Management studio error while creating/editing maintenance plan

Hi,
I had MS SQL 2012 enterprise edition installed and everything was working fine. Later I removed MS SQL 2012 and re-installed. Now when I am trying to create maintenance plan I am getting below error. When I click Yes system allows me to go through the maintenance
plan wizard and create new plan but when I want to edit it give me same error and it doesn't open screen to edit the plans. Can you please provide solution to below error?
Microsoft SQL Server Management Studio
The 'Microsoft.DataTransformationServices.VsIntegration.DtsPackage, Microsoft.DataTransformationServices.VsIntegration, Version=11.0.0.0, Culture=neutral, PublicKeyToken=89845dcd8080cc91' package did not load correctly.
The problem may have been caused by a configuration change or by the installation of another extension. You can get more information by running the application together with the /log parameter on the command line, and then examining the file 'C:\Users\pac\AppData\Roaming\Microsoft\AppEnv\10.0\ActivityLog.xml'.Continue
to show this error message?
Yes   No   
I tried repair option from MS SQL 2012 setup but it didn't solve the problem. This is my production system and it has TFS 2013 and it's database. Please let me know how severe this problem is? Is it something to be worried about in future? How do I solve
this error?
Regards, Premal Acharya

Hi Michelle,
Thanks for your reply. I resolved this issues yesterday by installing SQL Server
Management Tools Complete. I suspect that
Microsoft.DataTransformationServices.VsIntegration.DtsPackage, Microsoft.DataTransformationServices.VsIntegration
DLL files were having issues. When I searched my system I could only find Microsoft.DataTransformationServices.VsIntegration.DLL and
Microsoft.DataTransformationServices.VsIntegration.DtsPackage.DLL file was missing. 
When I re-ran the MS SQL setup to add new feature I selected Management Tools Complete and after installation this error was resolved. Though this has solved the issue for now I feel the error shouldn't have come with Management Tools -
Basic installation as I had installed MS SQL Server before with Management Tools - Basic and it had worked without any issues. 
For now this issue is resolved but it will be of good help if I can know the cause of this error and what could be the possible solution. 
Thanks.
Regards, Premal Acharya

Similar Messages

  • Error while creating Rough cut planning profile

    Facing the following error while creating rough cut planning profile (mc35) in SOP for product group. "Work center x plant y does not exist for task list type 3". pls advise- do i need to create tsk list for product group? pls advise with tcode to be used.

    pls check the (task list ) usage you have maintained in the Work center.
    In OP45 , pls ensure that for the usage ,
    task list type 3 (Rough cut planning profile) is included.
    If it is not included there , pls include the TL type 3 for your usage and now the prob will get solved.
    Regards.,
    Sheik

  • Error while creating table maintenance generator

    Hi,
    I am getting below error while creating table maintenance generator.
    Screen SAPLZtest   0002 could not be generated.   In DYNPFIELD_ATTR field LENGTH has the invalid value 241.
    Reason for that error might be:
    In the table I have a field with a dataelement(customized) of type Char and length 241.
    But in the other table Iam using the standard data element(standard) of same type(241 char).In this table Iam able to create table maintenance generator without any errors.
    And the domain Iam using is same for both the tables.
    Please help me to solve this.
    Thanks in advance,
    Sravanthi

    Hi,
    you can go to transaction se51 and go your screen. active it.. you can find thesolution.
    refer these links..
    Error in table control
    Error while creating table maintainence generator !
    Thanks and Regards,
    Ahamed.

  • Error while creating a Development plan template

    Hi Gurus,
    I am facing errors  while creating Development Plan Template.
    This is how it goes :
    When i click on Define Forms for Talent Assessment --> a wizard pops up & i select Development Plan :
    In first step, I am giving Title,Integration with SAP Learning Solution (check) & a rating scale.
    Now after clicking next, I am adding 2 development areas :
    1) Training
    2) Mentoring,
    now as soon as I'm clicking on End Configuration, It displays 2 errors & 1 warning message :
    error1 : Element Appraisal Template 'XXXXX' contains errors.Cannot change status.
    error2 : Value type 000000XXX of value class Q does not exists
    Warning 1 : You have maintained a description that is not displayed.
    In PHAP_CATALOG, when I'm trying to manually release the Criterion Group (VB) or Appraisal template (VA), it does not allow me to do it.
    Kindly let me know how to proceed further.
    Regards
    bharti

    Hi,
    Even though it gives the error,the new RTF template is uploaded and it is reflected when I query the template again.
    But when I run the Concurent program and see the output,the output still shows me the old template.
    Regards
    Jujaar

  • Funds Management related error while creating Purchase Requisition

    Hi,
    Am working in ECC6.0 system with Funds Management integration. While creating PR am getting  below mentioned error
    "At least one GL account was not derived by the budgetary ledger
    Message no. FI_E034"
    Diagnosis
    You are using the Funds Management system integrated with the budgetary ledger (BL) active for FM area .
    Postings into the budgetary ledger require a GL account for each of the budgetary ledger line items. However,
    in this case, at least one of the line items in the BL interface table does not contain a GL account.
    Use the link below to analyze the table contents before and after the account derivation process.
    Budgetary ledger account derivation trace
    System Response
    The budgetary ledger cannot post this document. The BL document"
    Can some body guide me how to fix this error.
    Thanks in advance

    hi
    which component you are using?
    FORMER BUDGETING OR   BUDGET CONTROLSYSTEM( BCS)
    CHECK YOUR DERIVATION STRATEGY BY USING FMDERIVE.
    CHECK DERIVATION RULE  FOR BUDGETERY LEDGER AND G/L ACCOUNT.
    THANKS & REGARDS
    MALA K VUNDELA

  • Problems with FL Studio: "Error while creating the ASIO driver."

    I'm trying to use ASIO with FL Studio with my SB Live 24-Bit USB sound card. However, whenever I select "Creative ASIO USB" as my output device, I get the message "Insufficient USB Bandwidth. This device will reset to its default ASIO settings.", followed by "Error while creating the ASIO driver."
    I've tried unplugging all other USB devices, switching USB ports, using a PCMIA USB 2.0 card, using Monster USB cables; all to no avail. It seems to me that there is plenty of USB bandwidth available but ASIO simply refuses to work.
    Here are my laptop's specs (it's ancient but still good enough to run FL Studio):
    P4 3.40GHz HT
    1024MB PC3200 DDR RAM
    SB Live 24-Bit USB sound card
    128MB ATI Mobility Radeon 9700
    Any suggestions?

    So I guess no one could help me then?
    It's OK, though, because I figured out the problem on my own. I had to change the "Device Control" settings in the Control Panel from 16 to 24-bit. Don't know why this would affect USB bandwidth, but whatever.

  • Unable to resolve error while creating a maintenance project for SMD

    Hi,
    I am getting an error when I try to create a maintenance project for SMD 331- SMD 341 - SMD 351 systems.
    ( SMD 331- Development, SMD 341- Test, SMD 351- Production ) SMD is 4.0 upgraded system.
    Detailed description of the problem:
    In SOLAR_PROJECT_ADMIN, I select a newly created project
    GS_SMD3513 and in tab 'System Landscape', go to tab 'Change Requests', here when I do consistency check
    I get following errors
    1. 'No consolidation system found for SMD-331 (project  GS_SMD3513)'
    2. Message from function module /TMWFLOW/CHECK_PRJ_CONS: No export system for SMD-351
    3. Error reading information for number range object /TMWFLOW/D
    The transport route between SMD331- SMD341- SMD351 is available as any transport request created in SMD 331 can be successfully imported to SMD 341 and SMD 351.
    I need help to resolve these errors.
    Edited by: Dipti Sawarkar on Jan 7, 2008 6:41 AM

    Hi Patmol,
    Have you tried to go to the previous or next timesheet and then navigate with the "previous period" or "next period" to the timesheet in question.
    Also have you tried to open it using a delegation session?
    Hope this helps,
    Guillaume Rouyre, MBA, MCP, MCTS |

  • Error while creating the Inspection plan by T.C QP01

    Hello Friends,
    In QP01, When i am trying to create a inspection plan system throwing the error message "The inspection plan identifier exists already. Enter another."
    Message no. QP054
    But in QP02, When i checked  for that material, Plant, Group Number, Group counter, Usage, Status, i didn't find the entry over there.
    Actually my requirement is to create a inspection plan for a material and plant combination with speicfic Usage as 61(customer requirement and status 4) but when i am trying to create that system throwing the error message explained above.
    Thanks and Regards,
    Jitendra Chauhan.
    Edited by: jitendra chauhan on Jun 1, 2010 4:28 PM

    Hello Friends,
    Thanks for your valuable answers.
    I checked in table MAPL, for a particular material, Plant, Group Number and Group Counter, there is no entry.
    Where as in table PLKO, for a particular Group Number and Group Counter, entry is there. Actually this Inspection Plan Group Number and Group Counter is assigned to multiple materials through Material Assignment. If i delete the entry for this in table PLKO, than for all rest of the materials also entry will be deleted.
    Hence how to resolve this?
    Actually for other material number, same plant, same group number and same group counter, entry exist. So can i simply go in the inspection plan of other material,same plant,same group number,same group counter and than inside the material assignment to assign the required  material code, plant and the group counter number?
    Looking ahead for valuable inputs from the genius.
    Thanks and Regards,
    Jitendra
    Edited by: jitendra chauhan on Jun 2, 2010 8:09 AM

  • SQL Server Management Studio 2008 R2 not showing Maintenance Plan

    I do not have the Maintenance Plan listed under the Object Explorer.  I am running SQL Server 2008 R2 (that is listed in Control Panel/Programs). When I tried to run the install to check that the management tool is configured I received the
    "instance id" error (SQLManagementStudio_X64_ENU.EXE).  After doing some reading online I found where some people used the SQLEXPADV_X64_ENU.exe install. This allowed me to see that the Management Tools were installed.  I am not an
    SQL expert and need to schedule a nightly backup of the database. 

    You need to have your permissions checked to ensure that you have appropriate permissions to see these. This link gives you the permissions required to see these and maintain them
    http://msdn.microsoft.com/en-us/library/ms187658(v=SQL.105).aspx
    Warwick Rudd MCT MCITP SQL Server 2008 Admin

  • Error While creating loan repayment plan

    Hi
    While I am reating loan repayment plan after making the necessary inputs in the loan(0045) IT it is showing the following errror. We are having only the interest free loans.
    <b>Effect.int.rate cannot be calculated because no flow records exist</b>
    because of this I can not put the loan end date for the loan type.
    Pls give solution
    Regards
    Mathews

    Hi,
    I think you need to check these two points.
    1. Are you giving the End date as 31.12.9999 or the date on which the loan will have been reapid completely. You need to give the end date as the one on which the loan gets repaid.
    2. Otherwise please go to spro-payroll-your country payroll-loans-Calculation-Adjust Value Date (here give end date as 31.12.9999.
    Please try the above two points and see if it works.
    Regards,
    Imran

  • Error while Updating Enterprise Link Plan in Design Studio

    Hi, All
    I am getting one Error while Creating Enterprise Link Plan in Design Studio of BAM and Failed to Create the Plan.
    i.e.(IMessageSourceReceiver>messageReceive:javax.NameNotFoundException: java:comp/resource/BAMTTT/TopicConnectionFactories/bam_ttq_tab not found)
    Setup:
    Integration between Oracle EBS 11.5.10 and Oracle BAM 10.1.3.
    I am trying to get the Raw Data and sending over to the Enterprise Link Plan.
    1. Created bam_ttq AQ and bam_ttq_tab.
    2. Configured all of the startup parameters required for Enterprise Message Source Type (Oracle (AS JMS and OJMS)) in the Administrator of BAM.
    3. Configured the Oracle (AS JMS and OJMS) with the following values in the Enterprise Message Sources in the Architect of BAM.
    Initial Context Factory : com.evermind.server.rmi.RMIInitialContextFactory.
    JNDI Service Provider URL : opmn:ormi://inaportal.inatech.com:6004:home.
    TopicConnectionFactory Name : java:comp/resource/BAMTTT/TopicConnectionFactories/bam_ttq_tab.
    Topic Name : java:comp/resource/BAMTTT/Topics/bam_ttq.
    JMS Message Type : Text Message.
    Durable Subscriber Name (Optional) : Bamclient.
    Message Selector (Optional) :
    Client ID (Optional) : ClientId.
    4. Also configured the data-sources.xml and applications.xml in OC4J (10.1.2) to reference the database schema where the BAM_TTQ queue is created.
    5. Modified the jndi.properties file with required properties.
    java.naming.security.principal = ias_admin
    java.naming.security.credentials = inaportal321
    java.naming.provider.url = opmn:ormi://inaportal.inatech.com:6004:home
    java.naming.factory.initial = com.evermind.server.rmi.RMIInitialContextFactory
    6. In the Design Studio I have a Plan with Oracle BAM Enterprise Message Receiver and Grid.
    And when I am updating the plan I am getting the following error.
    IMessageSourceReceiver->messageReceive: javax.naming.NameNotFoundException: java:comp/resource/BAMTTT/TopicConnectionFactories/bam_ttq_tab not found
         at com.evermind.server.rmi.RMIContext.lookup(RMIContext.java:164)
         at javax.naming.InitialContext.lookup(InitialContext.java:347)
         at iteration.enterpriselink.sources.JMSConsumer.start(JMSConsumer.java:85)
         at iteration.enterpriselink.sources.JMSMessageSourceReceiverImpl.jmsConsumerStart(JMSMessageSourceReceiverImpl.java:1001)
         at iteration.enterpriselink.sources.JMSMessageSourceReceiverImpl.messageReceive(JMSMessageSourceReceiverImpl.java:326)
    [Oracle BAM Enterprise Link error code:  0x75 -- 0x1, 0x75 -- 0x3A]
    Error during Message Receive operation.
    [Oracle BAM Enterprise Link error code:  0x75 -- 0x1, 0x75 -- 0x3B]
    Error while processing the data for the step 'Oracle BAM Enterprise Message Receiver'
    [Oracle BAM Enterprise Link error code:  DC -- 0x1, DC -- 0x83]
    Error while processing the data for the step 'Oracle BAM Enterprise Message Receiver'
    [Oracle BAM Enterprise Link error code:  DC -- 0x1, DC -- 0x83]
    Update of Plan "EBS_Example" failed.
    [Oracle BAM Enterprise Link error code:  PlanMgr -- 0x1, PlanMgr -- 0xD5]
    Can anybody pls help me out with this? Its Urgent for Me
    Thx
    Renuka.
    Message was edited by:
    Renuka

    hi renuka..were u able to resolve this issue with the naming exception....cheers...

  • Error while creating ASN in SNC

    dear all,
    We are tring to create an ASN against a PO in "Due list for purchasing documents" in SNC but getting the following errors, the material is invalid, ship from location is invalid and the customer location is invalid.
    PO created in ECC and received in SNC. The PO acknowledgement was also received back in ECC but not able to post ASN from SNC to ECC.
    Request to please let us know if we have missed out on some master data setting?
    Thanks in advance.
    mahesh.

    Hi Mahesh
    I am also getting the similar type of errors while creating ASN against planned receipts in SNC . I was trying to find for some help & saw this thread.
    Just wondering if you managed to rectify the error & able to post the ASN?  Will appreciate if you can share the resolution with me.
    We are also on SNC 7.02.
    Regards,
    Tapan

  • Error while creating rough cut plannin profile using Info structure

    Hi,
    I got the following error while creating rough cut planning profile for Info structure,
    Capacity planning is not possible for this info structure S504
    Message no. MA489
    Diagnosis
    In the planning parameters for info structure S504, no key figure for capacity planning has been entered.
    Procedure
    If you want to capacity planning to be possible for this info structure, you need to enter a capacity key figure in the planning parameters for the info structure in the Implementation Guide.
    The info structure which i used here is created by me. Can any one help me to overcome this error
    Waiting for your replies
    G.Muthamil Murugan.

    Hi addy,
    Thanks for your reply. I have maintained the following Info structure which I created,
    Under characteristic I have maintained the following,
    1.Sales Organisation.
    2.Sales group
    3. Sales office
    4. Distribution channel
    5.Division
    6.Material
    Under Key figure I have maintain the following,
    1. Order items
    2. Production
    3.Sales
    4. Stock level
    5. Target stock level
    6. Day's Supply
    7. available capacity
    8.Target days supply
    I don t know where i did mistake. can you correct me.
    Regards,
    Muthamil Murugan.G

  • Costing error while creating maintenance order

    Hi,
    while creating a maintenance order,when i go for precosting ,the following error is coming,please help to resolve this problem
        " No prices could be determined for object Activity type "

    Hi,
      In my activity master data I have maintained as in planning. Kindly tell me how to check whether the cost sheet is maintained as integrated planning for this year. i have check in my customised setting from the following menu path controlling -> General Controlling ->Maintain version->Maintain setting for each fiscal year (version maintained is plan/actual version). Here i have maintained integrated planning for the year.

  • Error while creating Quality Plan

    Dear Experts,
    While creating the Quality Plan following error is coming -"Error occured when checking type "
    In the log of task list following error is appearing - "Op. 0060, CH 0060:char. iden % used for QDI several times in task list"
    Please give your valuable suggestion onto this.
    Thanks
    Sumit

    It means you are sending down the same characteristic to an external system like LIMS more then once. 
    I believe this is a warning.  Not a hard error but I'm not 100%sure.
    Craig

Maybe you are looking for

  • Error Handling and Error Messages

    I already posted this in the java programming forum, but I dont think the people responded understand patterns, or what I was asking. Here is my original post, for reference I am not asking how to catch and exception, or how to display an error, I am

  • Reporting in Hyperion Workspace

    Hi all, I am a beginner in Hyperion Workspace reporting and have slight hands on experience on Hyperion Planning. I created some planning applications, corresponding dataforms and business rules. Now while creating new reports from Workspace a report

  • Command + S not working

    Hey guys, I'm stuck with a problem here. The shortcut Cmd + S stops working a few minutes after I log in to my user account. It'll work for some time after I log in but then will stop working. After that, it doesn't work in any application. The short

  • Interfaces bloat in JMS

    There are 43 interfaces in JMS api as of j2ee 1.4beta. That seems to be awful lot of interfaces to do messaging. The "domain unification of the interfaces" in jms 1.1 is a welcome improvement, but still it's huge. Any thoughts ?

  • Lightroom CC showing up as 'Try'  in Creative Cloud app rather than as upgrade to Lightroom 5

    I have a current photography plan.  I am running Windows and my PC meets minimum requirements.  Creative Cloud is only showing Lightroom CC as a 'Try' Option rather than an upgrade to Lightroom 5.  Do I just have to bite the bullet and install the tr