Master Data Delta Load failing

Hello,
We have a master data process chain that does a delta load of 0MATERIAL_ATTR, OMATERIAL_TEXT etc....
On 3/26/06 at 8:15 pm was the last time this process chain ran successfully.
On 3/27/06 at 8:15 pm the process chain failed on the first step: 0MATERIAL_ATTR (Delta Update) and thus did not process furthur.
The reason the chain failed was because the message server was down, so no BW requests were successful.  i have all my other data loads running correctly now.  So this Master Data problem is the last mystery I need to figure out.
When I look at the monitor for the failed 0MATERIAL_ATTR (Delta) I see a message that says "Non-updated Idocs found in Source System"
When I click 'Process manually' in the monitor. it says 'incorrect data packets are now updated again'
The chain was attempted to be ran on 3/28/06 at 2:25 pm and it failed again at the same step.  The message in monitor this time was 'Sending packages from OLTP to BW lead to errors'
The chain was again attempted to be run on 3/28/06 at 5:06 pm.  Again it failed at the same step. the message this time was 'Update mode R is not supported by the extraction API'.
I tried to manually run the infopackage outside of the chain and I got this message when I clicked 'Start'.  "the last delta update was incorrect" Therefore, no new delta update is possible.  You can cancel the request or: Attempt to load the data of the last delta update again."  I click 'Request again' and I get the message:  'Update mode R is not supported by the extraction API'.
All of these loads transferred 0 records and failed.
Any advice on how I can get my master data on track again?
Thanks,
Nick

Hi Nick,
I would suggest that you do a full load to get all the data and then ReInit the process. Since it is master data, the full load and ReInit is possible with no major issues.
Re: Update mode R is not supported by the extraction API
Hope this helps...

Similar Messages

  • Master data delta load failed

    Hi All,
        Delta load for 0MAT_PLANT master data failed and the error message in monitor is  "there are duplicate records (with same key)". 0MAT_PLANT is coumpounded with 0PLANT. I checked in PSA and there is more than one record with the same key (0MAT_PLANT & 0PLANT). My understanding is master data has to be replaced if a new record comes in with same key as the previous one. I am not sure how to correct this and finish the load.
      Can anyone throw their inputs?
    Thanks,
    Kim.

    0MAT_PLANT is sourced from table MARC in R/3. Keys in MARC is also Plant and Material just like th eInfoObject 0MAT_PLANT.
    Check table MARC in R/3. If that also has duplicates and you want to get the data load through, then load to PSA and upload from there ignoring duplicates.

  • Master data delta load failure

    hello Friends,
    Today i have faced cost center master data delta load failed in my project.
    The error is - Requesting the last delta for master data is not supported.
    As it is delta load, I have followed below steps.
    1.      Request made forcefully red.
    2.      Triggered same infopackage and load completed successfully.
    friends, can you please outline the error and why it has came, as i have checked OSS notes but still not able to find exact notes for it.
    As i have to give the reason to the clilent , please your help weill appriciated.
    Please suggest me this error belongs to , and why it came.
    s it is completed sucessfully still i have to give details to my client.
    Regards,

    Hi,
    There r lot of reasons to fail the master data load, the error which u got was because of failure in the source system.
    <i>The error is - Requesting the last delta for master data is not supported.</i>
    This is due if a delta is still running then it gives that message, u have to check whether it is running in the source system, if not u can make it to red then repeat the load.
    for checking follow the menu path from monitor ---evironment->job over view->in source system, there u have to enter the user id password it will take to directly SM37 with that job name.
    Hope it helps.
    Regards
    Siddhu

  • REPEAT DELTA WILL WORK FOR MASTER DATA DELTA LOADS

    Hi Guru's,
    REPEAT DELTA WILL WORK FOR MASTER DATA DELTA LOADS?
    AS I AM NEW TO SAP-BI CAN ANY ONE GIVE THE DETAIL EXPLANATION ON IT.
    IT WILL BE GREAT AND HELPFULL.
    Thanks and Regards,
    CM

    Hi CM,
    yes you can perform the repeat delta even for the master data if the datasource which was supplying the data was delta capable.
    You can do the repeat delta only in case if your previous request was erroneous and dont forget to make the request red in the status,so that system will treat like you are requesting the failed request once again where in case you will miss the previous request, i,e erroneous request if you dont make the request red.
    when you make the request red manually in the status,the pointer will move to the previous request once again in the delta queue and there will be no chance of missing the delta records.
    This process was same for both transaction as well as master data.
    Regards,
    Sunil...

  • Is there settng source system level for master data delta loading perfo

    Hi Viwers,
    Good Morning,
    I am loading data from the source to target level for Master data it is taking too much time,I would like to know the how to increase the master data delta loading performance.
    I would like to know the source system level is there any setting requited & target system level also.
    Please give your inputs..........
    Thanks & Regards,
    Venkat Vanarasi.

    Venkat -
            Are u deleting the indexes of data target before delta loading ? If not,delete the indexes of data target before delta loading  and recreate them after delta loading is done.This procedure increase load performance.You can perform whole procedure in process chain.
    Anesh B

  • Error during master data delta load

    Hi All,
    I am loading delta master data to an info object 0DPM_DCAS through a flexible update.
    Received an error "101 data records in table /BI0/XDPM_DCAS marked for deletion...
    158 duplicate record found. 126 recordings used in table /BI0/XDPM_DCAS"  at the Update level.
    The status is red. There is no additional info in the Error Message button.
    Also subsequent deltas cant be triggered and it says "Repeat cant be requested".
    Please suggest an explanation and an way out.

    Hello VishNo,
    How r u ?
    This error is because of the Duplicate records existing in the InfoObject. Also, seems to be the problem in the Master Data Time independent navigational attributes table. Check the data and also the Monitor screen Details Tab entries & come back again.
    Best Regards....
    Sankar Kumar
    +91 98403 47141

  • 0material master data delta loading

    Hi,
    Could anyone let me know how can i check in R/3 side if   0material delta laoding getting 0 record?
    What I mean is that: we have a process chain loading all master data, including "0materail" Material Number(0MATERIAL_ATTR), and Product number(0MATERIAL_TEXT).
    and it runs once a week.
    this week, I noticed that there is both 0 records has been laoded from R/3 to BW for both (0MATERIAL_ATTR) and (0MATERIAL_TEXT) delta load. while teh other master data load runs normal, get records as normal.
    But i am not sure how to check in R/3 side, to ensure whether there are some new records created during this week or not.
    which transctiion and table i should check.
    Please advice,
    Ping

    Check there is any Selection criteria in the Infopackage data selection tab. if you have any selection provide the same selection in MARA.
    If you don't have any selection and if u won't see records in RSA3 means... some problem with extractor.
    all the best.
    Regards,
    Nagesh.

  • MAster Data - Delta Load Error?

    Hi,
    I am having error in 0COSTCENTER delta load. In the Info Package of 0COSTCENTER, it was not selected to PSA. It was selected to InfoObject directly.
    Since this is a delta load for Master data, how can i correct this error?
    Thanks!
    Venkata

    Hi Venkat,
    You can done a full upload without affecting Delta upload. Make a test on Dev or Qual and you will see that a full on Master Data does not stop delta process.
    Ciao.
    Riccardo.

  • Master data delta load issue

    Hi Expert,
    We have recently enhanced a Master Data object with 3 fields. These fields are directly mapped from a DSO. When the delta load is done, these 3 fields are not getting the data, while a full(selective) load gets the data and the 3 fields get populated. What can be the reason for this?
    Thanks,
    Anupama

    Hi,
    Then if data already updated to info object through full load, again if you run delta dtp for the same its not fetch any records, so after full load, initiliaze the delta dtp, In DTP in exectue tab you will select processing mode as select option : No data transfer delta status in source is : fetched, aftet that you can run your regular deltas. it will work.
    Regards,
    satya.

  • 0 records in master data delta loads.

    We have activated delta on 0CUSTOMER_ATTR and verified the queue is active in RSA7. However the delta load is not fetching any records. A full load, however, does. I have deleted and reactivated the delta init multiple times with no success
    The infopakage error monitoring status has the following  messages
    <i>No new data since the last delta update
    Diagnosis
    The data request was a delta update, meaning, the data basis in the
    source system has not changed since the last update.
    System response
    Info IDoc received with status 8.
    Procedure
    Check the data basis in the source system.</i>
    Thanks in advance.
    D

    hi ok first check what Ajay said the BD61 if it is activated in R3.
    After that go to roosgen fill in the name of the DS 0custmer_attr select the line with the R3 from which you want to extract data.
    Copy the message type.
    Then after you have made the change (update or creation) go to table cdhdr and cdpos to get the change doc object, table name and field name.
    After that go to bd 52 paste your message type and add the entry for in your case for the phone number in communication tab
    chge doc ADRESSE     table : ADR2     field name : TEL_NUMBER
    Launch the delta it should work.
    In fact when you go to bd52 you will see the fields that are entered for the fields to be taken into consideration when an update is made (they are mainly based on the chge doc obj DEBI) so if you need more fields add them in function of your needs and the info you get in cdhdr and cdpost when you do changes. You can do this only manually so take care of repeating these steps in QA and in prod.
    Hope this could help you to solve your issue.
    regards
    Boujema

  • How to Delete a Failed Master Data Delta Load ??

    Hi all,
       The Delta update load for 0VENDOR_ATTR is failed. I have changed the TOTAL traffic light in Status tab of Monitor to 'RED' and clicked 'yes' on the next pop-up screens.
         After activating the Transfer Rules, I have tried to load the Delta again and it failed with 'Update mode R is not supported by the extraction API
    R3 (Id) 11 (No.)' . The long text says 'The application program for the extraction of the data was called using update mode R . However, this is not supported by the InfoSource.' 
       How can I fix this problem so that I could load delta, PLEASE?
    Thanks.

    Hello Venkat,
    How r u ?
    I just found this; check all the Threads under the topic
    http://sap.ittoolbox.com/groups/technical-functional/sap-r3-bw/update-mode-r-is-not-supported-by-the-extraction-api-949241
    Have a look at OSS 427812.
    Best Regards....
    Sankar Kumar
    +91 98403 47141

  • Master data Full load to Delta load

    HI
    I have Order number (ZONDRNO)for this we are loading the Master data form BW  to BW full load.
    This Order number is Generi Data source
    Can any one help me how to do master data Full load to Delta load.
    Thanks in Advance
    kumar
    Edited by: kumar reddy on Oct 9, 2008 3:14 AM

    Hi,
    Firstly you are stating that you are loading from BW to BW. How are you doing it ? Are you doing through a datamart ?
    Secondly you have also told that you have created a generic datasource so from this we can deduce that you are not doing a datamart load but you are doing through a datasource.
    Thirdly to achieve delta for a generic datasource you should make sure that the datasource in question here is delta enabled.
    Once all these are done all you need to do is a delta init and schedule further delta loads.
    Regards,
    Pramod

  • Master data delta

    BW Experts,
      Right now we are doing all full loads for our master data. I have heard about Master data deltas which brings only the changed and new records. what is the setting to be made in BW for this. Also what is the setting to be made in R/3 3.1i and R/3 4.7. Help is greatly appreciated.
    Thanks
    Ashwin

    Hi,
    For MD deltas to occur, the process is the same as transactions delta. On the R3 side you need to make sure that the std datasource is delta enabled (most are). If its a generic one, then you need to make that delta enabled if not already.
    On the BW side, you need to set up an infopackage to do initialization without data transfer(since you are already doing full loads) and then set up the delta.
    One word of caution here, would be to do a full just around the time you set up the delta, so as not to lose any delta data, as there might be new MD records or changes to existing ones that might not get captured. This is very rare, but its better to do a full around that time.
    Cheers,
    Kedar

  • Master data text load failure?

    Hi all,
    My process chain for master data text has failed and i am getting the below error message?
    error records written to the application log
    error 4 in the update.
    pls advise me on this what should i do?
    thanks
    Pooja

    Hi,
    I will suggest you to check a few places where you can see the status
    1) SM37 job log (In source system if load is from R/3 or in BW if its a datamart load) (give request name) and it should give you the details about the request. If its active make sure that the job log is getting updated at frequent intervals.
    Also see if there is any 'sysfail' for any datapacket in SM37.
    2) SM66 get the job details (server name PID etc from SM37) and see in SM66 if the job is running or not. (In source system if load is from R/3 or in BW if its a datamart load). See if its accessing/updating some tables or is not doing anything at all.
    3) RSMO see what is available in details tab. It may be in update rules.
    4) ST22 check if any short dump has occured.(In source system if load is from R/3 or in BW if its a datamart load)
    5) SM58 and BD87 for pending tRFCs and IDOCS.
    Once you identify you can rectify the error.
    If all the records are in PSA you can pull it from the PSA to target. Else you may have to pull it again from source infoprovider.
    If its running and if you are able to see it active in SM66 you can wait for some time to let it finish. You can also try SM50 / SM51 to see what is happening in the system level like reading/inserting tables etc.
    If you feel its active and running you can verify by checking if the number of records has increased in the data tables.
    SM21 - System log can also be helpful.
    In your case it is probably because of invalid character issue.
    Thanks,
    JituK

  • Master Data Process chains failing due to special charecters?

    hi experts,
    we have done all the master data(FI,SD,LO,QM,PM,MM,PP,PS) and created process chains and transported into production system.
    when we run the process chains we are facing lot of issues regarding special charecters.
    for example. 0MAT_VEND_ATTR Data source. 
    MATERIAL VENDOR (field - IDNLF).
    'UDGÅET
    &''UDGÅR
    &''UDGÅET
    &''36/5599/LED./FÆLLES
    &''SØTRANSPORT &
    those are the special charecters are coming when i try to execute through RSKC the above Material Vendors, its giving different special chars for different MATERIAL VENDORS like below.
    FÆLLESSØTRANSPORT
    04/5160/FORSØGSAFD.
    (5150)FORSØGSAFD.
    like that there are about 15 master data chains are failing.
    due to that reason the below transcation chars are not executing.
    please suggest me is there any routine or is there any procedure to take care of unpredicted special charecters loading successfully into BW.
    regards
    venuscm

    I don't think its a global setting problem.
    Permit the char in RSKC...
    Check with the functional team why they are getting Special char values in the loads. ask them to rectify the special char so that you can extract the same to BW side.
    go through the blog links provided earlier in my post...
    Check the below link which might be of some use to you,..
    /people/jyothi.velpula/blog/2010/12/23/removing-invalid-characters-using-field-routine
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/d0afbb81-f219-2c10-4181-b20f6b10e373?quicklink=index&overridelayout=true
    Edited by: prashanthk on Jan 3, 2011 5:35 PM

Maybe you are looking for

  • Stuck Smartforms !!

    I get text using the read text FM in Smartforms into an Internal table of type TLINE. Then I create a Loop node and loop the contents into a structure of type TLINE . In the loop node i create a Text node and try to display the content of the structu

  • 3.1.3 Backup file transfer to iPhone 4?

    I'm planning on giving my iPhone 3GS to a family member when I upgrade to an iPhone 4. He doesn't want the iOS4 update on the phone. When I do my final backup on the phone, can that backup be transferred to my new iPhone 4 safely? So my basic questio

  • JAVA Class error .. cannot locate the issue (my code included)

    I am diving into JAVA, and I am experiencing a little bit of difficulty. The code below is not working :: package therectangeclass; public class Rectangle { private double length; private double width; public Rectangle(double l, double w) { length =

  • Text type on Confirmation header

    Hi! Does anyone know whether it is possible to configure the text type on the Confirmation Header, under Documents? Basically, we have turned on confirmation approval and if we reject a confirmation, we will be given a choice to enter the rejection r

  • SAP BRIM: SAP CC + SAP CI * chargeable items rated in output files in the same instance

    Hello Experts, I'm contacting you just to ask if it is possible and how should I configure SAP CC (Convergent Charging) and Sap CI (convergent invoicing) to reproduce the following scenario: Nowadays having two SAP CC different instances I'm able to