete some of them without causing PWA to crash.
    If anyone out there can point me in the right direction / send me some documentation or links it will be greatly appreciated!
    Thanks!
    Jorge

    Hi Jorge, I had the same thing on two different tenants within the last week - one today. I will just clean up the SharePoint groups manually. The ones with the descriptions are the correct Project Server permission mode groups... Hopefully Microsoft will
    fix this soon, you could raise a support ticket on your office 365 tenant - support is pretty quick! Paul
    Paul Mather | Twitter |
    http://pwmather.wordpress.com | CPS

  • Project Server 2013 SSRS reports by logged in user group

    Hi All,
    We are using project server 2013. We have developed SSRS report. We need to display the projects based on the logged in user security group(e.g Project Manager, Administrator etc.) I tried with the below query got from a forums. But it is not working. Is
    there is any way to get the security group of the logged in user using SQL query.
    SELECT     MSP_WEB_SECURITY_GROUPS.WSEC_GRP_NAME, MSP_WEB_RESOURCES.RES_NAME
    FROM         MSP_WEB_SECURITY_GROUP_MEMBERS INNER JOIN
                          MSP_WEB_RESOURCES ON MSP_WEB_SECURITY_GROUP_MEMBERS.WRES_GUID = MSP_WEB_RESOURCES.WRES_GUID RIGHT OUTER JOIN
                          MSP_WEB_SECURITY_GROUPS ON 
                          MSP_WEB_SECURITY_GROUP_MEMBERS.WSEC_GRP_GUID = MSP_WEB_SECURITY_GROUPS.WSEC_GRP_GUID
    Thanks in advance, Taj

    Taj,
    The query above gives you a complete list of user groups and users. It does not filter by resource name/group.
    You can get the logged in user using the "USer Filter" webpart, on which the SSRS report is being displayed (assuming you are displaying it on a SharePoint page).  You will need to pass this as a parameter into your SSRS report.
    http://www.wonderlaura.com/Lists/Posts/Post.aspx?ID=214
    http://www.wonderlaura.com/Lists/Posts/Post.aspx?ID=91
    Prasanna Adavi,PMP,MCTS,MCITP,MCT TWitter: @prasannaadavi Blog: http://www.prasannaadavi.com

  • Project Server 2013 Anonymous Access (SP or PS modes)

    Greetings,
    This has become quite painful.  I have two tickets opened with M$ and I've never witnessed that with which I am witnessing.
    Simple question, how to enable Project Server 2013 Anonymous Access...I've been at it for over a week, I've tried in both SP perms mode and PS perms mode.  And I've built a bone stock SP/PS server to determine if my farm's jacked or not.  I get
    the exact same behavior...prompt for creds.  M$ told me today that anon has never ever been something offered in SP or PS today or at any point in the past.  A simple gotomeeting sent that group reeling out off into outer space.  I'm glad I
    could help them on their technical journey, but damn't if I don't feel used for spending $1000 on two tickets.
    Tried everything I could possibly think of...Please help, before I eat a bullet.

    When you enable anonymous access to a Web site, you allow anonymous users (and authenticated users who have not been granted access to the site) to browse the entire Web site, including any list, library, folder within a list or library, list item, or document
    that inherits its permissions from the Web site
    I think you are referring to PWA/_layouts/15/user.aspx if I understood your query correctly.
    As you could read, its referring to SharePoint list and libraries and not Project Webpart data.
    Anonymous Access: Specify what parts of your Web site (if any) anonymous users can access. If you select Entire Web site, anonymous users will be able to view all pages in your Web site and view all lists and items which inherit permissions
    from the Web site. If you select Lists and libraries, anonymous users will be able to view and change items only for those lists and libraries that have enabled permissions for anonymous users. 
    So this anonymous doesn't mean users can access, PWA pages like Projects.aspx with anonymous account. If this happens all anonymous users would see all projects...
    Project PWA site, has pages like tasks.aspx, projects.aspx, Timesheets.aspx, etc. Users who access Project Server 2010 through the Web interface (Microsoft Project Web App) use these pages that are composed of Web Parts, which are modular elements that present
    information on SharePoint pages. Now, to get users based data, this checks for user role, permission and data is rendered.
    http://technet.microsoft.com/en-us/library/gg314584(v=office.14).aspx
    I am curious to know if you would like all users who have not been granted access to the site also access your projects? What is the objective or business requirement you are trying to solve here.
    Shazeb Khan

  • Project Server 2013 for Resource Planning & Project Portfolio Management

    We are looking to  use project server 2013 for resource and project portfolio management.  We are an IT department of approximately 600 growing to 1,000 within the next several years.
    We would like to us PS2013 to do the following :
    Manage Portfolio of Projects
    Manage Resources against this Portfolio
    Calculate Project Finances using resource roles and rates
    I would be grateful to have both comments on experience , both positive and negative.
    Thank You

    Many teams within organizations are turning to Project Server to help them control resources, deliverables and costs better.    It does resource management very well with work & cost resources, baseline costs, material costs, budget costs and
    out of the box earned value analysis (EV).  The Strategy (portfolio) component is very powerful and it will help you identify project that align to your objects then do what if analysis to find the right mix of projects.
    Here are a couple of things you should think about when moving to PS2013:
    1) Who will be using the tool?  If it is a mix of onsite staff, remote staff, vendors, contractors etc. you may want to think about a hosted solution.
    2) Training.  Don't assume everyone will just magically 'know' how to use the tool.  Train everyone (team members, PMs, Executives) then train them again.  It's the only way to truly get the value out of the tool.
    3) Who will manage the system?  This is not a typical application.  The right administrator needs SharePoint, Project Server, SQL Server,  MS Project, Analysis Services and SQL Report writing skills.  Please note that much of this can
    be learned by the right person but DEFINITELY find the right person.
    4) Don't start customizing right out of the box.  You will get frustrated.  Adjust your organization to the tool early on.  I know that is easier said than done but you need a realistic approach to get tool acceptance moving early.  
    5) Use workflows but don't use them right out of the gate.  Workflows are great but I suggest you wait until phase 2 or 3 to start aligning them to your business processes.  
    6) Lastly and most importantly, you must first establish your own business processes THEN  align them to the tool.  DO NOT assume the tool will create business process for you.  You must think about how you are going to initiate a project,
    how are you going to track deliverables, how will time sheets be managed, etc.  Get to a whiteboard, crack open Visio and start building and establishing your processes now.  PS 2013 is pretty flexible and usually will align well with existing business
    processes.
    And don't forget to hire a good consultant.  They can be brought in during key phases of your roll-out to add value, help you avoid risks, and provide you with best practice advice.
    Good luck.

  • Timesheet Manager in Project Server 2013

    Hi,
    Can anyone send me the Timesheet process steps in Project Server 2013?
    1. I would like to set someone else as my timesheet manager but while creating a user when i click browse button in timesheet manager field i do not see any resources.
    2. Timesheet is automatically approved by default, to change that process i enabled Require line approval before timesheet approval option in server settings - timesheet settings and defaults. After doing this i submitted my timesheet, it shows the status
    " your timesheet has been sent to "usernamel" for approval. The user himself is the timesheet manager, When i click on Approvals option nothing is available. How to approve it?
    Please help.
    Is there a forum which explains the process of timesheet.
    K.Gokulraj

    Gokulraj,
    Just to add on to the previous reply,
    1) To be able to set as a Timesheet Manager, the user needs to be in the "Timesheet Managers" list, which can be set under Server Settings >> Timesheet Managers
    2) As long as the user is his own Timesheet Manager, the timesheet gets approved automatically.
    3) When you select "Line Approval Required", that means that the approvals from Project Managers are required before the timesheet manager sees the timesheet.
    In your scenario, check who the status managers are for all the projects in that timesheet. Have them all approve the updates. Then, because the User himself is the TS Manager, the timesheet will get approved automatically.
    Prasanna Adavi,PMP,MCTS,MCITP,MCT http://thinkepm.blogspot.com

  • I'm an admin of this site, but now can't access some pages in Project Server 2013 e.g. Project center, PWA setting

    I'm an admin of this site, but now can't access some pages in Project Server 2013 e.g. Project center, PWA setting

    it may be your browser.  CHeck the folloinwg
    1) Turn on Compatibilty mode
    2) Security Options / Make it a local trusted site
    3) Turn of Protected Mode in the browser under Security
    and have you tried it from Chrome
    CHeers!
    Michael Wharton, MVP, MBA, PMP, MCT, MCTS, MCSD, MCSE+I, MCDBA
    Website http://www.WhartonComputer.com
    Blog http://MyProjectExpert.com contains my field notes and SQL queries

  • Notification to Manager if task/Time sheet not approved in Project Server 2013

    is there any option if any user(Resource) updated his/her task & sent to his/her Manager for approval
    and Manager is not approved ( say in said timeline or days) then some notification should go to one step up (as Reporting Manager of that Manager who not approved task update & time sheet) in Project Server 2013?

    A solution could be to create email subscriptions on an SSRS report containing the non-approved task updates by manager.
    See reference here:
    http://bhushan.extreme-advice.com/email-subscriptions-for-ssrs-reports/
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, MCP |

  • Access Project Server 2013 from personal mobile device

    Dear All,
    This is something great about Project Server 2013 (PWA) where users can view theirs task & other information on their personal mobiles, tabs etc. But i not able to access my company Project Server 2013.
    Is that i am missing something to install or configure PWA 2013 as i am admin for this application?
    Kindly let me know 

    That means your PWA site collection in not published externally so your mobile device can't resolve the DNS. If you connect your mobile device to the same network your Project Server environment is on, it will work as the DNS would resolve. You probably
    want to look at publishing PWA externally if you want to use it on mobile devices. Here are some links for you / your IT department, the process is the same for PWA and any other SharePoint site collection:
    http://www.brightstarr.com/sharepoint-technology-and-application-insights/securely-publishing-sharepoint-externally-using-web-application-proxy
    http://blogs.msdn.com/b/sambetts/archive/2014/04/02/setting-up-a-reverse-proxy-for-sharepoint-with-tmg-server.aspx
    http://www.isaserver.org/articles-tutorials/installation-planning/Planning-SharePoint-Publishing-TMG.html
    Paul
    Paul Mather | Twitter |
    http://pwmather.wordpress.com | CPS

  • Help needed Regarding Project Server - 2013 Workflow

    Hi All,
    I am new to Project server 2013 Workflow, hence please help me regarding this. Pardon me if this question is too trivial. 
    I have created a project type associated with a workflow and my workflow is as follows :
    So I am not doing anything here, I am just testing the workflow as mentioned by technet site : http://technet.microsoft.com/en-us/library/dn458865(v=office.15).aspx
    But it is mentioned that, after a minute or 2, the workflow state will change, also they have mentioned to press the Submit button.
    But in my case, the workflow is not moving to next stage [It just says 'The workflow is still processing - which never changes after hours] or I am getting the submit button (Submit button is disabled on the ribbon). Below is the state of my workflow :
    PS : I have made the user added to Portfolio managers group as well. But still I am having this same issue. 
    The Workflow manager is installed properly, and it is working fine in case of List workflow. I am facing the issue only wrt Site workflow for Project server 2013.
    Please help me to solve this issue.
    Thanks,
    shanky

    Hi Kiran,
    I am now facing issue while assigning a task to a person in the workflow.
    I am having a person named say 'John' , who is included in Project Manager as well as Portfolio Manager.
    And I am using a workflow as :
    Stage : Conceptual
    Assign a task to John (Task outcome to Variable: Outcome5 | Task ID to Variable: TaskID3 )
    Transition to stage
    Go to Approval
    But this is again giving issue as :
    Workflow Internal status : Cancelled
    Details: System.ApplicationException: HTTP 401 {"error":{"code":"-2147024891, System.UnauthorizedAccessException","message":{"lang":"en-US","value":"Access denied. You do not have
    permission to perform this action or access this resource."}}}
    PS : I have used the same Sharepoint admin account for 'Account Name' in ‘User Profile Sync' , Is this causing the issue? Please let me know.
    Thanks,
    Shanky

  • Project Server 2013 Project Site Permission

    Hi All,
    Q1: We are using project server 2013, most of the time the projects are created by the PMO coordinators and it will be assigned to the project manager. Project coordinator and Project Manager belongs to "Project Manager" group. After assigning
    the project when the project manager tries to access Project Site, he is getting "why you want to access this site". When I checked project site permission only project coordinator name is added to the Owners group. Normally the project owner should
    have the permission to the project site, how to fix it.
    Q2: We have different enterprise project type with different site templates. When the project type is changed from one type to another, is it possible to delete and recreate the respective project sites automatically.
    Thanks in advance, Taj

    Taj,
    Q1) this is a question related to how your security is set up. If you are using Project Server Permission mode, people in Project managers groups, who have edit ability on your project will get added to the Project manager Synchronized group on the project
    site upon publish. You just need to make sure your secueiry ctegories and groups are set up as such.
    Alternatively, you could set the owner of the project to be the project manager once they take ownership.
    Q2) This will be a manual activity. You need to disconnect the site under server settings, then delete site. Then you can create the site, which will pickup the new EPT set project site template automatically.
    Cheers,
    Prasanna Adavi, Project MVP
    Blog:
      Podcast:
       Twitter:   
    LinkedIn:
      

  • How to import the Issues list from an Excel File in Project Server 2013

    Hi,
    I'm using Project Server 2013.
    A Project Manager has been playing with the Issues List, deleting some fields, creating new columns and modifying some columns name. The result of this is that I'm getting this error everytime the task
    Reporting (Project Sync) is executed:
    General
    Reporting Wss list sync failed:
    ReportingWssSyncListFailed (24018) - 1100. Details: id='24018' name='ReportingWssSyncListFailed' uid='4feafda7-f147-e411-940d-005056957f05' SPListType='a1efd9a9-bd03-4604-91f3-31a2cc5693ff' Error='1100'.
    ReportingWssSyncListFailed (24018) - 1100. Details: id='24018' name='ReportingWssSyncListFailed' uid='5deafda7-f147-e411-940d-005056957f05' SPListType='a1efd9a9-bd03-4604-91f3-31a2cc5693ff' Error='1100'.
    ReportingWssSyncListFailed (24018) - 1100. Details: id='24018' name='ReportingWssSyncListFailed' uid='69eafda7-f147-e411-940d-005056957f05' SPListType='a1efd9a9-bd03-4604-91f3-31a2cc5693ff' Error='1100'.
    ReportingWssSyncListFailed (24018) - 1100. Details: id='24018' name='ReportingWssSyncListFailed' uid='75eafda7-f147-e411-940d-005056957f05' SPListType='a1efd9a9-bd03-4604-91f3-31a2cc5693ff' Error='1100'.
    ReportingWssSyncListFailed (24018) - 1100. Details: id='24018' name='ReportingWssSyncListFailed' uid='81eafda7-f147-e411-940d-005056957f05' SPListType='a1efd9a9-bd03-4604-91f3-31a2cc5693ff' Error='1100'.
    ReportingWssSyncListFailed (24018) - 1100. Details: id='24018' name='ReportingWssSyncListFailed' uid='8deafda7-f147-e411-940d-005056957f05' SPListType='a1efd9a9-bd03-4604-91f3-31a2cc5693ff' Error='1100'.
    Reporting message processor failed:
    ReportingWSSSyncMessageFailed (24016) - RDS failed while trying to sync one or more SP lists. The RDS queue message will be retried.. Details: id='24016' name='ReportingWSSSyncMessageFailed' uid='5beafda7-f147-e411-940d-005056957f05' QueueMessageBody='ProjectUID='a1efd9a9-bd03-4604-91f3-31a2cc5693ff'.
    ForceFullSync='False'. SynchronizationType='Issues'' Error='RDS failed while trying to sync one or more SP lists. The RDS queue message will be retried.'.
    ReportingWSSSyncMessageFailed (24016) - RDS failed while trying to sync one or more SP lists. The RDS queue message will be retried.. Details: id='24016' name='ReportingWSSSyncMessageFailed' uid='67eafda7-f147-e411-940d-005056957f05' QueueMessageBody='ProjectUID='a1efd9a9-bd03-4604-91f3-31a2cc5693ff'.
    ForceFullSync='False'. SynchronizationType='Issues'' Error='RDS failed while trying to sync one or more SP lists. The RDS queue message will be retried.'.
    ReportingWSSSyncMessageFailed (24016) - RDS failed while trying to sync one or more SP lists. The RDS queue message will be retried.. Details: id='24016' name='ReportingWSSSyncMessageFailed' uid='73eafda7-f147-e411-940d-005056957f05' QueueMessageBody='ProjectUID='a1efd9a9-bd03-4604-91f3-31a2cc5693ff'.
    ForceFullSync='False'. SynchronizationType='Issues'' Error='RDS failed while trying to sync one or more SP lists. The RDS queue message will be retried.'.
    ReportingWSSSyncMessageFailed (24016) - RDS failed while trying to sync one or more SP lists. The RDS queue message will be retried.. Details: id='24016' name='ReportingWSSSyncMessageFailed' uid='7feafda7-f147-e411-940d-005056957f05' QueueMessageBody='ProjectUID='a1efd9a9-bd03-4604-91f3-31a2cc5693ff'.
    ForceFullSync='False'. SynchronizationType='Issues'' Error='RDS failed while trying to sync one or more SP lists. The RDS queue message will be retried.'.
    ReportingWSSSyncMessageFailed (24016) - RDS failed while trying to sync one or more SP lists. The RDS queue message will be retried.. Details: id='24016' name='ReportingWSSSyncMessageFailed' uid='8beafda7-f147-e411-940d-005056957f05' QueueMessageBody='ProjectUID='a1efd9a9-bd03-4604-91f3-31a2cc5693ff'.
    ForceFullSync='False'. SynchronizationType='Issues'' Error='RDS failed while trying to sync one or more SP lists. The RDS queue message will be retried.'.
    ReportingWSSSyncMessageFailed (24016) - RDS failed while trying to sync one or more SP lists. The RDS queue message will be retried.. Details: id='24016' name='ReportingWSSSyncMessageFailed' uid='97eafda7-f147-e411-940d-005056957f05' QueueMessageBody='ProjectUID='a1efd9a9-bd03-4604-91f3-31a2cc5693ff'.
    ForceFullSync='False'. SynchronizationType='Issues'' Error='RDS failed while trying to sync one or more SP lists. The RDS queue message will be retried.'.
    Queue:
    GeneralQueueJobFailed (26000) - ReportingWSSSync.WSSSyncMessageEx. Details: id='26000' name='GeneralQueueJobFailed' uid='98eafda7-f147-e411-940d-005056957f05' JobUID='9e937da7-f147-e411-940e-005056957f0d' ComputerName='b579360a-53ab-4fe0-bf9b-c62f5e8d3529'
    GroupType='ReportingWSSSync' MessageType='WSSSyncMessageEx' MessageId='1' Stage='' CorrelationUID='0945bd9c-0d6a-a0f1-47b0-68cdfcfbff9a'. For more details, check the ULS logs on machine
    b579360a-53ab-4fe0-bf9b-c62f5e8d3529 for entries with JobUID
    9e937da7-f147-e411-940e-005056957f0d
    What I'm trying to do is to create a new Project from the scratch, update the Issues List, not deleting or modifying columns, just creating new columns in order to match the names he (the Project Manager) put in his Issues List, then Export the list to Excel,
    and then create a datasheet view matching the Exported list, but here I don't know how to import the list (copy / paste or whatsoever it can be done...)
    Do you know how to do it, or do you know another/any method to solve this problem?
    Thank you in advance,
    José Espases

    Hi José,
    2 considerations: 
    The first one is that (as you experienced) one should not delete or rename any of the predefined columns in the risk/issue list. What you did is the right way, meaning keeping the native column as is and creating new ones based on the business needs. Finally
    you just need to create view with the appropriate fields.
    Then for importing risks from an Excel list, I can't test it right now, but you should have a datagrid view (MS Access type) allowing you pasting data from Excel.
    Hope this helps,
    Guillaume Rouyre, MBA, MCP, MCTS |

Maybe you are looking for

  • Save Open dialog box opening very slow

    I have windows 7 professional 64bit OS. whenever i try to open/save as dialog box it appears very slow, then it will say it is not responding then after 10-15sec it will come alive. Need help!!!!!!

  • Error creating a Web Service. Help!

    Hi, I'm triying to create a web service but when I try to test it or execute, it gives me this error: ORA-20001: The webservice was unreachable because either the URL you supplied was invalid, your environment requires a valid proxy server address fo

  • Purchase order in Me21N, Me59N, MEMASSPO

    I need to insert an authority check when user try to create a purchase order in Me21N, Me59N, MEMASSPO. Does any one know an exit, bapi ... that involves all those transactions? Please help me. Thanks,

  • I changed my apple id on itunes, but it wont change on my ipad, how do i get my new id onto the ipad

    i had to change my apple id, i did it on itunes through my account settings, but for some reason it didnt carry over onto my ipad, its still using my old id, and i cant get the new one onto the ipad.  i cant find anyway to change the id on the ipad.

  • Blue and Grey Bar taking up bottom half of page in Firefox?

    Hello, I have a massive blue and grey bar going across the bottom of my screen when I use Firefox resulting in my screen size being half of what it should be. What is this and how can I make it go away? Been using Firefox for years and this is the fi