Mass Extension of Materials to various Plants

Hi there,
I have a Material NO. 11205 creted in Plant A001.  I have 30 Plants ranging from A001 to A010 then B001 to B010 and so on.  Is there a Transaction in SAP thru which I can extend Material 11205 in all the Plants at one shot?
Please assist.
Many Thanks

Hello,
There isn't a simple transaction to extend plants as there is for storage locations. In my experience, there are usually significant differences in the setup of materials in the different plants so you need to take account of these when extending plants. If this is something you do on a regular basis you can either set up an LSMW to create the new plant views or have an ABAP'er write you a custom program to do this.
Sorry I couldn't give you something more positive.
John.

Similar Messages

  • Mass extension of materials in the plant

    Hi friends,
    How to extend the mass of materials to the other plants?
    Thanks in advance.

    I have a small issue in LSMW. 
    I want to extend about 4000 Material to a new plant. I am using LSMW to do that. I have used BDC and I have called just three fields Material Number, Plant and Valuation Class. The Plant I have fixed i.e. put the constant number while the Material Number and Valuation Class is picked up from the excel CSV file. However when BDC reaches the stage where it take Plant input, it doesnt do anything neither it picked up the constant. I have tried all the option i.e. Use Constant, Use field from Excel file, Use Fixed Values. No matter what I do, it doesnt pick up the value.
    Please help in this, I am really tired of this issue.
    Sajid

  • Mass Extn. of materials to new plants(MM17 or any other T Code)

    Hi can you guys advise me on the following:-
    I havve materils A,B,C,D and so on which are let us say present in plant P1, P2,P3 and P4.
    My requirement is to do a mass extension of these materials to new plants which could be say P1A,P2A,P4 and say P3
    Kindly advise.
    I tried MM17 but could not complete the same as it the field WERKS of MARC does not come inthe search fields
    Thanks in anticipation
    Rajeev

    Hi,
    Use MMZ1 t.code for extension of material.
    Regards,
    Biju K

  • Bapi for Extension of materials to differnt plants

    Hi Gurus,
    i want extended the material to  differnt plant. using bapi , the bapi name is ''BAPI_MATERIAL_SAVEDATA'. while run the program error occured " MATERIAL DOES NOT EXIST I N THE PLANT 4000'  . pls give me idea how to extend the material to differnt plants.
    Thx in advance

    You can refer this link for more assistance
    link:[http://www.sap-img.com/abap/bapi-to-copy-materials-from-one-plant-to-another.htm]
    May be your mapping is wrong.

  • Mass Extension of BOM to a New Plant

    Dear all
    I have BOMs master data in the system for Plant 1000.
    However, I would like to perform mass extension these BOMs master data to Plant 2000.
    Can I use CS20 or other methods to do?
    Thanks
    Joseph

    Dear Joseph,
    There is no T Code to perform this activity in mass,create a BDC for the same and go ahead.
    For individual material you can assign the plant through CS05.
    Regards
    Mangalraj.S

  • Using Profit Center Accounting for balance sheet reporting on various plant

    Hi Gurus,
    Can anyone please tell me the steps I need to take to use PCA for balance sheet reporting on various plants under one company code. If there is a better way then please let me know. Thanks

    Hi,
    It depends on the organisation structure you decide on and as such PCA is recomended for your requirement.
    Cosider each plant as a Profit center and decide cost centers under each plant/profict centers.
    For all the materials under each plant assign the prfict center or that pant.
    Change the feild status groups for Profit centers as mandatory.
    If you are in 4.7EE You need to write derivaton rules & Assign dummy profit center for scenarios that overlap or for sales made by one plant of the stocks of other plant.
    Need to identify the Asset costcenter/Plant/location wise adn need to assign in ACSET.
    You need to rum F.5D , F.5E as period end process.
    Down payments need to be handled by way if user exits if you are in 4.7EE
    If you are in >= ECC5.0 then simply activating the document split will give you the PCA wise balances without much month end closing activities.
    Make Zero Balance and Profit centers as mandatory in document splitting charactersics.
    In any case you need to completely test the scenarios and how you are goinbg to get th eprofit center in all the scenarios.
    Reward if useful.
    Sarma

  • Mass extension of material

    Hi experts
    Whenever the material is created it has to be extended to 30 - 35 plants. Is there any standard t code by which we can extend it to all plants. (I think MM50 is one of t code). Is there any other t codes, Please inform
    Regards
    Muthukumar

    Hi,
    MM50 is for extending the material views only,
    1. For extending materials to other plants use MM17/MASS.
    2.Or , Use The LSMW or  BDC to extending materials to other plants.
    hope it helps...
    manoj singh

  • How to find materials in a plant

    Hello gurus
              Can anybody tell me 1. how to see materials in a plant ?
                                                2.Error Message SG105 Enter rate / USD rate type M for 03/21/2008 in the system setting.
    i am struggling with it please any body can help me
    Note : Please search forum before posting,Go through forum rules
    Edited by: Jeyakanthan A on May 26, 2011 12:28 AM

    Hi Kalyan,
    To find or to listout the materials based on the plant means, use t.code: MM60 and give the plant.
    then, you can retrieve the list of materials specifict to that plant.
    Or else you can also see,  all the relevent data of each material specific to the Plant or Plants through ABAP table view.
    use t.code:  SE16 or SE16N   in that enter table name:   MARC  or MARD     enter the Plant (s) , then execute (F8)
    it will listout all the relevent data of each material of the plant (s).
    But,
    where as the message what you have given is not specific to the question that you are asking?  and
    that is more relevent to exchange rate maintainence for currency " M " type. for USD vs INR combination or your client company code specific currency.
    Pls, let us get the clarity on the question, please?
    Hope you have understood.
    Regards,
    Sapsrin

  • How to Upload the Materials for one Plant and then copy the same to all oth

    Hi All,
       I am using Material Types NonStock, Service, Spare Parts and Trading.
       How to Upload the Materials for one Plant and then copy the same to all other plants.
    can anybody give response for this requirement.
    Regards...
    <b></b>

    Hi,
    Using MM01 Only we can upload Plant Details.
    If you want to extend to other plant also, Use MM01 and select Plant view and give new plant details.
    If you want to copy from one plant to another plant after selecting Plant view , next screen you can select From Plant and To Plant Details.
    Reward Points If it helps you.
    Regards,
    Murali K

  • Retive the changes done for materials in perticulare plant

    Hi Friends,
    i want to pull the changes done for materials in perticular plant
    for specific USER in a view.
    mean .. what the USER was changed for that meterials in plant.
    regards,

    Hi,
    Use CDHDR and CDPOS table.
    Thanks,
    Sen

  • Reg storage location for all the materials in the plant.

    Dear Gurus,
                       In my plant I would like to know the storage location for all the materials in the plant.can u guys suggest me the solution?

    If Stock is there in Each Storage Location then You can Run MMBE Report by Inputting Material & Plant. Then it will Show All the Storage Location Stocks for a Plant.
    Or you can Run MM60 Report Which will give you Detail Report.
    Else you Can Check in MMSC List of Extendable Storage Locations.
    Regards,
    Ashok

  • Assign multiple internal parts (materials of different plants) to one MPN

    HI
    I have a requirement to assign multiple internal parts (materials of different plants) to one manufacture part number.
    but in HERS material type it allows to assign to only one .
    can  any body suggest how can I do this.
    Sreeram

    You can do that.
    1:Assign the new plant to the sales org / distribution channel - Enterprise structure
    2:DO the shipping point determination for the new plant.
    3:Extend the materials to the new plant.
    4:If there is intercompnay process, please check "Assignmnet of organizational units to plants" in navigation SD - Billing - Intercompany billing.
    5: Check if there are any pricing records, output records....et cwhich has Plant as parameters. if yes maintain the entries for the new plant.
    These are the things I could think of.
    Before deleting the existing plants, make sure there are no open documents existing for these plants, else system will not allow to delete.
    Regards
    Sai
    Edited by: Sai on Jun 1, 2010 4:19 PM

  • BAPI to move materials from one plant to another

    Hi,
    I'm looking for a BAPI to move materials from one plant to another. Currently i'm carrying out the steps manually in transaction 'HUMO'.
    Kindly let me know if there is a BAPI available for the same.
    Thanks & Regards,
    Esha Raj

    Hi,
       To copy material from one plant to another plant we can do by MM01 TRANSACTION also, check below link it is helpful.
    [link1|Re: copy material from one plant to another]
    Thanks,
    Asit Purbey.

  • How to transfer all materials from one plant to other plants?

    How to transfer all materials from one plant to other plants?

    Hi
    To transfer stock in one step  between plants belonging to same company code use movement type "301" and using transaction code "MIGO". IF you like in two step it helps to monitor stock in transit use movement type "303" and "305".
    303 Transfer posting plant to plant in two steps - removal from storage
    305 Transfer posting plant to plant in two steps - placement in storage
    to transfer stock between plants of diffrent company code go for stock transpor order using tcode "me21n"
    hope it helps

  • Regarding extension of materials to new storage location.

    Hi ,
    Materials sourced from plants CH01,CH03,and LN01 needs to be extended to a new storage location .
    Could you please tell me, how it is to be done?
    Thanks!
    With Regards,
    Pritee.

    Extend the material to diff sto locations is
    T.code : MMSC
    enter the material and define the number of storage locations you want extend
    Laxman

Maybe you are looking for

  • Errors with publishing, please help

    I have recently published my site to a folder and then used fetch to transfer it to a server. When the site is transferred there are several errors that appear which include, spacing issues and strange icons on the pages. The website is www.buffbus.c

  • How to restore TABLESPACE not in backup set?

    I was playing with RMAN on one of my test databases. Here's what I did. 1) Performed full backup on an ARCHIVELOG enabled database 2) I created a table space named TBLSP 3) shutdown the database 4) Corrupted the only data file in TBLSP 5) startup As

  • Question about Web Cache!

    I want to install another web server on the 9iAS machine. Can Web cache simultaneously support the Apache and the IIS??

  • How to enable automatic sequence numbering for intercompnay invoice?

    How can the sequence for "PA Internal Invoice" be automated.?

  • Multiple result sets from stored procedure into CachedRowSet

    How can you obtain multiple sets of data from a stored procedure that returns multiple result sets, when you'd like to use CachedRowSet rather than ResultSet? My database's stored procedures return multiple result sets, but I'm not sure how to manipu