Mass change in base unit of meausurement

Dear All,
Is it possible to make change in base unit of meausurement by using massd??
Regards,
Nitesh

Hi Nitesh,
Using massd transaction, unit of measure can be changed.
Please use the following selections,
1)  Select Object type as Product
2)  Under selection criteria, select the following attributes,
Header data  Base Unit
Header data  Product
Header data  Unit of Measure
Location-Dependent Data    Location
3) Under attributes, select
Header data  Unit of Measure
Then press the select button bottom followed by pressing change with display and then you can make changes as you wish and then save.
Regards
R. Senthil Mareeswaran.

Similar Messages

  • Changing of base unit measure

    Hi Experts,
                  I have problem regarding the changing of base unit of measure, I already closed all documents of related material, but still it can not be changed
    Error message given as
    The base unit of measure cannot be changed.
    The reasons for this are:
    Material staging requirements already exist.
    Reserv.No. Item
    No Data
                 awaiting for your valuable answer.
    Rakesh

    Dear,
    Message no M3 189?
    Activating the deletion flag or completing the production order technically is not sufficient if you want to exclude the production orders from the check since you can cancel these statuses at any time.
    The solution is to set the deletion indicator for the affected orders with the help of Transaction CO78 and to archive afterwards.
    Please refer OSS Note 95491and 138767.
    Regards,
    R.Brahmankar

  • Changes in Base Unit of Measure

    Hi,
    We got an issue,User tried to change the Base unit of Measure from NO to KG.
    1.For this material we dont have stock in unrestricted and quality,But it has reservations. 2.It has got Scheduling agreement,3.This material is used In BOM.
    So if i cancel reservations,then remove this item from scheduling agreement and delete it from BOM.Will it work further to change the Base Unit of Measure.
    Please Do help me in this matter
    Thanks and Regards

    1) You can only change the base units of measure under the following circumstances
    •No stocks are available for the material.
    •There are no existing purchase requisitions, purchase orders, or scheduling agreements for the material.
    •At present, no purchase orders or purchase order items are being created or changed.
    •Item is not linked in any BOM as chield part
    If requests for quotations, purchasing info records, or contracts are available for a material, the system emits a warning while changing base unit of measure. Still if you want to change unit of measure specify in a dialog box the factor for converting the base unit of measure into the new base unit of measure. The purchasing info records are then, if necessary, updated.
    2)  Solution
       As system is not allowing changing base unit of measure there will be either stock of this material or existing purchase document
    1) If there are stocks in the previous period, you can clear them as follows:
    a) Post the stock in the previous period to the current period (for example, using movement type 561) so that the stock for the previous period is the same as the stock for the current period.
    b) Clear the stock with the posting date in the previous period (for example, using movement type 562).
    2) If there are Open purchase requisitions, purchase orders, or scheduling agreements for the material.complete all P2P cycle for open orders (purchase requisitions, purchase orders, or scheduling agreements) and then close it.
    3)Delete item from BOM
    Then
    1.     Run Trnx MM02 (Change Material Master immediately.
    2.     Overwrite the old base unit of measure with the new one in basic data screen.
    3.     Save the change.
    3) System checks
    If a change criterion (Trnx. code MM02) is meeting all necessary prerequisites (as mentioned in point 1).System allows changing base unit of measure. Otherwise it displays warning or error. U can display the reason for this, by choosing Display Errors (ctrl+F1)

  • Changing Base Unit Of Measure in Material Master

    Dear All,
                  We need to change the base unit of measure of certain materials who have been assigned inspection plan. We have deleted the material from Inspection Plan and later even the plan. But still the system not allowing to change the BASE UNIT OF MEASURE. The error thrown by the system is : Material is assigned to inspection Plan.
    Please guide in this regard as changing the material for us will be a very cumbersome act.
    Regards

    Hi Rohan,
    Please check 'display errors' in MM02 when you are trying to change the BUoM. It will say what prevents you from doing that.
    Please check:
    http://www.sap-img.com/materials/change-base-unit-of-measure.htm
    BR
    Csaba

  • Changing Base Unit Of Measure (Material Master)

    Hi
    1. How to check this? (Any successful changes in material master only took place when there is no open document from SD, PP, MM & FI for that material. )
    2. Base unit of measurement cannot be changed.  The reason being material movement history is there in table - MSEG mainly which otherwise create inconsistency in reporting.  -
    Is this line applicable for current period or previous period in current year or previous period previous year???
    3. There are no existing purchase requisitions, purchase orders, or scheduling agreements for the material. -
    is this means open / pending purchase orders  or the the PO's created in system with respect to material where the GR and IR is already done
    4. You can change the base unit of measure if there is no stock of the material during current and previous period----
    is this means the term " previous preiod" is previous period in the current finacial year   or its applicable for the previous preiod in previous financial year
    5. Post the stock in the previous period to the current period  - -
    how can we do this???
    Vijay

    See this OSS note : especially the last sentence:
    From OSS note 138767
    Within the material master record maintenance, you want to change the base unit of measure (base unit). During the change, the system performs extensive checks in order to avoid inconsistencies in the applications which use the material master.
    In particular, the following checks are performed:
    The base unit must not be defined as an alternative unit of measure for the material
    No International Article Number must be assigned to the base unit
    No proportion/product units must be defined for the material
    No configurable material must be assigned
    The material must not be used as a configurable material
    Stock must neither exist for the previous period nor for the current period
    No physical inventory must be active
    No reservations or dependent requirements must exist for which the deletion indicator is not set
    No planned orders must exist
    No purchase requisitions, purchase orders or scheduling agreements must exist for which the deletion indicator is not set
    No WM transfer requirements, no WM quants or no WM posting change notices must exist
    The material must not be a bill of material
    The material must not be contained in a bill of material
    The material must not be used as a production resource/tool
    The material must not be used in task lists
    No standard cost estimate must exist for the current or future period
    No production orders must exist
    No planned independent requirements must exist
    No run schedule headers must exist
    If the base unit has dimensions, no serial number profile must be assigned
    No sales and distribution documents must exist which have status Not processed or Partially processed.
    Solution
    If necessary, all reasons mentioned above must be eliminated by archiving the objects listed
    1) SAP checks this for you. A new button will appear in MM02 and after you click this button to check the error log, you will see which documents exist.
    2) I have not seen that an existing movement will restrict the change of a BUoM.
    3) No purchase requisitions, purchase orders or scheduling agreements must exist for which the deletion indicator is not set
           it is not caring about GR done or IR done. it telling you that the deletion indicator has to be active. As a deletion indicator can be reset easily, you probably have to archive the documents
    4) the previous period is the period before the current period.
       today we have February, hence the previous period is January.
    5) first make sure your current stock is higher than the stock of the previous period. if it is lower, then you have to create inventory in current period first e.g. with 202 movement with current date.
    Then you issue the previous period stock with 201 movement and previous period date (make sure periods are open in OB52 and MMRV allows posting to previous period).
    Finally you issue the left stock in the current period with 201 and current date.
    Now previous period and current period stock is zero. After the change of the base unit you have to get the stock back into the system
    Edited by: Jürgen L. on Feb 2, 2010 3:58 PM

  • Change base unit of measure

    Hi,
    Its me again. I need to change the base unit of measure of a material but a task listw as created via QP01. I tried to delete this via QP02 but i still cannot change the base unit of measure. Is there any way except for deleting the task list via CA98?
    Thanks.
    Elen

    Ellen,
    Unfortunately the answer to your question is no..You have to use a transaction like CA98 or QSR6 to delete the Inspection plan from Database. Please take necessary authorisation and delete this plan.
    Alternately set this material to with deletion flag and client & plant level status, so that you cannnot use this material any longer. Now create a new material with correct Base unit of measure and use this material.
    Regards,
    Prasobh

  • Error message during Base unit change in material master

    Hi
    I am getting error message " Independent requirements are already assigned to the
    material" when doing change in base unit in material master.
    But I do not find any independent requiement for the plant in t code MD04.
    Can anybody help me to get a solution for this?
    Thanks in advance
    Pradipta Sahoo

    Hi
    Thaks for your reply.
    I checked in MD63 and don't find any entry. That makes me suprprise why the error shows as an independent requirement entry exists.
    Please reply if you can further help me in this matter to solve this.
    Kind regards
    Pradipta Sahoo

  • Credit note based on AR invoice but base unit changed to Yes

    Is there anyway to improve the current design which allow the users to change the base unit column to Yes if the credit note is copied from AR invoice?

    What is your reason to change unit?  It may not be logical to change it even if you wrongly created your invoice.  When you create Credit Memo, it has to be consistent with AR invoice even if it is wrong!
    Thansk,
    Gordon

  • Can we change Base unit of Measure ?

    Hello,
    I got a requirement to change the name TO(tonne) base unit of measure in MM01 into MT. Is it possible to achieve this if ys share me the procedure.
    In short when i click F4 help in base unit of measure in the place of TO i want to change it into MT.
    Thks

    If u want to  change the base unit of measure... firstly do the conversion method... MM02 (If the material is a finished or semi finished) -> Work Scheduling View -> Put the UNIT OF ISSUE (MT) and then give the conversion factor unit measure.... and save...
    if u want to change the base unit of measure... Change the MRP PRofile and then change the Base Unit of Measure...
    It is better to consult PP and MM Consultant....
    I think you got the solution... Give me the point....
    With Regards,
    Debopriyo

  • Change Base Unit Mesure

    Hi Experts,
    Is there any form or report or ABAP program to make a massive change of base unit mesure of a material that has stock, POs, Process Orders, etc.? This is because this material has a lot of operations and is impossible to eliminate all documents.
    Thanks in advanced.

    Hi,
    As per OSS note 138767 there's no easy solution, you have to eliminate all problems that prevent your from the change (you have to ekiminate stock, archive...).
    In case of batch management indicator change there's a special SAP solution (OSS note 533276) that changes the indicator w/o eliminating anything in the system. But this solution is not FOC (you have to pay to SAP AG)...
    But I'm afraid that in case of BUoM change there's no such OSS note... (You can contact and ask SAP to confirm this).
    Regards,
    Csaba

  • Mass change UOM

    Hi,
    I tried to change alternative UOM in MM17 but instead of change - the new alternative UOM was created. Both units have the same ISO code set and the one that was added is flagged as a primary unit for that ISO code. Is it a standard behavior?

    Hi Joven,
    I have maintain the alternate UOM for those materials in Master Data.
    What I want to do is during the inventory count entering in transaction MI04, I want to do a mass change for the unit of enter (UOM) for one whole inventory document (change from base unit to alternate unit).
    For example, in MI04, count sheet 10000001 has 40 materials, the unit of entry is default to M (the base unit of the materials). If lets say during the inventory, we weight the materials in KG, so we have to enter the count qty in KG as well. I want to do a mass change to change the unit of entry from M to KG for one whole count sheet 10000001 (all 40 materials).
    Currently, I have to manually change the unit of entry from M to KG line item by line item, if there is 40 materials (40 line items), then I have to change 40 times for 1 count sheet.
    Is there a way to do a mass change during the count entering (change 1 time for all the 40 materials, instead of change 40 times)?
    Kindly please advise. Thank you.

  • Cannot switch base units on Goods Receipt PO copied from Purchase Order

    Hi,
    I am wondering if there is a simple trick or setting for this or if we have to use a UDF/FMS...
    When using Uom for sales and purchasing, you cannot switch between Yes and No for base units on the target document(GRPO) when copying a PO to GRPO.
    For example, enter a purchase order selecting 'No' for base units and enter quantity 1 for item with Uom case(25 pcs in a case). 25 are ordered. If the warehouse receives 23 instead of a full case from the supplier,  they want to be able to enter 23 on the GRPO(copied from PO). They don't want the warehouse staff calculating what percentage to put in for quantity (23/25 = 0.92),  they would just like them to use the drop down box and change the base units to Yes and receive the quantity 23 units.
    Any suggestions?

    Hi,
    How often this would happen?  If it is very frequent, my suggestion would be considering it when you create PO.  You know, if you could change that option, the link between PO and GRPO will be broken.  It is not recommended.
    Thanks,
    Gordon

  • Conversion of Order Unit to Base Unit

    Hi Friends,
    How to set the conversion of Order Unit to Base unit.
    The scenario is like this.  Purchase order is made in Rolls but the stocking will be in meter.   I my case, when the GR is made in meter, the rolls should be multiplied by 65.  Instead the system is dividing the rolls by 65 meters which is wrong.
    I want to correct same, but dont know where to do.
    Kindly guide me to correct this.
    TIA.
    Regards,
    Mark K

    Hi Mark,
    You can only change the base units of measure under the following circumstances
    • No stocks are available for the material.
    • There are no existing purchase requisitions, purchase orders, or scheduling agreements for the material.
    • At present, no purchase orders or purchase order items are being created or changed.
    If requests for quotations, purchasing info records, or contracts are available for a material, the system emits a warning while changing base unit of measure. Still if you want to change unit of measure specify in a dialog box the factor for converting the base unit of measure into the new base unit of measure. The purchasing info records are then, if necessary, updated.
    As system is not allowing changing base unit of measure there will be either stock of this material or existing purchase document
    1) If there are stocks in the previous period, you can clear them as follows:
    a) Post the stock in the previous period to the current period (for example, using movement type 561) so that the stock for the previous period is the same as the stock for the current period.
    b) Clear the stock with the posting date in the previous period (for example, using movement type 562).
    • 2) If there are Open purchase requisitions, purchase orders, or scheduling agreements for the material.
    We suggest completing all P2P cycle for open orders (purchase requisitions, purchase orders, or scheduling agreements) and then close it.
    Then
    1. Run Trnx MM02 (Change Material Master immediately.
    2. Overwrite the old base unit of measure with the new one in basic data screen.
    3. Save the change.
    Reward points for helpful.
    Regards,
    Harini.S

  • Modification of Base unit of measure

    Hi expert ,
    I whould liek to change a material UOM from PAC to PC..
    i had clear the Sales Document , clear the stock .
    When i try go to MM02 change from PAC to PC
    the system display error
    "Standard cost estimates for the current period already exist
    Valuation area"
    how should i tackle this problem?
    Please advice me expert.
    thanks
    Wilson

    From OSS note 138767
    Within the material master record maintenance, you want to change the base unit of measure (base unit). During the change, the system performs extensive checks in order to avoid inconsistencies in the applications which use the material master.
    In particular, the following checks are performed:
    The base unit must not be defined as an alternative unit of measure for the material
    No International Article Number must be assigned to the base unit
    No proportion/product units must be defined for the material
    No configurable material must be assigned
    The material must not be used as a configurable material
    Stock must neither exist for the previous period nor for the current period
    No physical inventory must be active
    No reservations or dependent requirements must exist for which the deletion indicator is not set
    No planned orders must exist
    No purchase requisitions, purchase orders or scheduling agreements must exist for which the deletion indicator is not set
    No WM transfer requirements, no WM quants or no WM posting change notices must exist
    The material must not be a bill of material
    The material must not be contained in a bill of material
    The material must not be used as a production resource/tool
    The material must not be used in task lists
    No standard cost estimate must exist for the current or future period
    No production orders must exist
    No planned independent requirements must exist
    No run schedule headers must exist
    If the base unit has dimensions, no serial number profile must be assigned
    No sales and distribution documents must exist which have status Not processed or Partially processed.
    Solution
    If necessary, all reasons mentioned above must be eliminated by archiving the objects listed

  • Base unit of measure issue during CIF

    Hello,
    we have one APO system which is connected to two R/3 systems (System A and System B).
    Actually one product number was coming years ago from System A with base unit of measure EA.
    We now need to add the same product number (with a different Business system group) via CIF coming from system B, but the source base unit of measure is ST.
    CIF interface stops with error "Error Text: Base unit of measure for product xxx" ....
    So actually I am looking for a way to add product xxx to the integration model in System B and transfer data to the APO system without removing the products and all linked master and transaction data from APO and creating new data.
    Maybe there is a workaround ...
    Thanks for any ideas and thoughts.
    Kind regards,
    Andrea

    Andrea
    One way is to add ST as alternate unit of measure in APO product master . This is because you cannot change the base unit of measure in APO without deleting all the dependent objects.
    After that you will be able to CIF over the data . But then you  have to remember one thing . Whenever you change the material master for this material in R/3 and CIF it over , the alternate UOM ST  will get wiped out in APO and you have to maintain it manually.
    Thanks
    Aparna

Maybe you are looking for

  • Need the user exit/BADI name to display the error msg in PO for net price

    Hi I have the below requirement. While creating the PO(Purchase Order) with reference to PR(Purchase Requisition),if the net price value is 0.01 USD then the system will display a pop up a error message that 'This is a free price for PR'. Can anybody

  • Quickmask Viewing Hangs PS CC

    I am looking to solve a performance problem. When I use Alt-Shift-Click on a layer mask to view in quickmask mode, the mask shows up very very slowly, one tile at a time, with the tiles separated by significant gaps, and the entire mask does not ever

  • G4DVD-RAM drive with  MAC PRO?

    I have an old g4 tower laying around, only because it has a DVD-RAM drive and I have tons of old files stored on those 2000 DVD-RAM cassettes (encased in plastic). Is it possible to install this drive into my new 2009 Mac Pro 8 core in the second sup

  • Download Software other than marketplace

    tell me website from where i can download software for my LUMIA other than Marketplace Solved! Go to Solution.

  • Missing Apps in Restore

    Please follow this carefully: I had the original 2G iPhone which I gave to my Wife when I upgraded to the iPhone 3G last year. During this time she has downloaded various apps. Last week my Wife bought the iPhone S for me, so she could have my iPhone