Manual Staging in control cycle TR creation WM/PP integration

Hi,
We defined Material Staging Indicator as 4 in Control Cycle
How do we trigger TR for this materials ly??? Do we need to create TR manually? OR any transaction which will allow to create TR automatically for desired quantities
When i go to Change production Order and WM pick list Requested quantiry/confirmed Quantory is Blank only requirement qty column has values
How i can enter quantities manually and trigger TR
Can i have in Prduction Order few materials manually staged and few option 1 [pick parts]

Let me rephrase
We are using Standard PP/WM integration to stage materials from warehouse to production Bins.
We defined Material Staging Indicator as 4 [Manual Staging] in Control Cycle of materials [as business wishes to move materials manually from warehouse to production Bins]
How do we trigger Transfer requests[TR] creation to initiate movement of raw materials from warehouse to Production bins.
Do we need to create TRu2019s manually? If yes How [As I understand TR doesnu2019t allow to move more than one material at a time from one Bin to another]
When i go to Change production Order and select WM pick list I could see Requested quantity and confirmed Quantity column are not getting filled only requirement qty column has values. All columns are grayed.
Can we have few materials manually staged and few via Staging indicator option 1 pick parts?  so that all critical parts will be moved manually and others SAP to create TRu2019s automatically
PLEASE HELP

Similar Messages

  • Control cycle mass creation with staging indicator 4

    Hi All,
    Is there any way to create control cycles in mass for staging indicator other than 3 - rel order parts?

    You can define a generic control cycle for manual staging parts and it will be valid for parts w/o control cycle. Please read SAP online help:
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/c6/f841494afa11d182b90000e829fbfe/frameset.htm
    For manual staging, you can define one control cycle per production supply area for all materials. This control cycle is then valid for all the materials in the production supply area, for which you have not defined an individual control cycle.
    If you want other mass cration / change tool, you have to develop it on your own.
    Edited by: Csaba Szommer on Dec 13, 2011 9:59 PM

  • Handling Unit Management and supply areas with WM/control cycles

    Dear all,
    has anyone come across the issue how to handle a replenishment process for production with supply area within WM and Handling Unit Management?
    Normally a supply area is being staged via control cycles. in the supply area, all storage units get lost (standard functionality as far as I know). When we post the GI, the components will be taken out of the supply area, backflushing is not allowed as far as I know.
    Now: what happens if HUM is switched on? Do we have to enter a HU for these GI's as well? Or does the supply area  keep the information of the SU/HU? I want to avoid that the users have to tell the system the HU no. for every screw they take/consume...
    Thanks & regards
    Christian

    Hi,
    (as already described,)
    it is possible to use handling unit management together with lean        
    warehouse management. You activate handling unit management independent  
    from storage unit management (that is only possible in case of full-WM   
    as far as I know).                                                       
    Only in case if storage location is full-WM- AND HU-managed the storage  
    unit management is always active and HU numbers are taken over as SU     
    numbers. In all other cases HUM and SUM are independent from each other  
    and number ranges must be set a way that they are not overlapping.                                                                               
    Regards,
    Ely

  • Manual Staging, TR creation WM/PP integration

    Hi
    We defined Material Staging Indicator as 4 in Control Cycle
    How do we trigger TR for this materials manually???
    When i go to Change production Order and WM pick list Requested quantiry/confirmed Quantory is Blank only requirement qty column has values
    How i can enter quantities manually and trigger TR
    Please help

    When i click log it isay 'Manual staging not picked directly for order'
    How do i stage/How do i give require qty and trigger TR creation
    Please help

  • Control cycle for production staging SAP WM

    We currently have control cycle for kanban purchase orders. Do I need to create new control cycle production staging. Actually I will be using fixed bin for production consumption. Kindly confirm whether existing control cycle of purchase order can be used.

    Material Staging Indicator for Production Supply
    The material staging indicator defines the method of how needed materials can be supplied for production with the assistance of the Warehouse Management system.
    As with the location coordinates (warehouse number, storage type, and storage bin), the system files this indicator in the control cycle.
    The following staging types are supported:
    "1": Pick parts
    These materials are picked according to the required quantity specified in the production order.
    "2": Crate or kanban parts
    These materials are always removed from the warehouse in full cases. These can be ordered, for example, as soon as a case of needed parts is emptied in production.
    "3": Release order parts
    Release order parts are scheduled individually and the quantities are supplied manually to replenishment storage bins based on the requirements of production orders and the stock levels in the scheduled production supply areas.
    "4": Manual staging
    Materials are staged manually. For example, you can transport individual components using manually created transfer orders, or you can use the bypass method to transport them directly from the goods receipt zone to production. In goods receipt posting, postings are made to the production storage bins from the control cycles.
    "0": Not relevant to WM-PP
    These materials are not relevant to WM staging. They cannot be requested using the WM system.

  • Issue in creation of control cycle

    Dear Gurus,
    During creation of control cycle (LPK1), the fields for source information is not appearing in my system.
    I compared control cycle in a different ECC system where source information is appearing.
    How can make the screen appear in my ECC system.
    Please find the screenshots.
    Any pointers will be highly appreciated.
    This thread is further to the threads in Production Planning and LE/WM Forum. I could not resolve the issue with the threads.
    Hope that I will get any pointer in EWM forum.
    http://scn.sap.com/thread/3609441
    http://scn.sap.com/thread/3610822
    With Regards,
    Malay

    Hello Malay,
    Can first contact your ABAPer and ensure the bottom screen is not an Screen Enhancement?
    If it is a some custom development, your ABAPer can help you on the logic behind it.
    Else, Let us know.
    Regards,
    Sathish

  • Issue during creation of control cycle

    Dear Gurus,
    During creation of control cycle (LPK1), the fields for source information is not appearing in my system.
    I compared control cycle in a different ECC system where source information is appearing.
    How can make the screen appear in my ECC system.
    Please find the screenshot.
    Any pointers will be highly appreciated.
    This thread is further to the thread in Production Planning Forum
    http://scn.sap.com/thread/3609441
    With Regards,
    Malay

    Manish,
    I do not understand how this going to solve the issue because why we need both KANBAN and WM control cycles for one material withdrawal for production?
    Br
    KK

  • Creation of control cycles for lean WH

    Hi All,
    Is it possible to create control cycles (backflush) for LWH, if so how?

    HI ,
    There is one more way to create control cycle.
    1. PK05 - create supply area ( earlier explained the procedure)
    2. PKMC - enter plant - go to change mode ( click on change icon ) - in the right hand window - you can see the create / copy icon.
    3.click on create icon
    4.select option - classic Kanban or event driven kanban
    5.enter material/ plant/ supply area.
    6.enter no of kanban / qty.
    7.In replenishment strategy - select appropiate option ( in our case it is stock transfer)
    8.enter - the tab will change from replenishment strategy to stock transfer.
    9.enter storage location.
    10.enter destination- storage type- bin
    11.enter if any additional data required to enter.
    12. save- control cycle will get generated.
    thanks
    Om

  • Control Cycle information missing in COR2

    Hi experts !
    I encountered an issue in all client about reservations update with control cycle values for alternative items.
    We use alternative items in a standard manufacturing BOM. (Strategy 1; probability of usage 100 % and 0 % for the others). These alternative items are WM managed and the control cycle are properly maintained.
    When we create the process order, reservation items are created for all items (even for items with a required quantity to 0 which are the ones with probability usage 0 %) in RESB.
    When releasing the process order, when the system is reading the control cycl information, only the reservation items with a required quantity different from 0 are updated with the WM info : Staging ind. (BERKZ) , Warehouse No (LGNUM), Storage Type (LGTYP), Storage Bin (LGPLA)
    I  could not find any customizing functions to manage reservations and control cycles.
    I looked for a SAP notes but could not find ant soving our issue.
    Do you have any solution to our issue ?
    Regards and many thanks for your help...
    Philippe

    Dear,
    Please refer the OSS Note 1136321 - COMAC: Double Transfer Requirements in WM Material Staging
    Or you can raise the issue to SAP in that case.
    Regards,
    R.Brahmankar

  • Issue with control cycle

    Hello all,
    Can somebody please tell me how to find who created a particular control cycle?
    Is there a way to find the id of the person who created/modified a control cycle?
    If yes, please tell me.
    Thanks and Regards,
    Umakanth.

    Hi
    Use Transaction AUT10 with T-codes PK01/PK02.
    Give the period for which you want to find changes.
    keep the changed by field open , i.e dont put your user id there.
    and execute, you will get list of all changes done through creation or chage transaction of control cycle.
    check it out and revert back for further discussion.
    Hope it helps you.
    regards
    Ritesh

  • Control cycle

    Gurus,
    What is the purpose of control cycle.Is it mandatory,for picking material for Production order.
    <<Locked - reason: failed to search before posting question>>
    Edited by: Csaba Szommer on Feb 8, 2011 1:30 PM

    Control cycle is maintained for WM staging of components for Process or Production orders.
    By maintaining control cyccle, you assign a staging indicator for material, plant and Supply area combination which will detrmine how the  Material Staging is done for Production Supply (LPK1)

  • Stanging indicator change in control cycle after production order released

    HI
    We have MM PP interface active
    i setup staging indicator 4 for one material via control cycle
    Production order is created and released
    now we would like to change staging indicator to 1 [pick parts]
    how we reread control cycles data in production order
    Thanks

    Try: CO02 > Functions > Read PP master data

  • Control Cycles

    Is there a configuration on a material or location [Production Staging Area] , where you can use a material control cycle in a way that would give you a red ball when scanning a material to the wrong PSA in production?

    SAP docu can be found here:
    http://help.sap.com/saphelp_erp2005/helpdata/EN/c6/f841494afa11d182b90000e829fbfe/frameset.htm
    control cycles can be created with and without material (just at plant level)
    As it is a tiny little transaction, you can load it with LSMW using own recordings.

  • Kanban - Control cycle

    Hello all!
    I am trying to create a control cycle for Kanban in my test system. I have created replenishment strategy in Customizing for Kanban and this was transferred all to my test system. When I want to input the address for a vendor it says: Replenishment strategy in plant ... does not exist.
    I suppose there must be a problem with my Replenishment strategy which I have created in Customizing for Kanban. I was not sure about what I need to specify. I have specified plant, type of Procurement:it is an external Procurement, working with Scheduling agreements, Order type - LP, GR - 101, Signal lock- 0. These are all information, which I have specified I was not sure about the rest.
    Please could anyone help me ??

    Hi,
    I answered to few of the threads, hope it will help you, if required any further info please let us know.
    Re: Implementing KANBAN-WM
    Re: Creation of control cycles for lean WH
    thanks
    Om

  • Create KANBAN control cycle (PK01) via LSMW

    Hi,
    Anybody perofrmed control cycle creation via LSMW using BAPI or IDOC method? I need to know the Business object (BAPI method) or Message type for IDOC menthod in LSMW for PK01 tcode.
    Thanks.

    you should enable the F4 search help in your LSMW.
    I have it active and found Idoc PKHD5