Manual entry of batches for finished product

Dear Guru's,
  I want the manual entry of batches in the production order & automatic batches for raw materials. I have maintained the autoamtic batch number assignment as Inactive in T-code OMCZ. After maintaing this system is asking for manual entry for batches for raw materials also. I want the manual entry for production order & automatiic entry for raw materials.
I have changed the setting to " No automatic batch creation in production / process order" in production scheduling profile through T-code CORY. Assigned this production scheduling profile in work scheduling view. Even though I am facing the problem.
Hope it is clear. Need your inputs.
Regards
Kalyan

Dear,
Kindly follow the path > logistic general > Batch management >Define Batch Creation for Goods Movements (here you can use function for creation of batch against movement type)
> logistic general > Batch management > Define Initial Creation of Data for Batch Master Transaction (Here you can use function for creation of batch against material type)
Kindly check and revert back.
thanks
Muhammad Ashfaq

Similar Messages

  • Multiple batches for a production order and mapping with components

    Hello Gurus,
    Our business requires to create multiple batches for one production order + they want to trace which component in the production order has been issued to the main equipment.
    For example, I am creating production order for 'A' equipment for 4 qty. Business wants to create 4 different batches for these equipment
    Lets say now 4 batches are created A001, A002, A003 and A004.
    Now lets assume 2 nos of 'B' component are required for 1no of 'A' component. So the requirement of B component is 8.
    Lets say 8 batches are generated B001, B002 ......B008
    Now lets say batch B001 and B002 are issued for A001 and packed together. How do we map this?
    I understand we can do some enhancement for creating the multiple batches but I still dont know how to map them with each other.
    Please help

    Hi Ethan
    There is a functionality called WIP batches, that allows you keep the batch traceability within an order.
    With WIO batches you can track which batch of component was used to produce each batch of finished product.
    See this link for more details:
    Work-in-Process (WIP) Batch - SAP Library
    BR
    Caetano

  • Daily Automatic delivery creation for Finished Products

    Dear All,
    As per my client requirement, they need automatic delivery creation when ever the finished products posted(Reached) in to the Finished Products Storage location with out time specification.
    Scenario is like this.
    1.Scheduling agreement will be created for one month or one year for the specific customer with specific products.
    2.After producing the material, from the production line finished products will taken in to the Finished product Storage location with some acknowledgement.
    3.When ever the acknowledgement happen(stock get added) automatic delivery need to be created for that acknowledged quantity with reference the scheduling agreement.
    4.There is no time specification When ever the finished products stock acknowledgement happen automatic delivery need to be created.
    5.There is no quantity specification also what is the quantity at finished products Storage location acknowledged for that quantity automatic delivery need to be created .
    6.If there is no production-->There is finished products -->No delivery should trigger.
    This will be applicable to specific customer and specific material only.
    Please give your valuable inputs as early as possible.
    Regards,
    Murali.

    Dear Rohit,
    1) Who creates the acknowledgement..
    -->Finished Products Storage location people will run this entry when they recieve the finished product from the production line.
    2) How frequently is this acknowledgement created..
    -->When ever receives the finished products from the production line,
    3) Is this acknowledgement a print out or a documetn type.
    -->It is not a print or document type, it is just an Transfer posting entry to add the Finished products qty to the existing stock at that particular storage location.
    4) If it is document type does it appear in document flow.
    -->No it will not come in the document flow.
    I hope it will clear for you,
    Regards,
    Murali.

  • Material Valuation for Finished Product in Production Scenario

    Dear SAP Gurus,
    Kindly recommend appropriate Material Valuation Control for Finished Product in manufacturing scenario. SAP recommends pricing control 'S' (Standard), but my client's buying nature is not periodic(varies), they buy material on requirement basis (On actual material consumption ) which is very frequent. Pricing for each buy also changes due to the market conditions. You are requested to suggest me appropriate Material Valuation Control (either S / V) for Finished Product along with reasons, advantages & disadvantages for the same.
    Thanks,
    Shantanu

    Hi Alll
    Well one disavantage in material with 2/V for production consumption is in case of incorrect goods receipt, incorrect price for example, all your consumption will be wrong.
    For correction you would have to reverse all production posting, correct the goods receipt and repost the production confirmation.
    If you were using 3/S configuration, all consumption would be done in standard price and at month end material ledger would calculate the actual price for price revaluation. People from MM would have time to correct the entries during the month.
    Regards.

  • Creation of Production order for FInished Product through Project

    Hi,
    Pls clear me on how we can create a Production Order for finished product.  
    If we confirm the production orders in PP, cant the same be confirmed in PS.. Should we consider the same activity types in both PS and PP
    Pls clarify

    hi srikanth,
    your answer has been very helpful... but could u clarify  why MRP is run in MD51 for WBS element and in MD02 for network..
    Pls clarify...  My scenario is like this ...                                                                               
    A
                            B                                                                                C
                    D  E F G H I                                                                                J K L M N O
    I have  a Assemblies B and C which are always delivered in sets.. under assemblies B and C,  we have 6 sub assemblies which has its own components.  I am assigning sub assemblies to differenet WBS elements 01 and 02. so, initially these sub-assemblies are produced to stock. this should happen in PP i.e., through production orders generated in MRP run ( MD51 ). In the next phase i will assign Assemblies B and C to another WBS element.  Again system should generate two Production orders thru MRP for this. Here the 6 sub-assemblies produced earlier will be consumed in confirmation of the production order...
    What i am doing is this correct...
    and the procurement for the components is happening thru the purchase requisition generated via MRP. the components themselves are not directly assigned to the project..
    Pls advise and clarify?

  • Query for Finished Product in Production

    Dear All
    I require a query for  Finished Product in Production. 
    Product       Opening Balance                 Receipt                  Issued Quantity                  Closing Balance
    Can anyone help me on this??
    Thanks,
    Pratap

    Hi Pratap,
    You may check this first:
    http://scn.sap.com/thread/1631705
    Thanks,
    Gordon

  • Pallet sheet for finished products printed in the not expected printer

    Hello to all,
    I have an issue right now with a user printing pallet sheet for finished products in Z602 printer.  The user wanted it to be printed in printer Z630.  I have checked transaction SU01 and found that the output device assigned to the user is Z630.
    What would be the cause of the documents coming out in Z602? 
    Just to add, the user print the document via transaction CO02, if the person needs more palette sheet then he prints by transaction LT01, and LT16 is just to cancel.
    Many thanks.
    Regards,
    Patvin
    Message was edited by:
            patvin

    Hi Patvin,
    You can try using T.code Co04 and after giving parameter got to Print and do print setting.
    If it solve reward and close this issue
    Thanks
    Bala

  • Purchase requisition generate for alternative bom use for finished product

    i hav alternative BOM for finished product in which different raw material component in both BOM of same finished product.But when i RUN MRP that time only one raw material requisition generate another alternative bom raw material requision not generate.
       Is there any option when i RUN MRP that time we select one of the alternative bom component of  raw material for generation purchase requisition.
    Thnaks in Advance

    Dear ,
    MRP will select the BOM based on the MRP4-BOM Explosion tab -Selection Indicator .It can eitehr of these ways :
    1.Maintain Production Version with  different Alternative BOM  and keep Selection Indicator -3 .So sysetm will look into only the Valaidty  and lot size of the Production version and select the correct BOM to explode  and generate PR for depednts based on stock situation
    2.If you maintain Blank -then it will look into order qty and select the BOM according ly
    As in your case , selection methods 3 will fit  and you need to maintain PV with correct validity and lot size in MMR-MRP4-PV option .
    Try in sand box with different lot size and validity with indicator-3 .Create Order and run MRP-MD02-1,,3,3,3,2
    Check and revert
    Regards
    JH

  • Palette sheet for finished products not printed in expected printer

    Hello to all,
    I have an issue right now with a user printing pallet sheet for finished products in Z602 printer. The user wanted it to be printed in printer Z630. I have checked transaction SU01 and found that the output device assigned to the user is Z630.
    What would be the cause of the documents coming out in Z602?
    Just to add, the user print the document via transaction CO02, if the person needs more palette sheet then he prints by transaction LT01, and LT16 is just to cancel.
    Many thanks.
    Regards,
    Patvin

    Hi Patvin,
    You can try using T.code Co04 and after giving parameter got to Print and do print setting.
    If it solve reward and close this issue
    Thanks
    Bala

  • Offseting entry to inven posting for finished product in sub  contracting

    When we post goods receipt in subcontracting inventory account is debited with finished product.What is the account name to which offsetting entry is made & how to configure this in automatic account determination.
    1) Same question was already asked and moved to T&P form.
    2) Basic question.
    3) Points will be unassigned.
    Edited by: Csaba Szommer on Apr 16, 2011 7:58 AM

    Hi,
    If Material has Price Control as "V" (MAP)
    (BSX) Stock A/c of Assembly - Dr
    (BSV) Change in Subcon Stock - Cr
    (FRL) Subcontracting Charges - Dr
    (WRX) GR/IR Clearing A/c - Cr
    (BSX) Stock A/c of Components - Cr
    (GBB-VBO) Consumption A/c of Components - Dr
    If Material has Price Control as "S" (Std. Price)
    If Material is having Price Control as "S" then Price Difference A/c will also in picture.
    This depends on configuration; SPRO > MM > Inventory Management and Physical Inventory > Goods Receipt > Price Differences for Subcontract Orders at Goods Receipt
    Price Differences for Subcontract Orders at Goods Receipt
    In this step, you configure for each valuation area whether price differences are generated for a Subcontract order at the time of a goods receipt if the manufactured material is managed at standard price and the standard price varies from the receipt value (externally performed service + value of components + delivery costs).
    Example
    Finished product: $400 (value at standard price)
    Subcontract order:
    o Ext. service : $250
    o Components : $100
    Posting schema without price differences:
    Stock account FERT : 400 +
    Stock change : 400 -
    GR/IR clearing acct : 250 -
    External service acct : 250 +
    Compon. stock account : 100 -
    Consumption account : 100 +
    Posting schema with price differences:
    Stock account FERT : 400 +
    Stock change : 350 -
    Price difference : 50 -
    GR/IR clearing acct : 250 -
    External service acct : 250 +
    Compon. stock account : 100 -
    Consumption account : 100 +
    And cost center is mandatory for subcontracting process
    the accounts for the BSX FRL and GBB-VOB needs the cost elements
    Thanks
    Diwakar

  • Third Party for finished product

    normally I sell a product and it is maintained as a Finished product.
    But now I dont have the enough Inventory for that product.
    So I have asked my Vendor to supply that material to the customer.
    In this case I cant maintain this product as the Trading good.
    how should i configure this scenario.
    regards,
    sheetal

    Hi
    there is no need to maintain a thirdparty material as trading goods. you just maintain as a standard finished product.
    and in VOV4 maintain a TAS(thisrd party) as manual item category for your standard item combination (lets say ORNORM-+- = TAN TAS)....
    <b>when processing a sales order just change the item category to TAS whenever you need a thisrd party order,.............</b>
    Hope this will resolve your problem  
    Reward points if helpfull
    Muthupandiyan

  • SLED for finished product

    Hi
    Our finished product is batch managed, batch creation automatic at the time of order release. We have maintained SLED info in the material master, but during GR (mb31/migo) it is not asking for production date. We have to update it in the change batch screen.
    please help.
    Regards
    Abhishek Rai

    Thanks for the reply, in OMJ5 the check is there for the plant level, also it is working for GR for raw material. Only while doing GR for production orders its not asking for production date.
    regards
    abhishek

  • Upload update for Warehouse for finished product in BOM

    Hi everyone,
    Is there a way to update the warehouse for the finished product in BOM using DTW? I can only update the warehouse for the raw materials / components through DTW but not the warehouse for the finished goods, except by doing it manually one BOM after another.
    Thanks and regards,
    Derrick

    Hi Rakesh N,
    I changed the default warehouse then I noticed that only the newly added/uploaded BOM took the default warehouse are the warehouse for the finished goods. The earlier BOMs were not affected by the change in the default warehouse - the warehouse remain as they were when initially uploaded. Is there a way to update the warehouse for the earlier added BOM. we have quite a huge number of BOM and updating them one by one will take too long to complete.
    Thanks,
    Eric

  • Different batches for same product in one HU

    Dear SAP Gurus:
    I have a couple of questions:
    1. Can you have multiple batches for the same product on one HU?
    2. If the answer is YES, what do I need to do because right now when we try to scan the product ID which includes the batch the system does not saves the scanned batch on the HU but it leaves the one that the "Delivery Document" already had. We tried deleting the batch (leaving it blank) on the "Delivery Doc." but still it does not saves the scanned batch.
    Thank You in advance for your help.

    Mario,
    Be sure you can pack multiple batches in one HU in standard system. What's more, you can pack several different materials and HUs in one HU.
    I'm not familiar with RF but you can check this link and you can also ask HU experts on LE forum:
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/76/ea7c38b5e211d391cf0008c7d94f4b/frameset.htm
    You can use this transaction to pick and pack material in one step. This can be useful, for example, if you need to pick several materials to be packed into one handling unit (HU). You can select an existing handling unit or create a new one. Identify the materials to be picked and packed by the delivery number.
    Regards,
    Csaba

  • All the raw materials for finished products

    Can anyone please help me how to find all the raw materials for a finished product. The desired result which i am expecting is same that we get through TCode CS15.
    Please help me to solve this issue.
    anyone who answers will be rewarded..
    thanx in advance

    Hi,
    Please note what you are talking is multi-level blow up & the logic given by me is for Single Level blow up. In any case you can modify the above mentioned logic as follows so that you will get the desired result.
    Once you get all the first child materials of a BOM i.e. 800024 then check in MAST if there is a BOM for this child material. IF you get sy-subrc = 4 in Select of MAST it means there is no BOM Present for this child material hence no need to take any action. However for child material 800120 you will get sy-subrc = 0 indicating that there is a BOM for this child material so write these child material in ANOTHER INTERNAL TABLE SAY 'X' & DO NOT WRITE THIS CHILD MATERIAL in your current internal table. Follow this procedure for all child materials of this BOM. Once your thru with all child materials. loop at internal table 'X' which contains all materials which are haveing a BOM so repeat the above mentioned procedure for all child materials of material from 'X" i.e. in your case 800120. Stop this process till internal table 'X' is empty. I hope this helps,
    Regards
    Raju Chitale
    Edited by: Raju Chitale on May 5, 2008 12:55 PM

Maybe you are looking for

  • How to disable sorting for some columns in a ALV GRID?

    Hi i have requirement where I have to disable sorting for some columns in a ALV GRID. i am using REUSE_ALV_GRID_DISPLAY function module. Can anybody help me. how to acieve this? Any code snippets will really be appreciated.

  • Attachments in SSHR - Learner Self Service

    Can the Learners attach any file along with their enrollment into a class? Is this feature available? Only administrators can attach files and post it.

  • What does the "Other" signify on the "Capacity" indicator in the 'Summary'?

    I was wondering if someone knew what the "Other" section in the Capacity Indicator at the bottom signifies? What files are included in it and how can it be accessed? It has eaten up almost 100 MB of my iPod disk, but I have no idea what the content i

  • X240 VGA connection to TV shows wrong resolution

    Hello, I recently migrated Win8.1 from X240 HDD to SSD, and replaced the stock HDD with the SSD. I managed to reset the system to the original Win8 factory settings, and updated through Windows update to Windows 8.1. I also used Intel Driver Utility

  • Vendor post dated cheques process

    Dear all my client wants to track post dated checks in sap where we configure in pdc process i search in sdn some body is saying sap is not provided standard pdc process please advice us. Thanking you kranthi