Mass change of Routing / BOM
Hi All,
I have a client who is implementing By-Products. My understanding is that to use By-Products the component in the BOM must be assigned to an operation and have the Back Flushing indicator set. The value of the component must be set as a negative.
The component that is to be set as a By-product exists in 80 BOM's / Routings. Can these changes be made on Mass. I fear not as the material assignment needs to be done manually???????????
Thanks in advance
Stuart
Hi MM,
Option 1 : When ever you create prioduction order go to component overview and check box backflush indicator it will work
Option 2 : make BDC for same to do mass
Option 3: you can do goods receive from MB1A with Movement type 551 do with order refernce
if solved give reward and close it
Thanks
Bala
Similar Messages
-
Hi all,
My question is mass changing of routing. Is there any transaction, mass changing of routing?
Regards
MSinanHi,
Try T code CA85, CA85N, CEWB.
SmanS -
Mass change in routing - operation details - machine times
Dear all,
I want to do mass change in machine times of aprox 20 materials in routing.
So can anyone guide me for the procedure.
Thanks.
Edited by: sapsarang on Aug 19, 2009 1:39 PMHI ,
As suggested by Mervin,better option is record in LSMW for CA02 transaction.
For creating LSMW ,please refer the link which explain the step by step procedure.
http://nabiljirani.com/SAP/SAP%20ABAP/SAP%20brain/LSMW_STEPS.doc
https://wiki.sdn.sap.com/wiki/display/CRM/LearningLSMWStepbyStep!!!
Hope it helps
Edited by: Girish Adaviswamy on Aug 20, 2009 6:59 AM
Edited by: Girish Adaviswamy on Aug 20, 2009 7:00 AM -
Mass change in collective BOM's
Hello Experts,
I want to change the quantity of a single material in several BOM's already created in the system, there are atlest 2000 BOM's having the same qty of that material which i want to change.
I had a look to the MASS change option in the system but i was not able to resolve my problem.
Please Help.
Regards
PrashantHi,
Please try transaction CS20.
If resloved then let me know.
Regards,
Jigar -
HI,
I need to add one more operation in the existing routings, every routing is mutiple routing and addtion to be made in all the headers. Can we do this using CA85N or should we have to user BDC or is there any other method available.
Regards,
JagHi,
I think CA85N should be not used bcoz this is for ....Mass replacement: work center....
and u have to add a new operation.
Try for BDC or LSMW,
Wait for experts advice
Thanks and Regards.. -
Dear gurus,
how can i changes std value in rate routing for more than one at same time
thanks in advance
umeshusing CEWB transaction, you can be able to do it.
refer to the link for more details
[http://help.sap.com/saphelp_erp60_sp/helpdata/en/79/517c3545413671e10000009b38f889/frameset.htm]
Edited by: vishal ashar on Mar 4, 2009 8:12 AM -
Hi,
We have a raw material which is part of BOM for several different models finished goods. Now we want to reduce the quantity of this raw material from 4 nos to 3 nos in all the BOM's of FG at one shot. Please let me know since in CS20 we can only do for single material at a time.
Regards,
YuvarajHi Youvraj,
Yes You can change it via CS20.
Go to CS20 and select Change Item data.
Select same material in reference Object and new Item data.
Just give new Item qty in Item changes data and execute.Select all those BOM where you want to change the Qty.
And press Change Item data.
Regards,
Dhaval
Edited by: Dhaval Choksi on Sep 23, 2008 10:49 AM -
Hi Guys
Is there any way I can update all my Routings with Activity type and Labour Cost in the Routing Master Data (CA02)
I checked MASS and MM17 but I see nothing pertinent to Routings
Thank you
RukshanaHi reddy
Yeh - to do an LSMW was my initial thought - but they are not keen on doing it that way
Therefore, I was wondering if there wasn easier or better way to go about it
Isnt there anything else?
Rukshana -
Mass change of BOM item and BOM item catergory
Hello Everyone,
I have a need to complete a mass change of a BOM item with another, usually I use transaction CS20,this works o.k. but this time I'm also changing the material with a new item catergory, for example a stock item with a phantom item.
Does anyone have an idea how to complete this task.
Kind Regards
FrankieHello,
Thankyou very much for your reply.
I did try adding the new material using CS20 but all the BOM qty's are different and as you know you have to complete this field, so it would mean changing one at a time, I attacked this issue from a different angle and created an LSMW so I can Mass delete the parts but then use this program to change the BOM item to the new part.
Thanks again for your reply
Kind Regards
Frankie -
Mass Change of Task list of type 2 with CEWB
Dear All,
How to do Mass Change of Master Recipe with Trasaction CEWB, it is only allowing to do mass change in routing not in master recipe.
Thanks
LisaHi lisa
As far as i know it is not possible to use CEWB for Master Recipe
coz there is no option for master recipe selection in working area of CEWB.
regards
Sachin -
Material BOM mass change error
Hi gurus,
When doing mass change of BOM via tcode CS20, i'm getting below error result.
The following messages were displayed:
Material BOM 00016478 : Delete Item(s)
19760 STM-220-(20UP)78DZ*C06U029(XC06U029)Sn 200
0130 L 01/01/2002 12/31/9999 1.00 PC > 1.00 PC
No batch input data for screen SAPLSDDT 0010
Folder created/extended
I wonder what does "No batch input data for screen SAPLSDDT 0010" mean? what should i do to correct this?
I also noticed that all items on the picklist were grayed out though i can still click on the checkbox button to select the items that I want to be deleted.
Has anyone encountered this problem? I usually use CS20 during BOM mass change and haven't encountered this kind of problem.
Hope to hear advise from you all on how to deal with this.
Thanks and regards,
ChadDear,
Error message no is 00344 ?
Please refer the OSS note Note 493096 - CS20: No batch input data for screen SAPLCSDI and Note 180686 - For CS20
Regards,
R.Brahmankar -
Mass change in component Scrap % in BOM
Hi Guru,
Can someone explain me the process of mass change in component scrap % in BOM ? I have to make zero coponent scrap % in BOM for all materials.Dear Vikash,
Check with t-code CEWB
for this you need to define work area in OP77
Regards
Madhu -
Dear All,
We were trying to carry out mass changes to Rate Routing,
by using CA85N we were able to make changes to Normal routing but not rate routing, in CA85N we were able to select only three types of task lists ie N, S & Q. Also checked in CWEB here also only the three types of task lists were provided for selection. Is there any other way for carrying out mass changes to rate rouitng, or settings in the above transactions.
Regards
MithunDear Mithun,
In my understanding only CEWB can help you to some extent,otherwise you may have to develop some
BDC's or LSMW's.
Regards
Mangalraj.S -
dear experts
how to add materials in mass change in BOM with CS20 or LSMW or BDC.
regds
princeHI
Check T code CS20 or thru workbench for CEWB you need to activate working area in OP77 select SAP_item .
check this thread
Mass changes for BOM Base Qty
Regards
Anupam Sharma -
Mass change in BOM - field "Relevant to sales"
Hi All,
How to do Mass change in BOM for the field "Relevant to sales" ?
Thanks.
MariannaHi,
Need to use CS02 recording in such a way that you can change every item in a particular BOM.
e.g. First get into HEader Material BOM (CS02), once you've General Item Overview screen, do NOT directly go to item details of any item.... first click on tab-'Position', enter either Item Number or Component or both and then go to item details to change the relevancy indicator. Once changed for a particular item, save the BOM & come out of it. Then try for next item & so on....
Again this is my initial thought, you need to try out few recording options like this and then chose the most suitable one. Take help from ABAP expert if any available.
Off-course, initiallly it would take time to set-up LSMW but later on just need to create a data-file & do the mass changes.
Hope it will help.
Regards,
Anup
Maybe you are looking for
-
Historic and Current data for Master data bearing objects
Hi All, We are trying to implement type 2 dimensions for all the master data bearing characteristics, where we require historic and current data available for reporting. the master data can have a number of attributes and all of them can be time depe
-
Purchase Requesition to Purchase Order
Hi Good Morning Friends I am facing some problem whicle using ME59 and ME59n (Automatic creation of purchase order from requesition) We are generation Req from Service Order or sales Order where Fixed vendor is coming by default but when we want to u
-
Hello, I found a Photoshop Elements 4.0 disc that is still in good condition, but my new computer doesn't have a disc slot. Can I still download it? How? Also, will there be compatibility issues because it is so old? I have a Dell PC with Windows 8.
-
Downloading and Installing Mountain Lion on a 2010 Macbook Pro Running OS X 10.6.8
I'm attempting to download mountain lion, but everytime I click the download button, it turns white and the just reverts back to normal. I tried restarting the computer, and I see the dock icon saying it's downloading, but again, nothing in the App S
-
Question marks coming in the menu bar in the Z Invoice Report
Hello Everybody, When I am executing the Zinvoice transaction code for my Invoice Report in my Development System and selecting the Get variant --> Variant name as VAR --> Clicking on the Execute button after that I am getting