Master reciepe copy in process order

Hi, i have 2 control recipies for same material. when i created manual process order with cor1, it is copying the first control recipe. i want it to copy second control recipe. how to set the same?

Hi,
Hi, i have 2 control recipes for same material
Control Recipe can be created only during Process Order Execution so it's not a master data.I think you want to say you have created 2 different Master Recipe which contains different sets of Process Instruction Categories (Which will give you different control recipe).
- So if you want to do manual selection of Master Recipe to create Control Recipe of your Selection then,
Create 2 different production version and assign Different Master Recipe to it.
- Now go to COR4 (Order Type dependent Parameter) and set selection of Production Version as Manual one.
So whenever you creates the Process Order manually system will give you a pop up screen to choose the Production Version.Select required Production Version and process further.
Regards,
Dhaval

Similar Messages

  • Storage location not getting copied in process order for components

    Dear PP Gurus,
    While making a production /process order the storage location of component materials is not getting copied from material master into the process order, it is showing any default storage location.
    What couls be the reason for it..
    For all components it is defaulting the same storage location.
    Please throw some light on the issue what could be the reasoon for it..

    Dear,
    System determine issue storage location from the material master, the value of the storage location of the BOM item, or the storage location from the supply area.
    Check in BOM component details storage location you have defined.
    Check production storage location from the plant segment of the component is taken into account for the use of MRP areas also. When planned order is being created for the superior assembly in a MRP area?
    Also check the Material requirements planning (PP-MRP)
    --> planning process
      --> BOM explosion and dependent requirements determination
        --> storage location determination for BOM explosion
    Regards,
    R.Brahmankar

  • Hot to copy document items in process order

    is there any settings to copy document items to process order?
    I have added item categary D in master recipe (BOM of material) of material.
    But when i create process order for that material, documents items is not getting copied.
    is any setting is there to copy it?

    Dear Vishal,
    If my understanding is correct,then I think document items does not gets copied into process order and further to this there is
    no key's to view the document as like that is available in a production order.
    If you check at the header - general data in a process order only operation/component overview keys will be available,where
    as in a production order in addition to these keys,you can check for document overview and sequence overview key's
    available.
    I'm unable to get any link in SAP help related to the same.Correct me if my understanding is wrong.
    Regards
    Mangalraj.S

  • Creation of Process Order without assigning master recipe

    Hi,
    I want to create a process order without having default master recipe for the given material or default operation for the given order type. I want the user to select the master recipe manually in process order. We do not want to use production version also.
    We can define the default operation for the order type (OPJG) so that we can create a process order. I do not want a default operation in the process order but the user should select a valid master recipe. If we have default operation in the process order, it serves no purpose as it is never used anywhere.
    Is there any way we can achieve this?
    Regards,

    Hi,
    Please find the required details and conditions for creating process orders without master recipe.
    http://help.sap.com/saphelp_47x200/helpdata/en/89/a42cb3461e11d182b50000e829fbfe/frameset.htm
    Regards
    Kannan

  • Profit Center in Process order

    Dear All,
    Can any one explain me how the profit center gets populated in process order assignment tab in COR3?
    1. From where it is picking the profit center (Is it pick from material master)?
    2. Any configuration required to get filled automatically?
    Thanks in advance
    Kumar

    Hi,
    Profit center is picked up from material master. if you maintain it in material master ---> Costing -1 view.
    However, if you are using project based planning & then system will replace it profit center of WBS element i.e. system will copy profit center of WBS element which is appearing in assignment tab of your process order.
    If you are not using Project based planning then material master profit center will be copied in process order.
    Regards,
    Tejas

  • How to print process instruction in process order.

    Hi dudes,
    ,y client is not having Process management interface, but they want to maintain process instruction for phases in recipe and want to take print of process instructions  in process order after release process order.
    Please explain the path for printing process instructions copied into process order.
    if some one assign PIs to phase in recipe, will control recipes be created after release of process order.
    Regards
    Daniel

    The easiest way to do what you want is to actually create the PI sheet and then print it off from the view PI sheet transaction (CO60).  This is then all standard functionality.
    to do this you will need to set the configuration to create the control recipe when the process order is released and send it to a recipe destination.
    Regards
    Laurence

  • Additional standard text in Process order

    Hi gurus
    I have a question. I have maintained a standard text in RECEIPE and the same gets copied into process order. In the process addionally i have added a standard text to an exting phase. But while printing the shop floor papers , the same is not getting printed. Only the one attached in the receipe is getting printed. Can anyone help he with this?
    I need both to be printed in the SFP
    Prasanna

    solved

  • Inspection Lot number on Process Order

    Hi Experts,
    There's an Inspection Lot field in process order in Assignment Tab, but it doesnt reflect the number of the Inspection Lot of the Material.  What am i missing?
    Thanks,
    Kumar

    hi kumar
    that inspection lot no is assigned to process order when you have maintained inspection type 03 ie inprocess check in material master . when you release process order you can see inspection lot is generated and that inpsection lot no you can on that field.
    Regards
    Pravin

  • Deleting operations in master recipe of process orders

    Dear Guru's,
           I want to delete the operations in master recipe of process orders. The operation numbers are different in different process orders. This activity has to be performed on bit large number of process orders. Can anyone help me in providing the process for doing this activity in mass. Any suggestions?
    Thanks in advance.
    Regards
    Kalyan

    Dear Kalyan,
    Why do you want to delete the operations(basically phases)at process order level?
    If it's really required to execute the Shop floor activties and if the order numbers is huge in number means then in my
    understanding only a LSMW/BDC can help you,but technically I'm concerned about selecting the operation/phases for deletion
    by passing on the confirmation number or operation number for a particular process order.
    If it would be the latest operation/phase for a product means then make the changes in the master recipe so that the same is
    getting copied into the process orders in the future.
    Check and correct me if I'm wrong.
    Regards
    Mangalraj.S

  • Process Order status CRCR needs to  re read master data

    All,
    I have an issue with re-reading the master data in process order.
    I have an order which was  released and control recipe was also released since we use pi sheet to record shop floor data.
    After releasing the control recipe user  made changes into bom and he wanted to re-read master data , on the master data tab re-read master data button is not activated not  if i go menu path from the header process order-> functions-> re-read master data is active.
    Neither i am allowed to set the deletion flag for the order, i am getting error message process order status CRCR does not alow to set the delection flag.
    Any solution to this issue is appriciated
    Either i should be able to re-read the master data or set the deletion flag...

    In your case Control Recipe is already created, so you need to send a process message to set the status of the control recipe to finished. "CRFI". Follow the steps below,
    Transaction CO57, to trigger manually a process message with message Category PI_CRST for the process order and Control reciepe combination.
    Then use Transaction CO54 to send the Message to the process order.
    You can complete the PI Sheet by clicking the "complete" button in the PI Sheet also.
    Now try to re read master data

  • Process order creation without master recipe creation

    Hi, i have created a finished product and i dont want to create the bom and master recipe for this finished product. when i create the process order for this material, i want system to copy the master recipe of the similar products either manually or automatically. please advise how to achieve the same.

    Dear Raju,
    Check these threads,
    Re: Create Process order without Production Version
    Production Order for a material without BOM and Routing
    Regards
    Mangalraj.S

  • New or copy field in process order

    Dear all,
    Can i add new field  in process order  at header lavel for ex. specific gravity  OR Is it possible to copy characteristic and value from material master to process order if yes then how?
    kindly help

    Hi
    Use the PPCO0006 exit - Enhancement to predefine fields in order header

  • Read Master Data for Process order status change (REL to CRTD)

    I am unable to read master data and thus change the status of process order from REL to CRTD. (COR2)
    The reason it says, error in BOM reading, Transport Requirement (TR) already generated.
    Even after deleting the TR (LB02), the issue still exists.
    Is there another way of changing the status or some more steps are needed for the TR deletion?
    Thnx!
    Abhi.

    Order header Status-
    REL  Released
    MSPT Material shortage
    PRT  Printed
    PRC  Pre-costed
    BASC Batch assignment complete
    BCRQ Order to be handled in batches
    SETC Settlement rule create.
    In the error log it gives-
    Diagnosis
    Transfer requirements have already been generated, so therefore the bill of material cannot be read.
    System Response
    The system does not execute the action.
    Then I deleted the TR (LB02), but still I cannot reread the master data.
    The MSPT was for only 2 materials out of 6 and there is no GMPS status.
    There is prod supply area and control cycle used.
    and the TR generated at order release.

  • Header material batch copy to component in Process order

    Hi,
    I have the following requirement...
    We create process order and assign the batch to process order manually..now during saving of the process order system has to copy batch of the process order ( header material ) to the one of the component in the batch automatically, as this is component is by product which comes to stock along with header material...What is the enhancement/ User exit can be used to meet this requirement...
    Thanks
    Kumar

    Kumar.
    What should be copied? The header batch or some/all of the characteristics of the header batch to a new batch for the component?
    Anoop

  • Enabling Xsteps in master recipe and process order

    Hi experts,
    I am trying to enable the Xsteps by assigning 'Xsteps' in Master recipe profile. But Xsteps tab is not getting enabled in master recipe. I think this is the only one setting to activate Xstep. Can anybody help me on this.? IS this a technical issue(Something related to basis?)
    Similarly I dont see the Xsteps tab in process order also. Is the SAP version a reason for this. I think Xsteps functionality are available from 4.7 onwards.
    Can anybody help me on this please?
    Thanks in advance.

    Dear experts,
    I encounter the same problem of Prathib. I'm working on ECC 6.0 and would like to use Xsteps. The repository is available (R/3 Enterprise SCM Extension 2.0 is imported) and I created several xsteps but i cannot imprt them in the master recipe because the button "Xsteps" is not active in C202, even the recipe profile is correctly set to PI01_XS.
    All SAP notes i found (01466 and 607815) are referring to 4.7 and are correctly implemented in my system. So the customizing and extensions are in place, but the button "Xsteps" is not active.
    Can anybody help and suggest further settings i need to do in order to use xsteps?
    Thanks & Regards.

Maybe you are looking for

  • Macbook Pro built-in iSight in Adium and MSN Messenger?

    All of my contacts (about 100 or so) have MSN messenger accounts. Is there a way for me to use my built-in iSight as a webcam in Adium or MSN Messenger? It just seems pointless otherwise since I only know 2 or 3 other people with .mac or AIM accounts

  • About making a down payment using F-51(without posting through F-48)

    Hi Friends, There are situations where the client has to make a down payment against a P.O. (even before the invoice is recieved). Then the normal process is to make a down payment using F-48 with a spl. GL indicator, in this process if there is TDS

  • Required Prepared Statement help

    Consider the following query select col2, col3 from table1 where col1 = ? I can set the bindings for the prepared statement as pStmt.setString(1, value); but sometimes I need all the rows in the table therefore the query would be like select col2, co

  • OIM 11g R1 - Generate Common Name

    Hello, if i create a new user in OIM the common name will be greate with <firstnam> <lastname>. Instead of a "blank" i need a "." between <firstnam> <lastname>. The common name should looks loke <firstnam>.<lastname> How do i edit this settings?

  • Problem in saving long text data from custom

    Hi Expert, I am working on a screen exit in QM01. I have created a editor box(like the description box under Description tab in QM01) using class cl_gui_custom_container and cl_gui_textedit. I am able to create and display the text I type in the box