Mapping asset's metadatas with production's metadatas

Hi everybody,
Let's say I have a production with a metadata called "Season" which has a value of "2".
I want to upload a new asset from the output of my Telestream engine encoder to this production. I use a metadata set for the uploaded asset which includes a field called "Season". I'd like to map this field to the same field in the production in order to automatically get the value "2" in my asset field.
Is that possible?
Thank you

I struggled with this myself for a few months now, and basically got the answer from the best possible sources ( oh, yes, straight from the bunker ). The answer is no. It is impossible to pass metadata from productions into assets.

Similar Messages

  • UNSPSC mapping with Product categories

    HI Experts,
    Can any one let me  know why we use UNSPSC mapping in SRM.Once we map it do we need to do any setting in SRM.How it works.
    KNowledge points will be appreciated
    regards
    subbu

    Hi Subbu,
    You can map UNSPSC category to your product category using bbp_catalog_transfer BADI
    Please check these links
    UNSPSC codes in SRM?
    UNSPSC code map with category ID
    Regards
    Azad

  • Discontinuation functionality with production orders

    Dear Guru's,
    Can anyone please confirm: is the functionality for discontinuation of a material (including follow-up material) not available with production orders?
    Example: in our system we have component A that is followed up by component B. This is set in material master - MRP 4.
    We also have production orders for the upcoming 4 months in our system. If the stock of component A is depleted within these 4 months, we would expect to see requirements (orderreservations?)  on component B, but this is not the case.
    Thanks for any comments,
    Rgds, AJ

    Hi
    Discontinuation works for Production orders.Couple of Checks needed for both Follow up and Discontinued Materials to arrive to actual problem
    1) Base unit of measure must be same
    2) Should have same MRP type
    3) Not defined as Co-Products
    For detailed info pl refer the link
    [Discontinuation|http://help.sap.com/saphelp_47x200/helpdata/en/b1/c044d1439a11d189410000e829fbbd/content.htm]
    Regards
    Brahmaji

  • How Can I Make A Large Photo with Product Detail for My Thumbnails in Dreamweaver

    Hello All:
    New to Dreamweaver, so my code knowledge does not exist yet. Have Mercy!!!!
    Anyway , I am making a typical product page.
    I prefer that when people click the thumbnail product photo to not have to click into another brower.
    Nowadays you are able to click in what is commonly called a "Quick View" that pops up and gives you a full sized
    image along with product detail, and pricing.  That's all I want.
    How can I link this [the larger photo and product detai] to my thumbnails in Dreamweaver???? 
    I want the look that is on every website like Target, Macy, etc.
    Someone, please help me to  !!!!!!!
    These lil' faces are really cute.  They are helping me to smile after hours and days, weeks of frustration.   TWIN MADDOG!!!

    Hi,
    don't understand your problem, ore hope to understand it right. You could put the images on a DW file and link to another file with the larger image and where you have written all your informations.
    I made this here only for a new, larger image (without additional informations):
    <!DOCTYPE html PUBLIC "-//W3C//DTD XHTML 1.0 Transitional//EN" "http://www.w3.org/TR/xhtml1/DTD/xhtml1-transitional.dtd">
    <html xmlns="http://www.w3.org/1999/xhtml">
    <head>
    <meta http-equiv="Content-Type" content="text/html; charset=utf-8" />
    <title>Unbenanntes Dokument</title>
    </head>
    <body>
    <p><a href="pflanze1_l.jpg" target="_parent"><img src="pflanze1_s.jpg" alt="Thumbnail01" width="100" height="75" border="0" /></a></p>
    <p><a href="pflanze1_l.jpg" target="_parent">or this you use an Hyperlink to the larger image</a></p>
    </body>
    </html>
    s=small; l=large
    Hans-G.

  • How can I map the composite_dn name with a composite in run time

    Hi All,
    I want to craete a report on number of total business and system faults with the help of Information Publisher in OEM 12c Cloud Control. I am fetching data from the table composite_instance_fault present in SOAINFRA schema. Below os my SQL statement:-
    select error_category,count(error_category) from prefix_SOAINFRA.composite_instance_fault where composite_dn=??EMIP_BIND_TARGET_GUID?? group by error_category
    Now I want to know that how can I map the composite_dn name with a composite in run time. When we fetch data from the repository we used to map target in rumtime by using ??EMIP_BIND_TARGET_GUID?? but here as I am not fetching data from repository, how can I map target in run time.
    On executing the above SQL statement its returing an empty table without any data.
    Please guide!!
    Thanks in Advance!!

    Hi,
    try something like this.
    Mike
    Attachments:
    Unbenannt 5_LV80.vi ‏12 KB

  • Calling a stored procedure from a URL with production XE?

    I have granted execute on a stored procedure to the user ANONYMOUS in order to allow it to be called from a URL. But I am getting a Forbidden error, rather than the expected execution of the procedure. Is there a trick to get this working in production XE?

    I think I figured this out. I don't think the grant to ANONYMOUS is going to work with production XE and the online documentation is in need of an update. It appears that production XE has been locked down and you will need to specify the name of each stored procedure you wish to allow to be executed by adding it to the WWV_FLOW_EPG_INCLUDE_MOD_LOCAL function. This is spelled out in more technical detail here: http://download.oracle.com/docs/cd/B25329_01/doc/appdev.102/b25309/adm_wrkspc.htm#BEJCGJFJ
    Another alternative that would work involves creating a separate DAD. Using the DAD approach with my schema made all of my stored procedures callable from a web browser, so I rejected this approach. To make this usable (secure) I would have needed to create and maintain a separate database user for the DAD and then only granted it execute for the stored procedures I wanted to be callable from a URL.
    Finally I read about using an on-demand procedure and having it invoke the desired stored procedure. While I didn't try this out, it sounds like another good approach because it maintains session security. If it can be used to return an image I do not know.
    - Jim

  • M175nw during s/w reinstall - unable to communicate with product

    Windows 7 64-bit / LaserJet 100 MFP M175nw / firmware 20120806 / all device resets done / software uninstalled after broadband hub replaced / re-install undertaken with McAfee firewall OFF / install undertaken with D-Link hub firewall also OFF
    Software starts reinstall, proceeds and then asks for USB to be temporarily connected - after doing so it automatically proceeds (thus indicating that it's communicating OK with M175nw) - says "Product has been detected" - WIndows 7 reports "device installed" - then install stops at 15% completion and says "Unable to communicate with product".
    Can find no way past this.
    Was working beautifully but could not avoid hub upgrade which had to disrupt setup hence re-install.
    HELP!

    Hi @MonicaABC ,
    I see that you are having issues the same issue with the printer installation, but you are on Windows 8.
    I would like to help you out today.
    Some of the steps are the same, I will provide more information for the Windows 8 steps.
    I have also provided steps for configuring the wireless through the ethernet connection.
    On the printer's control panel, touch the setup button, network setup menu, wireless direct, turn it on.
    Here is a document to access the Wireless on Windows 8. How to Connect to Wireless Networks in Windows 8 and Windows 8.1.
    Select the printer's network name.
    Open Internet Explorer and type in the IP address (192.168.223.1) for the printer in the address bar.
    This will load the Embedded Web Server for the printer.
    Select the networking tab, wireless on the left hand side.
    Fill out all your network information, select infrastructure, select your network name, put in password and type of encryption.
    Apply settings.
    Now the printer should be configured over the wireless network.
    Then go to the wireless on the computer and select your network name.
    Run the uninstall from the CD software to remove any registry files.
    Disconnect the USB cable if it is connected.
    Perform a clean boot and disable any Antivirus Software temporarily.
    Then run the latest drivers. Software & Drivers.
    Select your operating system, click next and click on the software to download and install.
    Wireless setup steps through a Ethernet connection steps:
    Connect the Ethernet cable from the printer to the router, temporarily.
    Run the install to see if the drivers will fully install by this connection.
    Follow these steps to configure the wireless now.
    Wait about a minute, print the configuration page to see if you get a IP address.
    Printing a Configuration Report.
    Then type the IP address into Internet Explorer's address bar to bring up the printer's web page. Select the networking tab, wireless on the left hand side. Fill out all your network information, select infrastructure, select your network name, put in password and type of encryption. Apply settings.
    Then disconnect the Ethernet cable.
    Wait for few minutes and you should get a wireless light on the printer, print the configuration page and check the IP address again. Then type the IP address into Internet Explorer's address bar to bring up the printer's web page. Just to make sure it is still on the network.
    Then flip the port with the new IP address.
    Go to start, devices and printers, right click the printer and left click printer properties, select the ports tab.
    Click Add Port, select Standard TCP/IP Port, then select New Port and follow the wizard.
    Type in the proper IP address for the printer.
    Make sure the printer is online.
    Test the printer.
    If you need further assistance, just let me know.
    Have a great day!
    Thank You.
    Please click “Accept as Solution ” if you feel my post solved your issue, it will help others find the solution.
    Click the “Kudos Thumbs Up" on the right to say “Thanks” for helping!
    Gemini02
    I work on behalf of HP

  • Unable to communicate with product message when installing laserjet cp1525nw printer

    I have a cp1525nw wireless printer that use to work fine wirelessly.  I changed my router password (linksys router) and now can't connect.  I have tried changing the password back to the original password and it still will not connect.  So I when back to the changed password.
    I have tried resetting the printer to the default settings, removed all HP software, deleted all temp files, rebooted machine and attempted to reinstall the printer.  The software loads fine, I've connected the USB cord and then get the dreaded "Unable to communicate with product" message.  I have previously tried to connect by WPS and that didn't work either.
    The Wireless Network Test Report shows that the Network Name Found test is Fail.  The Network Summary report shows a different Network Name under the wireless Network Configuration section than my network's SSID.
    What do I need to do?

    Hello,
    I see that you are having issues setting up the printer over the wireless network. I will certainly do my best to help you.
    The password might not be recognized by the printer, if there are spaces or special characters in it.
    Restore the printer defaults. Press the OK button, select Network Config, then select Restore Defaults.
    Print a configuration page to make sure the SSID and the IPv4 address are cleared.
    Printing a Configuration Report.
    Run the printer software again and select Add a Device to setup the wireless again.
    If you are having issues, then uninstall and reinstall the software to configure the wireless.
    Uninstalling the Printer Software.
    HP LaserJet Pro CP1525nw Color Printer Drivers.
    If you need further assistance, just let me know.
    Have a nice day!
    Thank You.
    Please click “Accept as Solution ” if you feel my post solved your issue, it will help others find the solution.
    Click the “Kudos Thumbs Up" on the right to say “Thanks” for helping!
    Gemini02
    I work on behalf of HP

  • Pricing issue with Product hierarchy - Urgent

    Hello,
    I have an issue on pricing determination with product hierarchy.
    I created product hierarchy as following,
    level1 - A0001
    level2 - A0001B0001
    level3 - A0001B0001C0001
    Then, assigned A0001B0001C0001 to material D in material master.
    I created condition record with A0001B0001C0001(level 3),  the system found the condition sucessfully when I created a sales order with material D.
    However, I created condition record with A0001(level1) but the system didn't get the price when I created the sales order with material D.  Since A0001B0001C0001 belongs to A0001, the system is supposed to get the price from the condition record with A0001... 
    Could you please let me know how to fix it?

    Hi,
    Thanks a lot for your kind explanation.
    Here is the access sequence I defined.  I wonder if there is anyway I can define PRODH1, PRODH2, PRODH3 in access sequnce the same way with customer hierarchy so that the system can check higher level data.  If it's not allowed, I think I should define routine in requirement as you advised.  Thanks!
    *Accesses
    AcNo       Description
      1           Customer Hierarchy/Product Hiearchy
      2           Customer Hierarchy/Product Hiearchy
      3           Customer Hierarchy/Product Hiearchy
      4           Customer Hierarchy/Product Hiearchy
    Fields
      AcNo   Condition    Doc. field      field lable
         1      HIENR      HIEBO01     CustomerHierarchy 01
                 PRODH     PRODH       Product hierarchy
         2.     HIENR      HIEBO02     CustomerHierarchy 02
                 PRODH     PRODH       Product hierarchy
         3      HIENR      HIEBO03     CustomerHierarchy 03
                 PRODH     PRODH       Product hierarchy
         4       HIENR      HIEBO04     CustomerHierarchy 04
                 PRODH     PRODH       Product hierarchy
    I wonder if I can assign product hierachy fields, PRODH1, PRODH2, PRODH3 to access sequence like customer hierarchy so that the system can check higher level data to get the price...

  • Make-to order with production in alternative plant

    Hi,
    We are thinking about implementing a scenario with Make-to Order production for our products, but with production in alternative plant (special procurement type 80).
    For example, sales orders will be directed to plant A, but production should take place in plant B - and using a make-to order strategy (in our case planning strategy 50 - planning without final assembly).
    Is there any problems with our approach, making it not feasible to implement? Is it even possible in SAP to combine MTO with special procurement key 80 (production in alternative plant)?
    Is there any other issues that can be foreseen with using this type of production strategy?
    Thanks in advance,
    Lars

    Hi,
    The production strategy which you are going to use is very fine.
    As per me there is one concern. Example you have created a sales order in Plnat A, in plant A that FG is handling through Special procurement 80, then in the MRP run system will be creating a planned order in Plant B without running MRP in plant B. In MD04 screen you can see planning plant as Plant A. In plant B, u r converting this planned order in to Production order and executing the production. While doing the GR against the production order, the goods receipt will happen directly in Plant A.
    This is the one problem (Accountability)  you can face.
    Regards,
    V. Suresh

  • Mapping a credit memo with an invoice

    Dear sir.
    Im creat a credit memo (Tcode F-28) it is ok, But I dont know how this credit memo matched to the invoice.
    Eg. I have created an invoice for Customer A (5000USD of goods), then I have a credit memo for this invoice. Creating a credit memo is ok. Now, I want to know how mapping the credit memo with this invoice to reduce customer's credit on this invoice.
    Help me.Thanhk you very much.
    Regards,
    Hangvt

    Dear sir,
    Thank for your reply, can you show me tcode to clear the CM with invoice raised.
    Thanks,
    Hangvt

  • I have upgraded to Lion, and want to upgrade my iPhoto 8.1.2, but when I try it says it was not purchased at a MAC Apple store, which it was.  Then it asks if I want to buy 9.2.3, and I say yes. It responds with Product Distribution file can't be verified

    I have upgraded to Lion, and want to upgrade my iPhoto 8.1.2, but when I try it says it was not purchased at a MAC Apple store, which it was.  Then it asks if I want to buy 9.2.3, and I say yes. It responds with Product Distribution file can't be verified. Maybe damaged or not signed.  How do I get this fixed, so I can download the new iphoto's that are available.

    How did you move your iPhoto library to the new system?  the recommended way is Connect the two Macs together (network, firewire target mode, etc)  or use an external hard drive formed Mac OS extended (journaled) and drag the iPhoto library intact as a single entity from the old Mac to the pictures folder of the new Mac - launch iPhoto on the new mac and it will open the library and convert it as needed and you will be ready move forward.
    LN

  • Valuation with material cost estimate: error with product

    Hi Experts,
    Message no. KE350, Valuation with material cost estimate: error with product "2286940000". Please suggest me to resolve this issue.
    Points will be provided for good solution.
    Regards,
    Jay

    Hi Jaya
    This means that your customization is wrong then...
    In KE4J or KEPC you have assigned costing keys to your material types or some other combination... You should have done this config in a way that costing key is not called  for in the case of non valuated materials...
    In Ke40 you have defined costing key where in you have specified "Issue error msg if no cost estimate found".. This costing key is assigned in KE4J or KEPC in a way that it is getting called even in case of non valuated materials...
    Do you have a separate mat type for non valuated material? If yes, remove this mat type from KE4J/KEPC..
    If you dont have separate mat type i.e. in the same mat type if you have both valuated and non valuated, then you have a problem.. You would get stuck in that case
    Regards
    Ajay M

  • Valuation with material cost estimate: error with product "117122"

    Hi people,
    We have the error:
    =====================
    Valuation with material cost estimate: error with product "117122"
    Diagnosis
    In Profitability Analysis (CO-PA), the system tried to valuate a line item using the current standard cost estimate.
    In order to determine the current plan period, the system needs to read the valuation segment of the material master.
    The system has found that the current plan period is not filled forproduct "117122" in plant "UBE1".
    We have the follow configuration in trans.: KE40:
    . Determine material cost estimate
       . Transf. Standard Cost Estimate
    . Costing Variant
    . Control Data for Standard Cost Estimate
       . Period Indicator = "Current Standard Cost Estimate acc. to entry in mat master
    . Addiitonal data CO-PC
        . Transfer cost estimate in controlling area currency  "activated"
    We think the reason about our error is because the field above is activated and some configuration more is necessary for this case. For examplo: Trans.: OKYW and this one was not configurated yet.
    Do you know what happend?
    If we need to configure some transation, or sonly process the cost estimate?
    Thanks,
    Rosana.

    Hello Guido
    Thank you very much for your return.
    It is happenning in a Client that some people are doing the configuration.
    Before we didin't have in KE40, the fiel "Transfer cost estimate in controlling area currency" activated.
    And now, the people activate that in this new Client and I don't know the impact about that.
    I think we have to make the configuration in OKYW.
    The other transation you told me, we don't have any information.
    Could you tell me some other idea what happend?
    Message error is just "Message no. KE350"
    Abou claculate the cost:
    It was calculated by trans.: CK11N for future planning and the real wasn't not possible to release because this material already have moviments.
    Could you tell us is there is some thing more to do?
    Thanks,
    Rosana.

  • Valuation with material cost estimate: error with product " 200038 "

    Hi,
    I am getting an error:
    Valuation with material cost estimate: error with product " 200038 "  (Message KE350).
    Kindly assist on the same?

    If this material is mto material go to t.code KE40 and maintain define access to standard cost estimate define cost key with
    "Transfer sales orde cost estimatex".
    If it is mts material define costing key with Transfer std cost estimate  and in costing data
    costing variant : ppc1
    costing verstion: 1
    period  indicator:  Release std cost estimate matching with goods issue or material costing matching posting date.
    This will resolve ur problem.

Maybe you are looking for