Master data in SRM when backend system change

Hi SRM Gurus,
Our scenario is ECC5 as backend system integrated with SRM 4.0(  SSP scenario and  iwith Catalog CCM2.0) Tech Implementation scenario is Extended classic .
Now our backend system will be changed to ECC6 from ECC 5.
ECC6 is installed on separate server for implementing changes in FI  ( separate Dev, QA, Prod environment )
Question is that when we integrate SRM4.0 with ECC6, all master data (product categories, products & vendor master) needs to be replicated from ECC6 to SRM4.0
As SRM system will remain same what will happen to present master data in Production system.
As deletion is not suggested what is the correct approach.
We can delete this master data in SRM Dev and QA.
Can we keep master data pertaining to ECC5 as it is in SRM.
Any idea as to what type of impacts one can expect if backend system changed from ECC5 to ECC6? Is there a recommended approach for this?
I already referred note SAP note 418886 /995771.
Regards,
Avinash

Hi
By changing to ECC6.0 you would be entering a new backend system. Since the master data in SRM is linked to the respective backend system, it should not impact you.The old master data would still be there but linked to old backend system. You can let the data remain as it is if you want.
Regards
Sanjeev

Similar Messages

  • Function Module to send Vendor Master Data from SRM to ECC

    Hi Guys
    I heard there is a function module in SRM which can send Vendor Master Data from SRM to ECC please confirm for me if there is such a function Module and what is it called. Thanks

    Hi,
    Vendor Master data is replicated to SRM from ECC. Standard Transactions (BBPGETVD,..) will be used to replicate the data from ECC.
    Vendor Master will exists in ECC, so there is no point in sending the same back from SRM to ECC. If the requirement is the other way around, we can use the transaction BBPGETVD in SRM system.
    Hope this helps.
    Regards,
    Hemanth

  • Master data from combination of multiple system source

    Hi All,
    We have a situation wherein we have to load master data from 2 different source systems. For the same Business areas ( Ex. SD, FI, etc). with most probably with same values. Since the master data is overwrite, the last load value will only be available.
    Please help me out in the precautions / design change need to be done in the existing system.
    Regards,
    N P Reddy

    Hi NPR,
    For this the recommended scenario is using Source System Compounding for the InfoObjects. See here for full info:
    http://help.sap.com/saphelp_nw04/helpdata/en/80/1a6399e07211d2acb80000e829fbfe/content.htm
    Hope this helps...

  • How to load master data from SAP R/3 system like Customer master...........

    How to load master data from SAP R/3 system like Customer master, materioal master , vendor master.............

    Hi Bramha,
            Check ...........
    Re: master data loading in BI 7.0
    /message/4708129#4708129 [original link is broken]
    Re: Master data loading.
    Regards,
    Vijay.

  • Scenario is HTTP to db. In HTTP client, when Sender is Business Component, Pi is getting data successfully but when Business system is used as sender Pi is not getting any message in sxi monitor. Please help

    Scenario is HTTP to db. In HTTP client, when Sender is Business Component, Pi is getting data successfully but when Business system is used as sender Pi is not getting any message in sxi monitor. Please help

    Hi Ankita,
    Try to trace at ICM level, Go to smicm transaction
    Set level to 3.
    Later send your request. Finally trace the request in:
    When you have seen the log, check if any exception is raised with your request or the request and share it here.
    Regards.

  • Inbuilt RFC/IDOCs to upload ITEM MASTER DATA in SAP IS Retail system

    Hi,
    Kindly let me know the inbuilt IDOCs/RFCs to upload ITEM MASTER DATA in SAP IS Retail system.
    Otherwise let me know the tcode to check the inbuilt IDOCs/RFCs in SAP IS retail system or let me know all MASTER DATA related inbuilt IDOCs/RFCs in SAP IS retail system.
    Thanks
    Ramesh

    Hi,
    Please check below link. hope it helps you to answer your question
    http://wiki.sdn.sap.com/wiki/display/Retail/SAPRetailPOS+Interface

  • Master data from SRM to MM

    Hi Gurus,
    Is it possible t transfer master data from SRM to MM? If it is possible, can you please explain me how can we do it??
    Regards,
    Eswar

    Hi
    You can transfer the master data
    Vendor Data - By first transfering the payment terms and quality terms by using
    Report: UPLOAD_PAYMENT_TERMS
    Report: BBP_UPLOAD_QM_SYSTYEMS - for quality sytems
    then 
    by transaction BBPGETVD for all the vendors  data from the back end
    Material Master Data by CRM Middlewear for the material master data of The process of material master data tranfer is simple and effective but you set the Adpater setting for the EBP side and Plug-In settings at R/3 side.
    If you still have any questions let me know

  • Issue while replicating the Master data from R/3 Backend to SRM

    Hi experts,
    I am supposed to do replication of master data from ECC 6.0 R/3 to SRM System.
    I have issue at T- Code:  R3AS.
    For Initial Load of objets :
    1) DNL_CUST_BASIS3
    2) DNL_CUST_PROD0
    3) DNL_CUST_PROD1
    I am getting following error. :
     The following Errors/Warnings occured. Do you want to continue?
     DNL_CUST_BASIS3: No active entry in Table SMOFSUBTAB. Read OSS note 339787
     DNL_CUST_BASIS3: No active entry in Table SMOFSUBTAB. Read OSS note 339787
     DNL_CUST_BASIS3: Object will not be loaded
    for all the objects we re geting the same error.
    In OSS Note 339787 :
    Reason and Prerequisites
    You attempt to start the initial load of the R/3 adapter for an object for which no function module for processing data from the OLTP is entered in the SMOFSUBTAB table. This means that the data would be ignored if the initial load could be started.
    Another cause for the output of this error message is the inconsistent maintenance of the OBJCLASS field in the SMOFOBJECT and SMOFSUBTAB tables.
    Solution
    Enter a processing module in the SMOFSUBTAB table or set the object to 'Inactive', so that no initial load is carried out for it. The change can occur using the maintenance Transactions R3AC5 or R3AC3.
    If you want the object class to be communicated, change the OBJCLASS field in table SMOFOBJECT so that the contents correspond to the OBJCLASS field in the SMOFSUBTAB table for the object.
    While checking the table entries, object
    “DNL_CUST_BASIS3, DNL_CUST_PROD0 and DNL_CUST_PROD1”  are not there.
    Table SMOFSUBTAB can not be maintained in SM30. how to maintain these entries in Table SMOFSUBTAB.
    Can any one help me in this regards. 
    Points will be rewarded.
    Thanks and regards.
    Kalyan

    Hi Dinesh,
    i have done reqd entries in the table CRMSUBTAB in ECC?
    also check other tables in ECC
    CRMCONSUM
    CRMRFCPAR
    CRMPAROLTP in ECC
    and
    SMOFPARSFA in SRM
    i want to know how to maintain the enteriers in Table L SMOFSUBTAB in SRM system.
    regards
    kalyan

  • PU12: all master data (+history) exported when 1 infotype is changed

    Hi,
    The problem we are facing is the following...
    We run report RPTUPD00 for an employee. This report updates all absences of an employee, which could be of several years ago.
    The next time we run the export, all master data of this employee is in the export file, not just the changed absences. And not only master data of the current payroll period, also all records of before. As a result, we end up with a temse file of a few 100MB, while otherwise it's never more than a few MB.
    I don't understand why this is happening. The records of the other infotypes have not changed since the previous export, yet they are again included, despite having change validation activated.
    I'm thinking it might be because report RPTUPD00 sets the earliest master data change date in IT0003 to the oldest absence (which is logical).
    In the documentation, there is the following:
    "During the first export after a change covering several periods, the changes are sent for every  payroll period affected by the change."
    But in our case, there are no changes (except to IT2001 of course), yet all other infotypes are also completely exported again.
    So I don't know how this can be solved, anyone has an idea?
    Thanks in advance! :o)

    Hi Raghu,
    I understand that after change credit limit in FD32 you musn't run it, because as note says:
    The RFDKLI20 report recreates the SD and FI credit data after
    organizational changes
    and I understand that change the credit limit (for instance, an insurancer set the credit limit to zero) isn't an organizational change. Think that if you do a SO in a moment when you have an insurance for nonpayment, the withdrawal of it isn't retroactive. I think that you know SAP Note 408596 - RFDKLI20: Recreating credit data - new documentation. Other useful note is SAP Note 396338 - Problems in credit management - analysis help
    The second. Avoid it in business hours. It's related with locks. You can lock to other users or other users can lock you (a SO, a FI document, and so on) and as these notes says, you must to re-run it.
    Finally, if you read the documentation of F.28, info icon, it suggests us: to run it in non-business hours and run it in background.
    Other suggestion, take into account the question related with documents that end-users changed their credit status, it's possible that these documents return to values before to change them with tools as VKM4 (but perhaps it happens with RVKRED77, sorry but it's been a long time since I did it last time).
    I hope this helps you
    Regards
    Eduardo

  • Master Data coming from 1 backend and GOA distributed to many bakends

    Hello,
    In our case (using SRM 5.0) one backend system is used to replicate all material master data and GOA will be distributed to multiple backends including the one that is used for master data. As far as i know the logical backend system is determined through materials/material groups while GOA is distributed. In the above case how can we intervene with this logic to be able to distribute the GOA to whatever backend we have, even though if the MD is not coming from them?
    Thank you,

    Hi,
    You can use the BADI BBP_DETERMINE_LOGSYS for this purpose.
    The method :CONTRACT_LOGSYS_DETERMINE (Determine Target System of Contract) has been provided for the same purpose.
    Sample BADI Implementation at SDN Wiki:
    https://www.sdn.sap.com/irj/sdn/wiki?path=/display/srm/bbp_determine_logsys-contract_logsys_determine&
    Regards
    Kathirvel
    Edited by: Kathirvel Balakrishnan on Feb 25, 2008 1:00 PM

  • BP Master Data gets updated when (AR/AP) Invoice is raised

    Hi All,
    I am running SAP B1 8.8 and I discover that whenever AR or AP invoice is raised, it will update the business partner master data. On the master data of the particular BP where the invoice was raised, I went in and click on the change log, the date of latest update is the same as the date when the invoice is raised. I was wondering why SAP B1 8.8 is doing that? I am running the latest PL which is PL 14 hotfix. But I don't think it's PL 14, as I can see the history of te change log was created even before I updated my B1 to PL14 hotfix.
    I have done multiple invoices with the same BP, and it seemed the update only happened once, which was the first time an invoice is raised.  Just curious as to why the BP master data needs to be updated.
    Many thanks.
    Cheers.
    Kevin

    Hi Rahul,
    I have checked, no FMS. But do you get the same pattern though? When AR/AP invoice is raised a BP, then go that BP master data, click on its change log under tools. Do you see the latest date of the change is the same as your invoice date?
    Thank you.
    Regards,
    Kevin

  • Layout module master data sending to F&R system

    Hi Friends,
    When interface is sending layout module master data to F&R system, getting error message 'FRE_MD_LAYOUT_SEND PROCESSING DELTA E    Sending release profiles - System Failure:' in FRE_UI t code.
    When i am re-transmitting those backup files again error is coming 'Error during retransmission'.
    When i debugged the program found out the file name format is not showing proper in SAP, the filename  showing for layout module interface is '20120208204837', according to program it should be in .DAT format but in SAP not showing & file at OS level is in .DAT format.

    Hi,
    here is more detailled information. The error message is issued in function module FRE_LAYMOD_SEND. This function module is called by the re-send function module FRE_LAYMOD_RESEND only if there is data to send. That means the data within the backup file has been read successfully before!!! You can assume the error occurs in the system connection between ERP and F&R. (ERP tries to send the data but cannot send successfully due to some missing or erroneous settings within system connection.)
    Let the system administration check the system connection settings.
    As well have a look to the F&R Wiki page within SAP Community Network. Some documentation is about the system connection SAP ERP and SAP F&R. http://wiki.sdn.sap.com/wiki/display/SCM/SAPForecastingandReplenishment%28FRE%29
    Kind regards,
    Rainer

  • Master Data Loading from APO--- BW System

    Hi Experts,
    I am loading master  data from the APO to bW System,after loading data into the BW System ,I found the number of data records are mismatching
    ex:APO (8340) --->BW (9445)
    and that to I tried to delet the data in InfoObject,
    only some records are deleting
    and one more doubt
    in APO i have info object ZA9MATNR CHAR 40
    With Conversion Routine PRODU
    in BW i have the same info object ZA9MATNR CHAR 40 with Conversion Routine ALPHA.
    and I have checked the Check box in transfer rules also,may be becoz of this I am getting more records.
    Could any body help me
    Thanks in Advance...
    Regards,
    Nagamani.

    Hi,
    Ideally it is impossible to get the increased count of data records when you load it into BW unless you are using the RETURN TABLE concept.
    Normally the record count decreases with the records with same keys gets overwritten/added.
    Coming to your second question, ALPHA conversion routine has nothing to do with the record count. It appends the ZEROS to the value coming in that InfoObject. For example, if the lenght of the object is 5 and data is coming only in 3 digits, it will append the ZEROS to make its length 5.
    Hope this info helps you.
    Regards,
    Yogesh.

  • Master data load from 2 source system

    Hi all,
            I am working on a project which has 2 source systems.
    Now I have to load master data from 2 source systems without making 0LOGSYS as compunding
    attribute. Because all the objects which i want to use compunding attribute are reference
    objects for lot of other info objects. So, i dont want to change the business content
    objects structure. Please guide me
    Thanks

    Hi,
    I cube there is nothing to do with compounding attribute, it will be handled in MD IO level.  As your requirement to separate the transaction happen in different source system then make add another info object as Zsource and make it as nav. attribute then design your report based on nav. attribute.
    Note that this separation is only possible in Material Related transaction not for others.
    Thanks
    BVR

  • Integration connections to bring master data into APO and BW system.

    Hi All,
    Can somebody give step by stip activities to be done FOR creating integration connection for following requriment.
    1)  To bring master data from R3 System to APO system through BI CUBES using BI type connection
    2) APO/R3 type connection R3 system to APO system.
    Regards

    Nikhil,
    Request you to let me know how can basis person helps in this.
      If this is an existing system, the applications team (APO and BW) will not require much assistance from you.  You can mostly sit back and watch them do all the work.
    I suggest that you read the help link in its entirety provided by expert Datta.  Much of the info there is helpful for both solutions.
    For the APO interface (question 2 in your original post) there is a complete step-by-step guide provided by SAP.  Check these two docs out.
    http://help.sap.com/bp_scmv250/BBLibrary/Documentation/B02_BB_ConfigGuide_EN_DE.doc
    http://help.sap.com/bp_scmv250/BBLibrary/Documentation/B05_BB_ConfigGuide_EN_DE.doc
    If you are being asked to select from one of the two scenarios you outlined, the standard Core interface is by far the simpler to implement.  Plus, it has the advantage that SAP will support you when something goes wrong.
    The BW solution is different, in that the developer (you?) MUST have detailed specifications before he can proceed.  Which master data?  At what organizational levels?  How often refreshed?  What will be the ultimate use of the data, and how must it be stored?  Where will it be stored? How to deal with inconsistencies?  Etc etc. SAP support will only solve technical problems in your solution, they won't solve errors of design or logic, unless you happen to get a very accommodating support person when you raise your message.
    But in case a basis person need to create RFC how can it be done for above scenario.
    The instructions for creating all the RFC stuff is contained in the connectivity doc I cited above.
    Best Regards,
    DB49

Maybe you are looking for