Manual Reservations Integration Model

Hello All,
In our project, during Go-live we dint had manual reservation Integration Model Activated due to some business reason. 
whenver a process order is created in R/3, Reservations for Components appear in R/3 and APO.
Now when the components are good Issued in R/3 during Finished Product Process Order, these dependent reservations are not deleted in APO though the stock is reduced. Upon analysis we found that by activating the Manual Reservation Integration Model , these reservation will be deleted and hence both the R/3 and APO System will be in sync.
Now the Problem is when we are trying to do this manual reservation Integration Model activation through Batch Job , activation is taking a very long time. Upon further analysis we found that for the material-Plant combinations, program tries to search records in table RESB and approximately it takes around 5 minutes for each material -plant combinations. In our integration model we have around 2400 Material-Plant Combinations. CFC3 settings for Reservations are select block size of 1000 and filter block size of 512. R/3 version is 4.7.
Table entries in RESB are close to 3.5 Million with 141 Extends.
So just wanted to check with you guys if anybody has experienced this problem before and what resolutions were put in place to addres this ? Are there any SAP Notes available ? I searched but could not found any.
also what would be the best way to go forward? Some of the options i could think are
1) Run the I.M for selected material-Plant Combinations
2) Run the I.M for generic selection Criteria ( i.e AS IS) during Weekend.
Pls share your opinions.
Regards,
Pawan.

Hello Kenneth,
As i understand from your message that if a final Issue Indicator is unchecked, then those reservations should be present in APO. However i got confused with your below statement
Therefore it is neccessary that reservations with final issue indicator set are available in APO.
I think you might be trying to tell  reservations with final issue indicator unchecked ( and not SET) are available in APO.
Regarding Transaction Code MBVR, I have few queries
1) Does this T-CODE MBVR sets the deletion Indicator in Table RESB or does it delete the Reservation permanently from Table.
2) I am not able to locate Completed Items field, which will enable me to delete Reservations. Can you pls let me know the field name.
Pls note that whenever i am trying to delete reservations thorugh t-code MBVR, it gives a message " No Document exists for the Speficied data".
thanks for your assistance,
Pawan.

Similar Messages

  • Problem activating integration model

    Hi,
          We have a integration model for Purchase orders and Purchase requisitions, PLanned orders, Manual reservations and production/process orders.
    In CFM2, when I activate, it is taking forever to activate.
    Here is what I see in CFM2 details:
    POs and PReqs     (2.503 no.s)
    Planned Orders     (2.503 no.s)
    Manual Reservations     (2.503 no.s)
    Production/Process Orders (2.503 no.s)
    The system has a clock moving in the left bottom corner with the message "Transfer Model type : Purchase orders and purchase Requisitions) and it's taking forever.
    I checked this [thread|Problem with activating integration model]. I don't have access to BD22.
    ANy other ideas on how I can complete this activation?
    Are 2503 too many??

    Hi Visu,
    Can you split the intregration model for each object and schedule the activation in background through CFM3.
    if there is any failure can see problem through SLG1.
    Manish

  • System copy:integration models altered

    Hi SCM experts,
    We have APO 4.1 connected to ECC system.Recently the QAS data is refreshed with PRD data and after that all CIF integration model variants in QAS are pointing to PRD system. There are more than 100 integration model variants and changing the logical system mnaualy to QAS client is taking long time.
    Is there any standrad report or t.code by means of which we can do a mass maintenance of these integration model variants ?

    Hi deeparai,
    You can change the name of logical system in ECC table CIF_IMOD. However, the integration models will not become active unless you generate them again (CFM1/2/3).
    Hope this helps in reducing manual work.
    regards,
    biplab

  • Can I work backward from APO CIF function module to ECC Integration Model

    On our APO box, I have activated the "new-style" BAdI which is called by the CIF function module /SAPAPO/CIF_TLANE_INBOUND:
    CALL BADI lr_ref_cif_enhance->inbound_tlane
    How can I find out what the business analysts have to do in their ECC Integration Model
    to make sure that the CIF_TLANE_INBOUND function module is called when the Integration Model is activated (so that the BAdI will also fire)?.
    Our current Integration Model does fire the BAdI /SAPAPO/IF_EX_TR_TRANSFER , but not the "enhance inbound tlane" BAdI called by CIF_TLANE_INBOUND.
    So ...to restate the question:
    How do I figure out what I have to tell the business analysts  to do in their Integration Model to make sure that CIF_TLANE_INBOUND is called when the model is actrivated ???

    Hi David,
    I was away in a long meeting and just came back. A quick check in another R/3 (Enterprise) system showed the following:
    There is no FM in the R/3 Enterprise box as CIF_TLANE_SEND and in APO (SCM4.1)  
    /SAPAPO/CIF_TLANE_INBOUND. This is not surprising esp when I check the other system versions based on which I did the initial research. It was ECC 6.0 with Enterprise Extension DFPS switched on (checked SWF5) and the APO system SCM 5.0.
    Lucky me I checked the internal Sandbox systems instead of my client systems otherwise I would have posted there is no FM CIF_TLANE_SEND
    Forget the SD Scheduling Agreement object I mentioned in the previous reply. That master data object will not trigger FM CIF_TLANE_SEND. I found the correct FM for it CIF_SDLS_SEND on R/3 side and /SAPAPO/CIF_TPSCO_INBOUND on the APO side.
    So you have to necessarily use the BADI or User Exit enhancements for TPSRC and NOT TLANE.
    In any case if its a Contract or Scheduling Agreement or Purchasing Inforecord master in R/3 (or ECC any version) then TPSRC is the FM used to create External Procurement Relationships (txn /SAPAPO/PWBSRC1) in APO during CIF transfer. Also a corresponding Transportation Lane (txn /SAPAPO/SCC_TL1) gets created when the Procurement Relationship is added in APO. Otherwise you can always manually create a transportation lane in APO which is an important master data for External Procurement Order / Requisition creation in APO.
    Hope this helps. I am logging off for today - so no more further digging. But thanks to you I discovered another small "blackbox" of SAP. Will blog on this some time later - till then you can take a look at the [CIF Wiki|https://wiki.sdn.sap.com/wiki/display/SCM/CIF] page.
    Best regards,
    Somnath

  • Integration model activation

    Hi All
    Goal : To activate the Integration model
    Right now, we are working on quality systems (both ECC and APO). There is a Int.Model for masterdata from ECC to APO. The Integration model is not getting activated.
    Reason: In APO under /sapapo/cq we have these line items "Base unit of measure for product X cannot be changed' (several hundreds of materials).
    Looks like there is a mismatch of Units of measurement for the same product in ECC and APO. For now I am matching the Units of Measurements in both the systems, but its kind of cumbersome because there are several hundreds of materials in the queues.
    Also, suprisingly there are some products whose Units of measurements *match* and are still in the line items (queues)
    Is there any better way to address this and activate the Integration model?
    Thanks
    Pooja
    Edited by: Pooja Challa on Sep 29, 2009 9:03 PM

    Hi Pooja,
    It is not advisable to change the base unit of measure in R/3 for the materials which have been transferred to APO. But it may be necessary to change it in R/3. During that time SAP is kind enough to give the warning.
    I am not sure how many materials are there in R/3 whose unit of measure has changed. If it is possible to find out using some kind of change document report then it will be good input to next step.
    Next step would be to maintain new base unit of measure of the material in the R/3 system is created as an alternative unit of measure of the product in APO (transaction /SAPAPO/MAT1, 'Units of Measure' tab) so that the units can be converted in APO if necessary.
    Since you only change the base unit of measure in an R/3 system in exceptional cases, it is assumed that you will subsequently change the change material manually in APO.
    Thanks and Best Regards, Manoj
    PS: I would encourage you to have look at following notes:
    Note 832595 - Product: Base unit of measure cannot be changed using CIF
    Note 809596 - Product: Base unit of measure must not be changed

  • Integration model for sales orders failing repeatedly

    Integration model for Sales Orders to APO is failing and in the CIF the error says "Customer requirement G BR 0082372353 900010 0000: liveCache problem, retu".
    This error appears everytime you we run the integration model and it says in the Job log; ABAP/4 Processor: SYSTEM_CANCELED.
    Note that this is "not" manually stopped but it still gives this error.

    Hi Kailash,
    Run /SAPAPO/SDRQCR21 in apo for the part contained in your delivery document, which is failing. While running the report, check the radiobutton, Build the requirements from Doc.Flow table. This will remove the inconsistencies remaining in the requirement table on R/3 side.
    Try this and let us know, if you could succeed.
    Regards
    Sanjeev

  • Manual Reservation against Maintenance Order

    Dear All SAP - MM Gurus,
    Is it possible to do manual reservation against the Maitenance order
    through
    T. code                             : MB21
    movement type                  : 261
    Maintenance Order Number: XXXXXXXX
    If yes, what all steps to be done in SPRO.
    I am trying to do it, but the system is throwing an error. and says
    that "manual reservation for order category 30 is not possible"
    Please help me. Its urgent.
    Thanking you.
    With Regards,
    Mihir

    Hello Mihir,
    Unfortunately, this is not possible. The long text of the error message that you are getting already offers some information about this:
    "Manual reservation for order category & not allowed.
    Cause:
    You entered an order whose category only permits automatic reservations.
    The following order categories do not allow manual reservations:
    .- 10 PP production order
    .- 20 network
    .- 30 maintenance order <<<<<<<<<<<<<<<<<<<< This applies to your case.
    .- 40 batch order (process manufacturing)
    .- 50 inspection lot
    System response:
    The system does not accept your specification.
    What to do:
    Enter a different account assignment, or cancel the processing.
    If required, check whether any reservations for the specified account assignment   already exist."
    An explanation to this fact is the following one:
    "The manual creation of material reservations in this scenario is not supported by the system. Every material allocation has to be assigned to the order operation. We have to keep a tight integration between the reservation and the order because of rescheduling, costing, material requirement planning etc. You cannot split some of the functions. Planning of material consumption has to be carried out via the order.
    There are no plans to change it in the future."
    Sorry, but there is no option!
    Best regards,
    Esther.

  • Manual reservation for order category 30 is not allowed

    Hi,
    I have created a shopping cart with maintenance order as account assignment category.
    SC is showing the status of Error in process.  When I checked the process erro cause in function module there I am getting the message " Manual reservation for order category 30 is not allowed "
    Can any one tell me how to move forward.
    Thanks & Regards,
    Govardhan,V.

    Hi Govardhan,
    If you are working in ECS, the Shopping cart will not create any follow on document in backend R/3.
    I think your Product category is 30, thats why the error says Manual reservation for order category 30 is not allowed.
    Where did you get the maintenance order? Generally maintenance order is created in the backend R/3 (Plant Maintenance) and a P.R will get generated against that order.
    Using PDP (Plan driven procurement) you can transfer that P.R to SRM and can carry out sourcing and can complete the procurement cycle.
    Can you please tell me what is your exact business requirement?
    Hope this will make you more clear.
    Clarifications are welcome.
    Award points for helpful answers.
    Rgds,
    Teja

  • CIF - Integration model name and APO application

    Hi Experts,
    In the CFM1 Transaction, there are 3 mandatory inputs are Model name, Logical system and APO application.
    Logical systems are customized in CFC1 transaction. I couldn't trace the model name and application creation.
    What is the transaction to customize/Create the new Model name and APO application.
    Hope this is very simple question to you and expect your soon.
    Thanks,
    Saravanan V

    Hi Somnath,
    Thanks for ur reply.
    First I saved the selection as variant. But it was not updated in the IM table.
    Then I tried to generate the model and now I can see the details when I use the F4 help.
    So, to create a integration model need to generate the variant once.
    Thanks for the confirmation.
    Thanks,
    Saravanan V

  • Transfer of material from R/3 to APO, Problem in Integration model

    Hi
    I have created Integration model for Transferring material from R/3 to APO.
    While  activating the model, it is giving error  with status as i..e. SYSFAIL
    On clicking the status, I am getting the following message
    "Logical system R3CON does not assigned to Business System Group"
    ?Where to locate the BSG in  R/3 and assign before transferring  matl to APO
    i require the steps&help  to solve the problem.
    Thanks in advance to all members for the help.
    Srikanth

    Dear Srikant ,
    Pls check you have followed the below steps in the same sequence for R3 and APO
    <u>CIF Settings in R/3</u>
    Check ALE settings or activate ALE settings          
    •Define the logical system               <b>BD54</b>
    •Assign logical system to a client               <b>SCC4</b>
    Set the RFC destination               <b>SM59</b>
    <i>Assign target system and queue type          <b>CFC1</b></i>
    Maintain the SAP APO release               <b>NDV2</b>
    Activate BTEs for SAP APO integration          <b>BF11</b>
    User parameters for CIF               <b>CFC2</b>
    <u>CIF Settings in APO</u>
    Check ALE settings or activate ALE settings          
    • Define the logical system               <b>BD54</b>
    • Assign logical system to a client          <b>SCC4</b>
    Set the RFC destination                <b>SM59</b>
    Set up business system group     
    –Create BSG                <b>/SAPAPO/C1</b>
    –Assign logical systems to BSG          <b>/SAPAPO/C2</b>
    Maintain distribution definitions               <b>/SAPAPO/CP1</b>
    User parameters for CIF               <b>/SAPAPO/C4</b>
    You have got stuck up somewhere in R3 setting , which I have marked in italic font i.e.<i>Assign target system and queue type          CFC1</i>
    I hope this will solve your problem .
    Thanks ,
    Digambar

  • Manual Reservation for Production orders with automatic reservations

    Hello SAP Experts, i have a question regarding Order Reservations, in my company when we create a Production order the reservations for each component are created automatically and assinged to a reservation number, the thing is when i try to create a Reservation through MB21 for the same Production order the system says that" for that type of production order i cant generate manual reservations", can you please guide and tell me if i can change this in the configuration ?? , if you need additional info please tell me , thank you in advance.

    Dear German,
    Your system working according to std SAP setting, u don't need to change any config setting. Because wehn u release order, it automaticaly genarates reservation for each and evry component of the order.
    when u do goods issue to order or to reservation either way it gets issue to the order.
    suppose if u need to issue any extra component to the order u can just add in order componet overview before u release the order. so reservation gets genarated for this componets too along with BOM components.
    In case afer release, if u need further components go to MB1A give mov type 261 and S.Loc and then click on new item push button, it pop ups one more window give all required parameters and post the goods. These goods issue will also gets updated in the order.
    But for the order uc an not manually create the reservations
    sree

  • Manual reservation for Project Stock / wbs element

    Dear Gueus,
    In Project base Industry,
    For Production order confirmation I want to transfer Project stock of raw Materials from Main Storage stock  to Production WIP stock,  from this WIP Stock,  I will consume raw mtl at the time of Order confirmation.
    Now at the time of Manual Reservation in MB21 system is not allowing  311 Q  Mvt type  for Project stock reservation.
    Is there any other procedure / t- code to reserve project stock.
    Pl guide me for the same.
    Thanks
    Umesh

    Hi,
    A word of caution, before processing any mass transactions such as COHV etc, its always better to double check the data. Reason is because the program performs mass update & any reversal would be a time consuming process.
    Now for mass confirmations of orders via COHV
    1. Execute COHV, in the first screen, select Order Headers, specify the order numbers in the field. If you have saved the list as a text file, then click on multiple selection & click the green icon at the bottom right corner, specify the file & the orders will be read.
    2. In the tab - Mass Processing, select confirmation for the field Function & if you want to execute immediately, then select the same in execute function. Depending on your rqmt, you can have the log & also output the logs.
    3. Click execute or F8, then select all the orders & then click on the mass processing drop down icon & click execute. The processing begins in foreground. Once the processing is done, system puts out a log showing the once which were confirmed & the once which were not able to be processed & the reason for the same. (For background processing, select the same in mass processing tab in the selection screen).
    Please note, for order confirmation to take place the status has to be REL, also if any user status is active, check if the same allows confirmation.
    I would strongly suggest, first try in your sandbox server & once you're familiar with its processing, then proceed to use in production system.
    Hope the above helps.
    Regards,
    Vivek

  • Manual Reservation for Movement type 261

    Dear Friends,
    I want to create a manual reservation (MB21) for production order i.e. movement type 261. But system is not allowing and giving error message order category 10 (prodn order) not allowed for manual reservation.
    Can some one help to know how the setting which allows manual reservation for MVt type 261
    Thx
    Rishi

    Hi,
    After my long analyzation, I came know that, this is SAP standard setting.We cann't make any changes in order category 10. As per SAP standard procedure , the below order categories do not allow manual reservation.
    10 PP production order
    20 network
    30 maintenance order
    40 batch order (process manufacturing)
    50 inspection lot
    So please make goods issue through MB1A , if you want tracking this issue seperatly please put your production order number in text filed.
    I hope the above information is useful for you.
    Please reward points if my information useful.
    Best Regards,
    Nagapandian.

  • Manual Reservation for Maintenance Order

    Hi,
    Can anyone suggest some procedure so that I can stop automatic reservation creation from Maintenance Order (Transaction:IW31, type PM01, Category 30) and create manual reservation for the same.
    Presently Manual reservation is not allowed for Maintenance Order.
    Thanks
    Satadal

    To the best of my knowledge this is possible. To the best of my knowledge G/L account determination for every material happens after a series of checks are done internally by SAP. By checks I mean the sequence of steps as customized by the consultant in the configuration. Now at the end of the sequence if SAP has not succeeded in identifying a G/L account it will open up a tab in which u can manually enter the G/L account. For non-stock item you can anyway enter it.
    I would suggest that you post this query in the MM forum also.
    thanks
    Bala

  • Manual Reservation for Maintenance Order (Category 30)

    Hi,
    Can anyone suggest some procedure so that I can stop automatic reservation creation from Maintenance Order (type PM01, Category 30) and create manual reservation for the same.
    Presently Manual reservation is not allowed for Maintenance Order.
    Thanks
    Satadal

    Hello Satadal
    nobody's answered you because it's not possible to create a manual reserve for logistic orders as Network/PP orders or PM orders.
    If you want inhibit the automatic reserve creation :
    - customizing (transaction OIOE) : set "Never" in field "Reservation Relevance/Generation of Purchase Requisition". The reserves will be created but they will be not relevant for MRP.
    - Hide the field AUDISP "Reservation Relevance/Generation of Purchase Requisition"  at component level (OICMPD) and operation level (OIOPD)
    Good luck
    silvia

Maybe you are looking for

  • How can I use a 3rd party XML parser such as xerces with OC4J ?

    Hi all tech experts, I am using Oracle Application Server 10g Release 2 (10.1.2) and i have installed Portal and Wireless and OracleAS Infrastructure on the same computer. i tried all the solutions on this thread Use of Xerces Parser in out applicati

  • Not able to select audio track.

    When unlinked and  I click on an audio track nothing happens. I can't clear or move the track.

  • PO Group for different Purchasing Groups of SC Items

    Hi , I want to create a single PO if 2 different PO Groups are available for items in SC. I could see that standard code is splitting PO for different vendors different Purchasing Groups contracts and soo on. is it possible to create a single PO for

  • Problems with Facelets

    Hi, I want to switch my JSF-View from jsp files to xhtml files to get Facelets Support for building templates and using JSF 1.2. I build two test sites template.xhtml and home.xhtml in the /webcontent/ directory and everything works. After that, I co

  • Apps will not open after upgrading to ios5

    I just upgraded my iPad 1 today, with the new ios5 system. Now I cannot get most of my apps to open up. They just blink once, but do nothing else when I tap on them ?