Material Ageing in subcontracting

Dear Friends,
Do u have any idea on material ageing..?
There is a requirement that material ageing of subcontracting components send for vendor show be displayed in a report  (is there any std report)
I have seen  reports (MBLM,MC46) but I am not able to get the details  .pls share your ideas if you know it

Hi Jeyakanthan A,
Thnk u for your reply
My requirement is such a way that ,need to list out the matreials /components issued to subcontracting vendor with material ageing,i have checked MLBL & MC46 but it does not contain the
Pls share your views isf any?
Thnk u in Advance

Similar Messages

  • Material aging report

    Hi everyone ,
    I have to develope material aging report, where client wants the output that they want to see is as fallows ..
    1) 12 Textbox with manual input in 6 textboxes.... i,e they have an existing local ERP report in which they will enter 6 textboxes manually
    Ex.. If they enter '0' they want 1 to be populate automatically and the data should be of 1 days back , If they enter '30'  in next textbox they want 31 to be populate automatically  and they want 1-31 days data , If they enter '48'  in next text box they want 49 to be populate automatically and they want 31-49 days data and so on .
    2..The thing is that how to give a 6 textboxes for the manual entry
    3..What are the inputs fields to be consider for the material aging will the 'LQUA' table fields work ... as i came to know there is  a standerd report  for Inventory Aging .....should i go for this.
    Thanks
    Srikanth

    Hi
    There is no standard report. z-report would be the solution.
    If you use, India Localization for subcontracting - J1IFR may help.
    Best regards
    Ramki

  • Report for material aging  in stock

    Hi ,
    I need to create batchwise  material aging report availible in stock. I am fatching most of fields from mseg table and I am taking ERFMG from mseg  for stock availibility.
    Is am going in right direction. please guide me for this.
    Regards,
    Seema.
    Moderator Message: Why dont you consult your Functional Consultant on this?
    Edited by: kishan P on May 19, 2011 12:31 PM

    Re: Opening & Closing Stock in transit
    STOCK IN TRANSIT
    Re: reverse the Stock in transit
    In- transit stock

  • Material Ageing Report

    Hi
    I need the Material Ageing report as the given following requirement
    1) Material With GR Date
    2) The Ageing will be for 30, 60, 90, 180, 270, 360
    3) Material with Normal & Special Stock
    4) Material with the Split Valuation
    If any one have worked on this developement then Reply

    Hi,
    Check the report in t.codes MC.9,MC.A,MC.B & MC.C
    OR
    Go for development with  an ABAP report
    Regards,
    Biju K

  • Material Ageing Report Through ABAP( MC46 Tcode Wise)

    Hi,
    I want to develop report for Material Ageing Report which is similar to the Tcode MC46 but the problem is functional consultant told me about this tcode only and there is no such information regarding the specified tables which are to be used. I had searched in SDN also but i did not got the desired  information.
    Edited by: nav009 on Mar 11, 2010 12:31 PM

    Hi,
    After comparing the tcodes MC46 and MC50,i am able to trace out that data is coming from the MBEW table but the problem is the ageing logic works on As On Date and the data to be *picked Less Than Equal to Posting Date *.
    There is no such field present on which i can made this logic succesful.. i tried to develop the report through different tables also(BSIM,MSEG and MKPF) but the quantites and the amount is coming accurate after comparing it with the above mentioned Tcodes.
    Is there any other table through which this problm can be solved....?
    Edited by: nav009 on Mar 12, 2010 5:42 AM
    Edited by: nav009 on Mar 14, 2010 12:21 PM

  • To develope  material aging report

    hi
      i want to develope a material aging report plz tel floe for this one and tables
    thanks
    venkat
    Moderator Message: Please read the rules of Engagement. SCN is not here to your job for you Thread locked.
    Edited by: Neil Gardiner on Jun 15, 2011 3:52 PM

    Try this standard TC
    MC46 - Slow moving Items
    MC50 - Non Moving Items
    Thanks,
    Sankar M

  • How to consider internal transfer movement for material aging Z report

    Hello Expert ,
    we are developing Z repot for material ageing .
          In this we are using BSIM table  but in our case internal transfer movement such as ( 411 ,412 ,413 ,etc.) create debit credit entry in BSIM for this reason value of material getting correct but age of material get disturbed .
    we are having sale order stock (E), WBS stock(Q) , Collective stock , Vendor Stock (o) & stock transfer between stock type possible.
    For all above consideration how to calculate material Age.

    Dear experts
    i have the same issue, could you pls advise the answer?
    another question; how to unify the stock locations rather than maintaining different locations such as sales order stock, free goods, commercial stock and in the same time the margin reporting to be based on transaction/line item in sales invoice?
    thanks

  • Material aging reports

    Dear All,
    Needs to knw the transaction codes for material aging standard reports.
    Thanks

    Dear,
    Check ; Re: Aging Report
    Regards,
    Syed Hussain.

  • Material Age analysis

    Dear Friends,
    I want to have a report on Material Age analysis. The age intervals are,
    0.30 days
    31 - 90 days
    91 - 120 days
    >120 days
    I know that there is no SAP standard report and have to get ABAP report developed. could anybody help me to create a logic for above requirement.
    Tks
    Sujith

    Hi,
    For material ageing analysis , you can use posting date as a base for calculating the age . so today's date( or date on selection screen ) - posting date in material doc will give you days ( age ) . so depending on days u can put in corresponding bucket ( 30, 60 ,90 ....) .

  • Histrorical Material Ageing

    Hi Experts,
    Is there a way by which I can get a report from SAP on material ageing for a historical date ( say a month back) today.
    Regards
    Milind Nair

    Hi Milind,
    u can go the tcode MC46 and MC50.
    which will give you the report for wht u r looking for.
    hope it wud have answered ur question
    reward if useful
    Aasif

  • Material Ageing

    Hi SAP Expert,
    i need to prepared functional spec for  Material Ageing Report. i'd like to have some samples for func spec (if any) ? and i would like to know if i what to prepared the functional   spec for Material Ageing Report , which table a involve ?

    Hi,
    Pl consider the following:
    MC.9  - Last Movement Date,Last GR Date,Last GI Date
    Tables -
    MSEG - Material document: item
    MARD - Material master: Storage location
    MAKT - Material Master: Description
    MKPF - Material document: Header
    MVER – Material Master: Consumption <Plant>
    Inf Structure S032.
    Regards,
    Mani

  • Material aging table

    Hi experts,
    Can any one tell me what is the exact table to display "Material aging"?
    points guaranteed
    cheers
    kaki

    Hi Kaki;
       If I understand what you mean by aging, I think the tables you are looking for are MARCH, MARDH and MBEWH.  They should the history in past posting periods, if there is any for that period.
    Cheers,
    John

  • What is 'Material Aging Workflow'?

    When I am going through the 'Release Content Document' of R12 Inventory, I came across a functionality called 'Material Aging Workflow'.
    I searched for this in R12 Inventory User Guide and metalink. But I am not able to find any details about this.
    Can anybody explain me about this?
    Regards
    Merlin Rajesh
    Message was edited by:
    Merlin Rajesh

    When I am going through the 'Release Content Document' of R12 Inventory, I came across a functionality called 'Material Aging Workflow'.
    I searched for this in R12 Inventory User Guide and metalink. But I am not able to find any details about this.
    Can anybody explain me about this?
    Regards
    Merlin Rajesh
    Message was edited by:
    Merlin Rajesh

  • Sending material from one subcontracting vendor to another vendor

    Hi Experts
    we have a scenario we have more than one subcontracting vendors.so the unused raw material should be send to one vendor to another.so how can we configure it.please give me feedback.
    Thanks in advance...

    Hi Madhu ,
    What do u mean sending unused material from one vendor to another ?
    In subcontracting u can send material to only one vendor at a time.
    Regards
    Ramesh Ch

  • Creating delivery notes for providing material to vendor (subcontracting)

    Hi,
    I am pretty new in the PP module of SAP, and have a general question regarding the subcontracting process for single operations in a production order.
    Assuming the raw material has id A and the final material has id B. My routing consists of several operations that have to be performed to transform A into B. One of the operations has to be done with subcontracting (key PP02), and the system creates the purchase requisition / purchase order for it. I have operations before and after it. 
    Now I need to send the parts to the vendor, and want to create some kind of delivery notes (paper), which helps controlling the shipping etc., how can I do this? All I have right now is the purchase order, which does not contain any information about the material, but only about the service to be performed by the vendor.
    I already thought about assigning a bom for providing material in the purchase order. But then I would need a material ID for the semi-final part which is somewhere between A and B and would need to have it on stock.
    What is the standard way of doing this?
    Thanks in advance!
    Kind regards!
    Daniel

    Hi Nandha!
    Thanks for your quick response.
    If I check the "Subcontracting" button on the tab Ext. processing in the production order, I need to assign components in the purchase order which will be provided to the vendor. These components either have to be on stock, or would be processed by MRP and planned orders would be created. That is not what I need.
    I have only one single part which consists of a raw material and only gets modified by the operations. No other component will be added at the vendor. So which material ID should I assign to the purchase order in order to just send the semi-finished pieces to the vendor? I cannot assign the raw-material again, because it would create another demand in the MRP again! I also cannot put the semi-finished parts on stock, because I don't have a material id for the part in this status.
    Thanks & regards!
    Daniel

Maybe you are looking for

  • USB ports not working properly

    I have a pavillion dv4 1123us - old.  It is not recognizing usb devices - although the usb ports are still providing power.  I have tried reinstalling the chipset and reinstalling the usb ports by deleting from device manager.  Intermittently, my mod

  • Photosmart C6280 All-in-One Printer Will not acquire IP Address

    I have happily had a Photosmart C6280 for some time now, however I recently replaced my router and my ISP Cable Modem (NetGear WNDR 3700 and Cisco 2100 respectively). At first everything was wonderful. Sadly, my NetGear router went bad and I had to r

  • How do you add a jar to the classpath?

    I'm trying to load a driver for MySQL, but the program doesn't seem to find the driver. I get an exception everytime. I keep seeing references about adding the jar (mysql-connector-java-5.1.6-bin.jar) to the classpath, but I don't know how to do that

  • After upgrading my iPad to ios7, I lost the airplay icon. Is this a common problem.

    After upgrading my iPad to ios7, I lost the airplay icon. Is this a common problem?

  • WebLogic 10.3 Silent Installation

    Hello, I am trying to do silent install of WebLogic 10.3 on the RHEL 5 (64 bit) by running below command. (FYI -I am using generic installer as I could not find the 64 bit installer @ http://www.oracle.com/technetwork/middleware/ias/downloads/wls-mai