Mass update Component in BOM's

Hi
We have a scenario where we need to replace component A by Component B in the BOM's,this component is used in more than 20  different BOM's(but usage is 1-production),
is it advisable to use transaction cs20 for mass update if not advise on it.
cheers

Hi surendra,
Yes u can Go with CS20 (for replaceing Component)
Absolutly no harm
Regards
kumar

Similar Messages

  • Settings for a component of BOM

    Dear guru ,
    For a component of bom with material type quantity and value updating I want to make these settings :
    -     relevant for costing
    -     not relevant for mrp dependent requirements
    -     only for information purpose for production order
    -     not a non-stock item
    How can I make these setting for a component of bom ?
    Thanks in advance.

    Dear
    Please find the answer of your question :
    - relevant for costing : In BOM  Select the component line item and double click .Goto Status Tab , you  have un-check the Check Box -Relevent for Costing
    - not relevant for mrp dependent requirements  :- Goto MM02 with item code  and select MRP4 view -Keep the seting 1 -Dependent Reuirement not relevent for planning in MRP
    At the same time u can keep the MRP Type : ND  in MRP1 View in case if u do not want to plan through MRP .
    - only for information purpose for production order : The will be copied with this item automatically or manually based on the configuration u have kept in OPL8-Order Type dependent parameters for your Production Order Type (pp01) .Here in BOM Selection -Automatic -1/Manual -2  should be kept in order type dependent parameters.
    - not a non-stock item  : Keep the item categoery in BOM as N  while creation of BOM in CS01.
    Hope this will fullfill your requirement .
    Regards
    JH

  • Mass Update Actions in production environment

    Hi,
    We have a requirement of updating some action scheduling/start conditions in production environment. The issue that we are facing is the number of crm objects that already have this action scheduled are running into hundreds of thousands. We effectively want the actions to be redetermined (similar to how one goes into the object in edit mode) for a huge number of objects.
    Is there a utility that SAP provide to mass update actions based on action definition? I understand that we can debug the update to 'ppfttrigg' table when we go into edit mode and simulate a utility ourselves. However, was looking for a generic solution, if provided by SAP.
    regs
    Manas

    Hi surendra,
    Yes u can Go with CS20 (for replaceing Component)
    Absolutly no harm
    Regards
    kumar

  • Mass Update Column In Tabular Form

    Hi,
    I'm trying to create a tabular form that has a mass update column function. i.e. the tabular form will be displayed as normal but at the top of certain columns will be a text box or lov and what ever is entered into those boxes will be cascaded into the empty values in that column without refreshing the page.
    Hope that makes sense.
    I've search the forum but cant find reference, is this possible.
    Thanks Andy

    Hi,
    Just wondering if anyone had any thoughts on this.
    I can get the text to populate another cell e.g.
    http://mlw-mis-2/dev/apex/f?p=174:4
    But how can i get it to reference a column, this is what I'm using to reference another item
    onKeyUp="f_getTextUpper('P4_COL1','P4_TEXT')"
    and I've tried changing the P4_TEXT to other things like
    apex_application.g_f03 (vRow)
    apex_application.g_f03 (i)
    apex_application.g_f03
    But with no luck

  • Field BSEG-MANST. does not exist in the screen SAPMF05L 0301 in mass update

    Hi,
    I am trying to perform a mass update of dunning data (level and date) on some open items. Using the mass change function through FBL5N, I receive the error message, and the update is not performed. I cheched with the layout editor, but the fields appears in the mentioned screen. The field is also allowed for modification in customizing, for the company code. I was not able to find the dunning fields in the field status editor, in customizing.
    Any hint?
    Thanks
    Massimo

    thanks, but it doesn't apply.
    More relevant is note 322163 Line items: mass change 'Payment Method' BSEG-ZLSCH, but this refer to a program error, our release is more recent, and, furthermore, the dunning fields aren't available for change in FB02.
    Regards, Massimo

  • Mass update of a custom field at Product Revenue level

    We are trying to update a custom field at Product Revenue level using the Opportunity Web Service. The webservice call is timing out as we have thousands of Opportunities.
    I would appreciate if anybody gives input on how we can massively update a custom field using Opportunity Web Service.
    OR
    Is there a way to mass update a custom field at Product Revenue level other than using a web service.
    Thanks for your help!
    -purna

    If you are not very much obsessed with Webservices, the other workaround is the Data Loader Tool. It was discussed earlier in this forum.
    Pl refer-
    Re: Product Revebue Updation
    Hope this helps.
    Rgds,
    Amit Sahu

  • Is there a way to mass update or replace the SPM Firefighter IDs table?

    We are upgrading from GRC 5.2 to 5.3.  In 5.3 FF/SPM has added an Owners field to the FF ID table (/virsa/zffusers), which is apparently a required field because I keep getting a "Invalid Firefighter ID Owner" error when I try to look at the table.
    Is there a way to mass update, or perhaps import/replace, this table?  I am having problems trying to update this table thru the FF table screen.  When I go to save my changes, it will return the above error because not all of the FFID records have an assignment in this new Owners field.  We have over 160 FFIDs, so I can't change all of the records at the same time.  I can only get about 20 per screen and it will return that error again when I try to page forward.
    Thanks.

    Hi Bob,
    that is perfectly possible - did it a few times already.
    Export the table from within Firefighter, download the owners table (sorry, need to look up the name tomorrow - but you can't miss it), then add the owners through an Excel vlookup. Then re-import the table in Firefighter, and you're ste.
    I'm at home right now - if you have difficulties getting this done shoot me a message tomorrow and I'll send you more details.
    Frank.

  • Mass update of Item category in Sale order

    Hi all,
       Kindly guide me to do the mass updating of item category in a sale order.
       I want to update the item category of all the items in a sale order.
       User will be giving large number of sale orders as an input.
       How to proceed to achieve the same?
    Thanks in Advance,
    Regards,
    shaju

    Hi,
         We can write a function module for this by getting an input it want to change this..For eachinput we can activate this in a loop
        Is they gave a file of inputs means we can go BDC or LSMW..If before transferring we want to make only little changes means we can do this by LSMW  otherwise we can go for BDC...

  • Material Account Assignment Group, in Sales Order Mass Update

    Sd Experts,
    We just went live, our consultant updated Account assignment group at the material level but did not updated existing materials. When we caught the problem and updated exisisting materials there were some existing orders already created. Which now I am getting an account determination error due to this field being empty at the material level.
    We have some sales orders that I need to update but they are just too many, currently I have been fixing them thru VF02, for to the material and update manually.
    Does anyone has any idea how to mass update this field for all existing orders, to update "Account Assignment Group" field automatically
    Your help will be greatly appreciated.

    Hi
    In Mass transaction choose object type as #BUS2032,after executing in the next screen from the tables choose#Sales Order Item Data, and from the fields choose#AcctAssgGr (MASSSDHE)-MASSSDHEAD_S-KTGRD, now execute to find fields Sales document and Sales Document item , here load all the Sales Orders for which the change is needed along with the items for which the changes are needed execute again to find the next screen with Sales Documet, Sales Document item and Account assignment which needed to be changed,now select the entire block enter new values in the Account assignment  box in the above, click on the 'Carry out MAss change button ' and then save, it will take some time basing the change tobe carried and issues a log as to how many documents were changed
    Hope this is clear,please do a test run before.
    Regards
    Chandra

  • Mass update of new house bank in the BP record

    Our client has switched banks.  We went in and added the new bank to the bank table and the house bank table.  We then changed the default bank in the Company Details and the Payment Methods.  The BP house banks were not changed as a result of this.  Although, when we changed the default in the Company Details, it asked if we wanted to update the BP's payment terms and we told it to continue.
    Is there to mass update the vendors with this new bank?  They have thousands of vendors, and if this isn't changed, the payment wizard does not work properly.  It moves all of these transactions to the Non-included area with a message that says the BP House Bank Account does not match the default.
    Any suggestions?

    You may use DTW to update DefaultBankCode for the BP.
    Thanks,
    Gordon

  • Mass Updating of Selected Rows

    (As you can see from my low number of posts I'm new to ApEx, so any information you can provide is appreciated.)
    Hi,
    I've been asked to include what I consider a heavy duty feature on a report. It has been requested that there is a form region above a report region. The form will have some fields on it to be used to mass update selected rows.
    For instance, let's say the report is a list of employees and their dept and the form has a dropdown dept field that contains a list of depts. They want to be able to select certain employees on the report, then select a dept from the form and then click an Update Rows button. They want the selected rows to be updated with the selected dept. * Also, they don't want the report to be editable. * The only way to update any rows is thru the Update Row button.
    I'm new to ApEx and can code in JavaScript, but am not an expert in either. And, I'm still trying to figure out what JavaScript syntax works in Element Attributes, etc. fields. But, I digress.
    I have looked over several threads, and went to several demo pages, and have learned some things. Hopefully they are correct. If not, please correct me.
    - Using the Row Selector is tricky.
    - You can get the Row Selector on a regular SQL report by changing it to Updateable SQL, adding the Row Selector type, and changing it back.
    - You can only see row information on a column if the column is editable.
    I now have a report that is NOT editable and has NO editable columns. And the report has the Row Selector. Also, the ID (key) of each row is the first column of each row. (It's a link field that populates another page.) With the ID I can populate the correct record. I'm thinking I need to populate the ID again in another column into a text field and then be able to access that value on the selected rows.
    Here's my dilemma. (That is, if I'm on the right track.) I need to know which rows are selected and then access the ID (key value) of that row. After that I can let my PL/SQL do the work.
    - - 1. How does the 2nd ID need to be defined such that people can't edit it, but the value can be retrieved? And, how is this done? I assume something can be put in the Element Attributes. If so, will you please provide the code?
    - - 2. What is the trick to knowing which rows are selected? An example snippet of code would be great here too.
    - - 3. Also, tell me if I'm on the wrong track and need to provide a solution in a different way.
    Sorry for the novel, but I wanted you to have a good idea of what I'm trying to accomplish so you may provide appropriate answers.
    Thanks much, Tony

    Hi Tony,
    check out the following threads:
    Re: Reference a value within a report????
    Re: MRU - trying to restrict UPDATE to only certain users - everyone INSERT
    BTW, you don't have to use any JavaScript. When you write your "Update pl/sql process" for the tabular form, just reference you page item which contains the department for your mass update.
    eg.
    FOR ii IN 1 .. Apex_Application.g_f01.COUNT
    LOOP
        UPDATE EMPLOYEES
          SET DEPARTMENT_ID = :P4_NEW_DEPARTMENT_ID
        WHERE EMPLOYEE_ID   = Apex_Application.g_f02(Apex_Application.g_f01(ii))
    END LOOP;Hope that gives you a direction how to solve that
    Patrick
    Check out my APEX-blog: http://inside-apex.blogspot.com
    Check out the ApexLib Framework: http://apexlib.sourceforge.net

  • Mass update of product master (lock material record)

    Hi! Does anyone know of any program that I can use to carry out mass update of product master in SRM? I am specifically looking at locking the materials. I originally intended to use LSMW and create a recording for it. However, the recording didn't work - when I clicked on the open button so that I can key in the product id, it returns back to the recording / LSMW transaction with the screen data. I did not even have a chance to proceed further.
    Any idea would be appreciated.
    Regards
    SF

    really . though you are ECS mode .
    material master must be there  right ?
    How your SRM PO will reflected ( indeed really creates in ECC i.e copy of srm PO).
    confusion here
    can you create a SC for local material and order a successful PO ?
    i know there is a product check in catalog web services - in SRM product master not necesary but your ECC must have material master right..
    Muthu

  • Mass updating of material master

    Hi,
    can any one plz tell me the process of mass updation of material master charecteristics such as classification name, classification type,charecteristics name, charecteristics value for the given materials.
    give me some brief overview so that i can proceed on that.
    I have to use either BAPI or IDOC only.
    Thanks & Regards
    Nageswar

    Hi Eswar,
    Please check with BAPI_OBJCL_CREATE_KEY. There are no of threads available on same topic. lease check for the available information in SCN.I will suggest you post this in Data transfers forum.
    Same thread
    mass updating of material master
    which was blocked by moderator  Thomas and posted the same again
    Regards,
    Madhu.
    Edited by: madhurao123 on Nov 2, 2011 11:43 AM
    Edited by: madhurao123 on Nov 2, 2011 11:45 AM
    Edited by: madhurao123 on Nov 2, 2011 11:47 AM

  • Mass updating a multi-valued field- to append the new value

    I have a question on multi-valued fields:
    I have store table with 5 multi-valued fields, say MLB, soccer, college FTBL, college Basketball, etc. 
    A store can have 4 MLBs, 2 soccer teams, and so on. 
    Say, there is a new MLB that came out called Mexico MLB team. 
    A user wanted to add this to 30 stores using a mass update.  But remember the 30 stores can have totally different sets of values in the multi-valued fields.
    How can I add this new value while still preserving the MLB team’s values of each store record?
    Does MDM not support this feature?
    I am using SAP MDM SP6
    An answer would be highly appreciated.
    Thanks
    Savi

    Savi,
    I assume you are defined these fields as multi-value lookup and linked to main table. In general, you can not because it will mess up and overwrite your multi-value entries for all of your 30 store records.
    Here is something in MDM come in handy. It is following the same concept but design your model a little differently. If you model your multi-value fields into qualified lookup table, it will be easier and optimized to handle.
    You can select all 30 records and mass-update with adding the new MLB entry into your Q-lookup table. Once you save, this mass-update action will respect all your diversity of each individual records with the new value added.
    Hope this helps
    If this answers your question, please kindly reward the points.
    Regards
    Dawei

  • Mass Update of Business Partner Data in CRM

    Hi,
    I would like to know how I can perform a mass update of business partner data in CRM and then have this replicated into R/3.
    I have found notes 802804, 876602, 859632 but these only apply to CRM 5.0 and we are currently working on CRM 4.0.  Does anyone know of anything similar which exists in CRM 4.0?
    I have checked other posts and found help files links like the one below but is this only on CRM 5.0?  (http://help.sap.com/saphelp_crm50/helpdata/en/3c/9b56fae6c7424cafcdf17370399812/frameset.htm )
    Has anyone used the tx. MASS in CRM?
    Also our volume update levels is as high as 300,000 record and updating in CRM and replicating into R/3 through the middleware is causing performance problems.
    Does anyone have any tips on the best approach for this?  Many thanks.
    Regards
    JoJo

    Mass not available in 4.0, could write your own LSMW routine but you still will create bdocs for updates so not sure how that will improve your performance.

Maybe you are looking for

  • Ipad won't sync . Error message 1140

    i connect my ipad to my macbook air and it comes up with this error message. It isn't full and im only asking it to sync apps and photos - no music or film/tv

  • NOARCHIVE mode and datafile DROP OFFLINE

    I have a 10gR2 database on linux that I use for testing. The db is in NOARCHIVE mode. I had created test tablespaces on a NAS (as opposed to the system tables on the local machine). The NAS crashed, losing the drive mapping on the db machine. Of cour

  • How to stop a while loop in LabVIEW from a C program

    How to stop  a while loop in LabVIEW from a C code

  • S it best to down res photos to display on apple tv?

    I would like to display a folder of images on my tv via my apple tv. Currently these images are between 4 and 8mb each - so way oversized for the HD display. Does anyone know whether it makes sense to create a shared folder with more appropriately si

  • UCCX 7.0: Outbound IVR call based on datetime

    Hi, I want to know can I dial my customers (through UCCX Outbound Subsystem) from the dialing list where datetime is included and I want to dial them at that particular datetime. The idea came from like example, I want to wish birthday to someone at