Manual Activity in SNOTE

Hi All,
Would like to know if adding a new field to the ABAP structure is a manual activity or not in a SNOTE.
Regards,
Vinodh.

Hello Vinodh,
It depends if it's a DDIC structure or not.
If it's a DDIC one, SNOTE can't do it automatically and it's a manual activity.
If it's a local structure defined in an include, SNOTE can change the source code automatically.
Regards,
Walter

Similar Messages

  • ABAPer to check this manually & not through SNOTE.:  if the note - 1037685

    Could you please check if the note - 1037685 is present in your system.
    Please ask your ABAPer to check this manually & not through SNOTE.
    Regards,
    Ashutosh

    Check the release that note is coming in by going to SAP service marketplace, and then check the release of the system that you are using.
    If you are on equal or higher release then that note is available in your system.
    G@urav.

  • SCSM - R2 UR2 upgrade - Rob Ford's MP has stopped working - Parent IR or SR Affected User in Manual Activity

    Hi,
    Since we upgrade SCSM 2012 last weekend the workflows associated with Rob Ford's 'Parent IR or SR Affected User in Manual Activity' have been failing
    See here for Rob Ford's solution
    http://gallery.technet.microsoft.com/See-Parent-IR-or-SR-3b8804bf#content
    Has anyone else come across MP/workflows that have stopped working following the upgrade? My company are pretty reliant on this running. Any help you can provide woul dbe really appreciated.
    tamrep

    I already answered this offline but if anyone has this issue here is my reply:
    Did you upgrade to R2 and are you seeing “Invalid HEX Character” errors in the Operations Manager event log on your workflow server?
    If so, there is a bug in R2 that causes this. You need to request a brand new hotfix, KB2961848 to address this.
    Rob Ford scsmnz.net
    Cireson www.cireson.com
    For a free SCSM 2012 Notify Analyst app click
    here

  • SCSM 2012 - Manual Activity stuck in pending

    I have a service request that was open with a single manual activity attached. The service request has been moved to the status of closed however the manual activity is still in pending. How do i cancel or close the activity?

    You will need to import the SMLETS module from
    http://smlets.codeplex.com/ for the correct cmdlets. Just install the SMLets and use the command "import-module smlets" at the start of your script or powershell command line.
    Make sure that your command line is constructed correctly as the portion "Get-SCSMObject- ClassName" should be "Get-SCSMObject
    -ClassName"

  • How can I create a manual activity that waits a specific number of seconds

    Hi
    I need to create a manual activity that waits a specific number of seconds. Is there a way to do that?
    Regards

    If you have a manual activity (Human Task) and you would like to define a task deadline in order to continue the process you can define it in the task definition as desribed here: Configuring Human Tasks - 11g Release 1 (11.1.1.6.1)
    But if you just like to stop the process without manual activities involved you can ideed use the Timer Catch Event. See section "6.8.2 Introduction to the Timer Catch Event" in Modeling Business Processes with Oracle BPM for further details.
    Regards, Danilo

  • Dimension PWXTY64 can only be manually activated in client 001

    Hi ,
    I am trying to transport some of my infoubes from Dev to Quality  where I can see th error
    Dimension PWXTY64 can only be manually activated in client 001
    Message no. R7048
    Diagnosis
    Dimension PWXTY64 does not have a number range interval. A new interval has to be generated so that IDs can be assigned. As IDs already exist, the interval has to be created during object activation. This is only possible in BI client 001 as the interval is client-dependent.
    The error occurred in client 000 - probably in after-import handling.
    System Response
    Dimension PWXTY64 can only be activated manually in client 001.
    Procedure
    Activate Dimension PWXTY64 manually in client 001.
    Please let me know what needs to be done to avoid this error
    Thanks ,
    Sany

    Have you found a solution to this issue?  We experienced the same thing this weekend, and we had to manually activate the Infocubes using the activation program.  But, if there is a way to avoid this in the future, that would be great.
    Thanks,
    John

  • Manual Activity Implementation

    We are integrating our existing product with Oracle workflow and have come across a scenario of manual activity implementation.
    I have used manual activities in other workflow engine. However I could not find any direct reference to manual activity implementation in the workflow guide.
    I saw notification activity but as per my requirement I do not need to send email but instead work only from worklist screen.
    How can I go about implementing manual activities?
    Thanks in advance.

    It is possible to model the scenario where a user needs to perform some manual activity before the workflow process can continue with the use of the 'Block' activity.
    Extract from the Workflow Guide:
    The Block activity lets you pause a process until some external program or manual step completes and makes a call to the CompleteActivity Workflow Engine API. Use the Block activity to delay a process until some condition is met, such as the completion of a concurrent program. Make sure your program issues a CompleteActivity call when it completes to resume the process at the Block activity.

  • Guided Procedures - Manual activity

    Hello,
    I'm trying to add a link or shortcut to a transaction in a manual activity for the GP Im developing....
    I get the following error when tying the link over a Managed System of the Solman (If the link is for the Solution Manager there is no problem):
    And this message when I clck over Display Help...
    Anybody knows where should I specify the Manage System??
    (I asumed that I would be automatically refered to the Managed system over wich I created the GP....)
    Thanks in advance.
    BR!

    Hi!
    I couldn't implement the note you told me. I checked the note and it has two instructions on it, but for a component with a support package level lower than the one in my system....
    NOTE:
    SYSTEM SOFTWARE COMPONENT:
    The  problem this note fixes, should already been solved for my system....
    Thanks, Carlos.

  • Activity implementer can not edit Manual activity content

    user role activity implementer can not edit Manual activity content assigned to him
    just he can mark complete or mark as faild
    what is required to give user permission to edit Manual activity ?
    Ahmed

    attached user role tasks assigned, still can not edit Manual activity assigned to him
    Ahmed

  • Issue - CIF queue for activation of IM requiring manual activation.

    Hi,
    For inbound setting, the CIF queue for activation of IM is getting stuck with ready status. Consequently the background job getting failed with time limit exceed status.
    The same queue when activated manually, gets cleared. Thus requirng manual intevetion.
    Please suggest solution to get rid of this manual intervention.
    Thanks and regards,
    Sushant

    Hi Sushant,
    If you use inbound queues check QIN scheduler on SCM side - transaction SMQR.
    From help:
    Call transaction SMQR and choose Registration.
    Enter the queue name CF* and make the required settings.
    EXEMODE: Execution mode (D - Dialog work process; B - Batch work process)
    MAXTIME: Maximum runtime that the QIN scheduler uses for activating a destination;
              default value: 60 seconds
    USERDEST: RFC destination with LOGON data. Specification of a logical destination
               with its own language on the local
    system. This means that the burden of integration can be distributed to a server group.
    NRETRY: Number of repetitions for failed calls, default value: 30
    RDELAY: Wait time between individual calls, default value: 300
    Regards,
    Alexander

  • SAP query Transport manual activity in Production

    All,
    Do we really need to use manual step to import the query to production system using some program ? will not be automatic as we do it normal reports ?
    Why this manual step needed ?
    Please help me to understand.
    Ram.

    Hello ,
    Please  go through this link
    How to Transport SAP Query(User Group Infoset and Query) to Quality System
    Transporting a SAP Query from DEV to PRD
    Transport of Abap Query

  • I am missing a "call forwarding icon" when manually actived

    Hello
    I am using cell telephones for more then 18 years now and i missing one options which was availible on all telephones in the past. (Nokia, Mobira, Motorola Sony-Ericsson) "The Call-Forwarding-Icon"
    When I am using to call forwarding services I need to go in the settings menu to see it is active. There is no indication icon that this service is active.
    Now I need to go in all the menu for seeing if the call-forwarding is active. Why can apple builtin a small icon (same as bluetooth).
    Is their a programm that can display this service?
    Who is able to help me?
    Regards
    Gérard

    Apple can help you.
    Send them a note
    http://www.apple.com/feedback/iphone.html

  • Activity prices maintained manually..Is KSII/MFN1 possible?

    Hi Experts,
    We have this scenario:
    1. Activity prices are entered manually in KP26.
    2. All Costs are maintained as Activity independent costs.
    3. For Production Cost centers, some costs (primary costs) are Activity relevant and others not relevant at all for Activity.
    4. No Splitting structure maintained so far.
    Now, we are considering calculating Actual Activity prices through KSII and then MFN1 for revaluating Process orders.
    I tried KSII in our test system, where I got the following error message # KP211. I even tried by maintaining the Actual Activity type category '01' and Actual price indicator '05' in AT master, but no luck.
    Short Text
    All activity prices are manually entered
    Diagnosis
    All activity prices in controlling area , fiscal year , and version were determined and set as manually entered prices.
    In actual price calculation, all plan activity prices, meaning those calculated automatically (activity price indicator 1 and 2) and those set manually (activity price indicator 3), are treated as if they have been set manually.
    System Response
    The SAP System cannot calculate activity prices automatically.
    Processing is cancelled.
    Procedure
    Check your activity type planning. To calculate the activity price automatically, you must set the activity price indicator accordingly.
    Proceed
    Questions:
    1.Given our case, is it possible to do KSII/MFN1? If yes, what configuration and master setup is required?
    2. What accounting/CO entry posted MFN1. Especially, want to know if value also posted to CO-PA?
    Thanks much for your time.
    SC

    Hi SC,<br>
    <br>
    sorry for my delay.<br>
    <br>
    Yes, you can process KSII even if you maintained planned activity prices manually. For this, the Activity type master should be activity price indicator "5" for Actual, hoever it's defalt value for planning (KP26).<br>
    Could you check activity planning value in your period as follows;<br>
    <br>
    1. Go to transaction KP26<br>
    2. Selection screen;<br>
        Set  your version and year/period and also cost center/activity types in problem.<br>
        Push Next Layout button (Ctrl + F8) and set layout 1-204 (named "Control indicators").<br>
    3. Push "Overview screen" (F5)<br>
    <br>
    You can see plan price indicator and also ACTUAL price indicator, so you have to check if actual price indicator is not "7" or "Blank". If not, please set it with value "5" or "6".<br>
    Hope you can understand what I wrote above, but if you have any queries, please feel free to ask me.<br>
    <br><br>
    Additonaly about your question regarding "activity independent" cost planning<br><br>
    In F1 help document for field "Equivalence Numbers", there're useful description how activity-independent costs allocates activity type and activity prices calculates. If you do not use cost split or activity-depend planning, you can process activity price calculation by "Equivalence Numbers". it's easy-way to allocate cost to each activity type. you can see this field also in KP26 with layout 1-201 (sample)<br><br>
    the following passage from field "Equivalence Numbers" F1 document.<br>
    <br><br>
    - Equivalence Numbers<br>
    Weighting factor for distribution of activity-independent plan costs of a cost center onto the available activity types.<br><br>
    - Use<br>
    This field group serves to weight the activity types created in a cost center. After weighting, the activity-independent plan costs of a cost center are distributed onto the available activity types.<br><br>
    -Procedure<br>
    If you want to change or create equivalence numbers in planning, this field must be defined in the planning layout. If this field is not defined, any existing equivalence numbers will be displayed, but they cannot be changed.<br><br>
    Examples<br>
    You have planned the following activity types for cost center 4420:<br>
      Activ. type    Plan quantity   Equiv. nr.<br>
    <br>
      FST            400 hrs            3<br>
      REP              50  hrs            1<br>
      RST              20  hrs            1<br>
    <br>
                                Total:    5<br><br>
    This cost center has planned activity-independent costs worth $20,000 . These costs are distributed according to activity price calculation onto the iteratively calculated activity prices (cost rates) of the activity types:<br>
    ATyp       Fixed costs           Fixed portion of activ. price<br>
    <br>
    FST    20,000 X 3/5 = 12,000     $12,000 / 400 hrs =   30 $/hr<br>
    REP    20,000 X 1/5 =  4,000      $4,000 /  50 hrs =   80 $/hr<br>
    RST    20,000 X 1/5 =  4,000      $4,000 /  20 hrs =  200 $/hr<br><br>
    Edited by: Takashi Kotani on Feb 9, 2010 7:55 PM

  • All activity prices are manually entered (Message no. KP211  )

    Dear All,
    I have maintained Activity Rates through KP26. On Activity Master I have set Act. price indicator = 5.
    Now when i am executing KSII it is giving me error message as :
    All activity prices are manually entered
    Message no. KP211
    Diagnosis
    All activity prices in controlling area FLGP, fiscal year 2011, and version 0 were determined and set as manually entered prices.
    In actual price calculation, all plan activity prices, meaning those calculated automatically (activity price indicator 1 and 2) and those set manually (activity price indicator 3), are treated as if they have been set manually.
    System Response
    The SAP System cannot calculate activity prices automatically.
    Processing is cancelled.
    Procedure
    Check your activity type planning. To calculate the activity price automatically, you must set the activity price indicator accordingly.
    Proceed
    Please let me know if I need to done any additional settings.
    Br, Vivek Srivastava

    Hi Vivek, 
    "The error message KP211 is display by the system due
    to the SAP System cannot calculate activity prices automatically.
    (can you review the settings in the system).
    The procedure that you have to follow is to review transaction code
    KP26 and your activity types.
    From viewpoint of actual price iteration all plan prices are political
    in the sense that 'prices does not change during actual price
    iteration'.  If all activity types have indicator 1 then everything
    will be evaluated with plan price in actual.  So actual price iteration
    has nothing to compute because no price will be changed.  You have to
    set price indicator to 5 or 6 in actual price indicator for at least
    one activity type in order to calculate the actual activity price.
    When you change some activity type master data in transaction KL02,
    these changes take effect in all relevant tables, BUT please notice
    that the values of TARKZ, TARKZ_I etc. are only DEFAULT values for
    activity planning and therefore ONLY READ ONCE when the relevant
    planning set is created. Subsequent changes to the master data (default
    value) take not effect in the planning sets. You have to change the
    values in every single planning set manually."
    You indicates that for the activity types you have set in the master data
    actual price indicator to 5 (Actual price, automatically based on
    on activity). But this is only a default value and can be overwritten
    for example during planning.
    Please see table COKL for cost center / activity type if have an empty field for
    the actual price indicator. Thus the system only finds the plan price
    indicators during price calculation and message KP 211 is justified if
    you consider the following part of the long text:
    In actual price calculation, all plan activity prices, meaning those
    calculated automatically (activity price indicator 1 and 2) and
    those set manually (activity price indicator 3), are treated as if they
    have been set manually.
    In order to run KSII as expected by you, you have to execute trans.
    KP26 for the cost center and activity type  using layout 1-204
    (Activity Types: Indicators).
    Here you can set the actual price indicator to 5.
    Afterwards there should be no further problem with KSII.
    I hope helps,
    Regards,
    MLM

  • Error while activating the ODS "Request No longer Exist in ODS".

    Hi All,
    I had deleted one request from four ODS's before completely loaded from R/3. Now when i am trying to activate from one of them using process chain it is giving me the error massage "Request No longer Exist in ODS".
    But when i am manually activating this it is not giving me any error.
    Please suggest solution for the same.
    Regards,
    Rohan Shah

    I had deleted one request from four ODS's before completely loaded from R/3.
    Before deleting the request make QM status red and then delete.
    when i am trying to activate from one of them using process chain it is giving me the error massage "Request No longer Exist in ODS".
    Already you have deleted the request. How can you activate the same request?
    Have you loaded the data again?
    With Regards,
    Kishore.
    Edited by: Siv Kishore on Apr 22, 2009 3:58 PM

Maybe you are looking for

  • Open Dataset for XML not reading the XML file, Returning Code 8.

    Dear all, Im trying to open an XML file using Open Dataset, since i have to execute this report in background and GUI_upload doesnt work in background. The XML file is available in my C:\, say, C:\xmlfile.xml. But  the open dataset is not reading any

  • Hostname not recognized when joining win2003 domain

    at work there is a win2003 AD set up.  the DHCP server is run on 2003.  on my ubuntu install, the hostname is "ubuntu", and when i use "ping ubuntu" on any computer on the network it responds. how do i get this working with arch?  i can ping the IP a

  • Illustrator is crashing

    I have CS6 version 16.0.2 (in the error reports it says 16.0 for  but i updated and problem persists) Windows vista w/all service packs Illustrator seemed to work fine for about a month but now will crash when I use color guide panel and open certain

  • Fonts for PageMaker

    How do I load fonts that are on my desktop into PageMaker 6.5?

  • Camera w. mp4 video to use Camera Connection to upload directly to iPad?

    I am off for some vacation adventures and the last camera I bought was a Nikon Cookpix S550 about 4 or 5 years ago. The video output is only .avi and my iPad 3 with camera connection kit can't recognize the format. I am not bringing my iMac with me o