Manipulate unloading point from Production Order

Hello all,
I need to update the unloading point on a TO based on information from the production order.  Specifically, update LTAP-ABLAD with AFPO-ABLAD.
I thought I was on the right path with user exit MWMTO001 but that doesn't work as it's not called until the TO updates have already been committed to the database.  Other user exists in the MWMTO* area weren't helpful either.  Before I dive in and look for enhancement points (that may not work in all cases), I want to know if anyone else has done this or knows of a good solution.
Thanks in advance for the help.

Hi
The unloading point field in production order filed is a text field. So your production controller or who ever using this order they need to maintain manually. There is no option to make default or autopopulate this filed in the production order.
The supply area which you maintained in BOM components is used for KANBAN , not for this type of production.
Thanks
S.Murali

Similar Messages

  • Unloading Point in Production Order

    Hi, I need some help. I want to update field "Unloading Point" in transaction CO01 (Component details). But I want to set it for every component in BOM so the user doesn't have to enter the unloading point manually in every production order.
    I updated the "Supply Area" field for the component in BOM item level (CS02) but when i create a Production Order the "Unloading Point" is still empty.
    Thanks in advance!

    Hi
    The unloading point field in production order filed is a text field. So your production controller or who ever using this order they need to maintain manually. There is no option to make default or autopopulate this filed in the production order.
    The supply area which you maintained in BOM components is used for KANBAN , not for this type of production.
    Thanks
    S.Murali

  • How to get unloading point value from Production order?

    Hi
    Can u tell me how can i get the Unloading Point  value from Production order where the
    Warehouse no,
    Movement Type AND
    Requirement Type F is given
    Kindly send me full select query (Table name-field name).
    Moderator message: please search for available information and try solving things yourself before asking.
    locked by: Thomas Zloch on Sep 24, 2010 9:15 AM

    Try these options.
    Table: AFPO
    Field: ABLAD.
    Table: AUFM
    Field: ABLAD.

  • Purchase order from production order !!  (Missing material no)

    Hi,
    This purchase order is created directly from production order.( My problem is the material number is no where shown on PO. but when I print it (print preview) i can see the material number along with the Production order number. I am writing a new report and need material no.
    Interesting thing is, even when the Material no is missing. I can see the short txt for material as 'Galvanise'.
    Pls help me in finding the material number.(item wise)
    Thanks & Regards
    Hrishi

    Hi
    1. Check table EKPO, if material number is stored against said PO,
    2. Check ME23N, ME23N, ME22, ME23 screens are u able to see material no. in any of T-code.
    If one of T-code not showing material number, it is sort of bug in system
    Regards,
    NNK
    PS:Award points for useful ans

  • Transferring field "Unloading Point" from ECC to SRM

    Hello Everybody,
    I need to pass the field "Unloading Point" from the ECC side to the SRM side. Currently, SAP doesn't transfer this field when we execute the program BBP_EXTREQ_TRANSFER.
    The field Unloading Point has been enabled in the SRM and is displayed properly for any Shopping Cart created there.
    In order to pass the field, I have explored the BADI - BBP_BADI_EXTREQ_OUT, but there is no field in this BADI which can be used for passing the Unloading Point.
    One solution that I have is to create a custom field in the BADI structure and then move the Unloading Point in this custom field. But then again, a question arises, how will SRM know that this is the Unloading Point field.
    Also, will any of the following BADI's do the trick?
    BBP_CREATE_REQ_BACK
    BBP_TARGET_OBJECTS
    BBP_CREATE_BE_RQ_NEW  
    BBP_GROUP_LOC_PO
    Please let me know if there is any solution for this problem.
    Thanks & Regards,
    Nikhil.

    Hi Disha,
    Thank you for your prompt reply.
    As per your recommendation, I looked at the BADI "BBP_DOC_CHANGE_BADI", but it seems that the BADI is triggered when we order or hold the shopping cart and not when we transfer Purchase Requisitions from ECC.
    Also, I had seen the thread previously, but it wasn't helpful to me.
    I will be just creating the PR in the ECC side, and won't be having any SC in the SRM before I execute the program BBP_EXTREQ_TRANSFER. I want the field Unloading Point to be moved for every PR created whenever the program is executed.
    If I have missed your point somewhere, do correct me.
    Thanks!
    Nikhil.

  • Open Multiple PDF files from Production order/Routing

    Hi Everyone
    We are in ECC 6.0 environment. We have a scenario where multiple documents were attached to single operation and also at multiple operations. But when I was trying to open these PDF documents, only the last file was getting opened and closing the previous file. How can I open multiple PDF files at one time from Production order or Routing?
    Any help is appreciated.
    Regards
    Prasad

    Hi Prasad,
    from DMS standard I regret but such a functionality is not available. In the standard originals can be opened only one after another.
    I think for realising this functionality an individual modificatoin is necessary.
    Best regards,
    Christoph

  • How to output serial number from production order in GLM ?

    how to pull serial number from production order in wwi template for GLM ?

    Hi,
    Please have a look to this thread:
    BAPI/RFC to get serial numbers for a production order
    Hope it helps,
    Kr,
    m.

  • Purchase Order from Production order

    Hi,
    This purchase order is created directly from production order.( My problem is the material number is no where shown on PO. but when I print it (print preview) i can see the material number along with the Production order number. I am writing a new report and need material no.
    Interesting thing is, even when the Material no is missing. I can see the short txt for material as 'Galvanise'.
    Pls help me in finding the material number.(item wise)
    Thanks & Regards
    Hrishi

    Hello
    To optimize the workflows, you can change certain functions of the standard material master by using customer exits.
    You can tailor the display of the material number to your requirements by using the SAP enhancement MGA00003. If, for example, a material has the number 123, you can use this enhancement to determine that the material number is to be displayed with a prefix such as MAT-. (The number 123 is still saved in the database.)
    Control for the material number assignment
    MGA00002
    EXIT_SAPLMG02_001
    (Internal number assignment)
    EXIT_SAPLMG02_002
    (External number assignment)
    Control for the material number display
    -{}-MGA00003
    EXIT_SAPLOMCV_001
    (Number conversion from display format to database format (input: start))
    EXIT_SAPLOMCV_002
    (Number conversion from display format to database format (input: end))
    EXIT_SAPLOMCV_901
    (Number conversion from display format to database format (input: start))
    EXIT_SAPLOMCV_902
    (Number conversion from display format to database format (input: end))
    Regards

  • BOM explosion from Production Order

    Hi All,
      I understand from SAP Help files that we can explode BOM from Production Order using Read PP Master Data. But it also says, that we cannot do this if items have already been issued out. So would like to know is there anyway out to ensure that the production order is reading the latest version of BOM.
      The reason i want to know is because, at present the BOM keeps getting updated & so the work order has to reflect the new items. The BOM contains about 300 or more items, so manual changes is very tedious & error prone at the moment. Furthermore some components are outsourced. So i want to receive them back & post new materials for them. Hope my problem is clear & await inputs
    Vivek

    Hi All,
    Thanks for the inputs. I think for the situation am facing, the Order change management method, should be of help, as the BOM changes does not take place on scheduled dates, for me to fix the BOM explosion dates & assign them. As of now the BOM gets changed, depending the customer requirements, which is unpredictable.
    Clarification required:
    1. The profile which is created using OPL7 & assigned in OPL9 is unique, i.e. for any change numbers of BOM will always follow the profile entered in 'Overall Profile' in Work Scheduling view & i do not need to create new profiles for each new change number of BOM
    2. Once i run the COCM with the new change number, in the production order - components view will i be able to see any error message for those items which no longer feature in the new version of BOM? & will the materials added in the new BOM automatically feature in that list or do i have to manually add these to the order & if so, how will i know which materials need to be added?
      Hope the clarifications sought are clear, await inputs
    Vivek

  • Deletion of Serial numbers/ Parallel sequences from production order

    HI ,
    I am trying to delete the Serial numbers from the production order programatically using the FM SERNR_DEL_FROM_PP. I dont get any error , but the serial number is not getting deleted from production order. If anyone have used this FM for deletion Please let me know what extra has to be done.
    Similarly i have a requirement or deletion of parallel sequence from the production order. Any FM to do the same?
    Code screenshot below
    CALL FUNCTION 'SERNR_DEL_FROM_PP'
           EXPORTING
                material              = i_matnr
                j_vorgang             = 'PMP2'
                ppaufnr               = i_paufnr
                ppposnr               = i_itemno
           IMPORTING
                anzsn                 = l_num_serno
                ZEILEN_ID             =
               SERIAL_COMMIT         =
           TABLES
                sernos                = gt_sernos
           EXCEPTIONS
                serialnumber_errors   = 1
                serialnumber_warnings = 2
                OTHERS                = 3.
      DATA ls_afpod_po TYPE afpod.
      MOVE-CORRESPONDING gs_afpod_po TO ls_afpod_po.
    *.....Update Number of serial numbers in parent order
      ls_afpod_po-anzsn = l_num_serno.
      update afpo
      set anzsn = l_num_serno
      where aufnr = i_paufnr and
            posnr = i_itemno.
      commit work AND WAIT.

    Hello,
    the function module SERNR_DEL_FROM_PP calls the function module SERNR_DEL_FROM_DOCUMENT within. There, the changes are only written into the memory.
    See also the code below:
    CALL FUNCTION 'STATUS_BUFFER_EXPORT_TO_MEMORY'             "P99K058111
            EXPORTING                                             "P99K058111
                 I_MEMORY_ID = MEMID_STATUS.                      "P99K058111
    The variable memid_status has the value 'SN_STATS'.
    So if you want to update the data, you have to call the following function module:
    CALL FUNCTION 'SERIAL_LISTE_POST_PP'
      EXPORTING
        MEMORY_ID_STATUS       = 'SN_STATS'
    Regards Simon

  • Accounting Entries for Materials Return from Production Order

    Dear Gurus,
    I have a scenario here that a raw material, valuated at moving average = 151 and qty = 100, was issued to a production order last month. Due to some issue the order was not completed for a while and 93 qty was  consumed for the order and because the remaining 7 were excess they were returned to the storage location. By that time the MOV had changed from 151 to 185 and the 7 qty was returned not at 151 (which would be correct) but at 185. This is a wrong accounting entry as it is showing an under consumption for the order.
    Anyone have an idea why the system is doing this because the material should be returned on the price it was issued at so that the accounting entries are knocked off (The accounting entries for return deliveries to vendors are of the same price that they are recieved no matter how ever long a period they are returned). How do we stop the system from doing so and if it cannot be done what is the solution to the scenario.
    Regards,

    The normal entires are as follows (depending on your configuration);
    1) Goods issue;
    Credit inventory and debit COGS;
    2) Billing document;
    Debit customer account credit sales accounts;
    3) Payment;
    Credit customer account and debit cash/ checking account
    pls assign points if helpful as a way to say thanks.

  • Intercompany Text-Based Standard Purchase Order from Production Order

    We have a business scenario where a material is made in a plant and then another plant performs a service on that material.  The customer wants the purchase requisition that is created from the production order from the producing plant to apply a vendor that is an intercompany vendor.
    The issue is, these purchase orders are text based purchase orders.  This process works perfectly when there is a material master.
    Scenario:
    Plant X = Production Order to make Material A
    Plant X = Production Order creates a purchase requisition in Plant X; Intercompany Vendor is assigned
    Buyer = Creates the purchase order from the purchase requisition
    Error Message: SAP issues an error message that this vendor cannot be used.
    We are looking for a way to create a text based purchase order (that represents a service) and assign to a intercompany vendor.

    The exact error message we receive is:
    Diagnosis
    You are entering an ordering transaction involving a vendor to whom a plant has been assigned. Normally, materials would be supplied by one plant to another in such a transaction.
    This process involves a delivery and billing document in the SD system. The PO for this appears directly in the delivery due list of the issuing plant (vendor) and therefore does not need to be transmitted.
    However, items without a material master record cannot appear in the delivery due list.
    Procedure
    Items without a material master record can only be ordered from vendors without a plant assignment.
    The point is if we create a vendor without a plant assignment, how can the inter-company posting be accommodated.

  • Goods Receipts 101 E from Production Order without valuation

    Hi,
    we faced a strange issue relating to the final confirmation of production order.
    In some cases, the goods receipt of main order, created by the confirmation in CO11N, has value "0".
    Taking a look to some production orders for the same product, they have no differences and the valuation is correctly with the plan cost estimate.
    The issue is triggered twice:
    1- Directly with the first confirmation in random cases;
    2- Confirmation with wrong value (higher than Zero), reversal of confirmation and new confirmation without valuation.
    Could you please help us?
    Thanks.
    MC

    Hi
    With Valuation Strategy M, a record is created in EBEW for each sales order
    1. The first goods receipt results in valuation on the basis of one of the subsequent strategies in the specified sequence. A standard price selected through one of the subsequent strategies is copied into strategy and serves as the valuation basis from this point onwards.
    - The system calculates the standard price on the basis of your customer exit COPCP002 Material valuation for valuated sales order stock.
    - The system calculates the standard price in a sales order cost estimate. This sales order cost estimate can be based on a unit cost estimate or on a product cost estimate.
    - The system determines the standard price using the production order cost estimate or the planned costs for the WBS element. If there are multiple production orders for the same sales order item, the system uses the standard price that results from the production order that delivers first (see strategy 1).
    2. If the above price is changed after first delivery, then the difference would be posted as output price variance at month end.
    3. Even reversal of first goods receipt does not reverses the standard price. You need to manually change it using MR21..
    4. Have you ticked "W/o Val Strategy" in your req class? If yes, it means that inventory is valuated using Std cost from CK11N... In your case, if it is ticked and Std cost is not released, then GR will be valuated at zero price
    BR,Ajay M
    BR,Ajay M

  • Sales order - show total plan costs (from production order) on sales order

    Hi all,
    I have the following question/scenario:
    We create prodction order to collect cost (hours) for a service. There exists also a material master for this service.
    The confirmed hours are posted on the production order and then setteld to the respective sales order (settlement rule SDI).
    What to I have to maintain/customize to show the total plan cost (for the service) on gthe sales order?
    If I check the sales order via VA03 --> environment --> cost report , I can see the planned sales revenue but no planned costs?
    (the actual value flows work so far, postings via settlement or billing document).
    I hope the topic is understandable. Any ideas?
    Thanks in advance.
    Edited by: Butch66 on Sep 27, 2010 7:07 PM
    Edited by: Butch66 on Sep 27, 2010 7:08 PM

    Hi
    Planned costs from prod order can not show on sale order.. Both are 2 separate entities in their own respects
    Unless you calculate sales order cost estimate on your sales order, you cant see planned costs on sale order...
    To calculate sale order cost estimate, make settings in your requirement class...
    1. Go to procurement tab of sale order
    2. See whats the requirement type
    3. Go to IMG > Controlling > Prod cost Contr > Cost Obj Contr > Prod Cost by Sales Order > Control of Requirements
    4. Here you can see mapping of req type to req class....
    5. If you want to have sales order costing and have sales order as CO object inorder to have sales order wise profitability, you should have following settings in Req class...
    >Acct Assignment Category should be E
    >Costing: Either Blank or X
    >Costing Id and Costing Method: As per your requirement
    Regards
    Ajay M

  • Goods Issue from Production Order in SAP

    Dear experts,
    I faced one issue not yet solve is that my customer created the production order
    then already issue for production for all quantities of child item .
    Example:
    Production OrderItem A
    Item A1 = 2 Qty
    Item A2 = 2 Qty
    Item A3 = 2 Qty
    Issue for Production Item A
    Item A1 = 2 Qty
    Item A2 = 2 Qty
    Item A3 = 2 Qty
    But later on, my customer found out that 1 Qty of Item A1 already damaged.
    So they want to issue one more Qty of Item A1 instead of one that already damaged.
    How can I issue one more Qty for this item?
    Please your advices are necessary for me.
    Best regard,
    Borey

    Hello Borey,
    Solutions may depend upon the way you want to book the cost for the damaged part A1.
         (a) If you want to book the cost to the production order itself (production order is a cost object), manually book consumption for another quantity using MB1A, 261 movement (you will have to mention the production order during posting this consumption).
         (b) If you do not want to book higher cost to that production order, you can:
               1. Extract damaged quantity of A1 from that production order using MB1A 262 movement.
               2. Create a manual QM lot and after rejection, move that damaged quantity to blocked stock.
               3. You can scrap or rework from that blocked quantity later.
               4. Issue another quantity of A1 from unrestricted stock to that production order using MB1A                261 movement.
    Hope I could help you.
    Best Regards.
    Rajen        