Mass component substitution in Task List

Hi Gurus,
I'have so many Task Lists, and total have hundreds of line operations.
But, now there material substitution. Let say, previously in Taks List using Material/Component "A", and now material "A" substituted become material/compenent "B".
How could we do change (mass change) to all Component in Task List that previously using "A" and than replaced by "B" and how about if there are unit of measure differences .
How do we do it ? Any T-Code to do this ?
Regards,
Tri W

Tri W,
   The material will be replaced, with the follow up material,  once there isnt sufficient quantity available to satisfy the demand from the reference date entered on the MRP screen.
    However, it looks like this replacement of the follow up material only works if you manually enter the orginal material in the components tab or if you import the material from a BOM.This doesnt seem to work if the material is directly associated to the Task list(Even though this is also assigned a BOM number of Type "standard") . When you import the task list into the order, the Original material is not replaced with the Follow up material if there isnt sufficient stock available.This looks like a bug to me, you may want to consider raising a OSS note to see where that leads you, otherwise my apologize for misleading you. We had used the BOM and this worked perfectly for us,hence i was pretty sure this would work for materials assigend directly to task list(Since this also had a BOM number and type assigned to it).
Best Regards
Narasimhan

Similar Messages

  • Routing-LSMW-Component Allocation to task list

    Hi Gurus,
    I'm creating LSMW to Routing using Standard-Batch Input method, have mapped the required structures.
    But I was unable to map the Component allocation to task list.
    Is it possible in the standard one else I need to go for some sort customisation.
    Can anybody throw some lite on this issue ?
    regards
    Ram Kumar

    Hi,
    You will find BIPMZ Batch input structure for component allocation to task list in the standard structure relations (no customizing required). Use the same for your need.
    Hope it clarifies your query.
    Regards,
    Vivek

  • Is there a was to do a mass delete on General Task List

    Hello,
    Is there a way to do a mass delete on General Task List?
    Thanks.

    hi
    Kindly check the T code IA25 ,just specify the key date as today and execute .
    regards
    thyagarajan

  • DB table holding the component materials in task list

    Hi all,
    I'd like to find out the relationship of the component materials inside a task list (IA07).
    I've found DB table PLKO and PLPO holding the data for task and operations respectively. Inside an operation, there are components.  I just can't find the DB table holding the components by F1 and where-used list ...
    Any advice?
    Thanks a lot.
    Message was edited by:
            Macy Lo

    PLMZ-PLNTY = PLKO-PLNTY
    PLMZ-PLNNR = PLKO-PLNNR
    PLMZ-PLNAL = PLKO-PLNAL
    PLMZ-ZAEHL = PLKO-ZAEHL
    PLMZ-PLNTY = PLPO-PLNTY
    PLMZ-PLNNR = PLPO-PLNNR
    PLMZ-ZUONR = PLPO-PLNKN
    PLMZ-ZAEHL = PLPO-ZAEHL
    if helpful, reward
    Sathish. R

  • UWL: Substitutions for tasks lists

    Hi,
    I am defining substitution rules for users who are allowed to manage and work on task items for a user who is absent. Does anyone know where  I set the rules,  where do I find the menu ''Manage Substitution''?
    Thank you!
    hilde

    Hi
    As far as I know this is not possible.
    One can set substitution rules in his UWL not in others.
    Regards
    Aparnna

  • Mass change of component in Task list

    Hi Experts
    I have thousands of material and there are changes done for them to use them in maintenance order task list as stock or nonstock.
    The task is to change the item category (from L to N or from N to L) of those materials used as components in task list and also find out those materials in BOM , Equipment TL and FL TL and change the item category.
    1.can this be done using a BDC (checking all task list / BOM for that material and change the item category)
    2. table to check component assigned to which operation in task list.
    Any help for this requirement
    Thanks
    Jey

    There is no standard transaction for the changing of components in the task lists this would have to be a bespoke program.
    If you are looking to change the components allowcated to the Bills of Material you can use transaction CS20 where you can replace the exisitng component category N with the new component category L.
    There is transactions for changing the PRT and Work Center if you get your ABAP consultant to have a look at the PRT transaction/program (transaction CA77) he may be able to copy and ammend this to make things a little easyer.
    Jim

  • Add component in task list

    Hello All,
    I have an issue with adding component in task list (for example task list number EIMN-68) via transaction IA05.
    When I try to add component to operation, I get the message *
    Standard BOM PAEIMN-68  4 already exists
    Message no. 29771
    Diagnosis
    You want to create a standard BOM for standard object PAEIMN-68 with usage .
    A BOM already exists for this standard object and usage. You cannot extend a standard a standard BOM.
    Procedure
    Check whether the standard BOM is suitable for standard object PAEIMN-68 and usage . If it is not, you need to create the BOM for another standard object.
    Is there any special way to create material master for such components.Whats the solution.
    Please help
    Cheers
    Sunny

    Hi Pithan, how are you..
    I want to add components.
    Just now I was able to add components. I explain how:
    When i added component number in operation, and press enter, system gave me the error that standard bom already exist. In the same screen I changed the BOM usage to 3 as universal usage. After this usage only, system allowed me to add components. No other bom usage allowed me to do so.
    Also, why system took me to BOM screen if I just want to add components.
    I wait for your reply.
    thanks and regards
    Sunny

  • General task list with component : creating standard BOM

    Hello,
    When adding a component to a general task list , i get a "create standard BOM" screen , see below for example :
    Standard object PA00000212            
    Plant                                 
    BOM Usage       4                                                          
    Change Number                        
    Valid From           07.09.2009      
    Can someone explain to me the relation between standard BOM and component within a general task list ?
    Thanks,
    P.

    Hi,
    Pls find some of the points below for your referece
    Standard BOM:
    Can used for assigning the material from the BOM to Task list operation
    That is, BOM  components for the object (Equipment, Functional Location , Assembly) can be retrived and assigned to maintenance Task list of the operation
    Condition: BOM corresponds exactly to the content of the structure list
    Free Material Assignment:
    Assigning Stock Material (Material number) those are not listed in the BOM of maintenance object directly to the maintenance task list
    Condition:  Setting to be done as BOM usage for Plant Maintenance (4)
    Path: Maintenance plans, work centers, Tasl Lists and PRTs>>>>>Tasl Lists>>>>>Control Data>>>>Define Presetting for Free Assignment of Material-----BOM Usage as 4
    Pls note that, while making free assignment, system creates an internal BOM  and this can not be processed from application.
    Hope this may useful
    Thanks
    Siva

  • PM:Task list Component addition

    Hello Guys,
    We are facing below issue.
    1. In task list component screen, if we add a component via Direct entry, system create Standard BOM.
    2. If we add the component via component selection from BOM, it creates the material BOM.
    The second method is preferable as changes in BOM is reflected in task list as the link is maintained. This is not an issue if we are creating task list manually as we can select the component manually. But however, if we create task list via LSMW or load program, the issue arises.
    When contacted SAP on OSS, SAP advised to use BADI IMRM_COMP_PROCESSING, method SET_COMP_PROCESSING with
    E_CORRECTION_ACTIVE = ' '. This seems to resolve the issue. But I am not sure of the side effects.
    Has any one implemented this BADI earlier and can share the experience?
    Thanks
    Ashish Barsagade

    hi,
    U can assign material BOM in Tasklist header... there is a Assembly field... just enter the name of Material BOM. and Material BOM would be attatched to task list.
    it will solve ur problem
    Regards,
    Amit kushwaha
    Edited by: amit kushwaha on Feb 25, 2008 10:45 AM

  • Task list characteristics values mass load

    I'm loading the task lists using LSMW, however, when recording the batch input it is not possible to populate the characteristicsd values for the task list. Do you know about any way to load task lists characteristics values in mass, using LSMW?
    Thanks,
    Ana

    Hi,
    Thanks for your replies, but I have already tried the LSMW route, but it is not at all helpful while loading the Operation Relationship and the Service Package details, as while recording I select some particular Operation in IA06, so it always tried to point out to that Operation, even if I mention the Different Operation Number in my loading file
    Do you let me in detail, if anyone has done the specific Operation Relationship or Service package Load through LSMW
    Thanks
    Saurav

  • General task list: component selection from BOM - possible in batch input?

    Hi experts,
    for the assignment of non-stock material to general task lists I have followed the advice from message[6115684|Re: General Task List Components;.
    So what I have done is:
    - Include non-stock material in BOM
    - Assign BOM to general task list header
    When clicking on the "Component selection" button in the task list components, I can select a component.
    When entering the material number of the component directly though, I get an error: "Material type X and line item type L not compatible" (CO135).
    I would like to upload the general task lists with a batch input recording, but I can't figure out how to select components.
    Any thoughts?
    Kind regards,
    Andreas

    Hello,
    We have the same requirement to load tasklists (change & create).  We are using the function modules EAM_TASKLIST_CREATE and EAM_TASKLIST_CHANGE.  However, i cannot get a non-stock BOM item to process.  Has anyone got this working?
    Thanks,
    Clay.
    EDIT: Found the answer - simply fill in the fields for BOM on the component (STLTY, STLNR, STLKN, and STLAL). 
    Message was edited by: Clayton Mergen

  • Component allocation to Euipment Task list

    Hello frinds,
    I have a query related to Plant Maintenence.
    We have a euipment task list with different counters . In each counter we have operations and components assigned to those operations.
    When order is created some of the operations are not getting copied and hence few components as well.
    Please tell me tables where i can find the allocation of compoenents to operations.
    Thanks
    Rohit

    Thanks Mahee,
    The table i was looking for is PLMZ (allocation of components to operations)
    I found that deletion indicator is set for certain operations in PLMZ and those components are not picked which are assigned to operations with deleltion indicator (LOKEZ-PLMZ).
    Can any one tell me how this deletion indicator is set for component allocation to operations and how do i remove this ?
    Thanks for help.
    Rohit

  • Functional location Task lists Header/Operation Mass Upload

    Hello experts,
    I am using LSMW to upload Functional location Task lists Header & Operations in T-code IA12, for this i am using the Standard program IBIP (Object -> 480).
    All required fields are in the standard structures apart from Operation QM Data, Recording view -> ERFSICHT & Inspection point Completion -> QPPKTABS (see attached screen shot).
    Should i upload these 2 fields in different way ?
    Thank you by advance.
    Regards,
    Soufiane

    Generally, for all kinds of task list (Maintenance, Quality as well as Production), I tend to use BDC programs by which all the fields can be addressed. In standard, there are certain fields which might have got avoided for certain reasons.
    So, I suggest you to look for some other options available.

  • Task list component...

    Client wants to see task lists that have components on them and what the components are. Could any on please help me to get the Task list. Any pointer from any side will help me a lot. Thanks in Advance.
    Thanks
    Azizur

    Hi,
    Pls check Tcode IA17 (Task List Printing List) with Output volume parameter selection as Material, Long Text Material etc.,
    Regards
    Siva

  • Solman Change Request Management Issue - about create task list

    Dears,
        We are now using Solman ChangeRM. I have created a maintainance project and maintained its logical component and IMG project. when I want to create a task list for this project, a message"The project is not released. Hence cycle can not be created" poped. The message no. is /TMWFLOW/CONFIG_UI017. Where can I release the project?
    Thanks
    Roger

    Hi,
    Pls click the check button(next to activate button)
    see the SLG1 log generated remove the errors shown in red.
    One it is done u press the refresh button & thn u cn create the task list
    chk
    https://websmp202.sap-ag.de/~sapdownload/011000358700000657692007E/ECTS_CHARM_SP12.PDF
    /people/dolores.correa/blog/2008/07/26/first-steps-to-work-with-change-request-management-scenario
    http://help.sap.com/saphelp_sm32/helpdata/en/0c/5b2160f6fa4b83a3674a210b1cdeb0/content.htm
    Regards
    Prakhar