Material Cost Estimate with different lot size.

What happens if the material cost estimate is run twice using different lot sizes each time  (all other parameters unchanged) for the same period?
Will the cost estimate run later overwrites the results from cost estimate run earlier (though the lot size is different)? What is the role of lot size in a material cost estimate?

The costing lot size impacts your cost estimate if you have lot size independent costs (i.e. setup cost).  Those fixed costs are spread over the costing lot sizee to give you a cost per unit..  Larger costing lot sizes can also help you minimize rounding issues.
You can only have one marked cost estimate in a given period.  However, you can create and save a cost estimate as many times as you want as long as you have not marked it for release.  When you save the estimate it will overwrite an existing estimate.  You also have the option of creating multiple estimates under different versions or with different costing variants.

Similar Messages

  • Re: create material cost estimate with ck11n without

    hi gurus,
    i need to do create material cost estimate with ck11n without cost result but before i need to check the BOM with material component 11111, and also instruct me how to correct maintain BOM list to get the standard cost
    if anybody do the same scenoria giveme your golden inputs
    thanks in advance,
    kumar.b

    Hi,
    As note 351835 explains, calculation needs an inforecord to calculate prices from purchasing. Prices from outline agreements are generally not taken into account. According to note 499699, the system may consider entries in the source but it will ignore entered agreements (before this correction, any source list entries with agreement were ignored).
    Prices from agreements could only be considered either via a modification or by using the user exit for material valuation (COPCP005).
    This unfortuntely is a restriction resulting as a side-effect from note 499699. As soon as an agreement is entered in the source list, the fixed indicator will not be considered anymore.
    You therefore have two options to overcome this.
    1) You create a second source list entry without an agreement; then the fix indicator will be reflected; report Z_CREATE_EORD from note  409960 could be used to do this automatically
    2) You are using user-exit EXIT_SAPLMEQR_001 in order to 'overrule'   the standard search for source of supply (enhancement LMEQR001)
    regards
    Waman

  • Error  - Material cost estimate with quantity structure

    Hello Gurus!
    Can anyone please help with the following problem:
    I’m trying to do the material cost estimate with quantity structure, but the system is throwing back the message  " There is no exchange rate for exchange rate type P on 1.01.2008: CHF -> EUR". 
    This happens because I have a subcontratation in my routing in CHF, and in transaction OB08, and I don’t had defined that rate (type P CHF –EUR).
    I need to know if there is any solution to the system assumes other Type of Exchange Rate (the last real exchange rate that I have introduced in my system, not the planned!)
    Points will be assigned to the suitable answer.
    Thanks in advance.
    Mary Jane

    Hi Sridhar
    Thanks for your reply.
    In OKEQ for the version 0, I have the rate type M.
    I don't understand why the system throwing back the message  " There is no exchange rate for exchange rate type P on 1.01.2008: CHF -> EUR".!
    Do you know why?
    Thanks and regards
    Mary Jane

  • Material cost estimate with quantity structure (tcode: CK11N)

    Hey dear friends.
    I donu2019t know in which forum I should put my question above.
    In fact, Iu2019m new to SAP PM module.
    Iu2019m trying to create material cost estimate with quantity structure (tcode: CK11N) for a material u201CXu201D.
    This material is manufactured.
    While running the transaction CK11N, I got an error message.
    After analyzing this error message, Iu2019ve realised that somebody had assigned wrong activity types to cost centers which are linked to this material in tcode: CR03, tab: costing.
    So Iu2019ve changed and assigned the right activity types.
    Then, Iu2019ve tried to run the tcode CK11N again. But the system still brings the wrong activity types and seems to ignore the ones that Iu2019ve assignedu2026
    It seems like the old activity types still linked to the cost centers somewhere else than in tcode CR03u2026
    Any idea about what am I mising ?
    Thank's in advance.
    Bahia.

    Dear Bahia,
    If its rate routing means,i guess you must be working in REM scenario.
    So goto CA22,delete the existing operation and then assign the same work center in a new
    operation,check what activity types is it proposing in the rate routing,if its reflecting correctly means
    save the datas.
    Also goto KKF6N--->click the change mode icon and then calculator button to create a preliminary cost
    estimate and then save the datas.
    One of our forum friend has asked you to check the production order read PP master data once
    again,but understand there is no production order concept in REM scenario,only planned orders.
    Then come back with your queries.
    Regards
    Mangalraj.S
    Edited by: Mangalraj.S on Jun 17, 2009 12:05 PM

  • Material Cost Estimate with Quantity Structure (How to download)

    Is there a standard report or feature available in SAP to download the material cost estimate with quantity structure?
    Currently we have to print screen and it is very tedious and can't do analysis with those screenshots.
    Please advice.

    Hi,
    There is a standard report you can use - S_P99_41000111 - Analyze/Compare Material Cost Estimates .
    With this report, you can report the standard cost estimates for a range of materials.
    Good Luck!!!  Assign points if this was a useful input to you.
    Thanks and Regards,
    Bhuvaneswari.S

  • Material cost estimate with Quantiy structure

    Hello All,
    Can anyone please help in the following problem. When we do material cost estimate with quantiy structure, system is throwing message as "source of supply cannot be determined".
    Maximum points will be assigned to the suitable answer.
    Thanks in advance.
    Srinivas

    Hi, Srini,
    Please check in material master data whether this material is in-house produced or externally procured, which can be found in MRP view.
    Please also check your costing variant and valuation variant for material cost estination, I think possibly you chose stratey L FROM Purchasing Info Record. If not, ignor it.
    If it's externally procured, SAP logic is that firstly it will check the source list, then determine the quota arrangement and find proper vendor for the selected material. The error message is possibly caused by missing vendor or wrong quota reason. So please follow the SAP logic to check data one by one.
    Please check the following link on vendor determination in online help document.
    http://help.sap.com/saphelp_erp2005vp/helpdata/en/7e/cb938143a311d189ee0000e81ddfac/frameset.htm
    Please specify if you also used mixed costing for material.
    Good luck!

  • Material cost estimate with quantity struchture : problem

    while running the costing transaction CK11N , the word u201Croutingu201D is not appearing under the explanation facilities.
    rate routing is already available
    what will be the reason and solution.

    Hi,
    There is a standard report you can use - S_P99_41000111 - Analyze/Compare Material Cost Estimates .
    With this report, you can report the standard cost estimates for a range of materials.
    Good Luck!!!  Assign points if this was a useful input to you.
    Thanks and Regards,
    Bhuvaneswari.S

  • Material cost estimate with quantity structure and without quantity structu

    What is the difference between material cost estiame with quantity strucutre and without quantiry structure?

    For the quantity structure pl read the following link
    http://help.sap.com/erp2005_ehp_02/helpdata/en/7e/cb938143a311d189ee0000e81ddfac/frameset.htm
    For without quantity stucture
    http://help.sap.com/erp2005_ehp_02/helpdata/en/7e/cb938143a311d189ee0000e81ddfac/frameset.htm

  • Material Cost Estimate with Qty Structure - Activity Cost

    Hi All
    While executing the Cost Roll up (CK11n) Im facing a peculiar problem . I have defined an activity for which the rates are also maintained in KP26 against the Basic UOM(eg for 1000 activity 10Rs is the variable price mentioned)  . When Im taking the min lot size say 1 for the costing run the quantity appearing against this activity is appearing in the lower UOM (taking actual gms but the value for this activity is appearing in rupees only calculating from activity price x this figure). This is making the whole activity cost on very higher side .whereas If I execute with the same factors but with big lotsize say 1000 the value for the activity is coming absolutely ok .
    Pls confirm me how to put a check on the value of activity or uom of activity to evaluate the standard costing with minimum lower size also
    Best Regards
    Manoj

    Im closing this thread

  • CK11N- Material cost estimate with & without agreement

    Hi,
    I have one material say M1 which I procure from two vendors A1 & B1.
    I have maintained info record for A1 with Rs.150 & B1 with Rs 100.
    Also I have an agreement with vendor A1 with price Rs 150.
    Source list is maintained for these two vendors & I have maintained outline agreement no with vendor A1 & also made vendor A1 Fixed Vendor.
    Now I run T code CK11N, where system is picking price for M1 as 100.
    But when I remove agrrement no from source list for vendor A1, system picks Rs 150 in CK11N.
    What is the logic behind this? Note that in any case my vendor A1 is 'Fixed Vendor'.
    Kindly guide me on the same.
    Regards,
    Piyush

    Hi,
    As note 351835 explains, calculation needs an inforecord to calculate prices from purchasing. Prices from outline agreements are generally not taken into account. According to note 499699, the system may consider entries in the source but it will ignore entered agreements (before this correction, any source list entries with agreement were ignored).
    Prices from agreements could only be considered either via a modification or by using the user exit for material valuation (COPCP005).
    This unfortuntely is a restriction resulting as a side-effect from note 499699. As soon as an agreement is entered in the source list, the fixed indicator will not be considered anymore.
    You therefore have two options to overcome this.
    1) You create a second source list entry without an agreement; then the fix indicator will be reflected; report Z_CREATE_EORD from note  409960 could be used to do this automatically
    2) You are using user-exit EXIT_SAPLMEQR_001 in order to 'overrule'   the standard search for source of supply (enhancement LMEQR001)
    regards
    Waman

  • Material cost estimate and mateiral cost estimate with quantity structure

    Hi sap guys,
    What is the difference between material cost estimate and material cost estimate with quantity structure

    Hi
    Both are in one way the same.
    Material cost estimate can be calculated as
    1. Material with quantity structure
    2. Material without quantity structure
    You can get more insight into it at the following link
    http://help.sap.com/saphelp_47x200/helpdata/en/7e/cb938143a311d189ee0000e81ddfac/frameset.htm
    Regards,
    Suraj

  • Raw material cost estimates

    HI experts,
    Currently we have the following scenario:
    There are some raw materials which are procured externally, and these materials are maintained with price control S
    Well, the problem is that the standard cost for the material consists of a few more components, for example:
    The standard price for the material X is 20 USD which consists of:
    - the price of the material itself : 15 USD
    - the import duty : 5 USD
    let's say if the actual import duty happened during IR is 6 USD, how can we get the variance from the difference between the import duty? I am unfamiliar with raw material cost estimate, but seeing that the import duty will be captured using condition type in PO, i assumed that we can use raw material cost estimates with this, and use the COPA report with record type B for this case.
    Could anyone give any suggestions regarding this case? It is better if it comes with step to step guide.
    Thank you very much in advance
    Regards,
    Erwin

    Hi Erwin
    1. The ideal design would have been Price Control V if the material is outright purchased... There by not leaving any scope for variances... You would agree that it is best to valuate inventory @ actuals as far as possible
    2. If you want to retain S, then release your Std cost as many times as the Base Price of 15 or Import duty of 5 usd changes... This will also avoid variances during MIGO.. However, it will throw up inventory revaluation figure each time u release new cost estimate
    Else, the variances will be updated to CO or COPA as per your choice in OKB9.... The record type will be B
    Are you not able to update variance to COPA?
    br, Ajay M

  • How SAP use transfer control or material cost estimate

    Hello!
    I have strategy "3-Previous standard cost estimate" in transfer control material cost estimate.
    I have cost estimate for product AAA with status KA and costing date from 01.01.2014.
    Product AAA produced from component BBB.
    Component BBB has two cost estimates with costing date from 01.01.2014 and 01.02.2014.
    I run cost estimate for product AAA with costing date from 06.03.2014.
    Cost estimate not use existing cost estimate for component and create new cost estimate.
    In help.sap.com contains next information about transfer strategy 3 - The system searches for existing previous cost estimate.
    why my system does not use the existing cost estimate for component?
    Thanks for attention.

    Thanks, Szymon!
    I use russian interface and read russian help. Where stragegy 3 has name "Прошедшая плановая калькуляция" which means "The last planned cost estimate".
    This led me astray.
    In english help i read next:
    Previous standard cost estimates
    The system searches for an existing previous standard cost estimate.
    You are completely right!
    two more questions:
    - We can not use strategy 3 if we not realesed cost estimate as standard price?
    - What strategy we should use for transfer material cost estimate with status KA?
    Thanks

  • Valuation with material cost estimate: error with product

    Hi Experts,
    Message no. KE350, Valuation with material cost estimate: error with product "2286940000". Please suggest me to resolve this issue.
    Points will be provided for good solution.
    Regards,
    Jay

    Hi Jaya
    This means that your customization is wrong then...
    In KE4J or KEPC you have assigned costing keys to your material types or some other combination... You should have done this config in a way that costing key is not called  for in the case of non valuated materials...
    In Ke40 you have defined costing key where in you have specified "Issue error msg if no cost estimate found".. This costing key is assigned in KE4J or KEPC in a way that it is getting called even in case of non valuated materials...
    Do you have a separate mat type for non valuated material? If yes, remove this mat type from KE4J/KEPC..
    If you dont have separate mat type i.e. in the same mat type if you have both valuated and non valuated, then you have a problem.. You would get stuck in that case
    Regards
    Ajay M

  • Valuation with material cost estimate: error with product "117122"

    Hi people,
    We have the error:
    =====================
    Valuation with material cost estimate: error with product "117122"
    Diagnosis
    In Profitability Analysis (CO-PA), the system tried to valuate a line item using the current standard cost estimate.
    In order to determine the current plan period, the system needs to read the valuation segment of the material master.
    The system has found that the current plan period is not filled forproduct "117122" in plant "UBE1".
    We have the follow configuration in trans.: KE40:
    . Determine material cost estimate
       . Transf. Standard Cost Estimate
    . Costing Variant
    . Control Data for Standard Cost Estimate
       . Period Indicator = "Current Standard Cost Estimate acc. to entry in mat master
    . Addiitonal data CO-PC
        . Transfer cost estimate in controlling area currency  "activated"
    We think the reason about our error is because the field above is activated and some configuration more is necessary for this case. For examplo: Trans.: OKYW and this one was not configurated yet.
    Do you know what happend?
    If we need to configure some transation, or sonly process the cost estimate?
    Thanks,
    Rosana.

    Hello Guido
    Thank you very much for your return.
    It is happenning in a Client that some people are doing the configuration.
    Before we didin't have in KE40, the fiel "Transfer cost estimate in controlling area currency" activated.
    And now, the people activate that in this new Client and I don't know the impact about that.
    I think we have to make the configuration in OKYW.
    The other transation you told me, we don't have any information.
    Could you tell me some other idea what happend?
    Message error is just "Message no. KE350"
    Abou claculate the cost:
    It was calculated by trans.: CK11N for future planning and the real wasn't not possible to release because this material already have moviments.
    Could you tell us is there is some thing more to do?
    Thanks,
    Rosana.

Maybe you are looking for

  • How to set up a Java Plug-in Download page in case of netscape?

    hai all of you, i have a problem regarding downloading plugin. i am using <object > and <embed> tags to download the plugins inorder to run the applets. but it is taking long time to download the plugin form sun.com. so what i have done is, i downloa

  • Can't connect to external MS SQL server

    I have two primaries and an external db. The two primaries were updated from 11.2.3 to 11.3. Everything is working great and the upgrade was successful. My database runs on an external MS SQL server. It hosts both the zcm database and the audit datab

  • BDC LSMW basic understanding

    hello... I have gone through this forum on the basics of lsmw and bdc, could any1 sumup when one would go for BDC and when LSMW? I Would appreciate if anyone could come up with a real world scenario for having used BDC/ LSMW. Thanks in advance -  han

  • Can we include a JSP page in an already included JSP Page

    Hi guys, I have a doubt with JSP include tag. The problem is .. Can we include a JSP page in an already included JSP Page AS shown below I have one JSP page Index.jsp -in this I am including "include.jsp" -Again within the "include.jsp" I am includin

  • Reg Slow Database

    Hi, Our Database Suddenly become slow in the recent days. The Same concurrent report which completes in seconds takes hours to complete. We gone through the awr report and found Top 5 Timed Events Event               Waits          Time(s)          A