Mass Realease of Production Order of BOM Item Multi Level

Dear Gruru,
      I have one requirement from client, if i release fert or halb production order then it will relaese all order as per BOM.
how it's possible, what are setting required for this. i used sp proc 52 for all materials in bom. in this some material are serilized & non serilized also.
Please help me,
Best Regards,
Dev

Dear,
I understood that you are expecting the full cycle for special procurement key 52. See the below steps for the same.
1.     For your SFG good you have to set the SPK 52 in MRP 2 material master. This has to done for all SFG goods.
2.     SPRO Settings t code OPJH
If the indicator set and not set ( Collective order with automatic goods movements)
You always set this indicator if you want to treat production orders that are linked to collective orders in the same way with respect to costs as production orders that are not linked to collective orders.
If this indicator is set and if you have used the special procurement key for the secondary requirements of a material to be produced to define that a collective order is generated then there are automatic goods movements between the production orders in a collective order. This means that a subordinate production order delivers the material he produces to stock. At the same time as the goods receipt posting a goods issue posting is made for the superior order. When the goods movement is
posted
costs are credited from the subordinate order
costs are debited to the superior order
If this indicator is not set then, in the case of collective order processing, there are no goods movements between the individual
Production orders. The costs collected for each order are then settled
to the superior order in period-end closing.
These are the main steps if you have any query, donu2019t hesitate to revert.
regards,
ganesh

Similar Messages

  • Mass change on production order (assembly type) to put deletion flag status

    Dear all,
    I've make a mass change on production orders to settle the status DLFL through the Tcode CO78.
    Some of the production orders  are "assembly order" type. Those could not be up-dated with the DLFL because there are linked to customer order. The customers orders are closed.
    What can I do to change the status for this kind of production orders. It is necessary for me to be able to put the DLFL status in order to improve the process of production closure done each month.

    Hi kiran 
    Thanks for the response. As I cannot put deletion indicator on the Assembly order directly, Do we have to put deletion indicator on the sales order item?. If so, Can we put a deletion indicator after the sales order was delivered and invoiced. What exactly have you guys done to put deletion flag on the production order.

  • How do we do production orders for same item code in different sizes

    Hi,
    We have Items which we buy as a single sheet of material and our customers can ask for us to cut the complete sheet into different sizes before despatching it. i.e
    Item Code Sheet1: Sheet size 100mm x 100mm
    Customer asks for sheet to be cut into 10 off 10mm x 10mm sheets, which we presently put on the sales order as a line note
    We then generate a production order for this item and indicate on the production order printout the line note
    We've recently had a customer who has asked for Item 1 in two different sizes on the same sales order ie
    Order Line 1 Sheet1 Qty:1 Line note: cut into 10mm x 10mm sheets
    Order Line 2 Sheet1 Qty:1 Line note: cut into 50mm x 50mm sheets
    When generating the Production order SAP combines the items into
    Product No: Sheet1
    Planned Qty: 2
    Where as we want it to create 2 production orders 1 of each different sizes items.
    I know I can create BOMs for those two sizes, but customers can ask for the sheets to be cut to whatever size they want. Is the best method to create BOMs on the fly for each different sizing option or are there alternative methods that are easier to manage ?
    Thanks
    Carl

    Hi Carl Rutter,
    You have to creat 2 special production order for this item. when issue the component make sure you issue the stock as per the cosumption becaue one have 10mmx10mm and the another item have 50x50 in this case you issue component by square inch wise. for example 10*10 = 100 squre inch.
    50*50 = 2500 square inch so the cost will be approtionate. you can Use multiple uom method to obtain this, other wise you have covert into stock then you issue the component. If you want traxk size wise ,you can use batch option for Finishe goods.
    Regards
    Sridharan

  • Reg:Bapi for mass creation of production order/confirmation

    Dear Experts,
    I wanted to know with the following BAPI is it possible to create Multiple production orders for different semifinshed Materials along with material availability check and other functions similar to CO01 transaction.
    I knew there are standard transactions for mass confirmation for production orders. But i need a confirmation on this BAPI . As i am planning to go-ahed with ,mass creation of production order creation / Order confirmation in single custom transaction.Need back flush activity even supported.
    BAPI_PRODORD_CREATE to create the orders.
    BAPI_PRODORD_RELEASE to release the orders.
    BAPI_PRODORDCONF_GET_TT_PROP to get the default data for the confirmation.
    BAPI_PRODORDCONF_CREATE_TT to ost the confirmation of production order.
    Along with this BAPI do i need to commit any other BAPI to carry out back flush for components.
    Need your suggestions to take it further.
    Regards,
    Daya.

    Dear SAP Daya
    If the issue has been solved, please close this thread.
    You have already mentioned that the issue has been resolved, thefore, you should not ask for help on another thread before closing this one, as it looks like you are trying to force people to answer your threads.
    Users are always trying to answer as many threads as possible on good will we don't need this kind of "incentive".
    Please read carefully the The SCN Rules of Engagement, especially point 8:
    Be responsive. If an SCN member has answered your question, please mark the answer as "helpful” or “correct”. Mark the discussion as “answered,” so that other members can find the answers more easily
    Also, I checked your old threads and I could observe that there is only one closed. Please review your old threads and close those already solved.
    BR
    Caetano

  • How to create production order for multiple items having common raw materia

    Dear all,
    We are running a sheet metal fabrication company at Vadodara Gujrat.
    Please guide us how to create single production order for multiple items using single raw material??
    For example, We want to produce baby shirt(item code AAA001), shirt with full sleeve(item code AAA002), shirt with half sleeve(item code AAA003),shirt slim fit (item code AAA004),shirt loose fit(item code AAA005) from single raw material say(item code XXX001).
    Right now we have to create 5 production order to produce above 5 items of single sales order  in SAP B1 though it is made from single raw material which is foolishness and time consuming too. (Please also note that to produce any finfish good item, raw material required for that item may vary every time in our process.)
    Kindly guide us how to solve the problem.
    Thanks.
    RUPESH  +91-9227744273
    WEB : www.gorasia.co.in

    Hi Rupesh Gorashiya,
    This is possible through MRP for that you have to put Sales Order first and Run MRP Wizard
    MRP Wizard Put Multi Production Order as per Item Taking in Sales Order just click it on and execute.
    Thanks,
    Srujal Patel

  • Is there a situation where we create a production order without BOM/Rtg ?

    What I see in the system, I was able to create a prod order without maintaining master data for PP ( expect material master)
    Is there a situation/scenario where we create a production order without BOM, Rtg
    Does the above situation applies to scenario like special procurement key ( 40- stock transfer from other plant )
    Please clarify

    Pradeep,
    Thank you for detailed answer
    Round robin of discussions
    When you covert a planned order to a prod order with reference to a material (CO40), it will ask for routing
    if rtg is not maintained for the material, the system will automatically pick the default rtg from OPJG
    When you create a prod order ( without ref to a material- C007), say suppose for unplanned rework we have
    maintain the rtg and BOM manually to the prod order
    Lastly, FOR SPk - 40 ( Stock Transport) for the issuing plant both BOM & Rtg needs to be maintained in the recieveing & issuing plant
    Due points have been assigned

  • Restrict Production order for Purchase Item

    Hi,
    Kindly put a ceiling on Production order for purchase Items, As of now It is open for making Production order even Valuation class & Procurement type is external procurement.
    Plz guide.

    NOt solved

  • Mass change of Production Orders status from TECO to CLSD

    Hi All,
    I want to do mass change of Production Orders status from TECO to CLSD. could you tell me is there any t-code by which i can mass change Production orders status from TECO to CLSD. I want Production Orders to be closed, so that further confirmation shouldn't be done for these Production Orders. please let me know the solution.
    Regards,
    Ram

    Hi Girish/Dogboy,
    I can set the status 'Complete' if Order is fully confirmed/fully delivered. When ever i run COHV for partially confirmed/delivered Orders, i get error log saying 'Balance of ORD................ is not zero'. Actually we have lot of Production Orders, where there may be Production Orders released only, partially confirmed etc. so i want them to be closed once for all.
    Regards,
    Ram

  • BDC for mass-upload on production order confirmation

    Hi ALL
    Is there any standard Program for the mass-upload on production order confirmation for labor and machine hours.
    the T-code to do this is Co12.
    thanks in advance !

    hi,
    You can use standard SAP program RCCLBI03 to do mass upload
    see these link
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/8046aa90-0201-0010-5e99-962948c83331
    thanks
    karthik

  • Error while creating Production order without BOM

    Hi Guys,
    While creating production order without a BOM i am getting the following error in the error log.
    Error: BOM for material xxxxxx does not contain any valid items
    Message no. CO636
    Kindly help.
    Regards,
    Sid

    Dear customer,
    could you check in the master data screen of the order if one BOM has been selected?
    please coudl you check your customizing the following transactions:
    OPJM
    OPJI
    what do you have in 'BOM slection field' MRP4 view of the header material?
    Please check if with this info you can find the missing data to explode the BOM
    regards
    Maria

  • Document Flow to Production Orders from BOM

    Dear SAP Gurus,
    I have attached a few documents at header level of the BOM. I have also attached document at item level in the BOM. When I create a production order these documents are not flowing to Production Order. Is there any way to do that. I also want to see them in CS11 and CS12 reports.
    In OPKP I have already checked Document Links-BOM "On Creation" and "On Release" for my production scheduling profile.
    Thanks and Regards
    Geravine

    Dear Geravine,
    You can use a Production Scheduling profile to specify that in a production order or process order
    particular business transactions are carried out in parallel
    generation of document link from material master on order creation
    generation of document link from BOM on order creation
    generation of document link from material master on order release
    generation of document link from BOM on order release
    Include the check boxes for Document links for material and BOM both under order creation and order release.
    Check in T Code OPKP.
    But in my understanding only the document that are attached to the header and the items with D category alone gets
    transferred to the production order.
    Regards
    Mangalraj.S

  • Mass change of Production orders operations in ECC 6.0 using COOIS

    Dear experts,
    Kindly Suggest a way to mass change of direct operations and components overview screen of production orders in ECC6.0
    using COOIS transaction code which was available in SAP 4.7 using environment >change order> operations or components once we execute the COOIS with certain input parameters in the out put screen,this function seems to be not available in ECC 6.0 , if available kindly guide me or any alternative way to perform the same.
    Thanks in advance for your inputs and help..
    Best regards,
    Nitish jain

    You have that button "Change Order" you can just click on it and once you're in the change mode of the order click "Component Overview" button , it's the same number of clicks...
    Anyway, SAP has changed the entire ALV for all the transaction codes using PPIO_ENTRY (COOIS, CO26, CO27, CO28 et al)
    look at question 12
    https://service.sap.com/sap/support/notes/540779
    if you really want your old GUI status. there is a way to get it back. In SE38 enter the program name PPIO_ENTRY and select variants and click display. Once you're in variants screen enter variant name and click create and select all "screens" check box and then it will take you the selection screen in there check the box "Old ALV Display" in the Technical settings sub screen. (If you want you can choose other functions also like "Selection List" as PPIOM000 Always display components directly etc. if you want ) Click on "Next Screen" button and it will show "Attributes" button then click on the attributes button and save it.
    Now go to SE93, make a copy of transaction COOIS to ZOOIS and in the variant field enter the variant you just created. The new transaction will always start with the variant you just created and it will look like your old COOIS with Environment > Change Order > Components will be visible.
    Edited by: Jeevan Sagar on Oct 20, 2011 9:50 AM

  • Mass maintenance of Sales orders,or/and items

    Hi friends
    Need some help.
    Is there a transaction in SAP by which we can reject large numbers of sales orders, or/and items in sales orders in a mass maintenance way.
    We dont want to use MASS or VA05.

    HI
    Being an SD consultant if u know about how to record transactions in LSMW or BDC
    it will be very useful
    for exampl like if u want to create condition records for 12000 maaterials if u create lsmw and do recording u rwork will be easy
    if u dont know about LSMW or BDC
    just sit with u r abapper and ask him to do LSMW also u try to learn
    it is not mandatory but having an idea about LSMW and BDC or SCAT will be more useful
    regards

  • Create an RMA without original Order and BOM Item

    Hello everyone,
    I know it is possible to create a RMA-Order without a Reference to the original Sales Order (the qty should be entered negative) ok, so far so good.
    Now I want to add a BOM Item into this RMA, however the sub-Items are not added into the Lines.
    Is there any solution, that the EBS will add these Lines automatically into the RMA Order?
    Greetings,
    Björn

    You can create RMA's without Original SO reference.
    The time you say there is no original SO reference, there is no way system can search for backdated pricing... hence, you would have to take care of price in your program or provide the selling price directly in RMA... like manual pricing... and ignore the price list pricing...
    A step further, in R12 there is enhanced control for serial & lot numbered items... so if un-referenced RMA's would create new let/serial number inventory, and referenced, can be received in same lot or you can create a child lot...
    -bs

  • Doesn't Create Production Order without BOM & Routing

    Hello,
    I have a requirement that Production Order is not be created without the BOM
    Is there any Customizing Setting??
    I have the option by implementing User Exit but i want to know is there any standard setting???
    Please throw some comments???
    Regards,
    Kumar

    Dear Kumar,
    1.First in OS30 - Application Specific criteria for Altern.Determination,include a
    new entry named ZP00 - NO BOM and dont include any of the check boxes.
    2.In OPL8 - Order Type Dependent parameters,Under Routing --Sequence
    Exchange must be "0" & Routing slection also should be "0".Under Bill of
    material,--BOM Application ,select ZP00 & save.
    Check with this & Revert to forums.
    If useful reward points.
    Regards
    Mangal

Maybe you are looking for

  • ATT iPad 2 64GB sim not picking up 3G

    Have an old iPad and just got the new ATT iPad 2 64GB sim is not picking up 3G. Wifi working fine. I set up my data account  and followed a few support forums on resetting network etc... And nothing works. Toggles wifi, powered on and off numerous ti

  • Question about dataset in demo photo Gallery V.2

    So I'm going to try and be as specific as possible. I'm trying to use the code on the Spry demo page to create a gallery and I'm stuck on how to get it to load my .xml files instead of the china, egypt, and paris files. The only reference I see to a

  • Logging in ifs and renderering capabilities out of the box

    Hello there Just wondering if anybody could clarify/confirm a few things for me... I'm currently trying to use 9ifs as a 'conversion' engine. I have an XML file within a 9ifs repository that I wish to transform using an xslt when I retrieve it. Does

  • 'EDI 110 - Air Freight  and Invoice details' Inbound

    Hi, Can anyone please tell me what is the IDOC type to be used for EDI 110 inbound? Thank you, Renu

  • IPhone 4S displays the number 162 in the sent folder?

    My iPhone 4S displays the number 162 in the sent folder, I do not currently have any sent emails in that account. I've done a soft reset and results are the same.