Material creation in ECC Frm MDM

Hi Gurus,
Has any one tried creating  new Material records in ECC frm MDM?
I have a scenario wherein a user  logins from EP and creates a new material record.This triggers the MDM workflow and the enrichment of the record happens.
Finally this material needs to be posted in ECC using XI.
I have tried doing this but however, the idocs fails saying that the Material Does not exists or is not activated..
Can any one guide me on this.
Helpful answers will be rewarded
Thanks
Simona

Hi Harrison,
I am entering the material number from MDM which comes under the external number range for that material type.
I have also checked with the settings and found that,the material type that i am using excepts both internal and external numbering.
So the material number should not be a problem rite?
But the error message says something abot activating the material,how can that be done from MDM?
Thanks & Regards
Simona

Similar Messages

  • Material creation process in SRM-MDM

    Dear All,
    I am new to SRM. Please correct me about material creation procedure in SRM if I am wrong:
    Normally in classic/extended classic scenario, material first created in MM and then it replicated to SRM. Base on configuration setting for number range, system either create the product ID same as material number number in SRM when it replicated into SRM. In final steps, the product information will upload into MDM either XI integration or manually via excel upload.
    My question:
    + Is it possible to automatic create product without XI via T.Code - MDMGX in MDM.
    + If the replicated product ID of SRM is different then MM material number, which number we should consider for creating product
       MDM.
    Thanks in advance.
    BR
    Jennifer

    Hi Jennifer,
    Answer1) You can only replicate Product Groups, Currencies and Unit of Measures through t-code MDMGX. XI/PI is required for Contract and Product Catalogs.
    Answer 2) If the replicated product ID of SRM is different then MM material number, you should enter MM material number and in External Web Service Configuration for that internal catalog, uncheck  "Do not check Product" indicator so that SRM will not check the Product ID and when item goes to backend system, it will have correct MM material number.
    Thanks,
    Anshuk Saxena

  • EDI FOR MATERIAL CREATION AND CHANGE

    Hello all,
    I have a requirement that when a material is created it whole detial about that material is saved at a given location as idoc.
    ie EDI configration.
    How know to configure EDI process order. How can we do for material creation.

    Since we are not using any message control, we don't need to setup the process code in WE41.  
    The function module has already been assigned to the message type in WE57.          
    Step1: Create a logical system - BD54.
    Step2: Create a distribution model - BD64.
                     Create a model view and add the Sender (SAP ECC)  and Receiver (Logical System you created).
                     Then add the message type MATMAS.
    Step3: Create a RFC Destination - SM59
    Step4: Create a port and assign it to the RFC Destination created above. - WE21.
    Step5: Create Partner profiles - WE20
                       Partner type - LS
                      Message type - MATMAS
                      Basic type - MATMAS05
    Step6: Trigger the material material through BD10.
    Hope it helps.

  • Material Updates from ECC to CRM

    Hi Experts,
    We recently had application of Enhancement Pack4 on our ECC system. After the application EHP4 pack, we have started getting some material updates from ECC to CRM. And those updates are failing in CRM as we do not have any material set up in CRM. Due to these failed updates, lot of dumps are getting created in CRM. So can u please advice where/how in ECC i can restrict these updates to go to CRM. Any help in this will be highly appreciable.
    Regards
    Charitha

    Hello Charitha,
    In txnn:R3AC4 of CRM , check INACTIVE flag for object MATERIAL (and any other objects whose data is not required in CRM)
    for your RFC destination (ECC).
    This would prevent any automatic data flow for this object from R/3 to CRM.
    Hope this helps!
    Best Regards,
    Shanthala Kudva.

  • Material Creation Using BDCs.

    Hi all,
    I have developed a program for Material Creation using BDC.
    Material is Being created and that is working well and good.Here i have a Requirement to update the Newly creted material in Ztable.So when i use call transaction mathod,i have written code for updation under the line CALL TRANSACTION.where in iam getting newly creatde material from MARA table,and so it is working perfectly fine..
    But our requirement should be sessions method,so when i use sessions method and exeute the program..we face the problem of updation.
    the piece of code for updation is updating previously created material.
    Literally speaking only the sessions are created ,when the program is executed,material is not created when program is run.Material is only created when the sessions are processed using SM35,
    So how should i do here,where should be the updation code written and where will we get the newly created material in sessions method..
    Pls Help me in solving this problem

    hai priyanaka it might be due to configuration problem
    bcos manulay also ur gettign this , so just consult ur MM consultant for soem setting
    regards
    afzal

  • Material Creation Date and Time

    Hi,
    Is there any place which stores the material creation date and time. We have checked table MARA, but that only has the creation date of the material, but does not give the material creation time. We have checked table CDHDR, but that only seems to have the material change date and time.
    From where can we retrieve the material creation date and time.
    Thanks and Regards,
    John

    Actually, CDHDR and CDPOS will have the value.  The CDHDR record will be marked as a 'U" record but look at the corresponding CDPOS record for MARA and it will be marked as an 'I' record.

  • Creation of Product  in MDM version 3.0

    Hi All ,
    Its Raja Singh presently working on SAP-MDM version 3.0. We have a client who wants to replace their master data system to SAP-MDM prefebly.
    In view of this i wanted to show them how a Proudct/Business partner will be created in SAP MDM.
    AS I am able to create Buiness partner and change master using transaction codes but i unable to do so for PRODUCT as i don't know the T-Code for the same.
    Do i need some setting to have t-code for creation of PRODUCT.
    When I am using t-code commpr1 , it says " This T-code is locked in MDM use portal".
    Can anyone guide me how to proceed step by step for creation of Product in MDM. you can Email me also relevent document at [email protected]
    In A Positive Anticipation
    Thanks
    Raja

    Hi Raja,
    I didn't quite understand what you mean by creating/changing data using transaction codes, because within SAP MDM 3.0 you are in a portal environnment and don't work with transaction codes.
    General remark: Information on the up-to-date MDM 5.5 is provided in the Service Marketplace. For an overview of MDM 5.5, see also http://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sap.km.cm.docs/library/mdm/capabilities provided with sap mdm 5.5.pdf.
    Kind regards, Markus

  • Error in pipeline material creation

    hi,
    we want to create one pipeline material as per our new requirement for showing gas consumption.during material creation with mat type PIPE, it's showing an error:The field Profit Center is defined as a required field; it does not contain
    an entry.
    Procedure
        If the field is the material group or unit of weight, and the field is not ready for input, check whether the material is locked. If it is locked, you cannot extend the Purchasing view or the Sales view. If either of these views needs to be extended, the material must first be unlocked. This can be done only by a user with special authorization.
    thanx,
    sheetal

    Hi
    In your client if Profit center accounting(PCA) is activated ,then you need to maintain the Profit center for the material.
    Option 1: goto OMS2, got details of pipleine material & select the Costing View of the material.
    Now goto MM01 in creation of pipeline material & maintain the profit center in Cotsing 1 View.
    Deactivating the field from mandatory to optional will not serve your purpose as PCA will get affected.
    Thanks & Regards
    Kishore

  • SRM PO vendor text not copied to PO material text in ECC Po

    Hi all,
    We are on SRM 5.0 Extended Classic.
    In ECS,is it std functionality that the PO vendor text from SRM PO is copied to PO material text in the ECC PO?If so,Do we need to do any configuration on the SRM side for this transfer?
    Thanks!

    Hi,
    In standard the Vendor text in SRM P.O would not get transfered to P.O Material text in ECC.
    I am not sure why do you want to transfer vendor text to material text.
    You need to use BADI BBP_ECS_PO_OUT_BADI to transfer this text to the required field in P.O.
    Please speak to your ABAPer and get the coding done to achieve your requirement.
    Let us know in case of any further clarifications.
    Regards,
    Teja

  • Material creation date for perticular plant

    Hello Experts,
    I have four plant have a same material,so i want to see the material creation date by plantwise.Please suggest me where can i see the material creation date by plantwise? Bcz. I want to develop report for this.
    Thanks & Regards,
    Vinay

    Hi,
    Go to T.Code: MM60,Then enter your required plant and execute.
    Now you can see the material with created date or last change date  and who created.
    If helpful then reward.
    Regards,
    Biju K
    Message was edited by:
            Bijay Kumar Barik

  • Process flow of material creation

    hi sap gurus,myself rekha
    i want to know the process flow  of material creation-FERT

    Check below link .You have to use transaction MM01 to create material.
    https://www.google.com.au/search?q=process+flow+for+material+creation&oq=process+flow+for+material+creation&aqs=chrome..69i57.9710j0j8&sourceid=chrome&espv=210&es_sm=122&ie=UTF-8#q=process+flow+for+material+creation%2Bsap

  • Material Replication from ECC to SRM 7.0

    Hi Experts,
    I am working on Extended classic scenario SRM 7.0 with ECC 6.0, I have created the Material Group and Master data in ECC system. While doing replication via R3AS i am getting the following error msg( I have applied Note 720819 & 330401in ECC ).
    Errors:
    Hierarchy for material types does not exist
    (Before materials are imported from the ERP system, the material types from the  ERP system must exist as categories in CRM/EBP. When the Customizing object DNL_CUST_PROD1 is imported, the material types are imported automatically and created under the category MAT in the category hierarchy R3PRODSTYP (product subtype).)
    MATERIAL: Object will not be loaded
    Pl do the needful.
    Regards
    Mohan

    Hi  Pl check whether you follwed these steps are not.
    Hi find below for the product cat
    Steps to create the product category in SRM:
    1) Create MM material groups in ECC client. This will create a transport. Go to SRM Tcode R3AS and select the object u201CDNL_CUST_PROD1u201D from the list and run it. You can monitor the job using R3AM1 in SRM. This will bring the material group into SRM. This can be seen in TCode u201CCOMM_HIERARCHYu201D in SRM.
    2) Once it is done. Go to IMG in SRM and go to path SRM> SRM server> Cross app biz settings> Account aassigmnet> Define GL code for Acc *** Cat and Prod Cat. Maintain the GL code against this prod cat for all the account assignment codes. This is client specific setting and need to be done in every client by opening it. This GL code is given in the form in ticket.
    3) Do a test and check if the product category is available for procurement in SC.
    Regards,
    Satish

  • Are there any standard web dynpro ABAP or JAVA for material creation(mm41)?

    Hi SDN,
          I have got the requirement to provide Web Dynpro application for material creation (transaction code is MM41) and I would prefer to enhance standard Web Dynpro more than develop from scratch. Now I got only the Web dynpro ABAP component for create sales order called "LO_OIF_MAIN_COMP" and GUI HTML for purchasing order that come with business package Eh4.
          Anyone who know please kindly help me.

    >but I afraid that I'm not able to find out what is its component name from application
    You could just lookup the WD Application in SE80 and then it will show you the component name. From SE80 choose Edit Object from the toolbar. Go to the Web Objects tab in the dialog. Type in the WD Application name and hit enter.  You will then see the details of that application.

  • Distribute Central Contract in ECC to MDM

    Dear SAP experts,
    We are in SRM 7.01 with backend ECC 6.05 and deploying classic scenario. We are also using central contrat management feature (Contract negotiated in SRM and then distributed to ECC), and we plan to use MDM Catalog
    As central contract will be distributed to ECC anyway, we plan to use tcode MECCM from ECC to send the central contract data to MDM catalog. Is this scenario possible? Or we can only distribute contract from SRM to MDM Catalog?
    Best regards,
    John

    In MECCM, uploading replicated Central contracts from ECC to MDM catalog is not possible.
    The program has a specific check to exclude replicated central contracts.
    Have you tried this?
    Regards,
    Sushil.

  • Adobe interactive form for material creation

    Hi experts,
    I f an adobe interactive form for material creation was created using JAVA... what part is involved in the ABAP pgm.
    Thanks in advance

    Hi,
    Pleaes find the sample codes for WD Java...
    https://www.sdn.sap.com/irj/sdn/developerareas/webdynpro?rid=/library/uuid/49f2ea90-0201-0010-ce8e-de18b94aee2d
    Regards,
    <i><b>Raja Sekhar</b></i>

Maybe you are looking for