Manual Lot Creation

Dear All,
I have got the following queries.
1:     I have to create manual inspection lots for incoming quality inspection.
        I have created my own inspection type.
        Which origing group should I assign to this inspection type.
2:     At the same time I want a different number range for manually created lot for better visibility.
Regards

Hi,
You can get this via table QALS
In that, the field: STAT01 is there for to find out whether lot is created automatically or manually.
If the field has value "X", this means that the flot is created automatically.
otherwise manual lot.
Thanks
SUMIT

Similar Messages

  • House banking, manual cheque lot creation,

    hello,
    house banking, manual cheque lot creation, the first feild to enter is payment document number, from where we get that payment document number, just entered the payment posting number, but count not save ,

    Hi
    for House bank creation use T.code -FI12
    For Check lot creation -
    FCHI

  • Manual Inspection lot creation

    Hi,
    In our scenario, there is customer inspection which is done after the final inspection.
    For this I have configured manual inspection lot creation after the final inspection.
    I expect that if a lot exists for a Sales order, it should not allow PGI for delivery.
    How can I set this?
    Regards
    Ramakanth

    With manual inspection, it may not be possible.But it possible by using standard inspection type 10.For this activate the insp type 10 in material master QM view and create the master data (insp plan). or you can use the same inspection as used for 04 insp type.For this do necessary config changes.Also in QM config, assign insp lot origin 10 to the delivery type used by SD(Std is LF).
    Vishal
    Edited by: VISHAL JONNALWAR on Aug 20, 2010 11:08 AM

  • Inspection Lot Creation after GR

    Dear PP/QM Masters,
    I have question regarding inspection lot creation after goods receipt.
    There will be GR once at the end of the shift with batch number. As batch generated during shift will be different, there will be multiple GR entry. But for every material only one result recording per shift is required and not for all batches generated. So, how to avoid creation of so many inspection lot? Automatic Inspection lot creation is required hence no question of manual creation of inspection lot.
    I checked function module ‘QAPP_CUST_IP_CREATE’ for inspection point functionality but its description “You can use the available function module to generate inspection points for the inspection during production already when the inspection lot is created.” Can I use function module ‘QAPP_CUST_IP_CREATE’ for restricting creation of inspection lot after GR?
    Request all Masters to help me in solving this.
    Thanks and regards,
    Devang

    Dear All,
    First of all thanks a lot for your response.
    I checked ‘Control Inspection Lot’ setting but even that can not solve my problem as in our case though GR with confirmation will be once in a shift (though in system shift is not defined) but batches will be different and hence material document will be separate. And requirement is to have single inspection lot per shift even if batches and material documents are separate.
    One option is to have multiple line items for GR in MB31 or MIGO or in COR6N. But all this transaction allows only one line item for GR against process order. So, can you suggest any function module or option to have multiple line items for GR.
    Thanks and regards,
    Devang

  • Early Inspection Lot Creation on Goods Receipt

    I work for a company that melts steel into batches referred to as Heats.  Each of these Heats are processed through various steps to create tubing.  In the tubing operations multiple Heats are applied to production orders but the integrity of each Heat is always maintained.  If we do a Goods Issue for 6 Heats into a production order, we expect to do a Goods Receipt of 6 Heats from that production order and inherit all of the Heat related characteristics for each Heat processed.  At certain points we do laboratory tests for chemisties and properties of each Heat.  These tests are run while the order is being processed through other operations but need to be recorded against the batch.  We are thinking that we need to do Goods Receipt Inspection with Early Inspection Lot Creation.  It looks like this method will create a single Inspection Lot upon release of the Production order.  Is there a way to create multiple Inspection Lots that will correspond to Heat batches prior to the actual Goods Receipt?

    6 partial GR (Heats) are done against 1 production order? Then, you will have one inspection lot and one usage decision for the entire lot (03 / 04: Goods Receipt Inspection with Early Inspection Lot Creation.).
    Think this: Each heat can be one sample/ inspection point each, in case of early goods receipt. So, if you have 6 samples: 3 pass and 3 fails, then do the Usage decision on 3/6th of the quantity at the end of the test: this needs to done manual stock psting while doing the UD.
    So, you do the inspection at the sample levels, but not at multiple inspection lot level.
    There is a way to create mutiple inspection lots on partial GR for the same process order.
    The logic lies like this, if your previous inspection lot is reset on usage decision, then you will get a new inspection lot when doing a partial GR.
    If the UD is not reset case:
    (a) Usage decision open: It will increase the QI stock in the same inspection lot. This means no new inspection lot creation.
    (b) Usage decision done: It will post to unrestricted, thinking that the rest of the sample is OK!! So, again no new inspection lot creation.
    This I tried on 04 inspection type. I am not sure on 03. Hope this helps!!

  • DMR level change at UD vs lot creation

    Hi,
         Can someone in simple English give me the business reason to have Q level change at lot creation level and at UD level. In what cases would one use either of them ? I have read the help and know how to configure in the system but need the business reason to chose one or the other. Please dont send me the link to help or to past posts which speak about how to create DMR rules in the system.
    Thanks
    GS

    No matter which one you pick, you can have issues.  It's picking the lessor of two evils.
    The issue comes in when you have the potential of having more than one inspection lot active at a time that uses quality levels and dynamic modifications.
    For "at lot creation" when you create a lot the quality level is checked and modified according to the established rules to the next "postition" or stage if you want.  It ASSUMES the lot just created will pass.  In this case if the lot fails, you have to manually fix the quality level after a fail.  If another lot comes in before you maually fix it, it could be skipped or reduced testing.
    For "at UD" the quality level is updated when UD is made.  In this case when a lot is created before the UD is made on a previous lot, the quality level is still at the same level as the previous lot.  As a result the new lot will be created at a level which maybe it shouldn't be.  Which could be wrong if the UD fails or passes on the previous lot.  In this case, the failure at UD on the first lot will reset the quality level and the next lot created should be at the right level, but the inbetween lot might not have been.
    Follow that?
    Craig

  • Manual Report Creation!

    Hi friends,
    I would like to learn about reports is there any place where i can get some videos about this. And i Especially for time being need to know about manual report creation i have little bit knowledge on creating reports.
    Any links to videos or tutors would help me a lot.
    Regards,
    Manoj Chakravarthy

    Hi friends any info on my above request it is of great importance for me please any help would be appreciated.

  • Quality inspection lot creation at  GIR

    Dear MM/QM guru's........
    Can you explain me in bref wat are the customizing setting in Quality managemnt and MM for creation of inspection lot the moment you go GIR and how to release the inspection lot..
    Reagrds
    SARFRAZ

    hi sarfrazny,
    first you have to activate the QM view in material and activate the inspection type in the material master .
    inspection plan to be prepared
    as soon as you process the the GIR a inpection lot will be created for which you have to record the result .
    kindly look into this
    <b>Inspection for a Goods Issue</b>
    Purpose
    The system can automatically create an inspection lot when a goods issue is posted in the system. A goods issue can be posted internally (for example, a material withdrawal from the warehouse) or to an external destination (for example, a goods issue to a customer). In a goods issue, the materials are usually withdrawn from unrestricted-use stock and posted to a cost center, project, customer, or other account assignment object. When the system creates an inspection lot for a goods issue, the inspection lot is not stock relevant.
    Prerequisites
    The system creates an inspection lot automatically for a goods issue if the following conditions have been met:
    In Customizing for Inspection Lot Creation (Inspection for a Goods Movement) QM is active for the movement type.
    QM is active for the material. This means that in the inspection settings of the material master:
    In Customizing for Inspection Lot Creation (Inspection for a Goods Movement) QM is active for the movement type.
    An inspection type is active for inspection lot origin 02 (goods issue)
    The other indicators for the inspection type are set appropriately to meet your requirements for inspection processing (for more information, see Processing Inspection Settings)
    Process Flow
    The system creates an inspection lot automatically when the goods issue is posted in Materials Management (MM).
    If the inspector will record results for inspection characteristics (controlled by the inspection settings in the material master), the system assigns an inspection specification (for example, a task list or material specification) to the inspection lot. If the system cannot find a specification or if more than one inspection specification is assigned to the material, you must assign a specification to the inspection lot manually.
    If dynamic modification criteria are defined for the inspection lot origin or task list usage, the system checks the existing quality level for the material (and the other criteria, if applicable):
    If a quality level is not available, the system creates one.
    If the dynamic modification rule specifies that the quality level must be updated when the usage decision is made, the system does not update the quality level now.
    If the dynamic modification rule specifies that the quality level must be updated when an inspection lot is created, the system updates the quality level now.
    The system calculates the sample size.
    If the sample calculation must be triggered manually (controlled by the inspection settings in the material master), you must call up the inspection lot in the change mode and choose the function to trigger the sample calculation manually.
    If you are going to inspect the goods in the inspection lot using an inspection specification:
    The system can print out the inspection instruction and/or sample-drawing instruction automatically when the inspection lot is created
    You can print out the inspection instruction and/or sample-drawing instruction manually when you call up the inspection lot in the change mode
    Result
    You can use the information in the sample-drawing instruction and inspection instruction as a guide to:
    Draw and prepare the samples at the work centers specified for each operation
    Inspect the goods in the inspection lot
    Record characteristic results and/or defects
    When you have finished recording inspection results and/or defects, you can complete the inspection.
    Result
    When you have finished recording inspection results and/or defects, you can complete the inspection.
    regards
    thyagarajan

  • Manual replica creation of DeDup Volumes

    Hi,
    we are on the way to update a lot of our file Servers to Windows Server 2012.
    DeDup will be enabled on the volumes.
    We are going to to backup these voumes via DPM2012SP1.
    Now my question: Is it possible to create a Manual replica (for example with the help of USB external drives) for dedup enabled volumes or does the replica creation process have to be triggered from within DPM console so that all data will be transfered
    over the Network?
    Thanks in advance
    regards
    /bkpfast
    My postings are provided "AS IS" with no warranties and confer no rights

    Hi,
    Unfortumatly, you cannot perform a manual replica creation for a deduped volume in a deduped state, however, you can perform the following, but don't think it would provide you much benefit.
    1) On the protected server that has the dedup volume you want to protect, create a dummy folder in the root of the volume.
    2) On the DPM Server, protect the dedup volume, except uncheck the dummy folder.  Choose to make a manual replica.
    3) Copy the contents of the protected volume to the replica volume using any method you choose. 
    4) Run the mandatory consistency check to make sure the data is equivelent.
    5) On the DPM Server, modify the PG and now include the dummy folder - basically uncheck the drive letter and recheck it so DPM will protect the whole volume now.
    6) On the protected server, delete the dummy folder.
    7) Re-run a new consistency check, and DPM will now protect the volume in a dedup state.  This will result in only transfering deduped blocks, and leaving non-dedup blocks intact.
    Again, that may not buy you much and may be a waste of time - but give it whirl.
    Please remember to click “Mark as Answer” on the post that helps you, and to click “Unmark as Answer” if a marked post does not actually answer your question. This can be beneficial to other community members reading the thread. Regards, Mike J. [MSFT]
    This posting is provided "AS IS" with no warranties, and confers no rights.

  • Inspection lot creation

    Dear Experts,
    Reqiurement as follow :
    We have four plant like 1000,1001,1002,1003,1004
    System creates inspection lot when we do GRN against in stock transfer PO when STO from
    1000 to 1004, 1001 to 1004, 1002 to 1004, 1003 to 1004, as we have activated inspection type 08,01 in MMR.
    My requirement is system should not create inspection lot when STO from 1003 to 1004 only.
    We can not deactivate inspection type as we need inspection lot when STO from other plant.
    Please help in this scenario.

    In QM, we can deactivate the quality for certain movement type.That means though QM is active in material master, if we are using any movement type for which QM is not active, it will not generate the inspection lot. For STO from plant 1003 to 1004, use the movement other 101 i.e copy of 101.
    Copy 101 movement say as 901.Using following path deactivate QM for this new movement type 901.
    SPRO - QM - Q. Insp - Insp lot creation - Insp for goods movement - Deactivate insp for movement type. Select the indicator "QM not active".
    Now use movement type 901 for STO from plant 1003 to 1004.
    Vishal Jonnalwar

  • Batch status at recurring insp lot creation

    We have setu recurring insp 09 for few materials. We use "insp stock at creation" option. So system work as expected and create lot and put stock in QI, but still batch status remain "unrestricted". Our req is at the time of lot creation it self system should set batch status as "restricted". How to setup it?
    When system setup "restricted" status for recurring batch? Help appreciated.

    check option
    Recurring Inspection: Block Batch at Lot Creation
    Specifies, that a batch is blocked, when the inspection lot is created, if the inspection date lies within the opening period.
    Use
    If you choose this option, batches are blocked, if their next inspection date lies within the opening period:
    If the batch status management is active in the corresponding plant, the batch status is changed to "restricted".
    If the batch status management is not active in the corresponding plant, the batch stocks are transferred to the blocked stock.
    If the batch status has changed or a transfer posting takes place, a new inspection lot is created for each storage location.
    If a relevant inspection lot already exists and the next inspection date has already been reached, the change of the batch status or the transfer posting also takes place

  • Change of Inspection Lot Specifications at the time of lot creation

    Hi,
    We are using In-process inspeciton.
    At the time of Production Order release an Inspection Lot is created automatically.
    We want the Lot Specification values to be changed based up on the Configuration of the Sales Order.
    Is there any User Exit or BADI  that can be used for this purpose?
    Ramakanth

    Hii,
    Lot specifcation values cannot be changed once inspection lot is created. If u know specification only after creation of inspection lot then u include unplanned inspection charcteristics. Here u can define spec after lot creation also.
    with regards,
    K.Lokesh.

  • Inspection lot creation while partial comformation in 03 inspection type

    Hi
    I want inspection to be created while partial confirmation of operation in CO11N in 03 inspection.
    It is happening with release of production order.
    PLz let me know -if anybody can help.
    Regards
    Pooja

    Hi Ram,
    Just check the SPRO setting SPRO---> Quality Management ->Quality Inspection->inspection lot creation--->inspection for goods movement --->deactivate quality inspection for a movt type.
    Here against movt type 262 uncheck the QM not active tick.
    It will solve your problem.
    Cheers,
    Tushar

  • Inspection lot creation for inspection type 05

    Hi Gurus,
    We have finished material FERT & semifinished material HALB.We have assigned insp. type 02 & 05 in material master of matl. HALB.When we create production order for FERT & confirm the order , inspection lot is generated for matl.HALB of inspection type 02.
    Now we are reversing the goods issue by movement type mb1a, movement 262.In customizing for movement 262 inspection lot origin 05 is assigned.
    My problem is that when i reverse the goods issue with mvmt.262, inspection lot is not created for insp. type 05. What should be the reason behind this? or are any changes to be done to above setting?
    Regards
    Ram

    Hi Ram,
    Just check the SPRO setting SPRO---> Quality Management ->Quality Inspection->inspection lot creation--->inspection for goods movement --->deactivate quality inspection for a movt type.
    Here against movt type 262 uncheck the QM not active tick.
    It will solve your problem.
    Cheers,
    Tushar

  • Inspection Lot creation for the 103 movement type

    <<Don't ask for or offer points>>
    Dear Experts,
    we have the requirement of Creating the Inspection lot for the 103 movement type. we have done all the necessary settings for 103 movement type (in OMJJ and under the node   Quality Management --> Quality Inspection -->Inspection Lot Creation -->Inspection for Goods Movements) but still I am unable to achieve the results. Same is happening for 105 movements.
    Kindly let us know what settings need to be done in order to achieve the same.
    Full points will be awarded for the reply
    Regards.
    Edited by: Matt on Sep 18, 2011 4:44 PM

    Hi,
    If you have activated two inspection types (eg 01, 0101) of same inspection lot origin (01), in material master you should  have a preferred indicator set for the inspection type for which you want to be selected when you perform goods receipt.
    This check box is available in the inspection type set up in the Material master.
    Also check whether the post to inspection stock indicator is set for the material (in the inspection type), then only material will be posted to inspection stock.
    Please confirm, what happens to the stock after making MIGO. check in MMBE and confirm
    Go through the link and maintain the necessary settings. I think default settings for 01 type should work.
    http://help.sap.com/saphelp_470/helpdata/en/2d/350e4d448c11d189420000e829fbbd/content.htm
    Regards
    Hari

Maybe you are looking for

  • HT4847 Question re: storage for photos

    I bought storage for photos, and yet I keep getting the notice that there is not enough available storage to take a photo. Yet, I only have taken ten photos and my settings tell me that of 15.0 GB in iCloud, I have 14.9 available. What can I do?

  • Sync between address book and google

    I have been driving myself nuts all day with this. Here's the scenario: a) I do not use mobile me. b) I have my address book on the mac setup to sync with google contacts (10.6) after it is initially setup: 1) if I add a new contact to my google cont

  • Satellite A200-20H - No sound after Windows 7 installation

    Hey Guys. I have just bought this computer from a mate, and I have decided to install Windows 7 on the machine. Everything seemed to work brilliant, until I wanted to try and play some sound. There is no sound what so ever on the laptop, all the slid

  • JScrollpane

    Hello, since my last post i seem to have got a handle on the gridbaglayout, the problem is, the listScrollPane inside of smokerPanel keeps overlapping the next column. I have no idea why it is doing this. the gridx is always 0 and there is an actual

  • Entire iPhoto collection lost!!!

    I went to open iPhotos just now and it offered me the chance to do something regarding the thumbnails. I clicked yes. The screen went blank, iPhotos had half opened, then nothing. Left it for half an hour, the relaunched and nothing! All the photos h