Mass T-code Of Planned  Order Deletion

Dear All
Is there any mass T-code  For Deletion of bulk planned order. An PIR.
Rgds
Pankaj Agarwal

Hi,
You can use function to execute one or more actions for a large number of planned orders simultaneously. This is possible both within the SAP System and over an interface from an external assembly control system.
Features
SAP supplies the function module MD_SET_ACTION_PLAF for action control.
This function module includes the following actions:
Explode BOM
Explode BOM, check availability
Check availability, only explode BOM in the case of a requirement
Check availability, do not explode BOM
Reset availability
Change planned order data
Schedule planned order
<b>Delete planned order</b>
Confirm planned order (in repetitive manufacturing)
Firm planned order data
Firm planned order components
Print component overview
This is in the foll link...
http://help.sap.com/saphelp_470/helpdata/en/f4/7d3f9344af11d182b40000e829fbfe/frameset.htm
Use T.code md75 to delete PIR.
Regards,
Senthilkumar SD

Similar Messages

  • Planned Orders Deleted

    Hi Experts,
    How do you delete collective planned orders? I mean by simply indicating the plant or MRP controller. Is there a log or you trace for this? What transaction code is used for this?

    Hi,
    MD16 - Collective display planned orders
    Just highlight the planned orders which you want to delete the planned orders then press "delete" button
    once planned order deleted, can't trace the history, no log file
    Regards,
    Sankaran

  • SNP planned order deleted in APO, but not in R/3.

    OK Guru's,
    We have a situation where during the weekend SNP planning runs, SNP Planned orders are deleted in APO, but the order is never deleted in R/3.  The change pointer is not in CPP and there are no failed queues.  Also, when you run CCR on planned orders, we will get an error on some orders saying "Not in APO" and the only option to reconcile that order is to "Send to APO".  The option that should exist is "delete in R/3" becuase the deletion never occured in R/3.
    If you send the order back to APO, the order will show in the "Production Confirmed" line of the Planning Book.  This is because APO is thinking that this order is an order that was created in R/3 when in fact is it really is a SNP planned order.
    Any clues to why this would happen?
    thanks,
    Brian

    How are you getting the SNP Planned Orders to R/3 in the first place.
    If you are transferring them using /SAPAPO/RRP7 then I guesss its a manual transfer and system does not consider SNP Planned Order deletion flag relevant for transfer to R/3.
    You will need to look into CIF enhancement to send the deletions to R/3.
    Normally SNP Planned Orders are not relevant for transfer to R/3 unless its replaced or converted to a PPDS planned order.
    Somnath

  • Planned order deletion in mass

    Hi,
    I want to delete all palnned orders in the plant.
    Planned order can be deleted using MD16. In MD16, MRP controller is the mandatory field. We can't delete all the planned orders in one stretch in a plant. We can delete the planned orders in a plant MRP controller by MRP controller only. My requirement is without giving MRP controller, the system has to delete all the planned orders in the given plant.
    Is there anyother way to delete all the planned orders in a plant.
    Regards,
    V. Suresh

    Dear Suresh,
    Check whether T code MDBA,can help you.
    Also refer this thread.
    Re: Collective deletion of Planned Orders
    Regards
    Mangalraj.S

  • Planned Order Delete

    Dear ,
    Can it be possible by single t-code i can delete all the planned order at plant level.

    Dear,
    You can delete a planned order by tcode MD12 / MD04 OR delete the requirement in MD62 after that run MRP (MD02) with planning mode-3 deleted and recreated. OR MD16 is the only option to delete all planned orders in mass.
    And check the result.
    Regards,
    R.Brahmankar

  • Planned Order deletion during MRP

    Hi all,
    We want to delete the planned orders during MRP, but before saving is done.
    So, we are trying to use the BAdI MD_PLDORD_CHANGE and method CHANGE_BEFORE_SAVE_MRP .
    After finding out the process order, we were trying to set the importing parameter IM_VSTAT to "L", which can be used to delete the planned order..
    But since it is an importing parameter, we cannot change the value of the parameter.
    Is there any alternate ways of deleting the orders before MRP is done ?
    Regards,
    SP.

    Not sure I understand the situation correctly...You want to delete the planned orders before MRP runs again. WHy do you want to do that ? Are these firmed Planned orders ?

  • Automatic mass conversion of SNP planned orders to Process orders

    Hello,
    we currently convert our process orders from APO by following steps:
    1. In RRP4 - select convert SNP orders.
    2. Click Save.
    3. Set conversion indicator.
    4. Click Save.
    This is a very tedious tasks and we would like to automate this.
    Reading previous posts - I know this can somehow be achieved in transaction RRP7. However, I haven't been able to convert SNP orders (steps 1. and 2.) in RRP7 yet. Does mass conversion only apply in setting the conversion indicator?
    Best Regards,
    Sam

    Hello,
    thanks for your reply.
    We are currently processing orders in RRP4. We would like to automate this process  as much as possible that is why we are considering RRP7. However, I haven't found a way to automatically convert SNP planned orders to PP orders in APO.
    Best Regards,
    Sam

  • Planned order scheduling mass update

    Hello all,
    Is there a way I can change the scheduling dates for the planned orders collectively. (not MD16) ?
    Thankyou

    Hi,
    check the following
    Mass Changes of Planned Orders (Action Control)
    Use
    You can use this function to execute one or more actions for a large number of planned orders simultaneously. This is possible both within the SAP System and over an interface from an external assembly control system.
    Features
    SAP supplies the function module MD_SET_ACTION_PLAF for action control.
    This function module includes the following actions:
    Explode BOM
    Explode BOM, check availability
    Check availability, only explode BOM in the case of a requirement
    Check availability, do not explode BOM
    Reset availability
    Change planned order data
    Schedule planned order
    Delete planned order
    Confirm planned order (in repetitive manufacturing)
    Firm planned order data
    Firm planned order components
    Print component overview
    In connection with an action, you can always change planned order data, for example; order quantity, dates or production version.
    The function module also enables you to program further customer-specific actions.
    You can execute the actions for several planned orders simultaneously.
    You can create action chains, that means, have the system execute several actions in a single operation.
    Activities
    Define your own actions and program a report that includes these actions. As an example of this, the transaction MDAC Execute action for planned order (MRP ® Planned order ® Execute action) is available.
    In this example action, you can use actions only for individual planned orders. Nor can you form action chains, only simple action transitions are possible.
    Determine an action key and action controls in Customizing for MRP in the IMG activities Define action key and Define action control. An action key describes the actions that can be executed for a planned order. Action controls determine which actions are allowed and in which sequence they are to be executed.
    Assign the key for the respective action control to the materials in the material master (MRP 4 view).
    Regards,
    nandha

  • Reg. Mass update of Planned order components

    HI all,
    I have a requirement wherein I will come to know the raw material consumption from storage location only at the time of production.
    Now what I am doing is before doing confirmation I am updating the storage location for particular component in the planned order change mode - md12.I am doing this because the  production confirmation is happening at External system and transferred via IDOC to SAP.So I cant add the sloc at that time.
    I am doing the changes to planned order one by one. On an average I am doing this for say 50 Planned orders which is time consuming
    Is there any option available in SAP to do mass change to the planned order components.
    Regards,
    MBN.

    Hi MBN,
    You can use the LSMW, BDC program or FM MD_PLDORD_CHANGE_COMP_ITEMS to update the storage location in planned order components.
    Regards,
    R.Brahmankar

  • User exit/ badi needed for planned order create/change,collective ATP check

    Dear All,
    I'm looking for a user exit/ badi which can be used for planned orders at the stage of
    mass collective availability check (COMAC tcode) update; or at some other relevant stages of mass update of planned orders.
    I need after collective availability check to perform the following:
    1) to copy date from "total comitment" field on header tab of planned order and paste it (replace old date) to order finish date on header screen
    then
    2) to start a scheduling.
    Very appreciate your help.
    Best Regards,
    Andrey
    Edited by: Andrey Kruglov on Apr 15, 2010 3:06 PM
    Edited by: Andrey Kruglov on Apr 15, 2010 3:07 PM

    Dear,
    Use the BAPI : BAPI_PLANNEDORDER_CHANGE
    Or use the function module MD_SET_ACTION_PLAF for Schedule planned order.
    and the transaction MDAC Execute action for planned order
    This function module includes the following actions:
    Explode BOM
    Explode BOM, check availability
    Check availability, only explode BOM in the case of a requirement
    Check availability, do not explode BOM
    Reset availability
    Change planned order data
    Schedule planned order
    Delete planned order
    Assign the key for the respective action control to the materials in the material master (MRP 4 view).
    Please refer this thread,
    Re: MDVP for collective orders
    Regards,
    R.Brahmankar

  • Partial conversion of Planned orders to Production orders

    Hi all
    I wan tot partially convert planned order to production order. I am able to do this with MD04. Is there a tcode for mass partial conversion. CO41 does not allow a partial conversion. Is there a way I can collectively do a partial conversion.
    thanks

    Hi John,
    To the best of my knowledge there is no t-code to do a mass partial conversion of planned orders.
    You can try with a lsmw recording of t-code co48 & then input your planned order numbers with the qty to be partially converted or alternatively use co41, change the qty & convert the planned orders, but with this you will need to re-run MRP to create another planned order for the balance qty.
    Hope the above helps.
    Regards,
    Vivek

  • Convertion of planned order into Purchase Requisition

    Hi,
    I have a planned order with Qty 50 (I have checked in MD16 it says qty:50)
    Scenario 1:
    I converted it to Purchase Requisition with qty.40, with change in qty. 10 numbers. After converting with qty. difference, I checked it in MD16, it say the qty as 10.
    Scenario 2:
    I converted it to Purchase Requisition with qty.60, with change in qty. 10 numbers. After converting with qty. difference, I checked it in MD16, I never find that Planned order in the list.
    Now my questions are:
    1. In which table this difference will be stored?
    2. Or is there any t-code to see this Pl. order and PR qty. difference?
    3. with respect to the second scenario why the planned order is not listed if i put more qty. in Purchase requisition than in the planned order?
    4. Is there any setting to be done in IMG?
    Thanks in advance.
    Regards,
    Dhan
    9600934854
    Edited by: DHANAVEL SUNDARAM on Feb 23, 2011 5:20 PM

    Hi
    Planned order are just like PR assume that if you have PR of 100 Qty but still you can do PO more then of PR Qty.
    In the same way in case of planned order either you can convert it to PR or Production/process Order it behaves in the same manner.
    Planned order data will be stored in table PLAF but once planned order deleted or converted it will not be in any table
    You can fetch the deleted planned order data or converted planned order data.
    But still you can go to individual PR to see the reference of Planned order no there.

  • Planned order not getting generated at plant level

    Hi experts,
          When i run MRP for a particular plant in T- code (MD01) Planned order is not getting generated but when MRP is done against a material in T - code (MD02) in the same plant planned order gets generated... Is there any customizing  to generate planned order in plant level.....
    Regards,
    Joseph.
    Edited by: joseph5885 on Aug 12, 2010 9:23 AM

    Dear Joseph,
    No it is not recommended. only in emergance cases this will be done
    Usually in MDRE and MDAB will be scheduled before MRP run at background for inconistancies in planning file enries
    So the above said t-codes will take care of the same
    Added
    Refer this link
    [Planning file entry;
    Regards
    Madhu
    Edited by: K.Madhu Kumar on Aug 12, 2010 6:53 AM

  • Conversion of planned orders to prod orders in background

    hi All
    Is there any program for mass conversion of planned orders in production orders which we can schedule in background.
    Amit

    Hi Amit,
    Try below method
    TCode: COHV (tab selection --- plant and etc...,, tab mass processing --- function - conveted planned order, order type - PP01, collective orders - do not collective orders)
    after Menu -- Program --- Excute in background -- set properties -- to set send SAP spooler --- click button immediate then check box periodic job and periodic values after save
    to monitor and get spool request bcackground this job
    TCode SM37
    or
    you can create background job using TCode SM36
    pls create varient for COHV
    PRG: PPIO_ENTRY with Varient
    Regards,
    Sankaran

  • Kanban:How to make MRP planned order non actionable?

    Scenario: In house Mfg with REM
    Process : Kanban (Classic)
    Example : Item "A" is in-house mfg subassembly.
    When Kanban is triggered, it generates planned order. Using REM, the mfg is done against the planned order and the Kanban cycle is closed.
    Meanwhile, the MRP generated planned orders are also actionable. These also can be used to mfg &  stock "A".
    Question :Can the MRP generated planned order be made non actionable?
    Thanks,
    Wish you all A very Happy, Joyous Diwali And Prosperous New Year!!
    Nitin

    Hi
       I beleive u have selected options of generating planned orders both by mrp and kanban(since same storage location is being planned both by MRP and Kanban). one option is when kanban generates planned orders, delete the planned ordes that are generated by mrp (eg if mrp already has created planned orders of say 400, kanban is triggered for a planned order of 100, based on settings we can immediatly decrease mrp order to 300 as the 100 is now covered by kanban(so total of 400 qty in plnd order at the end of the day)). pls let me know if this would solve ur problem.
    Sam

Maybe you are looking for

  • Can i start a new itunes library on a mac?

    i understand that holding shift woks for windows but not mac. my specific problem is that i have 300 songs on the computer but 700 on the ipod. i just bought an album on the computer that i cant transfer to the ipod. if i can start a new library and

  • Can't see shared photo streams in Aperture

    I have created a number of photo streams and shared them with my wife. My wife has accepted the streams and can see them on her iPhone. She uses Aperture on the Mac but cannot see the streams there. She has the three checkboxes on the photo streams t

  • Azure & Visual Studio Professional MSDN

    Hi, With a Visual Studio Professional MSDN subscription you can provision Visual Studio 2013 dev virtual machine(s). When selecting the MSDN option when creating a VM from the gallery gives several options with VST to choose from. - Is a VST Pro MSDN

  • What will happen with Authorware when XP is gone, will it work with Window's 7?

    I have one computer with Window's Vista 64 bit and one with Windows XP. I understand Microsoft is not going to be doing updates for XP starting this year. Will Authorware work on another operating system like Window's 7? Can you run a Window's 7 64 b

  • Flash Lite 2.1 on OS X???

    Hi Macromedia guys- The 2.1 update with emulator update only exists for Windows? Please help me understand how to best access Flash Lite 2.1 on OS X and it looks like my only option right now is to use the 2.1 player on a test unit (cell phone). Is t