Mass maintainance of material master

Dear Gurus,
We want to maintain some missing field on the MRP views of the material masters for all materials(FERT, HALB AND ROH). Pls what T-CODE or how can we maintain this since the materials are up to 10,000 in all.
Thanks

Hi
As you have more records, its good to use LSMW batch input or BDC
With regards
Pavan

Similar Messages

  • Error during Mass Maintenance of Material Master

    Dear All SAP guru,
    During mass maintenance of order unit ( PCS) and variable order unit "1" (Active) from T-code MM17, system is giving one error message.
    Error Mess:  30000052280140 : Messages have been issued: number MASS000120000000 and notification No.:
    MK101.
    While system allowing automatically to log through MM90, but after puting the log no.: MASS000120000000, system is not execting.
    Pl suggest ....as conversation factor is also maintained in material master for this.
    Regards,
    Pinku.

    HI ,
    check note 487111.
    According to this note
    Symptom
    In the planning data mass maintenance (MPGD_MASS), you select the "Conversion" field (UMREF) and enter the new value e.g. '2,01' and save the change. In the log of the mass maintenance, the system issues error
    MK101:
               ....... : Messages have been issued: number MASS............
    Detailed display of error message:
    Message number BF 020
               Value cannot be interpreted as a floating-point number. Other terms
    Reason and Prerequisites
    The problem is caused by a program error.
    The symptom occurs if during the maintenance of your own user profiles, you defined "Comma" for the decimal notation (Transaction SU3).
    Due to a program error, the system saves the value of the field to be changed program-internally in the exponential display with "Point" as the decimal place (2.01E+00).
    Solution :
    You have implement the solution mentioned in the note .
    Regards,
    Anupam

  • How to maintain the material master data in plant

    Hi all,
    while creating BOM I am getting an error "no material master data in plant' can some one help me how to maintain the material master data in plant
    Regards,
    Balu

    Check the material available in MARC table in SE11 transaction against your plant.If it is not available please maintain through MM01 transaction.

  • Mass maintainenance of material master for the field MARC-NCOST,SOBSK

    Hi
    While maintaining two fields NCOST and SOBSK for hude materials using MM17 transaction, the transaction executed properly while saving the transaction. There is no warning and error messages for all materials. But it was not updated in material master or in tables. for other field relavent to MRP updated correctly.
    when I am maintaining manually for each material it is taking the value update the same.
    Please explain the problem why it was not updating and let me know the solution.
    Regards
    Kishore

    Hi,
    Thanks for ur response.
    I am getting green light. Please note the application message given below.
    "The material cannot be maintained since no maintainable data transferred
    Message no. MG160
    Diagnosis
    You wanted to maintain an existing material master record as follows:
    By changing it
    However, you have not yet maintained the material master record for the organizational levels and data fields specified, or user departments selected. You can therefore process this data only in Create mode.
    By extending it
    However, you have already fully created the material master record for the organizational levels and data fields specified, or user departments selected. You can therefore process this data only in Change mode.
    In both cases, this message can appear if there is no maintainable user department left. This occurs if you have not set the Check required fields indicator when transferring data (program RMDATIND). Although the absence of an entry in required fields does not then necessarily result in an error, the number of maintainable user departments is reduced accordingly.
    Procedure
    Depending on the cause, maintain the material master record in Create or Change mode, or also transfer the missing required fields."
    where can I find IDoc list for this transaction.
    Regards
    Kishore

  • Mass changes of Material Master field with different values

    Hi,
    How to change a field in Material Master for more than thousand materials. I think MM17 can only be used for mass changes of materials with same values. I need to upload different values for different materials. Is there any other way to do this.
    Thanks,
    K R Vishnu Kumar

    Hi Kumar.
    I think you have to use LSMW for mass updation for Material Master fields with different values.
    Regards,
    Rahul.

  • Mass updating of material master

    Hi,
    can any one plz tell me the process of mass updation of material master charecteristics such as classification name, classification type,charecteristics name, charecteristics value for the given materials.
    give me some brief overview so that i can proceed on that.
    I have to use either BAPI or IDOC only.
    Thanks & Regards
    Nageswar

    Hi Eswar,
    Please check with BAPI_OBJCL_CREATE_KEY. There are no of threads available on same topic. lease check for the available information in SCN.I will suggest you post this in Data transfers forum.
    Same thread
    mass updating of material master
    which was blocked by moderator  Thomas and posted the same again
    Regards,
    Madhu.
    Edited by: madhurao123 on Nov 2, 2011 11:43 AM
    Edited by: madhurao123 on Nov 2, 2011 11:45 AM
    Edited by: madhurao123 on Nov 2, 2011 11:47 AM

  • Problem with mass IDoc for Material Master

    Hi All,
    Can anyone suggest a solution to work with mass IDocs for Material master?
    We have DEBMDM and CREMDM as mass capable IDocs for Customer and Vendor. How do we get mass Material Master IDocs from R/3 in a single XML file?
    Also the standard Material repository supplied with SAP MDM 5.5 SP3 doesn't have any XSD definition for MATMDM. Can anyone throw some light on this problem?
    Regards
    Pooja

    Hello Pooja:
    The standard way to do it is to generate a single file containing multiple idocs (And for the sake of performance, I suggest you stick to this technique).
    In the case of material master, everything is straight forward. In the case of customer and vendor master, when data flows from R/3 to MDM no idoc conversion needs to be performed by XI.
    However, for the case of customer and vendor master, when data flows from MDM to R/3, XI needs to separate the data in CREMDM to CREMAS and ADRMAS in order for R/3 to be able to process the idocs; as well as separate the data in DEBMDM to DEBMAS and ADRMAS.
    The good thing is that you do not need to worry about all this mappings and conversions in XI. The only thing you need to do in XI is to import the standard business content for SAP MDM 5.5 into XI.
    Hope this helps.
    Regards,
    Jorge.

  • Mass update on Material Master

    Hi MM experts,
    How can I "mass update" a large number of material to avoid a lot of manual work?
    Specifically updating/changing  Commodity code / Import code number for foreign trade.
    thanks!
    Warm regards,
    Jump

    Hi,
    Please try using T code MM17 to carry out mass change to material master record.
    Regards
    ram

  • Mass change of material master

    Hi Experts,
    I have a query regarding mass change to be done in material master. I need to update one value in the Material group 4 field in sales org view 2 in MM02 transaction for nearly 300000 materials. One option i find is LSMW and the other i saw is transaction MM17. Please let me know how feasible is this MM17 transaction? Is it possible to upload all the 30000 materials through MM17 transaction in one go and update the field? Will there be any performance issue if MM17 transaction is used?
    Please give your suggestion.
    Thanks
    Dinakar

    Hi,
    Use MM17,
    Goto the Transaction code MM17 and in the table check the MVKE- sales org data for material
    and select the Fields tab and choose the field MVKE-MVGR4 and  execute
    Now enter all the materials in the next screen  for which you want to change  and execute
    In the next screen you can maintain the new values for the old
    Please check and revert
    thanks,
    santosh

  • Mass Change in Material Master

    How to do mass Change of material group (say from 1HA TO 1HB) in material master in basic data 1 tab.
    Plz explain steps.

    Hi Rohit,
    Follow the Steps  SPRO - SAP Reference IMG - Production - Material
    Requirement Planning - Planning - Define Storage location MRP per plant - Enter
    the plant - Check for which Storage locations has got the indicator 1 - Storage
    Location stock excluded from MRP - Now remove that or choose the values.
    if you give me brief i can help you out more.
    Thank you .
    Regards
    Ram

  • Mass deletion of material master at plant level

    Hi,
    Is there any way to flag materials nearly 500 Nos for deletion at plant level.
    Regards,
    Vengat

    hi,
    Use mass transaction for putting the delete indicator for the material master...this is to be done from MM17 tcode...
    and later they all could archived...Archive it from MM71 and can display this from MM72..
    Regards
    Priyanka.P

  • Mass extension of material master to differnt sales area

    Hi,
    How can we extend material master to different sales area enmasse.?
    Regards
    Kantha

    A material master is not just linked to a sales area.
    you have to create sales views per sales org and distribution channel.
    there are many fields in there that need to be maintained, SAP stores this info in table KNVV
    if all data in the new sales area is equal to an existing sales area, then you can easily extend using MM17, if not, then you have to use LSMW.
    MMSC_MASS is for storage location extension, this is certainly not a transaction to create sales area data views.

  • Mass maintenance of material master

    Folks
    I am trying to make mass maintenance to certain fields in the material master. I want to change the MRP type from PD to X0 for several materials.
    How do I accomplish this on single shot ?
    Thanks

    Hi
    Please follow the below steps to mass change your MRP type.
    1.Go to transation MM17
    2.Select MARC in the tab Tables
    3.Select MARC-DISMM in the tab Fields & Execute
    4.Input the materials & plants ehich under goes changes.Execute.
    5.You will get two section of screens.In the top you can see New values with emty field.you can give the new value.In the bottom you get the details of existing field for material/plant combination
    6.Click the button called Carry out mass changes
    7.Save and check the log for any errors.
    You have to consider the mandatory fields that affected during the change of MRP type.
    Hope you can do the changes now.
    Thanks / karthik

  • Mass Deletion of Material Master

    Hi All
    Please am trying to delete material master have created. i need a Tcode for mass deletion.
    Thank you.

    Hi,
    In MM06 you can set deletion flag for materials (mara-lvorm).  For multiple materials, use T. Codes MM17 or MASS. 
    ---> Select MARA Table
    ---> Select multiple selection, past all material list and execute.
    ---> Select DF at client level from field selection tab.
    To delete the Material Master records totally, use SARA.  If there is posting done, then need to archieve that too.

  • Profit Center Maintaining in Material Master

    Dear Friends,
    One of my client has Posted a material(without maintaining Profit center in Materila master) to wrong profitcenter.
    Now he is trying to maintain the correct profit center in Material master record for that material.
    But system not allowing this as there is stock for that material in warehouse.
    My client Requirement is,
    He want to maintain the correct Profit center in Master Data without reversing the whole stock.
    Can u pls tel me is it possible or not.
    if it possible means kindly explain the steps.
    Rgds,
    Sankar D

    If your client is very much strict enough to change the profit center in Material master only then you also tell him strictly that it is not possible & thats why the system is giving the error message.
    Regards,
    Indranil

Maybe you are looking for

  • Camera Raw Ver 8 does not open Canon 20D images

    I recently updated Photoshop CS6, Camera Raw plugin to Ver 8.1.0.43  Now for some reason the CR2 images from my Canon 20D will not open. These images used to open just fine in Camera Raw Ver 7.  Has CR Ver 8 dropped support for the Canon 20D raw imag

  • 5700 Xpress Music V03.83.1 freakin'

    *There is an error to report the correct time in Message details as well as, *There is an error the picture taken time to show the correct time of picture taken. *In 3-D Tones another error that it does not work in reverb mode of Railway station; Duc

  • SQL Queries in Code V/s Stored Procedures

    Hi Friend, Can any one of you guide me with following.. What is faster ? using SQL Queries in Java code or using Stored Procedures which are called from code? I understnd Stroed Procedures are faster and definitely it provides more maintainability. I

  • Document Templates in MS Word - how to cut the leading zeroes in number

    Hello CRM gurus ! We use document templates in MS Word but have the document number printed with the leading zeroes. example we have now: 0005000681 example we want to have: 5000681 Question - how to do that? Is that in standard? The document number

  • Macbook Pro randomly and regularly. Any help?

    My Macbook Pro (Mid 2010, 2.66 Ghz Intel i7, 8Gb, 10.8) keeps randomly restarting. It doesnt appear to be related to any open apps, I have checked the smart status of my drives etc. and so far no luck. I would really appreciate some help, below is th