Manul Creation of Inspection lot type 01

Hi All,
While we create manual inspection lot with std inspection type '01', is it possible to allow to enter PO number  also ?
Regds
Jomy

Dear Jomy
It is not possible in standard to put the PO number. You can make use of the short text. please look into the below link for the same subject
Link: [Re: Manual Inspection]
Regards
Gajesh

Similar Messages

  • BAPI for Creation of inspection lot

    I have two scenario:-
    1.Can any body help to find BAPI for creation of Inspection lot for the material under PO envisaged for PDI.
    2. Can any body find me a BAPI or FM which can creates inspection lot in QALS table without inspection lot origin under 01 i.e. 0101 or Z01SI01.
    My objective is to creation inspection lot without assigning Inspection type of Z01SI01 or Z01SI02 and so on in the material code under a respective Plant 1004 or 1005 0r 1006 so on.
    In my Z Development for creation of inspection lot BDC is run for QA01 as this code created inspection lot on when material code has inspection type Z01SI01 i.e. location of source inspection and vendr code particular classification under 010 vendor class inspection type Z01SI01. System search both the inspection type for both material and vendor then create inspection lot in QALS table by assiging inspection matching inspection on the lot.
    I want to get rid of assignment of inspection on the materilal. If any BAPI or FM is avalable for creation of inspection without assigning inspection type on material code. I want to create inspection lot in which Inpsection type assignment can be done based on vendor class only.
    YPB

    2. Can any body find me a BAPI or FM which can creates inspection lot in QALS table without inspection lot origin under 01 i.e. 0101 or Z01SI01.
    I am very sure that this is not possible.You can not create inspection lot without inspection lot origin or inspection type.
    Regards
    Sujit

  • Restrict creation of inspection lot for certain work centers

    Hi
    My client needs to restrict the creation of inspection lot at certain work centers although QM is active for all material processed in these work centers.
    I am using the  function module 'EXIT_SAPLQAAT_002' of QAAT0001 for this purpose. Z04 inspection type ( with Post to insp stock) is maintained for all these material.
    A different Z table is there , where material-work center combination is maintained for which no inspection lot is required.
    Logic provided so that system searches Material-Work center from production order then compares it with the Material-Work center combination with the maintained Z Table.If both found same then no inspection lot will be generated.
    But an error message (Change the inspection stock of material XXXXXX in QM only) appears for all those material while doing confirmation in CO11N . Hence system does not allow to complete confirmation for those material where QM is active.
    Please suggest if i am using the correct Exit or any further improvement is required.
    Thanks and regards
    D Mohanty

    Hi
    Actually the issue is resolved now.The problem was with coding where we were using Table-AFRU for reading prod order details.But AFRU does not consider fresh orders for which it was replaced with AFKO.
    Also the Z table must be maintained as Plant-Material-Work center combination prior to go for any order confirmation.
    Thank you all who have gone through the post , hope this will help those who have to map the same scenario at their end.
    Regards
    D Mohanty

  • Stop Automatic Creation of Inspection Lot for a condition

    Dear Gurus,
    While Creating a Delivery through a Sales Order, Config is maintained such that "Inspection Lot" will be automatically Generated.
    Now Business wants to Stop this Automatic Creation of Inspection Lot only for a Particular Delivery Type and for a particular mode of Transport.
    Do we have any User Exits / BADIs to achieve this requirement.
    Please let us know.
    Thanks in advance.
    Regards,
    Vinay Mutt

    Hi
    To meet you above mentioned requirement you have to modify the program RQAAAS10 as per your logic both to create lot for Expired Material and to consider project stock or vendor stock as In standard SAP these stock are not considered.
    regards
    Manish

  • PR Creation at Inspection lot creation

    Dear QM Experts
    can we generate Purchase requisition with the creation of Inspection lot, Automatically.
    in my case there are some inspection operation performed by external agency for which he charge some amount for services.
    for this i created a control key of external services and assign this in the inspection plan in a separate operation and enter all the required data like cost element, vendor, Purchasing oganization and material group but when i created the inspection lot , PR is not generated,
    should this requirement be cater by SAP?
    Regards

    Hi,
    Why do not you try here Source inspection.
    During crsation of purchase order lot will get generated .you can inspect material before its coming to your place..
    You have to activate 0101 inspection type active.
    Qinfo record you have activate source inspection.
    Even in procurrement key in custamizing you can have option if material get rejected.
    Once purchase order created to create lot you have run transaction QI07.where you can click on create lot.after saving this transaction you can get lot..Then you record result as per toyr requirement like from external services.
    Regards
    SANIL

  • Scenarios for "manual creation of inspection lot"

    Hi QM gurus!!
       I would just like to ask the main function of QA01 or "<b>Manual creation of inspection lot</b>"
    What are the cases/scenarios where this tcode is used? I would really appreciate if you could help me.. Thank you.
    Regards,
    Heinrick Palad

    HI,
    The table below provides a brief overview of the functions you can use to process inspection lots. Appropriate cross references are included for the more extensive tasks or for those for which additional information is available.
    Prerequisites
    The inspection lot processing functions can be linked to various authorizations that are checked by the system whenever you try to process an inspection lot. The following types authorizations are relevant to inspection lot processing:
    Material authorizations
    The material authorization for QM is stored in the material master. For more information, see  Creating and Changing QM-Specific Data for a Material.
    Inspection type authorizations
    This authorization controls which inspection type the user can access in order to create an inspection lot. The inspection type authorization is plant-specific.
    No authorization checks are executed in QM when an inspection lot is created automatically.
    Features
    Function
    Pushbutton / Menu path
    What you should know
    Accessing the initial screen for the inspection lot processing functions
    Logistics ® Quality management ® Quality inspection ® Inspection lot processing ® Inspection lot
    Creating an inspection lot manually
    See Creating an Inspection Lot Manually
    Changing an inspection lot
    Choose Change
    Enter the number of the inspection lot you want to change and then choose Enter.
    Displaying an inspection lot
    Choose Display
    Enter the number of the inspection lot you want to display and then choose Enter.
    Creating a new batch in an inspection lot
    See Batch Creation in Inspection Lots
    Cancelling an inspection lot
    Call up an inspection lot in the change mode and choose Inspection lot ® Functions ® Cancel lot.
    See Cancellation of an Inspection Lot
    Blocking/unblocking an inspection lot
    Call up an inspection lot in the change mode and choose Inspection lot ® Functions ® Block lot.
    To unblock an inspection lot, choose Inspection lot ® Functions ® Unblock lot.
    When you block an inspection lot, you cannot process the lot further. You must unblock the lot if you want to perform any additional operations.
    Transferring stock in an inspection lot
    See Stock Transfers
    Making corrections to inspection lot quantities
    See Corrections to Inspection Lot Quantities
    Creating a QM order
    Call up an inspection lot in the create or change mode and choose Goto ® Insp. lot acc. assgnmt.
    See QM Order Creation
    Resetting the sample calculation
    See Resetting the Sample Calculation
    Printing inspection instruction/sample-drawing instruction
    See Printout of Instructions
    Approving a task list
    Call up an inspection lot in the create or change mode and choose Inspection lot ® Functions ® Give approval
    If the task lists in your company must be approved before they can be used, you should make sure that only approved task lists are assigned to an inspection lot. If the system selects a task list that has not yet been approved, you can use this function to approve the task list (provided you have the necessary material authorization).
    this link help u.
    http://help.sap.com/saphelp_erp2004/helpdata/EN/be/00bbe7ca5311d2961800a0c930e04c/frameset.htm
    reward is usefull.
    tahnks.

  • Automatic creation of inspection Lot upon GR

    Hello all,
    i have a problem with QM module. I want that when QI is active in material master the system automaticcaly create an inspection lot. At the moment when i post the GR the system doesn't create it.
    The GR is posted in a storage location manage by WM, so i have customize also the interface WM-WM.
    Can you help me, please?
    Thanks
    Matteo

    Hi Matteo,
    The settings required for automatic creation of inspection lot are as follows:
    1. Tick the procurement active tick on the material master and assign a QM control key.
    2. Assign inspection type 01 and set this to active.
    3. Create the q-info record for the material, plant and vendor combination.
    4. Set the inspection control to inspection active in the q-info record (no need for the status profile unless you controlling which inspection type to create depending on the specific status).
    5. Also ensure for the PO you receiving that the stock type is set to quality inspection and the QM control key is specified.
    This should create the inspection lot automatically without the need of a status profile.
    Regards,
    Roderick

  • Creation of Inspection Lot in QM Module without inspection lot origin

    I want a solution regarding creation of inspection lot without assigning inspection lot origin to material code.
    We have developed function which creates inspection lot for the material against which PDI is envisaged on the material of a particular Purchase order. In my view we do not require assigning inspection lot origin on the material code as process has been mapped through Qinfo record. By assigning the inspection lot origin on the material is unnecessary step in our process.
    Can any body suggest solution regarding above problem.
    Yatindra Bahuguna

    Dear,
    We have developed function which creates inspection lot for the material against which PDI is envisaged on the material of a particular Purchase order.
    Little bit stuck up.... can you explain the above in detail...
    As I understood you developed a function -
                         - Which creates material inspection lot
                                             - Which Pre Delivery Inspection applicable on particular purchase order.
    YES?
    Regards,
    Syed Hussain.

  • Can this inspection lot type 06 be changed

    Hi! all
    could you please suggest me on this
    this is related to QM
    When using the standard SAP customer returns process an inspection lot is automatically created. Can this inspection lot type 06 be changed to allow stock to transferred to u201CUnrestrictedu201D or u201CBlockedu201D stock in a similar way as inspection lot type 01.
    regards
    Vikas

    Hi,
    Go to MM02, QM view, here deactivate inspection Type "06" and activate Inspection Type "05" i.e. Inspection for other goods receipt
    And then go to Schedule line category of Return sales (For e.g. DN ) in VOV6 and assign the movement type as 655 instead of 653 and then run the complete new cycle and check.

  • Creation of inspection lots for vendors

    Hello friends,
    How can we create inspection lots for all vendors at a time? I want to record results for my vendors(near about 2000 no.) by inspecting their raw matwrials in a lab.

    Hi Kiran,
    Why you are going for manual lot creation if the scenario is like above?
    1.     Assign inspection type 01 to material master
    2.     Prepare an inspection plan through QP01 with usage 5
    3.     Inspection lots will get generated with lot origin 01 whenever you do good receipt through
    migo with 101 movement type
    Conclusion: Inspection lots will get generated automatically whenever you do good receipt with vendor material combination.
    Best Regards,
    Anand Rao

  • Creation of inspection lot 04 depending on production version

    Hi Experts,
    could you tell me if it is possible to create a Good Receipt inspection (lot origin 04) depending on the production version used ?
    My material has 2 production versions:
    0001 - production with process order
    0002 - production with repetitve manufacturing
    When I do a GR on process order, I do not want to create an inspection lot 04.
    When I do a GR on product cost collector, I want to create an inspection lot 04.
    As I have entered inspection types in material master data, I do not know how to do the distinction ?
    Thanks in advance for your help
    Best regards
    Amaury

    Hi
    Check user exit
    QBCK0003 |Extended QM check for goods receipt
    Regards
    Sujit

  • Certificate creation for inspection lot

    Dear all,
       Is it possible to create test certificate for inspection lot of type 04. what is procedure to create this test certificate.
    Thanx & regards,
    Harish Parab.

    Hi Harish,
    You can generate an inspection certificate for the inspection lot generated for 04 insp type.
    U need to use QC21 Certficate for inspection lot transaction ( U can search the lot for ur production order)
    Basic steps to be done
    1. Create certificate profile
    2. Assign profile with out any recipient.
    3. Generate certificate
    Regards
    Venugopal

  • Automatic creation of inspection lot for Expired Batches

    Hi All,
    I am in one trouble and need some help in above scenario.
    I am able to create inspection lot for batches about to expire, but how to create inspection lots for batches which were already expired or which next inspection date already missed?
    Master data like '09' inspection type, inspection plan is already maintained.
    Second question, is QA07 also affect on special stocks like vendor stock or project stock etc?
    Immediate response will be appreciated.
    Thanks

    Hi
    To meet you above mentioned requirement you have to modify the program RQAAAS10 as per your logic both to create lot for Expired Material and to consider project stock or vendor stock as In standard SAP these stock are not considered.
    regards
    Manish

  • Avoiding creation of inspection lot for certain vendors.

    Hi,
    There is one requirement from my client side , that Inspection lot should not be created for certain vendors ( Issuing plant also consider as vendor here).
    The correct requirement is if it is transfered from other plants it should not create the lot and on the other vendors it should create.
    We have a have a option through maintaining the QM info record but it was not maintained earlier and newly creation is too difficult.
    I remember there is some exit is available to overcome this. Any one having the earlier experince on this...Provide the exit and FM name... High priority one.
    Regards
    Pragash

    Dear Pragash
    1) You can maintain Quality info Record in enmass using QI06. Only maintain for the vendor you need to skip.
    2) This exit can help you in controling the inspection lot
    QAAT0002 Control of acceptance lots/goods receipt  
    QBCK0003 Extended QM check for goods receipt                                         
    Regards
    Gajesh

  • Regarding creation of inspection lot origin-03

    Dear all,
                  The standard  behaviour of inspection type 03 is When production order is released inspection lot is created.Client requirement is when particular operation is confirmed only inspection lot to be generated.Is it possible?
    For example in routing there are 7 operations and in the sixth operation is Quality audit opeation
    inspection  lot is created when production order is released,  lot is generated but the requirement is when fifth operation is confirmed only lot to be generated.
    with regards
    kumar

    Hi Senthil Kumar,
    AS per best of my information concern your issue can't get resolved with inspection type 03. But yest at time of confirming the Fifth operation you can get the 04 inspection lot triggered by calling the auto GR at this operation confirm by setting the control key at these operation. and these 04 lot can be triggered more than one time for an order.
    Regards,
    Shyamal

Maybe you are looking for

  • When I right click "save image as" on a JPG file, I get no response at all. How can I fix this?

    I am running Firefox 34.0 on Linux (Fedora 20, KDE desktop). I checked the Mozilla download site and it says I have the latest version. When I right click on a JPEG file to save it, I get the "save image as" option, but when I select it, nothing happ

  • Change of Domain name and IP address - Urgent requirement

    Hi, The Oracle internet directory is installed as a separate component and we have a requirement for changing the ipaddress and domain name . Could any one please tell me what steps need to be done or any related documents for changing the domain nam

  • Compile and Install JK2 connector Solaris 9

    Hi I 'm trying to create a cluster server using Apache and two Tomcat's instance. My problem is when I have to use the JK2 connector (reference http://tomcat.apache.org/tomcat-4.1-doc/config/jk.html) because I need to compile some files, but I new in

  • Is there any FM to to pick Perner from Position.

    Hi I am new bee in HR. I have a position number using which i need to pick the perner of that position. Please let me know if there is any standard function module to do so. Thanks,

  • CIDX scenario

    What is requirement for CIDX Adapter and send me step by step process for one scenario thanks