Mass Extn. of materials to new plants(MM17 or any other T Code)

Hi can you guys advise me on the following:-
I havve materils A,B,C,D and so on which are let us say present in plant P1, P2,P3 and P4.
My requirement is to do a mass extension of these materials to new plants which could be say P1A,P2A,P4 and say P3
Kindly advise.
I tried MM17 but could not complete the same as it the field WERKS of MARC does not come inthe search fields
Thanks in anticipation
Rajeev

Hi,
Use MMZ1 t.code for extension of material.
Regards,
Biju K

Similar Messages

  • Create/extend materials for new plant with new profit centers

    Hi.
    We have created a new plant and want to create/extend the materials from an existing plant to the new plant (with new profit center). Can this be done via MM17?
    Regards,
    Kjettern

    Hi Kjettern,
    To extend the existing material to a new Plant/Profit centre, pls follow the following steps: -
    1. Copy down the material number (i.e XYZ) you want to extend.
    2. Go to t-code MM01.
    3. Enter the material number (i.e. XYZ) you copied from (1) into the Material field and hit ENTER.
    4. You will get an information on the bottom that "the material type XXX and the industry sector YYY has been copied from master record".
    5. Pls note that Basic Data 1 & 2 is not changeable as the same set of material data will be used when a material is extended.
    6. Hit ENTER again. To change other details other than Basic Data 1 & 2, select the views that you want.
    7. You will be prompted to enter a Plant. Here you must enter the new Plant that you want to extend the material to and hit ENTER.
    8. You will get a confirmation stating that the material already existed and will be extended (to the desired Plant u entered in (7)).
    9. Ensure that all the data in all the important tabs are maintained, for the right Storage Location, Warehouse Num, Moving Average Price, Standard Price etc. before proceed further.
    10. Hit Save. You will get a msg that "Material XYZ created".
    Now you are able to use this material number in the new Plant you created.
    Hope this helps.
    Rgds.

  • Mass extension of materials in the plant

    Hi friends,
    How to extend the mass of materials to the other plants?
    Thanks in advance.

    I have a small issue in LSMW. 
    I want to extend about 4000 Material to a new plant. I am using LSMW to do that. I have used BDC and I have called just three fields Material Number, Plant and Valuation Class. The Plant I have fixed i.e. put the constant number while the Material Number and Valuation Class is picked up from the excel CSV file. However when BDC reaches the stage where it take Plant input, it doesnt do anything neither it picked up the constant. I have tried all the option i.e. Use Constant, Use field from Excel file, Use Fixed Values. No matter what I do, it doesnt pick up the value.
    Please help in this, I am really tired of this issue.
    Sajid

  • MM LSMW extending materials to new plant

    Hi Experts,
    I got a requirement, where I need to create a LSMW for extending the materials for a new plant. Should I use MM01 or MM02 Direct Input Method of LSMW(RMDATIND). Kindly help me with this.
    Regards,
    Riya

    why dont you try it yourself manually before you try to do it with a load program.
    Just execute MM02 in your system and try to extend it to a new plant, you will immediatly have your answer.
    Change: you can only change what exists
    Create: you create something that does not exist.
    Can you change the plant data that does not yet exist in material master?

  • Mass Extension of Materials to various Plants

    Hi there,
    I have a Material NO. 11205 creted in Plant A001.  I have 30 Plants ranging from A001 to A010 then B001 to B010 and so on.  Is there a Transaction in SAP thru which I can extend Material 11205 in all the Plants at one shot?
    Please assist.
    Many Thanks

    Hello,
    There isn't a simple transaction to extend plants as there is for storage locations. In my experience, there are usually significant differences in the setup of materials in the different plants so you need to take account of these when extending plants. If this is something you do on a regular basis you can either set up an LSMW to create the new plant views or have an ABAP'er write you a custom program to do this.
    Sorry I couldn't give you something more positive.
    John.

  • Assets in New plant rollout with in the company code

    Hi guys,
    My client is went on go live 31.03.2007 (Legacy asset transfer date) and there is one more plant which is maintaining in Legacy system, now client doing roll out for that particular plant  golive date is 31.03.2009 (plant).
    Now My problem is when I am trying to do the AS91 (Legacy data transfer for plant) with capitalization date 31.03.2009 am getting an error message "Capitalization date must be earlier than or same as transfer date".
    Please  suggest me how resolve this issue and If I change the Asset transfer date from 31.03.2007 to 31.03.2009 is there any impact for the assets which was already capitalized for other plant.  Acctually how Legacy Asset transfer date will work, please give some light to proceed further.
    Thanks for your help and support

    Hi
    Thanks for your replay, but these are not the new assets (Asset are already capitalized in plant, not that plant rollout is happeing, so now we want capture the accumulated depreciation as well.
    If I do AS01 it is not possible to upload accumulated depreciation in Asset subledger.
    Please not in legacy system depreciation already calculated till 31.03.2009.
    Please suggest me.
    Thanks
    Sreenivas

  • Contact names transfer in sync to new computer but not any other info-why?

    New computer-trying to transfer contacts from iPad (and iPhone) to the Outlook on PC....the names carried over in the sync process, but zero numbers, email addresses, etc...help!

    Answered my own question - sort of (and after some hours)...
    Plenty of other threads refer to the how-to-copy-your-library support pages - in my case, I'd used this to copy an older iPod library to the new laptop and did not copy the iPhone library as well.
    Copying the full library off the old library fixes the problem for the iPhone and I'm now rebuilding the music+podcast library to support the iPod.
    Summary is that you must copy the library for the iPhone from old to new PCs. If you have another i* device, then you may run into the same issue as me...

  • Reg:T-CODE for open and close period for materials(new plant).

    hi sap guru's
    T-code for following process
        can anybody send me , how to create calendar to new plant . and what is the T-code to be use for open and close period of materials for new plant.
    thanks
    sakthi..

    Hi Sakthi,
    I am assuming that you are asking about the factory calendars which are assigned while difing the plant.
    Factory calendars are created through transaction "SCAL".
    Opening and closing of MM periods can be done through transaction MMPV.This is based on the company code.Before using MMPV ,you can look the last opened period in the transaction MMRV.
    Reward points if it helps.
    Regards
    Karan

  • Update for MIC - Qn / Ql for new plant

    Dear Experts,
    I need one clarification.
    we have created one new plant in quality inspection side, till not created any code group and selected set
    for the particular new plant.
    But already having the code group and selected set for the existing plant.
    It is possible for use the existing plant code group and selected set in new plant.
    or
    It will be created in new code group and selected set in new plant.
    What is the way for update in single item  and mas  update procedure.
    through any t.code or LSMW?
    I am waiting for yours valuable feedback.
    Thanks with best regards,
    N.Umapathy

    Hi,
    these all variants which are not transportable...you can directly do test in quality and production...
    Kuber

  • LSMW for extending materials to new set of plants

    Hello All,
    Our requirement is to extend some hundreds of materials to a set of few plants. Can this be done in LSMW? Or should BDC be used??
    Please elaborate on this.
    Regards
    Mahesh

    Hi Girish,
    How can I extend materials to a new plant and Sales Org.  through LSMW?
    I use the Standard Batch Object 0020, program RMDATIND for creating new Materials the first time (this qworks fine), but there is no option 'Extend to existing material'  or there is no field called Reference Material...
    Maybe it is because we use internal numbering of the new Materials that makes it unpossible to extend materials to existing material-numbers?
    Thank you, regards, Walter.

  • Purchase of Raw Mat by New Plant (CoCd New) from Old Plant (CoCd Old), STO?

    Dear all
    Our HQ which has an operating Plant A belonged to Company Code (CoCd) A,has acquired Plant B belonged to Company Code B.
    And due to the supply change management issue and strategic business location, HQ has decided to move both Plant A and Plant B into a new location (both Plant A and B are located quite far from each other) and these 2 plants are going to be consolidated into a new Plant C with new Company Code C. And CoCd A and B will then cease to operate.
    Now, due to the legal requirements, CoCd C will need to purchase all the raw materials from both CoCd A and CoCd B respectively at a different date due to the plant move.
    Previously, I have come out with the solutions
    1. Extend the material codes of Plant A & B to Plant C. Extend the SLOC as well.
    2. Plant C will create normal PO to buy from Plant A, with vendor = Plant A. Price will take from Supplying Plant A.
    3. Plant C will perform GR reference to this PO. Here the Stock Account of Plant C will be Debit.
    4. To reduce Stock Account of Plant A, perform GI to Scrap. Then FICO will do double entry to bring the value to Customer Account which is Plant C.
    5. Since we do not PGI or touch on SD, there is no billing doc and manual customer invoice has to be done.
    However, on 2nd thought, I think of to use Stock Transport Order. However, there are a few types of Stock Transport Order in SAP HELP:
    1. STO between Plants with 1 step
    2. STO between Plants with 2 steps
    3. STO with SD delivery
    4. STO without Delivery
    5. STO with SD delivery and billing.
    We are running against time and would prefer not to touch on anything in SD to do STO. And we do not need to monitor the Stock Transit as physical plant move will take place first, that make STO in PLant with 2 steps no applicable.
    Requirement:
    1. PO raised must take the standard price in Material Master of the supplying plant.
    2. It involves buying of stocks of 1 new plant C from the old plant A & B at the respective time. Accoutning document and relevant posting must be audited for legal purpose.
    3. If possible, we prefer not to touch on SD or the complicated solution to achieve this purpose.
    I have read a lot about the above 5 types of STO but I am unsure which one is best suit me. Please advise.
    Thanks.

    I just tested with Option 4: Create STO without SD Delivery.
    However, in the PO itself, it does not even have the INVOICE TAB at the item level. How am I going to perform Invoice Verfication to put the 17 % input tax which is very important?
    However, I have proceded with my testing for STO without Delivery
    1. Create PO with UB Doc Type and Item Category U, supply plant = Plant A. However, there is no Invoice Tab at the item.
    2. Perform GI reference PO, MVT 351. Here due to come missing config, I have done the following:
         a.Company Clearing Account
         b.Create customer master  CoCd CN10
         c.Create vendor master for CoCd CN50
         d.Account type D is not defined for document type WA. Go to OBA7 to tick Customer.
         e.Account type K is not defined for document type WA. Go to OBA7 to tick Vendor
        1 Material doc with 2 accounting doc generated, each for CoCd C and CoCd A
    4. Perform GR referenc ePO, MVT 101.
        1 Material doc generated with no accounting doc.
    5. MMBE Stock Overview, stock quantity of Plant A is now transferred to new plant C.
    There is no way I can do invoice as in MIRO, it said my PO contains no item.
    I desperately need my perform STO to have
    (a) Invoice Verification to capture input tax 17%
    (b) Delivery Cost maintained.
    I do not want to complicate the material master maintenance of the sales view of all my 16000 raw materials. That is why I prefer not to go for STO with SD DElivery.
    Can anyone please advise?
    Edited by: Daimos on Sep 4, 2009 12:49 PM

  • Abap dev for new plant

    Dear all,
    We acquired new plant, and we are inegrating that new plant which is not in sap, into our sap system.
    and lots of customizations have to be done.
    I understand that on the mm front new plants creation, assignments to cocode, BA etc happen.
    I am quite sure about abap front.
    What developemnts would be needed on abap front:
    like extension of all teh materials to the new plant.  I think this can be handled through LSMW.
    what else abap developments do i expect.

    This will depend on, when and where the data related with plant is required.
    As per my understanding the ABAP development which summarize the data at plant level will be impacted.
    In case , you have hardcoded values on the basis of plant , then you have to consider the new plant also.
    Get all the Z reports related with plant information and check. Its will be easy if you view the modification log and naming convertion.Hope it help you.

  • How to Upload the Materials for one Plant and then copy the same to all oth

    Hi All,
       I am using Material Types NonStock, Service, Spare Parts and Trading.
       How to Upload the Materials for one Plant and then copy the same to all other plants.
    can anybody give response for this requirement.
    Regards...
    <b></b>

    Hi,
    Using MM01 Only we can upload Plant Details.
    If you want to extend to other plant also, Use MM01 and select Plant view and give new plant details.
    If you want to copy from one plant to another plant after selecting Plant view , next screen you can select From Plant and To Plant Details.
    Reward Points If it helps you.
    Regards,
    Murali K

  • Establish materials' handling in Plant

    Hi,
    Scenario: My user have 4 new projects for plant XYZ.  Since they want to see the materials by project (materials will share the same warehouse) they requested to create new plant for each project! for easy monitoring. Is there any way in  to handle these materials in the warehouse and same plant but different project.
    Thanks

    You can use the special stock - Projects for achieving your requirement. The stocks will be separately identified as Project stock with special indicator. Creating a plant for this is not a good approach. A plant should only be used for representing a manufacturing location or a legal entity. Also if tomorrow, you have more projects, you will be forced to create more plants and addition of each plant means lot of master data requirements, soon you will be immersed in a sea of unnecessary data.

  • Core Interface for new plants

    Hi All:
    We created new plants and have all the other transaction data.  But when I created the IM for these plants and activated the model, I do not see these plants data in APO.  I tried it a few times.  I checked if the connectivity between APO and R3 was an issue.  It is not.  What are the things I can look for?  Transaction /SAPAPO/C3 gave me one message 'Incorrect import parameter for method /SAPAPO/CL_CURTO_DB=>SAVE_DATA.

    Sorry... I send the message before I completed the message.....
    Hi All:
    Looks like the new locations has been CIFed already.  Then I created an IM for some specific materials and some of these plants.  I could activate the model, I do see these material plant combo in the active IM (CFM2). But they are not in APO (RRP3 or MAT1). 
    I checked the following transactions in R3 (SLG1 and CFG1) and (/sapapo/C3).  I dont see any log for these.
    I checked the queues both in R3 and APO and they are not blocked.  But there are many other logs in APO that are greyed (not red, not green) which tells me that they have not been processed yet.  My suspicion is if are processed at all. 
    I checked the connection (changed a factor in an existing material plant and they flow).
    Can anyone help pl?

Maybe you are looking for

  • How do i get my nokia n8 to print to my officejet pro 8500a?

    Hello Can anyone tell me how to get my Nokia N8 mobile phone to print a photo using HP Officejet Pro 8500A? I have got the wireless connection enabled, but when I select the photo on the phone and click on Print, via Bluetooth connection, the Printer

  • Need urgent help with database startup

    dear all, i am using oracle 10g on windower server 32 bit. i try to startup my database today, and it give me error, and it is my production database, i need very urgent help from you.(i have no rman backup , and the data is not so necessory, since i

  • Ora Errors in Alert Log:ORA-27508, ORA-27507, ORA-27300, ORA-27301

    Hi All, I have a Solaris 5.9 machine with Oracle 9.2.0 installed on it. But the connectivity to the database is lost intermittently. I am getting the below mentioned message in the Alert Log: ORA-27508: IPC error sending a message ORA-27507: IPC erro

  • Converting the Opaque Element into Readable format.

    Hi, Right now, I am using the FTP adapter to continously poll for a new file. Whenever new file comes in, our BPEL process gets initiated. We get the contents of the file in the variable of opaque element( I have given Message Schema is Opaque in the

  • Badi for searchterm and lifecycle

    Hi, When an account is created then the value in searchterm is checked against a table .If the value in searchterm is present in the ztable and our lifecycle value is customer then that account is created otherwise an error message is to be returned