I have been trying to do Mass assignment of Material in routing through LSMW but it seems not working. I've done recording but when I'm trying to execute the batch input, only one material become assign to routing.
Can someone share his thoughts on how to do this?
Regards,
Ahmed Rouby

Hi Ramagiri.
Its Working but when go for second line its overwrite on the first line so only one material become assign to routing.
Regards,
Ahmed

Similar Messages

  • Mass assignment of materials to Inspection Plan

    All,
    Is there any standard transaction or BAPI/BADI to assign multiple materials viz 1000 plus to an Inspection plan.
    Thanks
    Anup

    You have two option to upload mass materials to inspection plan.
    Option1: Go to QP02 --> Material assignment screen. Here you can assign 14 materials at a time and do page down to assign next 14 materials. This is time consuming activity.
    Option2: With help of techinical person develop LSMW/ BADI which call QP02 to update material assignment in inspection plan.
    Please find few relavent descussion below, I hope it will help you take decisioon.
    [mass assigning of inspection plans]
    [Mass Assign Material to Inspection Plan]
    [Re: Mass material assignment  in Inspection Plan.]

  • Batch-Classification - Mass Assignment

    Hallo all,
    I created a new Class for Batch-Classification.
    Now a would assign this new Class to existing Batches in the System.
    Unfortunately I didn't found any "MASS" transaction for this change.
    Transaction   MSC2N  has only separatelly usage for it.
    Transaction   CLN24N can I use only for the material assignment (material master data - classification for batches). 
    The direct assignment (Material + Batch) I didn't find there.
    I'm still looking for something easier then LSMW is.
    My question: is any possibility for MASS assignment for existing batches in the system (except LSMW)?
    I'm looking forward of your answers
    Katie

    Hi,
    Thank you for your answer.
    Transaction MSC5N could be O.K. for a users, I think, that better is BMBC, because there is the function MSC5N integrated.
    But I need only assignment for classification fields (without value) to a batch for 100.000 items
    For this action are MSC5N and BMBC useless, because I can assign the fields only manually for every item there.
    Regards
    Katie

  • Assign Material Number to plant

    Hi all
    I already have plant 9903.But how to assign material to this p[articular plant.I tried by using the transaction MM01,MM032,MM03.But i couldnt.I am using the 6.0 version.Please help.
    With Regards
    Vijay

    Hi Vijay,
    Do the following step. Go to MM01-> Enter the material-> Select the views-> Enter the Plant for say 9902, Sales Org 0099 and Distribution channel 01. Under sales data view you can find the Delivery plant 9902 and save the material.
    If you are changing the existing material then you can use MM02 and follow the same steps and change the delivery plant accordingly. You can also use Transaction code MASS if you want to change many number of materials.
    Thanks & Regards,
    Nagaraj Kalbavi

  • Urgent Error in Displaying Hierarchy in Bex- like not assigned Material

    Hi Gurus,
    plz  solve my problem like displaying Hierarchy in Bex ,
    I loaded hierarchy from R/3 system into Bw 0Mterial.
    In Bex 0material Properties I Selected heirachy on Material , this heirarchy having 8 levels,
    but in the out put it showing only one level displayng
    like Not Assigned Material.
    i did all the bex setting well, but i dnot know why i am getting this ...
    plz any one help..
    Thanks in advance
    Anil

    hi,
    Is your heirarchy uploaded properly for 0Material ?? If yes juct check out if your transcational data is in sync with the hierarchy master ? If it is not then it wuill display as Not Assigned..
    Regards,

  • Mass Changes to Rate Routing

    Dear All,
    We were trying to carry out mass changes to Rate Routing,
    by using CA85N we were able to make changes to Normal routing but not rate routing, in CA85N we were able to select only three types of task lists ie N, S & Q. Also checked in CWEB here also only the three types of task lists were provided for selection. Is there any other way for carrying out mass changes to rate rouitng, or settings in the above transactions.
    Regards
    Mithun

    Dear Mithun,
    In my understanding only CEWB can help you to some extent,otherwise you may have to develop some
    BDC's or LSMW's.
    Regards
    Mangalraj.S

  • How to use T-Code QP01/QP02  FM CZ_CL_S_MTK_CREATE to assign material?

    I guess the function can hep me to assign material to the insepection plan?
    Any body can give me a sample code ?
    When i use this FM CZ_CL_S_MTK_CREATE as follow:
    It respond an error message 'Header invalid'.
    Any thing wrong?
    How Can i solve it?
    Or can you give another BAPI OR FM to assign material?
    TKS  a million~~~
    REPORT  zlorry.
    DATA mtk LIKE mtk_class_data OCCURS 0 WITH HEADER LINE.
    mtk-mandt = sy-mandt.
    mtk-matnr = 'PSAA05E-050(H6)-R'.
    mtk-werks = 'ZZ01'.
    mtk-plnty = 'FERT01'.
    mtk-plnnr = '01'.
    mtk-plnal = '00000006'.
    mtk-zkriz = '00000006'.
    mtk-datuv = '20091003'.
    CALL FUNCTION 'CZ_CL_S_MTK_CREATE'
      EXPORTING
      I_ECN_S                         = ' '
        i_key_date_s                    = '20091002'
       i_flg_mtk_check                 = 'X'
        i_mtk_class_data                = mtk
      i_flg_collect_all_msg           = 'X'
    IMPORTING
      E_TSK_LOCK                      =
      E_ZKRIZ                         =
      E_ECM_DATA_ERROR_TYPE           =
    EXCEPTIONS
      ALLOCATION_NOT_CONSISTENT       = 1
      NO_AUTHORITY                    = 2
      NO_AUTHORITY_FOR_MATERIAL       = 3
      TASK_NOT_LOCKED                 = 4
      NO_VALID_MATERIAL               = 5
      NO_VALID_SALES_DOCUMENT         = 6
      COUNTER_OVERFLOW                = 7
      IDENT_ALREADY_EXISTS            = 8
      NO_VALID_TASK                   = 9
      PATH_INCOMPLETE                 = 10
      ECM_DATA_NOT_SUITABLE           = 11
      OTHERS                          = 12
    IF sy-subrc <> 0.
      MESSAGE ID sy-msgid TYPE 'I' NUMBER sy-msgno
              WITH sy-msgv1 sy-msgv2 sy-msgv3 sy-msgv4.
    ENDIF.

    Hello
    Are you looking for material assignment with the existing Inspection plan or afresh. If it is a new inspection plan kindly use this BAPI BAPI_INSPECTIONPLAN_CREATE
    Regards
    Gajesh

  • How to assign  PRT in routing

    hi,
       please tell me how to assign  PRT in routing.
            Thanks
             Parag

    hi friend,
      for assigning the PRTs in routing go through following ways:-
    1. go in TC  CF01
    2. enter PRT (spanner.hammer,document,etc (only one)
    3.enter
    4.save the settings
    5.go in routing CA01.
    6. click on PRT ( first select the operation to which the PRT is to be assign)
    7. click on OTHER
    8. fill the requirements
    9.enter and save.
    hope this solution will solved your problem,
    thanks and regards,
    sachin.

  • Mass Delete - BOM and Routing

    Hi,
    My client want to delete around 400 BOMs and Routing, there is mass delete Bom and routing?
    Can anyone tell me the deatiled steps on how to delete Bom and routing?
    Regards,
    Sankaran

    Hi,
    The below link may be helpful..
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/8d/3e4b8a462a11d189000000e8323d3a/content.htm
    Regards,
    Siva

  • CN01 assign Material Component to internal activity

    Hello gurus;
    In transaction CN01 / CN02 can I assign only one Material Component to internal activity without Bill of Material (BOM)?
    It is possible? How can i do?
    Best regards,
    Mariano

    Virendra;
    Thanks for your response.
    I saw the SAP Help portal in [http://help.sap.com/saphelp_46c/helpdata/es/4c/227a7746e611d189470000e829fbbd/frameset.htm]
    and I must use a Bill of Material to assign material component. There is no other choice
    This is the point where I disagree with SAP, cause the client says that they use Operational Networks, cause it's more simple to assign components to activities.
    Best regards.
    Mariano

  • Auto GR of Serial number assign material

    Dear All,
    I have assign serial number to the inhouse produce material. And as per client requirement of automatic GR for same material, am doing auto goods movement at the time of confirmation.
    So for serial number assignment material system giving error for serial number obligatory material this movement is not possible.
    Is there any other method for serial number assign material to do auto GR. Plz revert its urgent.
    Regards,
    Rajesh

    Rajesh
       we tried to do Auto Gr with serial number for FG iIn my company but can't do. Finally we convinced our users to do manually.This is SAP standard that Auto GR is not possible for the material maintain with Serial Number
    So you must convince your clients for the same
    I hope that  will help to you
    Regards
    S.Anbalagan

  • Plant grey out when assign material to activity

    Dear All
    How can system make it gray in plant when i will assign material to activity at created stage of WBS. Is there any config to make it gray in the plant &material under activity ??? I want plant to be editable even after assign material to activty.
    Regards

    Hi Hari Krishna
    Thanx for your reply but in my project when i assign material to activity w.r.t procurment indicator (PF) as a MRP- relevant reservation  my plant was editable but when i assign material w.r.t  procurment indicator (ZPF) in advance procurment via a network my plant was not editable @ that time my PR no. also not generated. If plant was not editable after generated PR it was okay but user require that before generated PR it was editable like in MRP- relevant reservation.
    Regards

  • Assigning Material Group per User

    Hi SAP Experts! =)
    Pls Help! does anybody have an idea how can I assign a Material Group per User. This is for authorization purposes. What I just know, is to Assign just one Material Group per user through Parameter ID MKL. This will only solve my problem if a User will only have access for a Single Material Group.
    Do you know a way how to Assign access for Multiple Material Groups? I would want to use this for the PR/PO process, so a User will only purchase Materials under his/her assigned Material Groups. =)
    Mik

    HI,
    Usually we give a star symbol for the authorisation object of material groups means the user is authorised for all the material groups.
    In case if you want to give multiple material groups for the user then we have to specify the material groups instaed of the star symbol.
    You can check the users authorisaion against the user ID in tcode SUIM.(Users with complex selection)
    Thanks & Regards,
    Kiran

  • Assigning material to class via ALE

    Hi experts,
    I am looking for a way to assign the materials to the class through ALE.  What message type can I use to transfer this information.
    Thanks for your help.

    Hi Rolmega,
    Please check this link and scroll to the middle.
    There is a section to talk about assigning material to class via config and ALE.
    http://help.sap.com/saphelp_nw04/helpdata/en/7e/cb843643a311d189ee0000e81ddfac/content.htm
    Hope this will help.
    Regards,
    Ferry Lianto
    Please reward points if helpful.

  • Activity 0010 has been assigned material components - Deletion not allowed

    HI friends,
    Even after deleting the material from the activity, the system is giving the following error message
    Activity 0010 has been assigned material components - Deletion not allowed 
    The status of the activity is REL.
    One purchase order already created for this WBS element.
    The material found deleted from the activity but why it is giving the same  message.
    Activity 0010 has been assigned material components - Deletion not allowed
    Edited by: M.Alagesan on Sep 13, 2010 1:15 PM

    Is that material already consumed?
    Generally when you try to delete the operation, it also deletes the dependencies of the activity, i.e., it deletes the components associated to that activity, if it is not issued to the order.
    Check the details in your system.
    Praveen