Master Recipe / Production Version

Hi,
I'm looking for FM/BAPI or IDOC's for creating/changing
master recipes (C201/C202) and production versions (C223). Can anyone help ?
TIA,
Rob Makelaar.

Hi Rob,
Message Type LOIROU ??
Regds,
Mano Sri

Similar Messages

  • Production version issue.

    Dear Guru's,
         I have created two version in material master.
    also I have changed in "opl8"{ production version = Manual selection of production version}
    but still system is not asking me for production version at the time of creation of production order.
    system is asking me routing only
    now I am selecting version from function>read master data ( production version).
    please sugest me wat i have to do for pop up of production version at the time of production order creation
    and also system is not giving me any request no. at the time of save the changes in IMG.what will be issue
    Nilesh

    Dear,
    please see that PV is applicable in terms of lot size, dates and status
    if both
    PV are valid wityh respect to the above then only upi will get the pop up for PV selection.
    MRP4 setting is alosm required.

  • Production version selection

    Hi
    If we have two production version with same lot size quantity and same validity date
    On what basis system determines IN THE PRODUCTION OR PROCESS ORDERS.
    The selection key in Material master is Production version only
    Please explain the logic
    Regards
    Sasikanth

    What is the basis for the Selecting the production version .
    How the system identify this is the first production version ?
    system will check the validity date, from lot size and to lot size with requirement qty,  if both the PV has valid on date having same lot size, System will take first created PV, if the first created PV is locked, then system will take second PV
    If i created Version with Number 1000, 1001
    and if we kept 1001 as the first , Which version system will create ?
    System will take first created PV, if 1001 is created as first then system will take 1001

  • Best production version and master recipe?

    Is there a way in SAP (ECC.5.0) to  choose the best production version on its own besides the date?
    Can MRP choose the best production version  and master recipe on its own based on cost?
    If so How? Config?
    Please advise
    thanks
    Walter

    Hi,
        MRP  selects production version based on   Lotsize,Validity date and status.In R/3 ,we dont have functionality like
       1. Simultaneous MRP and Capacity Planning
       2. Best Optimum  route of production.
    This is very much available in APO only. You can use either of Quota arrangement or Capacity evolution functionality to distribute planned qty into other resources based on past experience.
    Regards,
    Velmurugan S

  • Is it Necessary to create production version if  using master recipe

    our industry Process industry
    we are using Master recipe for Production
    is it necessary to create production version

    Hi Krishna,
    Production version is essential to mantain if you have a PP-PI industry scenario.
    However, if you have not mantained it, you can still create a process order. Process order first searches for the production version (automatically/ manually) depending on the configuration settings.
    If you have not mantained it, system would throw a SAP standard information message, "Material XXXXX: Production Version not mantained".
    If system is not able to select valid master recipe / version.  it would look for default values for operation in the master recipe settings and would try to create a operation.
    Please see the following link:
    http://help.sap.com/saphelp_470/helpdata/en/ee/641c181bed11d29bfe080009b31c68/content.htm
    Method for Selecting Alternative Bills of Material
    Indicator determining the selection of the alternative BOM when requirements are exploded in material requirements planning.
    Use
    With Selection by order quantity, the system chooses the alternative BOM into whose lot size range the order quantity falls. The lot size range and area of validity of the BOM apply.
    With Selection by explosion date, the system chooses the alternative BOM into whose area of validity the date falls according to the setting BOM via dates.
    With Selection by production version, the system chooses the alternative BOM defined in the valid production version. The lot size range and area of validity of the production version apply.
    With Selection only by production version, the system chooses the alternative BOM defined in the valid production version. The lot size range and area of validity of the production version apply.
    If no production version is found, no production orders or process orders can be created.
    BR
    Rahul

  • I try to install my creative suite master collection (student version) on my new mac. the point is that when I want to write the product key. The computer does not accept the number 3. so what can I do ?

    I try to install my creative suite master collection (student version) on my new mac. the point is that when I want to write the product key. The computer does not accept the number 3. so what can I do ?

    Can you use the number 3 key elsewhere?
    [topic moved to Downloading, Installing, Setting Up forum]

  • Error in making production version in material master..

    the error is: to date is in the past.
    Scenario: i am trying to maintain production version in the material master for finished material. this error is coming for each material. Pls help. points on the helpful answers..

    Dear,
    Go to the MM02-MRP 4view clik on production version her you need to maintain the validity from From-To date as toadys date say11/11/2008 to 31/12/999 then double click on it then maintain the details like routing, bom and do the consistancy check if green light appear it means your PV is correct.
    Regards,
    R.Brahmankar

  • Production Version in Material Master

    Hi,
    I am having problems with this.
    I need to either change date on a production version or
    delete the product version.
    I have tried using a batch input sequence from my program both for changing the date
    and for deleting the production version and this all works well.
    Now this isn't good enough since there can be multiple production versions on a material
    and I don't know which line to change or delete in the batch run.
    Is there a good FM or BAPI to handle this?
    I don't want to change the MKAL table directly since there is a history table
    connected to this also (MKAL_AEND).
    What is the best approach?
    Rgds,
    /Fredrik.

    How can I use this to achieve what I want to do, either
    change the production version date or delete the production version?
    I have tried C223, but this is not good enough, nor is batch run in MM02.
    I can have multiple production versions and can not pick the correct line
    in batch run to change or delete.

  • Master recipes operations not getting transfered in SNP PDS to APO from R3

    Hello APO Gurus,
    I am trying to transfer SNP PDS for master receipes from R3 to APO.
    Issue description::
    The operation is not getting transfered correctly , some system default operation "010 generated Operation (from Planned Delive)" is getting generated in APO, also activity and resource capacity is not getting transfered. This situation exist for one plant 1000, for other plant 1100 the SNP PDS created correctly.
    i have following points:
    1. Is there some customizing setting missing on R3 or APO side  for plant 1000 tbefore SNP PDS transfer
    2. What need to be checked on master recipes data in R3,
    i have checked on below points
    1. FG Materials and all the Component Material to be in APO in a Active Integration Model.
    2. BOM & Routing and Production Version setup correctly.
    3. The Routing Operations have to Relevant to 'SCHEDULING'.
    4. Try deleting the existing Integration model for materials & re-create new IM & activate.
    Please help me to send SNP PDS correctly to APO to take heuristic run.
    Regards
    Gajendra
    Edited by: Gajendra_APO on Aug 23, 2011 1:14 PM

    Hi,
    It is good that you have given your already checked points.
    Please check the following things also and try to retransfer the PDS.
    1. Check your resource in ECC, whether you have maintained the Process formula.
    2. Check you have maintained some values in Master Recipe for processing time
    3. Check whether the resource has been transferred for your plant 1000 to APO and an active IM exists.
    4. Also check the type of the resource transferred to APO. It should be a single-mixed/ multi-mixed or bucket resource.
    Hope this will help you to solve the issue.
    Regards,
    Manimaran M.

  • QC Activity based on Material Production Version

    Hi,
    Normally, we perform QC activity based on Material Code, i.e. in Material Master we maintain inspection type in QM View for material which needs QC activation during Good Receipt from Production
    Is it possible to perform QC Activity based on Production Version of a material i.e.
    For Example
    Product A having 2 Production Versions
    IF Product A with Production Version 1 then No QC required during goods receipt from production
    IF Product A with Production Version 2 then QC required during goods receipt from production
    So please tell me what feasible solution possible from your side
    With Regards,
    Kunal Sheth

    Dear Sap User,
    Production version is nothing just a combination of Master recipe/Routing and BOM used for particular production or process.
    If you are having so many production version then you have to choose which you want to choose but if you are having a single production version then it will be chosen automatically.
    Do it once and revert in case of any query.
    Rgrds,
    Dheeraj Rawal
    Edited by: Dheeraj89 on Feb 9, 2012 6:13 AM

  • Creation of Process Order without assigning master recipe

    Hi,
    I want to create a process order without having default master recipe for the given material or default operation for the given order type. I want the user to select the master recipe manually in process order. We do not want to use production version also.
    We can define the default operation for the order type (OPJG) so that we can create a process order. I do not want a default operation in the process order but the user should select a valid master recipe. If we have default operation in the process order, it serves no purpose as it is never used anywhere.
    Is there any way we can achieve this?
    Regards,

    Hi,
    Please find the required details and conditions for creating process orders without master recipe.
    http://help.sap.com/saphelp_47x200/helpdata/en/89/a42cb3461e11d182b50000e829fbfe/frameset.htm
    Regards
    Kannan

  • Process order creation without master recipe creation

    Hi, i have created a finished product and i dont want to create the bom and master recipe for this finished product. when i create the process order for this material, i want system to copy the master recipe of the similar products either manually or automatically. please advise how to achieve the same.

    Dear Raju,
    Check these threads,
    Re: Create Process order without Production Version
    Production Order for a material without BOM and Routing
    Regards
    Mangalraj.S

  • Production version consistency check

    Hi,
    I am facing an issue in which i have created a BOM and a master recipe group. The production version is created and all the things are maintained properly so that consistency check shows green light i.e. everything is fine.
    Then i delete the same material from recipe group and then do the consistency check then it turns to yellow since recipe group is missing.
    But when i reassign the material to the recipe group and do the consistency check then also it remains in yellow and gives 2 line items in check result :-
    one with message that task list exists.
    and another with missing task list /material assisgnment .(in this the todate is the date on which i deleted the assignment)
    My confusion is that after reassignment it should turn back to green but it is not.
    Can you please help on this.
    Thanks
    Rohit

    Hi Rohit,
    Check Production Version Valid from date and also Date from when you have reassign that material in Master Recipe again.Both should be match.
    Regards,
    Dhaval

  • Regarding the KEY DATE OF PRODUCTION VERSION

    Dear Guru's
    Client facing a issue like :
    They have master recipe which was created on say example: 01.01.2001 and they had changed "activity type" activity time" later on date for particular Production version P001.  & obviously Production version Valid from date is on  01.01.2001.
    But if he check the key date of particular version(P001), it shows the same date as 01.01.2001 & it will show only the recipe which was created on 01.01.2001.
    It is not showing any other changes which we did after 01.01.2001
    While transferring to APO, system is picking the Production version (P001) based on the key date 01.01.2001 & they are not getting the changes in that recipe while creating the order
    How can we resolve this issue Plz help.
    Thanks & Regards,
    Arvind S

    Thanks Krishnan,
    But when I createa  new formular variable, I have lots of options for varaibles.
    So, in the formula screen.
    Formula variables->New Formula variable - > Edit
    Then
    Processing by ->Replacement path ->ref characteristic date
    Then, on the replacement path tab:
    Replace variable with ->variable.
    Click on the box to search available variables to replace, and I have lots of options e.g.
    Current fiscal year (single value entry, mandatory)
    Approver
    Base budget
    etc.
    but not "key date of the query". It is not there?
    Any more help gratefully appreciated.

  • Recipe Upload using MRTRS300 MASTER RECIPE WRITE

    Hi SAP gurus,
    Has anyone used  the MRTRS300_MASTER_RECIPE_WRITE FM to upload the Master Recipe
    As i have many scenario in it like material assignment at header level at BOM component level, production version assignment.
    Has somebody work on this area please help as there is no documentation also available for this FM.
    Thanks

    Hi,
    Can anyone help
    Thanks

Maybe you are looking for

  • How to get the url of a document in content management?

    Hello, I have used API  'SKWF_PHIO_CONTENT_URL_GET to get the url of a file in CRM content management. But when I tried to open this url in explorer got error message "SSF error: Decoding not possible". Could any one please help me to resolve this pr

  • Customer sales seperated to tax

    Hi experts, I have a question: RFDUML00 generates all customer sales in whole. But I want just to seperate the customer sales for special tax code. E.g. Customer 1000 has sales in tax code A1 xxx u20AC. In SAP marketplace a hint exists, which says th

  • How to get Music Player to play AAC files and show...

    I feel the need, the need to share my recent experiences with you! Firstly to restate the already known facts: The Nokia Audio Manager in PC Suite is incapable of reading any tags as far as I have seen, from a tag (AAC/MP3) or from a CD itself and it

  • Truncate not allowed when using ruleframe?

    Hi all, I am using the ruleframe transaction management and in proc I use: execute immediate ('truncate table <table name>'); I will get the following error: Error QMS-00100: Unhandled Exception ORA-02091: transaction rolled back ORA-02290: check con

  • Plant determination in Disconnection Order

    Dear Friends, In Disconnection order, I would like to determine the plant automatically. I can do this by defining in the PROCESSING VARIANTS if I have only one plant. But I have 2 plants. That is the problem. 0001 - For Zone 1 0002 - For Zone 2 My r