Material apporval after work order release

Dears
Many times our PM team requires material after relase also
But as per std sap practise if we save this material even after release then reservation creates
can you guide me how we can send the extra material for apporval again after release
Regards
Ingole chandrashekhar

Dear Pete
It is that when order intially planned apporved then afterwords aome material is required for same work carried out
Again when planner can change the  order he adds new material in it without apporval of his senior since then he saves the order it creates reservation from order even after release
How to avoid this situtation
chandrashekhar Ingole

Similar Messages

  • Why the missing parts list changed after Pro.order released

    I open a pro.order before released ,then I do the availability check get a missing parts list, this list including less parts than the missing parts after pro.order released ,why does it caused?which configuration caused?
    Thanks,
    Helai

    Hi Lai,
    You can do Material Availability check at the two stage of Production / Process Orders.
    - First is to control (Check Missing Part) at the time of Order Creation.
      T.code is OPJK - Select order type and Business Transaction -1 at the time of Order Creation
    - Second is to control(Check Missing Part) at the of Order Relase.
      T.code is OPJK - Select order type and Business Transaction - 2 at the time of Order release.
    So it may possible that you have assign different checking group or checks to the above both stages , that's why you got different result regarding missing parts during above both stages.
    Regards,
    Dhaval

  • PM Work Order release date.

    Hi guys,
    Where to find the work order release date? In the Header Data, there is no field mentioning about release date. There are only Basic Start/End Date and Malfunction Start/End date.
    Thank You

    Hi Rio,
    Generally that basic start date is date which order is going to be released,
    In Application tool bar There is a "release" button whenever that button is clicked that order is released with the date which is basic start date there is no special space for release order date.

  • How to block material issue to work order

    Dear Expert,
    How do block material issue to work order when the item have been flag for deletion in MM module and have also been block for procurement and inventory in mm module.
    Please help

    Hi,
    Thank you for the prompt reply, what you mean by the Standard SAP? can you provide the reference link? I am facing the problem that the item material have been flag for deletion and been block for procurement and inventory in MM module material master data however it still able to material issue to work order. Any ideal how to block the material issue to work order when the material item have been flag for deletion and block for movement in MM material.
    Please help.

  • Blocking Specific Material Type in Work Order

    Dear Gurus,
    Is there any way to block specific material type in work order. Could not find any suitable link in SPRO.
    Advance thanks for the update / response.
    Sahu.

    Hello Ajaya,
    Though I have never realized such requirement in SAP but I think user-exit "CNEX0026 : Customer enhancement for general inspection of material" can be useful. You can make use of structure RESBD or CAUFVD and fetch the material number which is being reserved in the maintenance order. Also, you will have to define the Z-Table for maintaining the material numbers which needs to be blocked. Configure the error message at the SAVE event.
    I have used this user-exit to make the entry of storage location mandatory whenever the material is reserved.
    I hope this helps. Please update the thread if you have managed to realize the requirement.
    Cheers!!!
    TOM

  • Work Order Release Approval workflow

    Hi All,
    I am trying to setup Work Order Release Approval workflow. I have set its AME using supervisory level as the action type. When I tried set work order status, I had to set the department as I set department attribute as its AME condition, and work order status changed into Release - Pending and form become disable.
    Where can the supervisor make his/her approval to relese the pending status?
    I tried the Maintenance Super User page, but it can only review.
    Any help is greatly apprecaited.
    Thank you,
    Iqbal

    HI
    Please post EBS release version da and platform details
    1001759 wrote:
    Hi All,
    I am trying to setup Work Order Release Approval workflow. I have set its AME using supervisory level as the action type. When I tried set work order status, I had to set the department as I set department attribute as its AME condition, and work order status changed into Release - Pending and form become disable.
    Where can the supervisor make his/her approval to relese the pending status?
    I tried the Maintenance Super User page, but it can only review.please see if this helps you
    follow this navigation
    1. eAM
    2. Work Orders > Query for existing unreleased work order.
    3. Release it & submit for approval.
    4. Approve the WO.
    ;) AppsMAsti ;)
    Sharing IS Caring

  • Material number changed after purchase order released

    Hi Experts
    Please we are experiencing this behavior in our system.
    A purchase order for a specific material number is created and released, after this we can change the material number and its plant ¿is this a standard and right be way of SAP?
    Thank for your help
    JM

    Hi,
    You can design your process as the business demand.You can set Release Indicator 1 in designing Release procedure for  PO , where release Indicator 1 is used for purchasing document cannot be changed/Change not allowed after release.
    Regards,
    Biju K

  • How to determine the Installation after Work Order installs a new meter

    Hi IS-U Experts,
    I have a question about the integration of Work Orders and Installation of Devices as it relates to IS-U data.
    Our understanding of a Meter (Installation) process is as follows:
    1.  A Work (Service) Order is generated by CS (or a Sales) process.  At minimum, the Device Location (ES65) and the Device Category (Material) needs to be provided for.
    2. A techniciation executes the Work Order to install the meter.  After which, this work is confirmed (IW42) and a Goods Issue is done on installed Device.  In our case, the technician decides actual Device Number based on his/her vehicle stock.
    3. Now, we want execute the IS-U Device Installation (EG31).  However, we don't know where to draw the IS-U Installation from.  There is no IS-U specific reference on the Work Order for the Installation. (It would be nice if the Order Type had an IS-U releavant screen category (table TQBT) for such a reference).
    We could create the Installation on the fly, but we need the IS-U Premise (ES60). Our expection, anyway, is to build IS-U data
    prior to the Work Order execution as part of the CS process. We defer IS-U Installation only because the device number is determined at the time of installation.
    How should the IS-U context data passed around in the Work Order?
    Thanks, Ed

    Hi Reddy
    Thanks for your reply, but the note says that only applies for India or Brazil legal purposes.
    In my case I still have confuse, in a normal Sales scenario CRM to R/3 how to works the determination of the delivery plant.
    I know that in R/3 is determined by:
    1. Customer-Material info record (Sales Area data)
    2. Customer Master data (Sales area data)
    3. Material Master data (Sales-area data)
    I can think that in CRM is determinate bye Material Master Data, but I still don't know if I can change
    it??  and where in the crm sales order before it is download to R/3??
    Thanks
    Sussie

  • Idoc will trigger after purchase order release workflow

    Hi Workflow Guru,
    I have a requirement to configure Purchase Order release workflow. I am configure the same its working fine, but my client requirement is when the purchase order finaly release one IDOC will be trigger and the document will send to other system. We have  PI for Interface.
    I want to add new activity step in my workflow template to trigger a Idoc after final release.
    Please give me a idea , how to do this.
    Thanks in advance.
    Regards,
    Ranjan

    Hello,
    Use the standard IDoc LOIPRO01. Have a look at program RCCLORD. use it in the method of the business object you are using.
    You'll need to configure the idocs and partner profiles as normal.
    Regards,
    Kiran Telur

  • Work order release

    HI all,
    can we release a work order from cor1 and cor2
    if yes where can we find that release flag
    Thanks in Advance,
    Suresh

    Hello Experts
    Just to add more info if i try to create a work order and after filling details if i click on "Put in Process" then again i got error mesage that Activity type ENHX01 is not valid in fiscal year 2012
    Regards
    Himanshu
    Edited by: Himanshu Nijhawan on Jan 3, 2012 1:00 PM

  • EAM OSP: How to Disable Requisition Import AutoRun on Work Order Release?

    Hi,
    We want to create Purchase Requisition for OSP resource Items from eAM Work Orders by manually running Requisition Import request from purchasing. But as work order is released Import Requisition is auto run and requisition created. Is there any parameter or profile option to stop this request from auto run on release? Kindly guide.
    Regards,
    Syed Mustafa Arshad   

    Hi Hrishi,
    Thank your for your response.
    The second option you specified Operation is used in case of Oracle Discrete Manufacturing not for EAM. It is used when you want to start requisition as Item is moved from one operation to next so it cannot be used in case of EAM.
    We wanted it because our requirement was to generate requisition in incomplete status and with requisition import automatically parameter is passed as "Yes" for Workflow and requisition is generated in Approved Status. There is a patch but it was not working fine with 12.1.3 and the issue is on SR and we needed a work around urgently. But now a new patch was provided and it seems our issue is resolved now and now Workflow parameter is passed as "No".
    And about requisition creation time, I came to know after raising service request that it is standard functionality and requisition import cannot be delayed to run it later manually.
    Thank again for your response.
    Best Regards,
    Syed Mustafa Arshad

  • Work Order Release related issue in PM

    Hi Experts,
    I am using the WorkOrderRelease template in BLS to release the work order in PM.After creating transaction in BLS , I created Query Template for the same.
    Now In both BLS as well as in Query template its working fine.
    But when i am trying to create the Display template for the same, i am not able to retrieve column names from OutputXML file automatically once query template is selected .
    Please guide me.
    Saumil

    Hi Jamie,
    ya i also know that it returns only one coulmn ' Message ' as output but thats the only field which will tell the status of releasing action like whether my Order is released or it is  already been previously released or there are some other errors. So because of this i need to display that column for which i am not able to create the display template.
    Please suggest.
    Thanks & Regards
    Saumil

  • How to block material issuing after sales order invoiced?

    As the subject mentioned,  could be a possible to block material issuing since sales order invoiced, or
    in the another words, after the sales order completed?
    Or could be a possible to set sales order as closed, and then material issuing related with this sales order are
    forbidden?
    Thanks in advanced,
    Zhou Zhen

    Dear Friend
    A sales order is created say order no 10000 and for material X say 10 units this order is delivered and PGIed and invoiced and the payment too has come
    That means the order 10000 is closed
    Case 1
    Now an user goes to VA02 t code and put this order no 10000 and changes the material X qty from 10 to 12 and opens up the whole order once again
    This can be controlled by using t code OVAH choosing message class the V4 message no 083 and change from warning to error
    Case2
    But to avoid the user to add material Y to the existing order say 10000 then i think we have to go for user exit
    Because the system doesnot even throw a warning message too in case 2 (according to my knowledge) and allows another line item to be added in the same order
    But you can test it if it throws any warning message we can try to convert that error
    But in case 2 it is not happening(even warning is not there)
    Regards
    Raja

  • Payment Card Information with Material Groups and Work Orders

    When processing purchase transactions that were purchased using a payment card, standard functionality in SAP says the system automatically generates a parked document with authorized users allowed to post these documents. When these documents are being posted, does anyone know if the user can enter a material group and/or a work order number for reporting purposes?

    >
    Monique Stephens wrote:
    > Training is not the issue.  Material groups are a matter of personal preference.
    >
    > My main concern is if it would be a violation of SOX if the material group is changed from the original shopping cart on the PO itself.
    >
    >
    > Monique
    If your business is privately held then SOX does not apply to you. If your business has stock w/shareholders then it does.
    Correcting or making the material group more accurite is something that would be MORE SOX complient and not a violation.

  • Supressing non work day messages for material requirments on Work orders

    Message CN687, pretaining to delivery date of materials takes into account the factory calender/nonwork days of the calender associated to the plant. This message pops up for every material line item on a work order, One could understand how involved it can be if ther are a number of materials on a work order, as you would have to enter passed each warning before continuing.
    Is there a way without preforming a mod that will allow us to supress this message on the work order side. Supply chain still wants to see it, however maintenance does not?

    Hi,
    As per my understanding your planned order is scheuling for 2 days.Check teh capacity view in the std plang book and check the date on which the capacity is being shown.IF the same is not showing on 15th then the problem is with scheduling not with capacity load.
    Also check the factory calendar assigned to resource master data.Check the date 15th on the bucket capacity on resource master SNP bucket capacity view.If the same is showing as working day then the master data needs to be changes.
    Hope this can help.
    regards,
    kaushik

Maybe you are looking for

  • Crystal Report Engine

    We have an ASP .Net application developed using VS2008 and Crystal Report for .NET in VS2008. We display most of the reports in Crystal Report Viewer, we also print the report directly to a network printer using PrintToPrinter function. We deployed t

  • GL Account Line Item Display

    Hi, While creating a GL Account Master, 'Line Item Display' was accidently not activated, under the Control Data Tab. This was subsequently done by editing the GL Masters after postings had already been made for about two months. Thus for the period,

  • Problem: 1 physical table -- multiple logical table sources

    Hi, I'm quite new to BIEE and setting up my repository. So I have a question, if the following scenario is possible: Physical Layer: TABLE_A: COL_A, COL_B, COL_C TABLE_B: COL_D, COL_E, COL_F Join TABLE_A.COL_A = TABLE_B.COL_D In Business Model I have

  • Purpose of Messages link in MI Client SP 18 ?

    Hi, Could anyone please tell me the purpose of Messages link in MI Client SP 18 ? what is it for ? when and what kind of messages it contain ? Currenlty when i am clicking on it , it is showing error page . Thanks & Regards, Vipin

  • Optional Multi-Value Parameters in a URL

    I have 3 summary reports, that each need to hyperlink to 4 detail reports. The summary reports use multi-value string parameters that are set to "optional" (this is crystal 2008). I need to construct URLs to support these optional parameters. The ope