Hello everyone,
We implemented [Note 645083 - Material period status set to "Closing Entry Completed"|https://service.sap.com/sap/support/notes/645083], along with [Note 364368 - Material ledger help desk|https://service.sap.com/sap/support/notes/364368] as instructed in the former. Then we ran MLHELP_DELETE_UMBEW and saw that revaluation amounts do exist, which we are supposed to move to a revaluation account. So here comes the question: Where are these amounts now, in a price difference account? Also, how do I manage them afterwards, just leave them on the revaluation account?
Thanks in advance.

Hello,
the correct closing of the previous period would have moved the revaluation amounts to the price difference accounts in the current period. But if you change the status manually, these revaluation amounts have to be deleted manually. Otherwise the single-level settlement will not work for the current period. The revaluation amounts will not be used for the actual costing in the current period and would remain on the respective accounts.   
Report MLHELP_DELETE_UMBEW can be run in update mode only by SAP Support. If you want these revaluation amounts to be deleted, please create a message (component CO-PC-ACT).

Similar Messages

  • How to manage the tables after deploying an SDA for Oracle

    How can I manage the tables after deploying an SDA  on Oracle.There is tool for MaxDB,but how can I connection to the Oracle Database?
    Thanks

    In J2ee administrator console

  • Why is macbook Air shutting down after lid is closed for around 5 minutes or more?

    Just puchased refurbed MacBiik Air i7 256 gb.
    When closing lid for extended time computer shuts down and need to restart using power button.
    Ive been testing for 10 minutes. Will wake up if lid is closed for shorter duration.

    Your MBA is going into deep sleep. When you restart, the MBA is loading the sleep image and not doing a complete reboot. When you MBA wakes up, how much battery charge do you have remaining.
    Deep sleep is enabled if your battery is draining or near empty.
    SmartSleep allows you to set the threshold of battery charge remaining, let's say 20%, when your MacBook will write the contents of memory to disk.

  • Period closing for assets accounting

    HI experts
    Since we are in 2009 i need to transfer the assets from 2008-2009, while doing the same through AJRW message is coming to close the books for 2007. on closing the books for 2007 through AJAB the error message comes some of the assets depriciation has not been completely posted . Actually the depriciation for dec'07 has been posted during book closure in dec'07 & BS has been printed on the basis of the same . However during 2008 we found some of assets having the start dep date is wrong , hence we have changed the date in 2007. the Depriciation for Jan to Nov'08 has already been posted without any error . kindly advice me how to proceed .
    Regards
    Saroj

    Hi Saroj
    Usually, during the year end closing process for Assets we initially need to close the previous Fiscal Year through TC: AJAB.
    At this point of time if the depreciation run is not done in the past or depreciation for some of the assets not posted completely we cannot close the FY.
    Similarly an error relating to determination of the base insurable value for asset will also occur in company code. Message: The base insurable value for this asset could not be determined.
    Usually missing index figures are the cause for this error.
    Therefore check the insurance specifications using master data maintenance. You should analyze the error by using the fiscal year change function in the screen for the insurance specifications.
    I hope this will solve your problem
    Regards
    Murali Kanth Natti

  • FM Period Closing for Particular Fund and Fund Centre

    Dear Expert,
    Can we block the FM period for the particular Fund/Fund Centre instead of opening it for particular account assignment and values ?
    Regards,
    Prad Pat

    Hi,
    Not by standard means. FM standard functionality allows to open periods not to block them. So, indirect blocking will be realised when you open periods for all combinations except for the one you want to block.
    If it is front end FI documents which will be posted for this FM assignment, the easiest way to block them would be writing validation in FI.
    Regards,
    Eli

  • Batch management indicator not able to turned on for a material

    Hi all,
    We are trying to turn on the batch indicator at material master for which we had inventory in the past. But all the open PO lines, inbound deliveries, open transfer requirements (we have WM too) were deleted. Earlier we were getting under "DISPLAY ERRORs" stock is present in plant level along with open TRs. So, TRs were deleted using LB02 and open PO lines were marked for deletion. No stock is available in MD04, MMBE & LS24.
    -  I read that previous period posting maybe affecting it but how do I see that as one of the other thread didn't clarify how to determine previous period stock.
    -  Also, another issue might be due to archiving issue. I am planning to perform SARA for MM_SPSTOCK. Is that requried?
    -  Finally, we had another part for which we deleted TRs in the system but didn't remove PO LINES. But system allowed us to updated the BATCH INDICATOR at mm level? Is there an inconsistency??
    Thanks.
    Naren

    We used the approach in testing in it worked.. but for some reason the transaction is not working in PRODUCTION. I am not able to perform 551 movement type in production system as I keep getting error "Number range is not maintained for the FI document type". But the document type which should be proposed is already maintained in NRIV table. This error doesn't come if instead of doing MIGO with 551 in previous period (date 09/25/09) we use current period then I get the document. We have technical team looking into this as we have lot of customization that determines the FI document type which I think is not working when we try for the previous period.
    Any one seen similar issues? I am closing the thread as I think it is the code error and once that is fixed we should be able to perform scrapping in previous period.
    If this doesn't work I will try the OSS note program RVBCONVMAT2BM.
    Thanks all for inputs.

  • Material Master Period closing:

    Hey Gurus,
    Currently we are running MMPV globally which causes few issues regularly.
    Hope running MMPV locally would fix these.
    Splitting the MMPV transaction event (by world time zones) would be a major piece of work to establish the impacts on other processess (such as billing, intercompany accounting, consolidation, standard costing runs and actual costing runs). Needless to say, such a change would need to involve multiple functions (Procurement, sales, finance).
    Immediate response in this regard in highly appreciable,
    Regards,
    KK

    You may refer to  note 520010 that has a FAQ on period closing, which recommends not to allow posting while period closing is being done.
    (My comments: You may trying closing the period following the Sun, However you may want to monitor the inter-company transaction closely to avoid any inconsistencies.)
    The note's content is reproduced below.
    "6. Question:
    After the period closing program runs, data inconsistencies occur in the previous period, although the data of the current period is consistent. What causes this?
    Answer:
    The following example describes a rare case that causes a large amount of data inconsistencies. During the period closing program run, the processing of a small MM document overtakes the processing a large MM document.
    Constellation:
    - In Customizing for materials management, "Late Lock" is activated.
    - In period closing for the material master (transaction MMPV), periods are closed during the interval between the last day of the old period and the first day of the new period.
    Example
    Date July 30, 2005, time 23:59
    - You begin processing MM document 1, an IDoc consisting of 1200 items.
    - Its posting date is July 30, 2005 and posting should occur in the current period.
    Date July 31,.2005, time 00:00 - 00:01
    - The period closing program runs a day before the current period 07 is finished and changes the current period from 07 to 08.
    - Therefore, all future goods movements and price changes with a posting date of July 31, 2005 are posted in the previous period.
    Date 31.07.2005, time 00:02 - 00:03
    - The system processes and updates the next MM document (2), an IDoc with 100 items.
    - MM document 2 contains goods movements that have combinations of material and plant that are the same as for MM document 1.
    - The posting date is to 31.07.2005, that is, MM document 2 is posted in the previous period 07.
    - The posting of MM document 2 causes the system to create history tables of the material masters that are to be posted for period 07.
    - During the posting of the previous period, the quantities and values are updated simultaneously in the history tables of period 07 and the tables of the current period 08.
    Date July 31,.2005, time 00:04
    - MM document 1 is posted and its processing is complete.
    - At the start of processing, the system determined that this document, with a posting date of July 30, 2005, is to be posted into the current period.
    - During the processing of this document the period is closed, but the posting program does not know this.
    - MM document 2 has updated the entries for the current period, however this is now 08.
    - The data in the history table of period 07 is now inconsistent as is the data for all the combinations of material and plant that are contained in MM documents 1 and 2.
    Conclusion
    <b>To avoid this constellation, do not allow any postings to occur whilst the period closing programs is running.</b>
    Before the period closing program runs, check in transaction SM13 whether outstanding update terminations of goods movements are still displayed. These must be cleared and closed before the period closing program runs.

  • Regarding batch managment in mm01 after stock had been made

    hi,
    I facing a problem when i tick on batch managment after the stock had come as i had not maintained the view while creating the material.
    But now i want to maintain this field as it is not allowing it.
    plzz help me out as it is really urgent to me.

    Hi,
    Changing from tick to untick or untick to tick of Batch Management indicator follow the procedure (Changing of status in Material Master Record)
    Changing the status of the material from Uncheck to checked or viseversa is possible only if the following conditions are met
    1 Check the Status of material MMBE
    2 There should not be any open Purchase Order Use SE16 & Table EKPO Give the material number for which we have to find the Open Pos; Alternateively ME2M can also be used
    3 There should not be any Open Production Order Use SE16 & Table AFPO Give the material number for which we have to find the Open Production Orders
    4 There sould not be any Sales Order Use SE16 & Table VBAP Give the material Number for which we have to find the Open Sales Orders
    5 There should not be any Purchase Requistion Use SE16 & Table EBAN Give the material Number for which we have to find the Open PRs
    6 There should not be any Stock in Transit MB5T
    7 There should not be any Plant availability Stock MB53
    8 There should not be any Reservation MB25
    9 Previuos Period Stock should be zero Use MM03 with Plant Stock & Storage Loc. View If Stock Exists follow the Procedure mentioned in next chapter to close
    10 Stock requirement should be zero MD04
    11 There should not be any open Delivery Use SE16 & Table LIPS Give the material Number for which we have to find the Open PRs
    12 There should not be any open Warehouse Transfer Request Use SE16 & Table LTBP Give the material Number for which we have to find the Open PRs
    13 There should not be any open Warehouse Transfer Request Use SE16 & Table LTAP Give the material Number for which we have to find the Open PRs
    14 The Batch Corresponding to the plant has to be set for deletion indicator MSC2N
    If previous period stocks exist, we can make a withdrawal posting as follows
    1. Post the same amount to current period stock (for example, using
    movement type 561) so that previous period stock and current period
    stock are identical.
    2. Make a withdrawal posting in the previous period for the stock
    together with posting date (for example, using movement type 562).
    If any of the above Stock Exists it has to be closed;If Any of the stock exists we cannot uncheck.
    After closing all the open items;the related business documents viz Purchase Orders,Production Orders,Delivery,etc has to be Archived
    Archiving has certain criteria while doing Archiving Process-- Systematic Archival is the Key factor i.e relationship diagram has be met.
    SAP Note Number 533383 - Resetting batch management requirement
    Regards,
    Vengat

  • Depreciation on Revaluated Amount

    Dear Friends,
    Our client wants to go for Revaluation and we did the following set up:
    We have created two depr. areas 01 Book Dep and 15 Tax depreciation
    In dep area 01 we have allowed revaluation as well as Revaluation Depreciation.
    T-Code: OABW 01 depreciation area to manage Revaluation
    OAYR For posting the revaluation amount in area 01
    AO90 For defining the revaluation accounts
    I have run transaction code ABAW to post revaluation.
    I have put only revalued amount as 100 for testing in the existing asset.
    Then after when i run repeat run for the previous month depreciation it is poting Revaluation amount in the GL i have given in AO90
    But it is not posting anything in the Depreciation.
    I have also tried to do fresh run for the next period it is not posting in the Depreciation for revaluation.
    Then i tried to post the amount in ABAW with
    "Proportional revaluation of annual ordinary dep." column. When i post it with repeat run, it has posted amount correctly.
    This value of "Proportional revaluation of annual ordinary dep."  is getting posted to the respective Depreciation and Contra Account.
    Q: But when we run the depreciation for the next period, depreciation is calculated only on the Old Value but not taken into account the Revaluated amount.
    Ex: NBV before Revaluation    : 1000 (depreciation per month : 100)
    Revaluated amount                      100
    NBV after Revaluation            : 1100
    According to our requiremnt the depreciation to be posted in the new period should be equal to 110.  But the system is posting only 100.
    How to post 110 depreciation.
    Thanks in Advance
    Rayala

    You can set up a virtual Area which is a Calculation of the two area you have then this can post the Difference for Depreciation only.
    I have done an excercise similar to this so if you need further informaton let me know.

  • Accounting period problem for doing PGI

    Hi Friends
    I am getting this error while doing PGI , I have entered Actual goods issue date in delivery header  manually . 15 .11.2008 . I am trying to do PGI on 7.12.2008 .
    u201C@5C\QError@     E     F5     286     900001     Period 008/2008 is not open for account type S and G/L 500010     @35\QLong text exists@     200.F     WHL ASSY ALUM 16 X 7     30,000     EA     0000000685u201D
    I guess it is because of accounting period closing for November 2008 .
    Just I want to know ,for doing PGI also ,  does  accounting period maters ?
    If it maters , I request you to mention solution please .
    With regards
    Jayapala S.H

    Hi jaypala
    Firstly go to MMPV and check the closing period of your company code if it is in past close the month by MMRV and then do delivery and PGI and check still if it is not working then Go to OB52 and maintain for account type S with the G/L account 500010 and the closing month and the year.
    Regards
    Srinath

  • Beta Period Ends for Exam 1Z1-218 – PeopleSoft Enterprise 9 HRMS Fundamenta

    The beta period closed for certification exam 1Z1-218 – PeopleSoft Enterprise 9 HRMS Fundamentals on January 31, 2009.
    This exam is a single requirement to earn the PeopleSoft Enterprise 9 Human Capital Management, Human Resources Consultant Certified Expert (OCE) certification.
    *READ MORE...*

  • COPA Assessment Cycles and FI Period closing.

    Hi Gurus,
    I have question related to the COPA Assessment cycles.
    We have closed the FI Period 03 and running the COPA Assessment cycles. while running the same, for few of the assesment cycles are completed and for the rest of the few  cycles it is error out stating the Period is closed.
    Why it is running successfully for few cycles and why it is complaining for Period closing for the others. We are on ECC 6 Version of SAP.
    Error out cycles contains Cost accounts and Asset Account GL Accoutns.

    Hi:
    If your CO allocation has some external postings (like GL or fixed assets) or generating some intercompany documents, then it needs FI to be open also. It happens sometimes if the allocation goes external so it would need fI period to be open also. If FI is close but CO is open, it would only work for CO specific allocations and others would error out.
    Please check the cycle/segment which is in error. If it is suppose to hit FI, then FI (OB52) and CO (OKP1) periods should be in sync.
    Thanks.
    Rahul

  • How can we change the valuation type for a material created.

    How can we change the valuation type for a material created.
    Note : All open orders are closed for this material.3
    Please guide

    Hi,
    You can change valuation class, or you can set valuation category for your material master. If valuation category is set you can extend your material master and in this way creating records for different valuation types.
    Please try to set the desired changes in your mmr (MM02) > save > SAP will give you error message > push 'Display error' button and you will see what conditions must be eliminated to carry out the change.
    - you are not allowed to have open transactional data
    - no stock in the current and previous period (using proper posting date in MB1A + 201 you can reduce your stock level to 0, and after that you can set it back by MB1A + 202)
    - in case of valuation category setting batch archiving may be necessary
    BR
    Csaba

  • Goods Receipt for packaging material - Item cat. ELP

    Hi expert,
    I am facing a problem regarding receive Packaging Material Item i MIGO via inbound. Problem detail as below hope you can advise me:
    1. I create PO order 1pc of Throttle
    2. In Inbound Delivery Screen I do Packing for Throttle by using Handling Unit Function, packaging Material is Carton Box.
    3. After Pack complete, Item for packaging material is auto generated in inbound screen:
    - Item Cat. of Throttle = ELN
    - Item Cat. of Carton Box (Packaging Material) = ELP
    4. When i do MIGO via Inbound: there is only 1 item for Throttle is displayed. How to do Goods Receipt for Carton Box item? Do i Miss any setting for that?
    Thanks.

    i thnk u sould maintain material master with two units one is throttle and second is cartoon.
    u shud maintain that how many throttle is equal to 1 cartoon.
    this u can maintain directlt in PO (In condition tab, with these two field : OUN and UN). in PO as a OUN ,give throttle n UN , give cartoon in item overview as well as condition tab.
    and during delivery change the unit in cartoon. then while migo, material will show in cartoon.
    hope it will be helpful.
    Thanks
    Nisha

  • How can I delay my MBP from hibernating until the lid has been closed for a set period of time?

    After extensive research, I have been unable to solve this problem and I'm hoping someone can explain this to me.   Everytime I close the lid on my 13-inch, Early 2011 Macbook Pro, it immediately starts to write to disk (solid light on the front) for several seconds until it finally goes into Hibernate mode (flashing light on the front).  The problem is, I frequently close the lid, then immediately reopen it within 15-30 seconds to resume typing or to add something I may have forgotten.   Each time I reopen the lid before the light has started flashing, the MBP wakes for a moment, and allows me to resume typing.  However, the Hibernation process has already begun and within 30 seconds, the screen goes blank.   I have to wake it AGAIN, which is very annoying.
    Based on my research, I could use pmset to change the hibernatemode to 0 (it is currently set at 3).   However, I dont wish to disable hibernate mode completely; I DO want it to save a hibernation image to disk if it happens to run out of battery, so that when I resume I havent lost anything.   
    I then researched using standby and standbydelay to attempt a delay of the write to disk when going into standby mode.   According to the pmset manual:
    standby causes kernel power management to automatically hibernate a machine after it has slept for a
         specified time period. This saves power while asleep
    standbydelay specifies the delay, in seconds, before writing the hibernation image to disk and powering
         off memory for Standby
    I then set these values as below, expecting the laptop to wait 4200 seconds (70 minutes) before trying to write to disk when I close the lid:
    standbydelay         4200
    standby              1
    Unfortunately, that did not work either.   If I close the lid, the light glows solid immediately (indicating it is writing to disk), and if I try to reopen the lid before it is done, it will wake and seem fine, then 30 seconds later it goes blank right in the middle of me typing something.   I usually have to click the mouse several times, or even the power button to re-wake it.  
    I do have InsomniaX installed, for when I want to close the lid and keep the machine awake permanently (while watching videos on airplay) and I have tried quitting that application to test this.  However, when I close/reopen the lid..the result is the same.   I cant keep InsomniaX enabled all the time, because it will never go to sleep when I truly want it to.   If I am not using InsomniaX, I just want to delay hibernation until he lid has been closed for a set period (say 15 minutes or more).  If I have not reopened the lid within that time, I want it to write to disk and go into hibernation mode.  And if the battery runs all the way out, I want it to go into hibernation mode before shutting down so I can recover.
    I would appreciate any help in solving this problem.  Also any insight as to why the standbydelay setting above did not work.   Thanks!

    Whats with the MBP lid? Dont close it ... if you're so concerned! Just go to System Preferences/Energy Saver and set it to how you like it.

Maybe you are looking for

  • ITunes could not connect to the iTunes Store?

    Out of the blue I can no longer connect to the iTunes Store - never had a problem before, haven't changed anything. According to the help page I should call my ISP - I did, they said they do not block any websites, I have the latest version of iTunes

  • How do I force Mini to use only minidisplayport?

    My problem is that latest two major OS X updates made my setup of an older VGA display and TV not working properly. I was able to switch between them with no problems before. But now, I am in situation where I need to place my Mini into another room.

  • Locking PCA Posting

    Hello experts, One of my manager is asking to lock postings for PCA (Profit Center Accounting) on periodic basis. He is asking just like OB52 in FI and OKP1 in CO locking based on the periods. Just like if you check for month Jan, Feb ,March etc auto

  • How do I see total number of songs in itunes 11.0 music library?

    I can see the total number of songs in my playlists but not in my music library in itunes 11.0. Can anyone help. Is there an instruction book available for the new version of itunes 11.0?

  • Create Motion Path

    Hi. I am trying to follow a tutorial, but I dont get the options they do.  Basically, I created an image and converted it to a movie clip.  Inside of this movie clip, I create a new layer and I give both layers 70 frames.  On the top layer, I then dr