Mass processing for rough-cut capacity

Hello PP experts,
Help me with the options of checking rough cut capacity in flexible planning in Mass.
Are there any separate transactions availbable or can i create a macro?
Thanks,
G.Madhvaraj.

Thanks Brahmankar, I understand that. Next doubt is,
This rough cut capacity situation is not been stored in my info structure.Where does it get stroed?
G.Madhvaraj.

Similar Messages

  • Problem in rough cut capacity planning

    Hi,
    I am facing following problem in rough cut capacity planning....
    When the capacity is overloaded in a particular month then capacity requirement is getting passed on to previous month as shown below....int the month of MAY 2014 capacity is getting overloaded then capacity requirement is transferred to Previous month APR 2014... I don't want this...what can be done to avoid this....I want to see overload in month wise....Plz help
    Thanks
    Kumar

    Hi Rupesh,
    Thanks for your help...finally issue is resolved...making the changes in OPU4 done the job...in OPU4 we need to remove the indicator of scheduling for rough cut capacity planning ........now getting the results as desired...

  • PP-PI:  Rough-cut capacity

    Hi Gurus,
    We are in a process industry and using descrete production. We are not using production group but we use product hierarchy.
    Now we want to run rough cut capacity to check resource capacity. Can anyone send me the complete scenario to check rough-cut capacity in my environment?
    Thanks in advance.
    Shiv

    1. Create a rough cut capacity planning profile in the Tcode mc35 using the infostructure.
    2. Then create your planning data for the flexible planning  mc93
    3. then when you create the Planning data in the View Tab - y ou have the capacity situation .
    4. when you select this it will branch to the Rough cut capacity planning - then select show in that
    5. Now based onthe values that you avhe maintianed in the RCCP you can see the capacity requirement in an additional screen below your planing values.
    Check the configuration for the
    Configure scheduling parameters in the SOP menu of the SPRO
    Let me know if you need more details

  • Rough-cut Capacity Check at any level on the Plng Hierarchy ??

    Fellow Experts,
    I have the following Planning hierarchy on my self-defined, consistent planning, Info structure:
    MFG Plant >> Prod Family >> Materials.
    Product Family is a grouping of materials by Machine Cells(Work centers). I've the data available @ the material level & the same is also auto-aggregated at the Prod Family levels. At this point I want to trigger Rough-cut capacity check at the Product Family level.
    I've maintained the key-figure on the Info Structure, required data set-up on MC35, config for Scheduling parameters (to do rough-cut planning) & selection ID maintenance for Rough-cut Plng Profile to be picked up. Yet, the system keeps bumping me off with "No Resource Load exists" error.
    Is there something wrong I'm doing or my expectations are incorrect?? Could someone help me out here??
    Cheers
    Anand

    HI,
    Make sure the capacity planning relevant field is maintained for the Infostructure config setttings in MC7F.
    Regards
    Ratan

  • Rough Cut Capacity Profile

    Hello All,
    I want to ask about Rough Cut Capacity Profile and how to analyse it in MC82 t-code,
    I have made RCCP using MC35 for a Product Group X, where i use 2000 ton for the base qty
    After that, i use MC82 t-code and than I enter the production line for just 1 month, for example i enter production value for June 2010, but for April,May and June still blank
    The Problem is when i choose View --> Capacity Situation --> Rough Cut Planning --> Show, to analyse the capacity requirement,
    I get that the Capacity Rqmnt value is not only in June, but also in May, Why it has to divide the calculation for 2 month? , because i just entry the production line for June, so i expect that the capacity rqmnt value is just appear in June
    and How to calculate the formula for capacity rqmnt in MC82 ?
    Regards,
    Marufat

    Hello All,
    Is there anyone who can help me?
    Please, I really need to solve this problem
    Regards,
    Marufat

  • Mass Processing for Forecast SOP

    Hi Experts,
    I have one requirement, I have to run Mass Processing for Forecast SOP in background Job based on consumption values updated in Material Master.
    I have followed all instruction give for doing this process (SAP SOP Mass Processing - SAPs'WORD - We SAP For Your Cause) but could not achieve.
    Can any one help to run in background job for Mass Processing for Forecast SOP.
    Thanks in Advance
    V.Sundeep

    Hello,
    Refer KBA    1778072 - Error message MA 653 when running mass processing forecast (program RMCP6BIN)
    Internal condition NOT IPRWA-VGVON IS INITIAL not fulfilled
    Internal condition NOT IPRWA-VGBIS IS INITIAL not fulfilled
    Forecast/historical period cannot be calculated MA 653
    Check your planning type which is used for your batch job. The number of historical periods in planning type (transaction MC8B) must not be smaller than the number of historical periods in forecast profile (transaction MC96). If the number of forecast period is maintained in the forecast profile (transaction MC96) the number of future period in the planning type must not be smaller than the number of forecast period in the forecast profile.
    A not appropriate entry in SOP User Settings (transaction MC79) in Number of periods in the planning horizon can have an effect on this also.
    Best Regards,
    R.Brahmankar

  • Rough Cut Capacity Planning

    Hey all,
    i wanted to configure Rough Cut Capacity Planning in such a way that
    1. i could view capacities of workcenters given that the demand (load) of planned orders could be executed in a particular period.
    I accomplished this partially, meaning i could find out the bottlenecks on the workcenters but this was only on single material level, if i wanted to run this check on multiple the system, supposedly, offers me the option of using the product group, my question is, where do i view these bottlenecks on capacity IF i want to run RCCP on Multiple products.
    2. i wanted to find out exactly how much i can produce in a period, given that the external and internal procurement lead times are incorporated this is usually reffered to as Master Production Scheduling, as far as i know atleast.
    kindly shed some light on these matters.
    Regards,
    Danish
    PS. i've seen similar posts to this but none directly addressing these issues hence i felt the need to ask these questions seprately.

    to further clarify my question i would like to see, as a result of stimulative planning (RCCP):
    1. Impact of Planning (planned order quantities) from ALL materials that were being planned on work centers used in recipes.
    2. Identification of bottlenecks, which is of course the subsequent function from point 1.
    3. Capability to produce with reference to Materials availability (lead-times being incorporated of components).

  • Mass processing for SOP

    Hi,
    I am able create sale plan through MC87 transaction by selecting the create sale plan through forecasting, when total consumption values are maintained in the material. But I want this to be done by MASS processing function. In other words I want to up date key figure sales in S076 table.
    There is one tcode MPBT which is to create total forecast in background. But this is happening only when unplanned consumption values are maintained in material. Is this behaviour is correct?
    Can u detail the configuration settings required for mass processing of SOP.
    Through help I came to now that mass processing can be done for forecasting. Is this forecasting and creating sales plan are same. Kindly brief.
    Thanks & Regards,
    N. Laxman

    you can refer the below link:
    [http://help.sap.com/printdocu/core/Print46c/en/data/pdf/LOLISPLN/LOLISPLN.pdf]
    configuration steps for SOP:
    1)Set parameter for Info structure and Key figure
    2)Maintain Transfer Profile
    3)Define Activity
    4)Define Key figure assignment
    5)Define copy profile.
    procedure of Standard SOP:
    1. Create Plan in inactive version
    2. Disaggregate product group plan & Check capacity
    3. Version Management
    4. Transfer Product group to planning
    procedure of Flexible Planning:
    1.Create Plan in inactive version
    2.Convert Plan in to Active Version
    3.Transfer to Demand management
    Master Data in SOP:
    1.Information Structure
    2.Planning Type
    3.Planning Hierarchy
    4.Product Group
    5.Resource
    6.Rough cut planning profile
    It's very helpful link & std procedures for SOP.
    SOP steps have 3 classifications
    1) STD SOP for Material
    2) STD SOP for Product Group
    3) Flexible Planning
    A) Now Let we take STD SOP for Material
    This will takes place in Material and Plant level
    so the charateristics will be Material and Plant
    The key figures are Sales,Production Qty,Targer stock level,.......etc
    Steps
    1) Create Planning for material MC87
    2) Copy to Active Version MC78
    3) Transfer to Demand Mangement MC74
    B) STD sop for Product Group
    Here also the Characteristics are same material->product group
    You have to maintain master data Product group
    steps:
    1) Create Product Group MC84
    2) Create Plan for Product Group MC81
    3) Disaggregate Product Group Plan MC76
    4) Copy to active version MC78
    5) Transfer to Demand Management mc75 for Pg or mc74 for material
    C) FLEIXIBLE PLANNING
    Here you can able to Define your own characteristics and Key figures
    Char like Sales org,Dis chann, Div,......
    Key figures like stock,invoice qty,....
    steps
    1) Create Info structute MC21
    2) Maintain Planning Parametes MC7F
    3) Create Planning Type MC8A
    4) Create Flexible Planning MC93
    5) Copy to active version MC8V
    6) Transfer to Demand managemet
    5) Create Std SOP Planning -MC
    6) Transfer to DM from change mode of Flex Plann with active version MC94
    if you want use the flexible planning info like SIS in std sop after the 4th step of above it will be like
    5) MC87 std sop there Sales data from SIS it will ask for info str and version then you can get it automatically then the std steps like
    6) Copy to Active Version MC78
    7) Transfer to Demand Mangement MC74
    Pls let me know any clarifications.

  • Rough cut Capacity load in Standard SOP

    Hi there,
                 I have created some sales & production plan syncronous to sales......but when I try to see the capacity load thru View- > Capacity Situation - > Rough Cut planning- > Show
    It is showing me that No Resource load exists ...... please guide me how can I see the load for the same
    Regards
    Kaushik

    Hi,
    Please maintain the settings as mentioned below.Then you can see the load.
    Before you can carry out resource leveling in SOP, you must:
    1.) Create a PP task list (a routing, a rate routing, or a rough-cut planning profile) for the material, product group, or characteristic values combination whose resources you want to plan.
    2).Configure resources planning in Customizing for Sales & Operations Planning.
    3).If you use routings or rate routings to do resource leveling, define the key figure to which the resources are tied. Do this in Customizing for Sales & Operations Planning under Set parameters for info structures and key figures.
    4).Define the planning plant of any information structure whose plant is not uniquely identifiable (that is, either your information structure does not contain the characteristic "plant" or your rough-cut planning profile covers more than one plant). Do this in Customizing for Sales & Operations Planning under Set parameters for info structures and key figures.
    5).Set the default SOP plant for Sales & Operations Planning. Do this in Customizing for Sales & Operations Planning under Set planning plant for SOP.
    Thanks,
    DV

  • Mass Processing for employees in HCM Processes & Forms

    Hi experts,
    We are trying to implement mass processing in HCM Processes and Forms,
    Could any one of you give us an overview how this works.
    Any suggestions / documentation is appreciated.
    Thanks in advance.

    Hi Nrupen
    To be honest there is not much to it and the SAP documentation covers it really.
    Enable the process to be mass processed.
    Make fields visible/invisible/readonly in the columns using the field attributes
    A singlle process is triggered for each employee in mass process table etc.
    Do you have a specific issue?
    Regards
    Ian

  • HCM Process and Forms - Mass process for PA

    Hi,
    I have developed one PA process with process type "Enable Mass Process"
    Now in portal the process is available both in Single employees process list and multiple employees process list. i want to remove it from single employees process list. Please advice the solution for it.
    Regards,
    Ashish Gupta

    Implement BADI HRASR00PROCESS_VISIBILITY_LIST

  • Want to do mass processing for inspection lots with status SPRQ

    Hello,
    My company using early lot creation for 04 inspection type. We have thousands of inspection lots with status "UD   ICCO SPRQ PRII PRSI STUP". Now due to SPRQ status, system is not closing process orders associated with thousands of inspection lots.
    Is there any transaction where I can do mass processing of inspection lots to change the status "SPCO" from "SPRQ"?
    Thanks
    Bhavesh

    Dear Bhavesh
    You may have to modify the standard program to do so. Modify this program RQEVAI30.
    This can help you
    Regards
    gajesh

  • Mass processing for forecating in SOP

    Hi all
    I ma able to forecast a material online thru MC87 in standard SOP, but when I try to set up a variant for mass processing in the background the forecasting does not work. Has anybody encountered this issue?
    thanks a lot

    Tajuddin
    Thanks for your reply. I am reading the R/3 documentation and it talks about Mass processing of SOP forecasting ( R/3 documentation verbiage below) I am trying to follow these steps but it does not work. Isn't this mass processing supposed to be for forecasting in mass in background?
    Am i understanding this incorrectly?
    How to Run the Forecast with Mass Processing
    You can use SOP’s mass processing function to run the forecast. In this process:
    You create a forecast profile.
    You create a planning activity and include in it this action (the forecast profile).
    You create a mass processing job for this activity.
    You schedule this mass processing job.
    The results of the forecast will be different if the forecast is run at a high level and the results then disaggregated to the detailed level than if you carry out the forecast at the detailed level.

  • Mass processing for printing shopfloor papers

    When I press background  processing for printing shopfloor papers  in COHV then I get message background  processing triggered but no print comes out of printer.
    Where to see result of background  processing. In COHV log is also empty.
    My requirement is that when I press print Icon in COHV then it should automatically print paper, No need to goto Sp01 and print from there .
    Please guide.

    Mayuresh,
    In the order print control configuration transaction OPK8, activate Print Immediately check box against the individual list in the "Spool Parameters for user" folder.
    Since you have mentioned that you are using Background processing for printing, you need to run Program "PPPRBTCH" in background to print the papers.
    Regards,
    Prasobh
    Edited by: Prasobh Karunakaran on May 7, 2009 8:03 PM. Added background processing program details as user is using background processing mode instead of online

  • HCM Proces & Forms - Mass process for OM

    Hello experts,
    I have a req. in which i have to
    1) Create multiple Positions
    2) Copy multiple Postions (upto 30)
    3) Change multiple Positions(upto 30)
    4)Delimit multiple Positions(upto 30)
    The req. is to create mass OM process (like mass PA process or special payments).
    Step1) As in mass PA process, user is able to select multiple employees, simillarly here user should be able toselect multiple positions.
    Step2) As in mass PA process, after selecting multiple employees, a WD table comes (imn enter data stap), here also a WD able should come with all positions selected in previous step.
    Step3) Once data for all the positions are saved , the corresponding action(cdelimit or change) for all the positions should be triggred in backend system.
    Please help.
    Regards,
    Ashish Gupta

    OK. So I understand the requirement a bit more now.  Ultimately you want 30 positions created but via one form and one workflow.
    Ideally in a create mode you would like to save the data multiple times. i.e. put the save data task in a loop, the iterations of which would be governed by an entry on the form? (A 'Number of Instances' field for example).
    I am not sure if it is possible to save the data multiple times - even if you are in create mode and therefore generating new positions. Maybe someone else can comment?
    Either that or can you clone the process object within the workflow? I think it best to at least use the form to process one position as it will have all the standard error checking, even if you decided to copy the position from within the workflow (via a program exit on a task or a class based based business object?).
    Cheers
    Ian

Maybe you are looking for

  • RFC Error: Program not registered

    Hi, We are presently facing issue with our GTS (Quality) and Seeburger system RFC connection. While doing the testing we are getting error as below: ======> CPIC-CALL: 'ThSAPOCMINIT' : cmRc=2 thRc=679 Transaction program not registered ABAP Programm:

  • Upgrade SAP R/3 to ECC 6.0 , Java Stack Upgrade

    Hi Experts We are doing R/3 upgrade to ECC 6.0, we have done technical upgrade,Now we are planning to do Functional Upgrade. like 1. Java Stack 2. Integrated Planning 3.BI Accelarator 4.Data Transfer process 5.Web Reporting Portal 5.New BI content 6.

  • How can i send an error message at EXIT_SAPMM06E_013 ?

    Hi I'm making some validations to Vendor and Partner Functions (table control in 'Partners' Strip) in Creting/Changing Purchase Orders (ME21N/ME22N).  I know the suitable user exit is EXIT_SAPMM06E_012 for making validation before saving, but this ex

  • Printing Regular Envelope

    I am used to Publisher, and pages is difficult for me to make an envelope. I created the custom setting for a regular envelope 3 5/8 X 6.5 inches. But I cannot get it to orient right when I am typing. I tried the landscape route on the hp6122 deskjet

  • SMS count for 5230

    how do i get the SMS count for Nokia 5230. In my earlier mobile i could go to Log>Message Log and get the count for Sent SMS's and Recieved SMS and for MMS's also. I could not find the option in the 5230. Is there any way of finding the number of SMS