My client has a requirement of mass change of Profit Centers in Product Cost Collector (Transaction Code KKF6N). Is there any way of doing this using LSMW or anything else?
I had tried with LSMW Recording, but there is a particular production version associated to profit centers in KKF6N tranasction, because of this I couldnt go to particular production version and update the profit center.
So, Is there any easy way doing this?
<REMOVED BY MODERATOR>
Thanks,
Kalikonda.
Edited by: Alvaro Tejada Galindo on Jun 9, 2008 6:29 PM
Kiran,
I have tried with Recording and problem solved.
Thanks,
kalikonda.
Similar Messages
-
Profit center in Product cost collector
Hi,
We need to change the profit center in the product cost collector after the actual postings were made. SAP does not allow to change the profit center. So any other work around solution for this issue? Can somebody help me with this?
Thanks & Regards,
RaghavaHi Bhuvaneswari,
We are having a situation,
The issue is to change the profit center for the product collector after the actual postings were made. Now the big problem is there is no PA transfer structure defined to execute the settlement for these product cost collectors and then change the profit center. Can you give some work around solution for this? And also what about the postings made previously.
To give more insight,
In the order type, Settlement profile is maintained
In the Settlement profile, Allocation structure is maintained
How do you link the settlement profile / allocation structure to the PA transfer structure?
I can not settle the order (Product cost collector) as there is no PA transfer structure
Thanks & Regards,
Raghava -
Profit center change in product cost collector
Hi All,
I would like to know what precautions we should take for mass changes of profit center corrections in the "Product Cost Collector".
I want to make same profit centers in material master and in product cost collector for that we need some report on "Product Cost Collector" or table name so that we may compare the profit center in material master and Product cost collector in order to make them in sink.
Regads,
RajHi All,
My query is from which T-code of product cost collector or any table by i get matrial and profit center combination.
Also i would like to know any precaution if any change of profit center in material master for product cost collector (privious is X cost center and now i am changing to say Y).
Regds,
Raj
Edited by: RBS123 on Jul 15, 2009 8:24 AM -
Mass change of Profit center in Cost collector
Hi
On FERT materials profit center was and i have created cost collectors for all fert materials.
How I can correct mass change of profit center on Cost collector.
tyHi,
You can use the MASS transaction code for changing of Profit Center for your FERT Materials.
Sateesh -
Change the profit centre in the cost centre master after a year
Hi All,
Could you'll please let me know whether it was possible to change the profit centre in the cost centre master and if i did what will be the implications.
Thanks and Regards,
VandanaRefer transaction code OKEG.
You can maintain master data for cost centers, cost elements, activity
types, and business processes with time dependencies. You can make
changes at any time for any given time interval. Data storage also takes
place with a time reference. In this way, a master data record can have
multiple database records storing different information.
The smallest interval is one day. To ensure data consistency, you cannot
change each field daily. The timeframes in which you can change a field
depend on the field functions, which are fixed by the system and cannot
be changed. Master data maintenance includes an automatic check for each
field's time-based consistency, resulting in individual time-based
maintenance for each field.
The following dependencies are supported:
o Not time-based
o Day-based
o Period-based
o (Fiscal) year-based
This function provides an overview of the time dependencies of
individual master data fields during master data maintenance, along with
checks and storage of consistency timeframes. You find this information
in the "Time dependency" column.
If you use fields requiring characteristics greater than one day and
which are changed for the system lifetime of the object, the system
automatically creates a new database record for this processing
interval, and changes the time-based validity of existing records. The
change is logged in the master data record with the time reference.
However, a great number of changes in multiple timeframes will result in
a correspondingly great number of data records.
Fields which you can change freely (indicated in the DAY column) can
possess different time dependencies only if you mark them additionally
as historically relevant. This activates the time-based updating for the
records.
Object 1000 has one master data record created with a fiscal year of 12
periods and the cost center name AAAAAAAAAA. During master data
maintenance, you change the cost center name in period 5 to BBBBBBBBBB.
The system reacts with one of two options.
o "Name" is marked as historically relevant. The existing master data
record for periods 1 - 12 must now become three records:
1000 01-04 AAAAAAAAAA
1000 05 BBBBBBBBBB
1000 06-12 AAAAAAAAAA
o "Name" is not marked as historically relevant. The existing master
data record remains intact, with the name changed for the entire
existence of the record:
1000 01-12 BBBBBBBBBB
Edited by: Ravi Sankar Venna on May 19, 2009 4:03 PM -
Changing the receiver cat in the settlement rule of Product cost collector
Hi,
I have created a Product cost collector using the Transaction - KKF6N. and observed that the settlement rule got created automatically with the CAT - MAT. I need help for below queries.
1. Is it possible to change the settlement rule for the Product cost collector?
2. If yes, Could you please let me know the procedure to do this?
3. If no, what is the alternate as I want to change the CAT from MAT to ORD.
Your help is very much appreciable and Thanks in advance for the help.Hi,
Check in order type, Which settlement profile is maintained. Then Goto settlement profile maintain receive type which you want to settle.
Regards,
Sreekanth -
Error while creating Product Cost Collector
Hi SAP Gurus,
While creating Product Cost Collector I am getting the following Error:
Enter a distribution rule for Order without a validity limit
Message no. KD059
Diagnosis
The settlement profile used requires you to define a distribution rule for Order. For period 009 2008, however, you have not created a distribution rule for Order.
Procedure
Create a distribution rule for Order without a validity limit, because, if the distribution rule does have a validity limit, the system always issues this message in the period following the last valid period.
You can also use a different settlement profile that does not require such a distribution rule, or change the settlement rule used.
Can any one help where exactly i need to maintain this.
The settlement profile settings are fine.
I am getting this error only after i have changed the scenario to Reproting point back flushingDear Suryanarayana
Please check the corresponding settlement profile for product orders.
In most of the cases message KD059 means that no distribution rule is assigned to your production order.
This is not an error, but the system design. In order to avoid message KD059 you will either have to enter settlements parameters and a distribution, or change settlement profile for valid receivers in transaction OKO7 from 'settlement required' to 'Can be settled'.
I hope this helps resolve the issue for you. I wish you the best in your endeavours.
Kind Regards,
Brendan -
Transfer of Costs in Product Cost Collector to COPA
Dear Experts,
Please can you advise me on this current issue I'm having. Below is a description of problem:
Customer is currently using report designed in COPA (KE30) to derive P&L report for using Plant as a characteristic.
This was being done at a time when Product Costing functionality was not being used
All costs (administrative, sales and production costs) were being collected in cost centers
At end of month assessment of cost center values to COPA is executed (KEU5)
Customer is then able to derive P&L report per Plant characteristic
However with implementation of Product Costing, all Production related costs are captured in Product Cost Collectors and not Cost Center
Hence we have no way of assessing or transferring total production costs from Product Cost Collector to CO-PA
We have tried to configure FI/MM PA transfer structure (KEI1) and default account assignment (OKB9) for automatic transfer of costs on goods receipt/issue, however this is not working because the product cost collector is used as the default account assignment for the transactions
So far only material cost valuation of sales/billed materials are possible (which does not address concern)
As a result we have a gap and customer is unable to derive P&L by Plant from CO-PA.
Can you advise if there is a way out, in order to have all Production Cost transferred to CO-PA.
Thanks,
Ola.Hi Ola
Your Cost centers would be categorized as below
1. MFG Cost Centers (In Plant)
2. Service Cost Centers (In Plant)
3. Few Cost centers (outside plant) Eg: Sales, Marketing, Sales offices etc
At period end
1. Allocate the Costs from SER CC to MFG CC using Distribution / Assessment cycle.
This will make SER CC as zero
2. Calculate actual activity price in MFG CC (KSS2 / KSII)
3. After this, do revaluation of PCC using CON2.. This will make balance in MFG CC as zero
4. Allow the Variances to be updated to COPA by ticking the "Variances to Costing based COPA" in your settlement profile
5. In short, what remains for you to allocate to COPA is the 3rd category of CC.. i.e. you should allocate those CC to COPA whose cost is not included in the cost of product using COPC module
Br. Ajay M -
Settlement Parameters on Product Cost Collectors
The basic config on Product Cost Collectors has settlement to a material.
1) Does someone know how to change the settlement rules to settle to a GL account or Order for new materials
2) For old materials, does someone know how to change the settlement rules. SAP - I believe in HELP and in note 388457 says you cannot change the setlement rules.
ThanksThank you for responding.
Unfortunately, even if you create a new profile and allocation structure, you cannot change it on the order.
I later found in SAP HELP that the settlement profile on cost collectors cannot be change. That was also verified by oss 388457.
But, I was hoping I was wrong or there has been a further change
Jeffrey -
REM Product cost collectors and Production version
Hi All,
Can some one pls let me know
What are the product cost collectors in REM and how to create the product cost collectors ?
What is the production version and the difference between production version and controlling version?
Thanks & Regards,
BujjiDear Bujji,
A product cost collector is a cost object in Product Cost by Period that collects the periodic actual costs incurred in the production of a material. It can be created in txn KKF6N.
[Product Cosr Collector|http://help.sap.com/saphelp_47x200/helpdata/EN/08/77ba810a1611d3a6b900104b55d538/frameset.htm]
[Product Cost Collectors: Collective Entry for Repetitive Manufacturing |http://help.sap.com/saphelp_47x200/helpdata/EN/08/77ba810a1611d3a6b900104b55d538/frameset.htm]
A production version determines the various production techniques that can be used to produce a material. It defines the following information:
Alternative BOM for a BOM explosion
Task list type, task list group, and group counter for assignment to task lists
Lot-size restrictions and period of validity
A material can have one or more production versions.
It can be defined in the Material Master (txn MM02) in one of the following views:
MRP 4
Work Scheduling
Costing 1
The costing version is a different issue. It is a costing parameter and is used to save several cost estimates for the same material, with the same costing variant and the same costing date (e.g. in oder to cost the material several times with minor changes without creating new costing variants).
BR,
Antje -
Hi,
Can anyone tell me what is exactly product cost collectors and what is the impact on the production orders and cost?
If there is a BOM change, we will just create new production version and new product cost collector. We will not update the standard cost. Is it that the new production orders will pick up the new cost based on the product cost collector? even though the standard cost was not up to date? What will be the impact to the accounting?
Kindly please advise. Thank you.Hi,
Following link will be useful:
http://help.sap.com/saphelp_47x200/helpdata/en/5f/1faba54aee11d189740000e8322d00/frameset.htm
A few points for reference:
- Product Cost by Period, Product is the main cost object.
- Actual costs can be collected on the PCC
- No settlement rule for a mfg order linked to a PCC
- In PCC, the components in the BOM picks up the price from the material master
- If Std Cost Est is not upto date, then matls in PCC will take existing / old price
- So the FG Preliminary cost estimate will not match with its Std Cost
- Moreover inventory valuation may vary if std cost est is not up to date
- The Valuatin variant specified in the Costing variant actual of the PCC is used to valuate the data confirmed for the mfg order.
- This costing variant results in a temporary prelim cost est for the mfg order. This preliminary cost estimate cannot be saved.
Integration with Mfg Order:-
If you have specified in the order type of your mfg orders that the costs should be collected on a PCC rather than on the mfg order, the system creates a link to the PCC when you create a mfg order for the corresponding combination of characteristics (such as material / plant / production version). The mfg order receives the status PCC (product cost collector). This status prevents costs from being allocated to the manufacturing order.
The above might give you some lead.
Raj -
Abolish product cost collector for production order
Dear Experts,
we use for some production order types the product cost collector. Now we plan to abolish them and change the settlement for production order. Which things do we have to pay attention? Do we have to finish our running production orders first or is it possible to change customizing during running production process. Thanks for your hepl!
Best regards
SteffenHi Ajay,
thank you for your answer.
We have tested two variants:
1. new order type, so we can process two separate settlements, for orders with PCC and the new orders without PCC. After archiving of all prodorders with pcc, archiving of pcc it should be possible to switch back to old order type.
2. change customizing without finishing existing orders, settlement for existing orders, all orders which already have been processed will be settled by pcc (status pcc usage in order header) We have not be seen any strange system behavior.
We use the pcc collector for different order types in different plants and want to abolish plant by plant. In this time the pcc will still be customized/exists.
Best regards
Steffen -
Standar cost and product cost collector not updating the new price
Hi,
Created Standard cost estimate for one FG product and runned the product cost collector. Based on that consumption delivery everthing is made. Later on the work center and activity type changed in routing. Now i am trying to run the standard cost with new activity price (due to work center change) for the current period, system is showing only the previous rate(previous period) and it is not updating the new price becuase of already we have created the product cost collector.
Can any one give the suggestion for how to update the new price in standard cost as well as new price updation in product cost collector.
govind.Hi
1. If the original cost estimate was run in the current month - Then you cant re-release cost estimate unless you reverse it from CKR1
If the cost estimate was of previous months - then you can definetely release it again
2. In cost collector, you need to manually cost it again using the Preliminary costing feature... Your cost coll will then show 2 cost estimates i.e. One from Original date to current date-1, and 2nd from Current date to 31.12.9999
br, Ajay M -
How can we remove a Product Cost Collector from the COst Object Hierarchy? Can we delete the PCC itself?
Thank youGo to chaNGE MODE .
Edit -> deletion flag -> set -
Old material overwritten by new material code in Product cost collector
Hi SAP Gurus,
How can I work around if a product cost collector with material XXX has been overwritten by a new material YYY when creating the KKF6N.
Both material code having the same plant, same orde type,same production version but just different material code.
When saving the preliminary costing for the product cost collector for material YYY, the system prompted me the order number 700022 which is already existing and created for material XXX.
By right, this shd not be happened but indeed it did.
Now when displaying the report S_ALR_87013127 - Order Selection, the report showed the new material YYY was created with order number 700022 but the content of the data was for old material XXX.
Now my problem is how can I get back the product cost collector for material XXX as the original order number 700022 was meant for material XXX and not mat YYY.
And also when executing backflush (MFBF) for old material XXX, the error msg prompted as 'content of order 700022: Mat YYY transferred to interface (IMSEG):Mat XXX due to this I can't backflush material XXX.
Really appreciate your expertise on this urgently.
many thanks!problem due to system bug, have to log to OSS for help.
Maybe you are looking for
-
Issue Invoking 10.1.2 BPEL Process from 10.1.3 Embedded server.
Hi All, I am trying to connect to BPEL 10.1.2 from 10.1.3 embedded server. When I run following code in debug it just stays at Locator locator = new Locator("default","bpel",jndi); line. It does not give any error message. Please help. Let me know if
-
Update to Airport Extreme - speed increase?
Seems like I experienced a speed bump when I did the upgrade. Anyone else think that, or is it just a coincidence? I tested with www.speakeasy.com .. came in at between 13000 and 14000 kbps.
-
Where are partitioning a cube based on calmonth & fiscper
Q1.where are partitioning a cube based on calmonth & fiscper ok In partitioning cube there are two types 1.physical partition & 2.logical partition so i want to know the both things and diferrences.
-
Dictation Feature when iPad is connected to a keyboard?
I've got the Apple keyboard/docking station for my iPad3. Is there a function to be able to dictate when its still connected to the keyboard?
-
How to connect SAP BW server to Cognos Report Net
Hi, Any idea on connecting SAP BW server to Cognos Report net to access the SAP BW cubes for Cognos Report. Please help me in this..to let me know the process steps to be followed. Regards, Ravi Nidamarthi.