Manual staging from IM managed Storage location

Hello all,
I have a client process where i want to do a manual staging from a IM based storage location to production.
Is it possible to do a manual staging to production from an IM based storage location and if there are any process pl. let me know. post the t-code and the process and any documents/links related to it.
Thanks,
Maxx

Can i use the Transfer posting for manual material staging to move the stock from IM based storage location to production.
Is it possible as i am not sure whether production has a separate storage location.
Please define your question... How can you expect an answer w/o knowing yourself what are you asking???
You asked about material staging from storage location to production. You can use MF60 (or MF60+MF65) for this purpose.
If there's no production storage location you can post only GI (mvt 261) e.g in CO27, MIGO, MB1A, etc.
Edited by: Csaba Szommer on Jan 17, 2010 8:37 PM

Similar Messages

  • Creation of new handling unit management storage location

    Hello
    I am using transaction HU02 and create a handling unit from existing material. But i don't have any HU management storage locations in the system.
    Could you please explain me how to create a HUM storage location?
    Thanks,
    Ilya

    Hello,
    I am trying to create new Handling unit, with HU02 t-code, and i am getting the following errror:
    The number range object 1 does not exist
    Message no. NR002
    Diagnosis
    The number range object was not defined.
    Procedure
    Maintain the specified number range object using Transaction SNRO.
    I've customized number range for object LE_SSCC in SNRO.
    Сould you please advise, what is my mistake?
    Thx in advance

  • How to pull inventory from a specific storage location

    Hi guys,
    I wonder how can i determine which storage location should we pull  the stock from ... We have a plant, warehouse and a storage lcoation (XX01) and now i need to create another storgae location (XX02) for the same plant warehouse... now when i create the order system pulls the componenets from same old storage location (XX01)... even though i have inventory in the new storage location ....can somebody guide me how to pull from new storage location. Thanks much

    In addition to helpful hints from other experts, I would like to discuss on other three aspects:
    1.  MRP Run:  This new storage loc is normally operated by production staff before issuing to production orders.  Therefore, some planners do not want to include this stock in the MRP Run.  You can do so by exclude the storage location from MRP (via configuration or material master - set to 1 - Storage location stock Excluded in MRP).  Alternatively, you can plan your replenishment via MRP run by setting with reorder point concept.  You can maintain reorder point and replenishment qty in MRP4 if you create at plant/stor.loc. level and set Sloc MRP indicator to 2 (Stor.stock planned separately).  Then when you run MRP, if stor.loc.stock falls below reorder point, reservration to transfer (311 movement type) is created.  This can be an alternative to the nex point I would like to mention.
    2.  Replenishment:  If you want the production staff to plan replenishment themselves, you can use pull list (MF60).  With the certain setting in the MF60 variant screen, you can create the transfer from store to prod.sloc. or create manual reservation.  Pull list can combine requirements from many production orders, calculate net req. (prod.order reservation - current stock), and perform the replenishment for you. 
    3.  ATP:  Your ATP for component can be set to check the stock at the plant level instead of sloc.level by configuration.  You cannot exclude some of sloc. if you check at plant level though. 
    In terms of material master setup, besides Prod.Sloc.Location in MRP2, you can maintain the stock determination group.  Then, you can add more rules like first from consignment then own stock of sloc. A, then B, then C, for examples.
    Hope it helps.

  • Picking quantity from a different storage location during batch split??

    Hi Gurus,
    Have an issue with doing batch split in a delivery with batches from several storage locations.
    Have delivery XXXXXX where I want to pick batches from several different storage locations.
    I click on the batch split button and select the different batches and quantitys.
    The issue here is that I would like to have the different storage locations entered automatically based on the selection of the batch I have made.
    The only storage location that is entered here or possible to be entered is the defaulted storage location that is in the first screen...
    My question is why can I get the storage location where the batch is located and acctually exists when I do select the batch in the batch split...
    The table LIPS and LGORT is not filed with the storage location so I do not know how I could fill this field with the correct storage location data...
    Thank You for all Your help!
    BR,
    Christian

    Hi Christian,
    you have not jet got an answer  -- here my suggestion.
    You have to use the Userexit Mv50afz1. Here you can do some checks and  you can do a popup, where you can sign the LGORT, where the batch is.
    In any case, you need an ABAPer
    In documentation, there is signed, that you should not change database other as Save_prepare - and that's too late.
    In one solution at my company, i show in a message the right information. In an other solution, i made a modification of table lips.
    But dont change the index of the current lips/xlips. That may have the effect of incorrest LIS - System.
    If nessesary create an ylips- Line of the position.
    Use an assign-command to avoid the change of the index.
    hans

  • Cycle count error "HU 100201 not in an HU-managed storage location" in LX26

    Hi,
    I get the following error message "Handling unit 1000020118 is not in an HU-managed storage location" When i try to initiate a cycle count for a bin through LX26 Tcode. Kindly advice about the cause of the problem and how I can fix it.
    Thank you for reading

    I am not sure but it probably is not, sorry looks like i posted this on the wrong forum

  • Serial Numbers in Inventory Management – Warehouse Managed storage location

    Serial Numbers in Inventory Management u2013 Warehouse managed storage locations
    We want to run inventory cycle at the warehouse for materials. These materials are u2018serial numberedu2019 in the material master. During the initial entry (say GR) of the materials, systems prompt for the serial numbers. At this point, system offers option of assignments of serial numbers automatically.
    While running an inventory cycle for warehouse u2013 and posting difference at WM level (LI01), system is throwing error as u201Cmaintain serial number for totol quantityu201D. System does not promt me to enter the serial number for the materials (count) which are found excess/shortage duing the inventory cycle.
    Is there any configuration where this scenario can be managed; system should prompt us to enter serial number while posting differenes at WM level (LI20).
    The inventory cycle is -
    1.     Create Physical Inventory Documents - LI01N
    2.     Activate Physical Inventory Document -      LI02N
    3.     Enter Count -     LI11N
    4.     Post Differences at WM level -     LI20
    5.     Post Differences at IM level(If Differences are posted at WM ) -     LI21

    Curious to know: The WM Inventory transaction - LI11N - (where we enter physical count. )
    1. Compared to MI04 - IM Inventory Transaction: where a pop-up window asks for serial number of the material.
    2. We expect a similar pop-up at LI11N transaction- where the system should ask serial numbers.
    Q.1 How can we achieve this?
    Q.2 Will this be a standard SAP practice?  (if we do customizing to get serial nos. pop-up window at LI11N)
    thanks,

  • Shipping in shipping point from plant and storage location is not possible

    Dear Experts,
    i am trying to configure STO with delivery scenario in my company
    after creating PO (sto UB) and delivery through vl10b when i try to do picking in vl02n and when i enter storage location its giving error
    "shipping in shipping pointxx from plant xxxxand storage location xxxx is not possible"
    i ve checked all settings
    1.plant and sh point assignment
    2. ovl2 sh point determination
    3.ovl3 picking location determination
    4 all master data cust n mat for loading group and shipping cond
    not able to find any solutions plz help
    Regards
    Supriya

    Check your entries in following options in SPRO path:
    IMG - MM - Purchasing - Purchase Order - Set Up Stock Transport Order - Setup Stock Transfer b/w Storage Location - Setup Storage-Location-Specific Shipping Point Determination
    Option 1: Define Rule for Determination of Shipping Point
    Option 2: Assign Shipping Points According to Storage Location (this should be there, if in Option 1 Determin. Rule; Shipping Point is L: Storage-Location-Specific Shipping Point )
    Regards
    JP

  • Create a WM managed storage location

    I have created a new Storage location which I would like to use to transfer materials to a warehouse storage bin.
    How do I make it so that a storage location is connected to my warehouse?  This is so that I can use MIG to transfer materials from a non-wm storage location to this new wm storage location.
    My end goal is to transfer materials from this wm storage location and put them in a storage bin.

    Hi,
    You need to assign the plant+storage location to a warehouse.
    Go to SPRO -> Enterprise structure ->Assignment ->Logistics execution ->Assign warehouse number to plant/storage location.
    Regards

  • Bin to bin transfer from SU managed storage type to NON SU storage type

    Hi Experts ,
    Kindly guide as how i can  perform  Bin to bin transfer from SU managed storage type to NON SU storage type
    Thanks
    Jinoy

    There is no particular technique for this. You can use single or collective method (LT01 or LT10).
    Provide the source SU and destination storage type and bin and save the TO. Your transfer will be complete.
    The SU number will be lost because you have moved the stock to a non SU storage type.
    Regards,
    Aroop

  • Automatic Inbound Delivery Creation in HU Managed Storage Location

    Dear all...
    I have created PO, packing instruction, and packing instruction determination.
    Storage location was set to HU managed already.
    Now I want do GR for PO (with MIGO transaction) which can create inbound delivery automatically, and also do the packing process.
    Which config/setting should I do?
    Thanks before.

    HI,
    In IMG-Logistics general-HUM-Basics-MM-IM-HU req for SL and default values for deliveries
    Select the plant and click Sto Loc there u can find HU ReQ, Check that HU Req Box.
    If you set this indicator for a storage location, the system does not create a material document when it carries out a posting, but creates a delivery via Shipping
    Regards
    Kk

  • How to activate IM and WM managed storage location

    Hello MM Sapperu2019s,
    Please let me know if a storage location is related to IM or WM how / which t code  I can  activate the both.
    Cheers,
    Kumar.s

    Hi,
    Go to LI20 - clear differences WM ,LI21 - clear differences IM
    Please go to bellow link
    http://www.sap-img.com/warehouse/physical-inventory-in-sap-wm-and-im.htm
    http://www.sap-img.com/warehouse/important-t-codes-in-sap-warehouse-management.htm
    Thanks,
    Raviteja

  • HU-managed storage location

    Hi!
    How to set up HUmanaged storage location??
    Thanks!
    BR
    Bea

    Hi,
      Follow the same path:
      Spro--logistics general-handling unit management--basics-material management---inventory management.
      Reward points if it helps.
    Regards
    Karan

  • Stock transfer between two WM managed storage locations

    Hi,
    I want to transfer some stock between two wm enabled storage loc (wm 120 and sl  0001 to another wm 200 and sl 0006) but
    not able to do so. Got to know that there are two components involved in this one IM and WM. I am new in WM so do not have much idea please provide me the right solutions.
    Thanks and Regards,
    Rahul
    Edited by: Rahul Shukla on Aug 23, 2010 12:30 PM

    Stock transfer w/o delivery:
    You can execute the goods movement in IM (one-step or two step) and after that you can process the TRs which are generated when posting GI/GR (hopefully your config is OK and TR is created automatically; else you have to maintain WM-IM interface). You can process the relevant TR from LB10 both in supplying plant (TO wiill be created from TR --> stock removal) and in receiving plant (TO will be created from TR --> putaway TO)
    Stock transfer with delivery:
    In supplying plant you have to pick the delivery (you have to create TO), you can do this e.g. via trx LT03, VL06O, VL02N (from "Subsequent functions" manu). In receiving plant you have to process the TR (from LB10) which is generated when GR is posted.
    (based on your WM-IM interface setting you may not get TR but immediate TO creation can be triggered, etc. If you are using inbound delivery as well you have to create putaway TO, etc.)
    Please specify your problem you are facing - in this case you may get specific answer.
    Edited by: Csaba Szommer on Aug 23, 2010 1:51 PM

  • How to Block postings for WM managed storage location

    Hi Experts,
    The scenario is we want to block posting for all materials for a WM managed sloc. We cannot use Authorisation management due to some limitations. Please suggest any other way to do this.
    Thanks

    Thanks for your responses.
    We are looking for an option where we do not have to do any configuration changes and flag for deletion or archive is not an option for us because it is just a temporary requirement. Moreover there are some technical limitations due to complexities in ALE so we cannot use MM06. Any other ways that anybody can think of?
    Thanks

  • Issues while manually exporting from Data Manager

    Hi Guru's,
    When we try to export dat in Excel Or Text OR Access and select/tick Qualifiers for exporting then "Split qualified lookup fields into multiple rows" gets ticked automatically and greys it out,so cant even untick it......
    This causes issues as we want the whole data of record to come in single row  and not in multiple row..
    Any idea/setting which can fix this..
    Regards
    Vikrant M kelkar

    Hi Vikrant,
    This is the default behaviour. You can check the same from the below link
    http://help.sap.com/saphelp_mdm550/helpdata/en/43/e0677c82b40a2ee10000000a11466f/frameset.htm
    Exporting Records -> Exporting Table Records -> Qualifier and Qualified lookup field export
    Regards,
    Jitesh Talreja

Maybe you are looking for