Material Components of a PO in BI DataSources

In which DataSources we find the Material Compoments of a Open PO (Sub-Contracting).
Thanks,

Hi,
Try 2LIS_02_SCL.
regards, André

Similar Messages

  • Documents attached to Material components

    Hi friends,
    In the project builder, I have the option of attaching documents to the material components and then a PR is generated. Can this document be viewed by the person who is converting this PR to PO? Because I want this document to be viewed by the vendor alongwith the PO released to him.
    regards
    Pratap.V

    Dear vishnu
    Standard SAP provides with a solution for this requirement using PS texts. u can create PS texts specific to the material component and u can transfer to the PR. the following are the steps
    1) In the network call up the component overview for a network or activity.
    2) Select the components whose PS text you want copy into the purchase requisition.
    3) Choose Components -> Copy PS text.
    Hope this will solve ur problem.
    Regards
    Murali

  • Is there any way to Authorization Management for Material Components?

    Hello every body
       Is there any way to Authorization Management for Material Components? 
       For example  i want to create , delete , modify  Material Components,how i can Authorization Management ?
       Enhancement or IMG or other ways?
                                                                                    thanks

    Alas, no, not in VBA.
    Regards, Hans Vogelaar (http://www.eileenslounge.com)

  • Create project material components with BAPI_RESERVATION_CREATE1?

    We have created a project structure down to network activities by using BAPI_PROJECT_MAINTAIN.  Now we want to add material components to the network activity like you do manually in CJ20N.  We do not want to release the network activity, just add the material components.  Does anyone have experience with creating these automatically?  Can we use BAPI_RESERVATION_CREATE1?

    Was informed about BAPI_NETWORK_COMP_ADD, so problem solved.

  • Adding Material Components in PS through BAPI_NETWORK_COMP_ADD

    Dear Experts,
    I am trying to create material components in a project through BAPI_NETWORK_COMP_ADD but it doesn't work. It gives the following error message: "Network operation 0010 does not exist". However it does create the network and its operation.
    Can anyone help me?
    Thank you,
    Claudinei Melo.

    Hi,
    Please add your Network and operation using BAPI_PROJECT_MAINTAIN and then try BAPI_NETWORK_COMP_ADD to add Material component.
    Regards,

  • Compare different project versions for material components?

    hi all,
    is it possible to display and compare different project versions for material components in different COLUMNS? i want to be able to view the data for each version in a different column.. currently i can view the different data per version but it is arranged  by ROW but i want to know if its possible to have different layout/report showing the different versions in separate columns
    Thanks in advance..
    Edited by: Ramesh on Sep 15, 2008 5:58 AM

    hi,
    thanks but this is not the report im looking for.. i wonder if its possible to show a report similar to CNMM or CN53N wherein the different project version data can be displayed side by side as columns?
    again, thanks in advance and regards..

  • MFBF window Missing BOM Components error "no material components available"

    Hello !!
    I need your help.
    We are doing MFBF for the material 12345REF.. but appear the window "Missing BOM components" with the error "no material components available".
    -We just review that exist a BOM, and it is valid,
    - The material has the RepMfg and has the REM profile.
    - exist a prod version and it is valid and has activated the RepMfg.
    - Route also exist and has the MfgRep.
    What could be generating this issue?
    Now Im lost!!

    Dear Marco,
    1.Check whether have you created the BOM component's along with a change number with a release key.
    2.If so means goto CC02 and set the release key for that change number.
    3.Goto KKF6N,enter the parent material number,plant and create the product cost collector for the producvtion version and save
    the preliminary cost estimate for this material and then check in MFBF.
    check and revert.
    Regards
    Mangalraj.S

  • Activity 0010 has been assigned material components - Deletion not allowed

    HI friends,
    Even after deleting the material from the activity, the system is giving the following error message
    Activity 0010 has been assigned material components - Deletion not allowed 
    The status of the activity is REL.
    One purchase order already created for this WBS element.
    The material found deleted from the activity but why it is giving the same  message.
    Activity 0010 has been assigned material components - Deletion not allowed
    Edited by: M.Alagesan on Sep 13, 2010 1:15 PM

    Is that material already consumed?
    Generally when you try to delete the operation, it also deletes the dependencies of the activity, i.e., it deletes the components associated to that activity, if it is not issued to the order.
    Check the details in your system.
    Praveen

  • Status close and material components

    Hi,
    If you have material components in your projects and when you finish your projects you set the project in status "CLOSE".
    What happen is that material components no longer are visible in project builder (CJ20N) after setting status "CLOSE".
    But if you go through compoent overview you still can see all the material component information but not from the left panel tree as icons in CJ20N.
    Do anyone know if this is a setting wich can be done to see the material components as icons in left panel tree, any way, after setting the status close?
    Best regards
    Jose Marin

    José,
    When you close the corresponding activity, the material components are flaged for deletion.
    If you still want to see them in the structure tree, you must change your PB options in menu Settings > Options. There you will find a flag to make the system display the deleted objects ("Display deleted objects"). Once the flag is set, the system will display the deleted material components in the structure tree highlighted in blue colour.
    Hope this clarifies
    Rgds
    Martina

  • Read all material components from activity

    Hi
    I need to read all the material components for an activity.
    For this i have read the table AFVC with the WBS of the activity and found my activity.For this activity i went to table RESB and read with key RESB-AUFPL = AFVC-AUFPL and RESB-VORNR = AFVC-VORNR and finally i get the informations needed for my material components.
    My problem is that by reading RESB with these 2 parameters ,the query lasts very long.For just one record i have to wait 1-2 minutes until something is found.
    Does anyone know how to read the RESB faster,when i know the WBs element and the activities.
    Thank you.

    Hi
    i found the solution for this
    I read with WBS element in AUFK
    AUFK-AUFNR = AFKO-AUFNR
    AUFK-PSPEL = AFVC-PROJN
    And then read table RESB with key
    RESB-RSNUM = AFKO-RSNUM
    RESB-AUFPL = AFVC-AUFPL
    RESB-VORNR = AFVC-VORNR
    Read all my records in 2 sec.
    thanks

  • Material Components cost break up

    Hi
    I am using CS13 t code to see the materials BOM details and i want to have the details of pricing like - cost of labour, overhead, machinery cost etc. But i am not able to pull out the data from tables.
    For eg Material no 6275 - labour 50, machinery cost - 60, overhead - 30
    Can someone help out in my requirement or let me know if this is feasible.
    Regards
    Malathi

    Hi Malathi
    You can execute report S_P99_41000111.. double click on any material and it will take you to CK13n.. Where in you can view the cost components
    br, Ajay M

  • Material Components

    Hi Gurus,
    I am doing one report in MM, the requirement is i need to fetch Material Issued Quantity & Total Quantity to Vendor.
    I am getting the Issued Quantity, but the problem is with Total Quantity.
    I asked my Functional Guy, he told me to pick the value from ME23n -- > PO --> Material Data (in item data ) > Components>
    then the Required Qty of Materials there.
    I have used MAST & STPO tables but the data is coming for some Materials & not coming for others.
    Can any one tell me where those values get stored? Which tables i need to use?
    Regards,
    Srinath

    Hi,
    Issued quantity means whetehr it is issued to cost center or any?
    Total quantity to vendor , it means is it a order quantity?
    Regards
    Madduri

  • Config Material - Components

    Hi,
    I need to know the tables/function modules to get the list of COMPONENTS for any configurable material with class type Variants.
    Example:  I have a material CMAT with components SFP and  MFP, I can see those entries using MM03 under Classification View. I need to capture those component entries. Is there any way?
    Thanks in advance...
    Sateesh...

    Hi,
      Use this FM "BAPI_MATERIAL_GETCOMPONENTS".
    Thanks,
    Prashanth

  • Component allocation of material components in routing

    Dear Sap Gurus,
    I am having a finished product in which it contains rawmaterials for making but it in my routing i am having operations of 10, 20,30,40,50,60 ( 10-shearing, 20-bending, 30-welding, 40-grinding, 50-bending, 60-grinding )
    but in my routing doing compoent allocation i am using materials from bom which contains components of 10,20,30 for routing operation of 10 and the output of 10 is the input of 20 routing operation so how can i give component allocation  in routing whether i should give for routing operation of 10 the bom components so that it can take for routing operation of 20,30,40,50.
    whether my procedure is correct or any body can help me how to proceed the above problem.
    regards,
    muralidhar.t

    Murlidhar,
    First of all tell me one thing, are you going to identify the inprocess material with a separate material or not?
    If you are going to do it, then your query can be answered.
    If component ABC is allocated to operation no. 0010, it gets changed to PQR, then you need to first create the code for PQR. Then do GR as a byproduct with movement type 531 & again do the GI with movement type 261 against that order itself.
    It's a quite tedious process & normally no one goes for this.
    It's better you deal to the initial component & the final product only. If you opt out for in process material codification then in future where there are several stages of the process, you find it difficult & next to impossible.
    Go for that if it is having major impact on the process (normally it never be).
    Hope this helps you.
    SmanS
    Edited by: SAP PP Consultant on Mar 30, 2009 12:59 PM

  • SA material components

    Hi,
    Go to ME38 -> enter the SA number -> A list appears. Double-click on one of them to get the delivery schedule for that line item, which will list the deliveries. Select on one of them and click on menu -> item -> components -> overview. A list of components gets displayed for the SA material selected.
    Is there any function module / table where the components can be fetched by entering the scheduling agreement ?? The component's structure is MDPM.
    On navigating for MDPM structure, I came across several Function modules starting with APO. But I guess they are designed for planned orders only.
    Please help.
    Regards,
    Vinodhini.
    PS: The components lists are not same as that of the BOM explosion of the SA material. Not all the child parts needs to be the component of the SA material.

    Hi,
    It depends on Activity control key configuration (OPSU). Please see Costs check box. This control key should be entered in Network profile in Activities tab (OPUU).
    Hope this clarifies your doubt.
    Best regards,
    Murthy.

Maybe you are looking for

  • Creating a new company in a new database

    I am attempting to create a new company, but want it in a separate database.  (Just like creating a Sandbox for development and testing.)  However, when I choose to create the new company (specifying company name, accounting periods, etc.), B1 will n

  • ERROR: JBO-26048 while createing a record.

    Hello, I have a table called ActivityTracker which has few Foreign Keys and one among them is for Activity_SubType (refering a table called Activity_Subtype). I am trying to insert a record in the ActivityTracker table using the following code: Entit

  • How to give save as dialog box using servlet?

    hello, i am building one application where i am generatinfreport in excel format. now the file generated is output.xsl. this is in c:\bea\wlserver6.1 directory. now i want to write a servelt get this file from location given above and give user Save

  • CMD + Shift constrain drag shortcut buggy in Photoshop CS6 (Mac)

    Since moving to Photoshop CS6 a shortcut I regularly use for switching tool and dragging elements on a page is producing varying results. The CMD + Shift drag is very useful to allow users to drag elements constrained vertically or horizontally on th

  • Limit a select statement

    hey everyone i was wondering if someone could assist me and tell me how to limit a select statement to just the top 25 outputs. ie: the top 25 employees with the longest years of service. any help, i am just learning this stuff thanks josh