Mass creation of BOM and Master Recipe for Plants

My client wants to do Mass BOM creation and Mass Master Recipe Creation from a Generic BOM and Generic Master Recipe for all 10 Plants by just a click of button.
He does not want to use copy function using CSO1 or C201, and do for plants 'one by one'. He finds it very time-consuming. He wants to copy for all ten plants all at once. Please advice how this can be accomplished in the best possible manner, and if by standard SAP.
Thanks,
Sac

Dear Sir ,
What is LSMW ?
I want to Copy some bill of material from another plant .I had used T code CS01 for it but only the header bill of material is copied .
The copy field in CS01 is only for first level boms the subsequent Boms are not copied .
so is there any other way to do it ? if possible please give the detail procedure .
Regards
Pankaj .
Edited by: pankaj.001 on Mar 9, 2011 10:55 AM

Similar Messages

  • Ways to secure BOMs and Master Recipes - Reg

    Hi ,
    Our requirement is to secure certain  Bills Of Materials and Master Recipes .
    Request inputs from the experts to achieve this . We need to maintain certain BOMs and Recipes  such that they are secured and handled by few set of people . I understand we can try doing this with some authorization object at BOM for changes etc.. but are  there better  ways to secure ?
    Regards,
    Madhu Kiran

    Hi ,
    Our requirement is not to restrict changes to BOM , Recipe and track  with ECM .
    Its a  kind of restricting few for the access of BOM , Recipe for which there shall be some kind if a solution using authorization groups creation and mapping . Currently exploring at our end on the same and would be grateful if some one could  provide better advice /methods .
    Regards,
    MK

  • Regarding creation of BOM through Master Recipe

    Dear all,
    I am trying to create a BOM but system is giving a message as BOM can be created through Master recipe only
    Please guide me where do we set this and what is to be done to avoid this
    Regards
    venkat

    Hi,
    Refer the answers from thread mentioned below.
    Re: BOM can only be extended via Master Recipe
    Regards,
    Lodhi.S

  • Planning for  product using multiple bom and multiple recipe involving SOP

    Hi friends,
    The problem. Currently we have maintained single BOM and single recipe (The BOM and Recipe used for MRP) for long term planning run. The FMCG sector of Client requested to have multiple BOMs and multiple recipes in the long term planning run. I.e. The planning is done quarterly and they wanted to use different BOMs and Different recipes for each quarter. But since the existing system has configured to use a single BOM and a single recipe we have a problem to use the long term planning run with the current setups.The problem we have is in this ‘001’ planning scenario.
    appreciate if you can help me how to accommodate multiple BOMs and recepis in the long term planning run.
    thanks and regards
    om

    HI Mr. Ready,
    We create PIR though a submit Job and in this case how to mention the production version while creating PIRs . Also if I am creating PIR through MD61 how to record the version.
    Please advice.
    Thanks and Regards,
    Om

  • Creation of business and technical systems for sld

    hi
    can any one help me out, to creation of technical and business system for system landscape directory ....give me detailed instructions.
    this is urgent requirement
    regds
    venky

    Hi pervalli,
    plz look to
    http://help.sap.com/saphelp_nw04/helpdata/de/31/f0ff69551e4f259fdad799a229363e/frameset.htm
    Regards,
    Udo

  • WIP Mass Load - Update BOMs and Routings on Unreleased Jobs

    I would like to be able to refresh the BOMs and Routings that are used by Discrete Jobs that are currently in status Unreleased. I would like to do this before I run MRP to ensure that any jobs marked as released during planning process have the most update to date BOM and Routing attached.
    I have tried to use the WIP Mass Load to do this by updating the Bom Revision Date and Routing Revision Date. Although this works in the Forms, when this Revision Date is updated via the WIP Mass Load,the BOM and Routing information remains the same.
    do I need to do something to trigger the change to BOMs and Routings on this Jobs via WIP Mass Load?
    I would appreciate any help on this subject.
    Thanks
    Barbara

    I think you may be able to use the Engineering Change order (ECO) functionality of the Engineering module to accomplish this. Even the BOM module contains some of the functionality.

  • Best production version and master recipe?

    Is there a way in SAP (ECC.5.0) to  choose the best production version on its own besides the date?
    Can MRP choose the best production version  and master recipe on its own based on cost?
    If so How? Config?
    Please advise
    thanks
    Walter

    Hi,
        MRP  selects production version based on   Lotsize,Validity date and status.In R/3 ,we dont have functionality like
       1. Simultaneous MRP and Capacity Planning
       2. Best Optimum  route of production.
    This is very much available in APO only. You can use either of Quota arrangement or Capacity evolution functionality to distribute planned qty into other resources based on past experience.
    Regards,
    Velmurugan S

  • Another account user is using my apple id as their rescue email. Apple know this but expect me to contact him directly rather that let lim know his error. Seem strange and a recipe for conflict. What do you think?

    Another apple account user has put my apple id as their rescue email. Apple know this but expect me to contact him directly rather that let lim know his error. Seem strange and a recipe for conflict. What do you think?

    Primary and alternate email addresses need to be verified but a rescue email address doesn't, it can be added to an account and used without being verified (you will get a verify button when adding/changing it, but the system doesn't force it to be verified). I would hope that the person using the email address as their rescue email address will notice that they aren't getting reset emails and that after contacting Support to get their security questions / password reset he/she will check what they've set it to and change it. The OP won't be able to log into the other account as he/she won't know its primary or alternate ids.

  • Reg:Opening and Closing Stock For Plant

    Hi All,
      i want to calculate the opening stock and closing stock for plant wise for the given Posting Period Date.
    Am having the opening balance and closing balance for all months but i need it as month wise.
    considering this example,
    the date is from 15.01.2010 to 15.03.2010 and for one plant
    considering this example,
    am having the opening stock from as 15.01.2010  to 15.03.2010 as 10,000 and the closing stock as 15,000.
    but i need in month wise like below,
    from 15.01.2010 to 31.01.2010 what is the opening stock and closing stock?
    from 01.02.2010 to 28.02.2010 what is the opening stock and closing stock?
    from 01.03.2010 to 15.03.2010 what is the opening stock and closing stock?
    this is purely based on plant wise and not material wise?
    could anybody say clearly how can i acheive this scenario?
    i have referred MB5b,mc.9 transaction programs but still confused how to go with plant wise for a particular period?
    Thanks & Regards,
    Suresh
    Edited by: suresh suresh on Mar 24, 2010 10:15 AM

    Hi,
    Refer to link below:
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/c1/3766e7449a11d188fe0000e8322f96/frameset.htm
    Regards,
    Venkat.

  • I need to display planned quantity and actual quantity for Plant in quarter

    Hi,
       I need to display planned quantity and actual quantity for Plant in quarter  AND  month wise as  below.
                                                                    Q1                              Q2  .......                              M1                                       M2 .........................................
    PLANT    MATERRIAL    UNIT     PLTY   ACTQTY          PLTY   ACQTY                   PLTY   ACQTY                    PLTY   ACQTY
    P1            M1                      EA        20        15                      30       25                             40       35                              50       45
    P1            M2                      EA        20        15                      30       25                             40       35                              50       45
    P2            M2                      EA        20        15                      30       25                             40       35                              50       45
    I will keep plant and material infoobject as row. Can you please suggest how i should design column section to display like above
    Regards
    Deep.

    Hi Deep,
    Assuming you have an InfoObject for Quarter (say 0CALQUARTER) & Month (say 0CALMONTH), drag the Quarter InfoObject & Month InfoObject below in the Columns. Drag your KFs i.e. Planned Qty & Actual Qty below the Month InfoObject to form a KF structure. If you don't want Qty Unit to be displayed alongside your KFs, use NODIM() function & display Unit in the Rows.
    --Priya

  • Maintenance activity type  and order type  for plant maintenance order

    How can i get the maintenance activity type  and order type  for a given plant maintenance order. Please let me know the table where i can get these two fields
    In AFIH i can only get the MAT for an order number

    Maintenance activity type -
    AFIH - ILART
    Order Category Indicator Plant Maintenance -
    AFIH - AKKNZ
    reward if heplful

  • Creation of MKK and Contract Account for New CRM Roles

    Hi Experts,
    I need a help in CRM for creating new roles and extending the same in R/3 in MKK role.
    Here is the problem I faced.
    I have copied the CRM000 role and created a new role ZCRM00 for
    business specific need. It is getting created in CRM and a BP is also
    getting created in R/3 BP but it is not creating an MKK Role in FI-CA.
    The following steps can be used to simulate the problem
    Step-1: Create a BP in CRM with the ZCRM00 role. Please do not
    extend or create the BP in Sold to Party Role. Because if the BP has
    Sold to Party role then the problem will not occur and Business does
    not want to have s in Sold to Party roles because customers will
    be having Sold to Party Role
    Step-2: Create a Business Agreement for that BP
    Step 3: Go to R/3. Run Transaction FPP3 and search for the BP created
    in  role. The system throws the message "usiness Partner <BP
    Number> does not exist in the MKK Role".
    Step-4: If you go to the transaction CAA2 and enter the Contract
    Account Number (Appearing in the Business Agreement Tab of BP Business
    AGreement Tab in CRM) and the BP Number the system will say "Business
    Partner <BP Number> does not exist in the Contract Partner.
    I have already executed the steps mentioned in OSS Notes 632749 but it did not result into anything.
    Can anybody please help me to create the MKK role and Contract Account in R/3 for the newly created role in CRM. I understand this thing works fine for the Sold to Party role in CRM. I believe when SAP has given the flexibility to create new role in CRM, there will be some way to create the MKK role and contract account automatically (very much like Sold to Party) in R/3.
    Looking forward for your reply
    Regards
    Karthi V

    Hi,
    Can you please guide us if you were able to resolve this issue and you were able to assign the MKK Contract partner role for the custom BP Roles.
    Thanks,
    Vamsi.

  • Regarding creation of bom and material in cfolder

    dear gurus,
    i want help from all of u.
    can any one tell me , what is the benefit of creating BOM / material in cfolder instead of R3.???????
    full reward points for useful answer
    thanks
    [email protected]

    Hi,
    cFolders is a collaboration tool (tool used for talking to 3rd parties outside your company.)
    Usually you will not give access to your ERP system to others. In that case you use cFolders as medium of sharing information with others.
    if the 3rd party colleague want to suggest some improvements or modify you design documents etc., he can do it in cFolders. This then can be verified by you in cFolders (once modification is done he can change the status in cFolders which will trigger a notification to you ) then import it to cFolders.
    regards
    Murugesh

  • 32-bit support for CS5.5 Production Premium and Master Collection  For Trial

    Where can I get 32 bit version of Premier Pro for trial?

    CS5.5 Production Premium &amp; Master Collection (Windows) include 32-bit Premiere Pro CS4 &amp; After Effects CS4: http://adobe.ly/n3Z4i4

  • Mass upload of characteristics and long text for Object Links in DIR

    hello all
    I want to upload characteristics and long text of Linked Objects in Documents: i wanted to use BAPI_OBJCL_CHANGE and family but, it is a class that is on a different level than the DIR as it does not belong to the DIR directly, but to objects that are linked TO the dir, via the tab linked object.
    any idea on how I can do that?
    LSMW and recordings do not work (or at least I did not find a way to make them work);
    have you encountered such a situation?
    thanks

    Dear,
    After call BAPI call also
    CALL FUNCTION 'BAPI_TRANSACTION_COMMIT'
    EXPORTING wait = 'X'.
    Please refer this thread also,
    BAPI_OBJCL_CHANGE.
    Regards,
    R.Brahmankar

Maybe you are looking for

  • How to set a background image to fill the entire screen on any device in a spark mobile application

    Hi, I started developing a mobile application with Flex. I'm trying to set a background image to fill the whole screen. I've been stucked at this point for days now. I tried everything and no solution seems to work for me. I'm using a TabbedViewNavig

  • How can I separate my itunes music from my windows media player music?

    I've tried changing the file location in preferences>advanced, but every time I open iTunes it doesn't find the library.

  • Calculating Standard working hours based on location/department

    Hi Experts, In Fusion HCM 8.0 Is there any way to calculate the Standard working hours based on location/department and FLSA code? For new hires, can this be populated based on above criteria? Please let me know how to proceed on this. Thanks in adva

  • Balance In Parent Account

    Hi All, This a question to which i searched the whole of Metalink and found only one answer NO. There is a Parent account which shows some balances. I do not know how it came up, the values actuly came from Assests when we ran depreciation. Is there

  • X-FI platinum driver upd

    Hi all, just bought a X-FI platinum my first creative sound card,been getting the scratch,hiss,screech etc problem many of you have also been reporting so i updated the drivers. Now everytime i try to use any X-FI installed app or the mode selector i