Hi all,
We are using material determination functionality. Automatic reason with Outcome B. As per SAP help, the Material is determined at SO level and it is copied over to DO . No availability check in DO and material is not redetermined at DO.This is exactly I am trying to achieve so using outcome B is used. But when I create DO, only the higher level item is getting copied and also with Zero quantity. So I can not proceed with DO. Has anyone come across this problem before? What is the copy control I need to maintain if I am using outcome B
Please help.
Regards,
Beena
Hi,
In a delivery referring to an order, material determination is carried out subject to the sales document type on which it is based. Material determination in a delivery is carried out for new items if material determination has been activated for the underlying sales document type. No material determination is carried out for items copied from the order. You have to assign an appropriate material determination procedure (in the standard R/3 system, it is A00001) to the Sales document type DL so that material determination can be carried out in deliveries without reference to an order (LO).
reward if its useful.
Regards,
Hari Shankar
Similar Messages
-
Material determination with Product selection
Hi SAP Gurus
We are using material determination with product selection. The process is that customer will send in one product in a sales order. At the time of doing ATP we have to look for about three or four possible alternatives and confirm that alternative which has the highest stock level depending on the ATP situation. We have configured material determination with SAP standard substitution reason0006 to take care of this. The problem with this is that this creates two line items in sales order as the item substituted is shown as a sub-item of the material entered. We do not want to have two line items in a sales order for this. Is there a way we can do material determination with product selection (Based on ATP) and have the item substituted replace the item entered in a sales order? In other words we do not want to see two line items in a sales order. The substitute item should simply replace the original item and the material entered could be stored in field VBAP-MATWA. I have gone through all the standard SAP documentation which clearly states that in order to material determination based on ATP we have to use outcome A or B both of which create a sub-item.
I was wondering if there is any workaround or if there is any user exit in which we can replace the original item with the substituted item?? Any help or any direction will be highly appreciated.
Another question is if we were to use APO for doing global/Rule based ATP is it possible to get rid of the double line items. We have also tried to use rule based ATP in APO and use product/location substitution in our sandbox system to see if we can get back only one line item. But even in that case we do get a sub item. Any help on this issue will be greatly appreciated. You can also send me an e-mail at [email protected]
Thanks
SDSAPCON>
SAPCON SD wrote:
> Hi SAP Gurus
>
> We are using material determination with product selection. The process is that customer will send in one product in a sales order. At the time of doing ATP we have to look for about three or four possible alternatives and confirm that alternative which has the highest stock level depending on the ATP situation. We have configured material determination with SAP standard substitution reason0006 to take care of this. The problem with this is that this creates two line items in sales order as the item substituted is shown as a sub-item of the material entered. We do not want to have two line items in a sales order for this. Is there a way we can do material determination with product selection (Based on ATP) and have the item substituted replace the item entered in a sales order? In other words we do not want to see two line items in a sales order. The substitute item should simply replace the original item and the material entered could be stored in field VBAP-MATWA. I have gone through all the standard SAP documentation which clearly states that in order to material determination based on ATP we have to use outcome A or B both of which create a sub-item.
>
> I was wondering if there is any workaround or if there is any user exit in which we can replace the original item with the substituted item?? Any help or any direction will be highly appreciated.
>
> Another question is if we were to use APO for doing global/Rule based ATP is it possible to get rid of the double line items. We have also tried to use rule based ATP in APO and use product/location substitution in our sandbox system to see if we can get back only one line item. But even in that case we do get a sub item. Any help on this issue will be greatly appreciated. You can also send me an e-mail at [email protected].
>
> Thanks
>
> SDSAPCON
In the substitution reasons ...mark the OUTCOME as blank for this particular 0006. I am not sure for ATP
rgds
Sai
Edited by: Sai on Mar 27, 2008 10:00 PM -
Material determination with ATP-CHECK.
I want use the material determ after the stock ATP-CHECK.
the need detail is that:
first the sales order item run the atp-check ,if the stock cannot supply all the requested quantity ,the shortage quantity will use the material-substitution,by the choose screen or automatic create the new item.otherwise,if the stock is enough to supply,not to run the funciton material determinaton.
this is the all my want,whether is it can be carry out and how to configure the sap setting.Hi Lee,
The standard system supports this. While creating the material determination records in Tcode VB11., while entering the we give the material entered and in the column material you have to give this same material first and by clicking the ICON 'Alternate Materials' on the Application Tool Bar you can give the sequence in which the substitution take place.
Hope this explains your query. If this is not clear please mail me to [email protected]
Thanks,
Ravi Sankar -
Free goods with combination of material determination
Hi All,
I have Materil X for this free good is Y. But for material Y there is material determination with A. In this case what will happen while i am entering the material X in the sale order/
As of my knowledge freegoods don't support for any special function like BOM & vairant config. I don't know about the material det.
Please clarify this doubt.
Regards
SunilHi Sunil,
You can see Material Determination and Free goods as two seperate issues.
For material X, Material Y will be a free good only when material Y is available in stock. The system will not substitute materiail Y with material A just because you have material determination configured for the same.
On the other hand, if you enter material Y on its own i.e. seperately at the line item level of the sales order..........then material determination will occur and the item will be substituted by material A.
See both of them as two seperate scenarios.
Hope its clear.............
Regards
Sai -
SAP SD Material Determination not reflected in assigned sales document type
Hi Experts,
I have implemented customized material determination, with requirement to change the UoM of the entered material, from GJ to MJ. I have assigned the procedure to 3 document types:
1. sales order type
2. credit memo request
3. debit memo request
However, this setup is only reflected in the 1st sales document assigned with the procedure. It is not reflected in the credit or debit memo request.
I have turned on the material determination analysis in sales order. Per my checking during credit memo request creation, the analysis indicated that the condition is found successfully. But the UoM did not change in the document.
Please assist.
Thank you.
HJMY
Edited by: HJMY on Sep 20, 2011 1:24 PMHi Ravi,
Thx for your reply.
But I am creating credit/debit memo request without reference to billing.
When I create credit/debit memo request, the material determination is triggered.
Per my test today for credit memo request, I found that the material determination is triggered.
However, the substition UoM is not reflected in the credit memo request document.
The result is reflected only in sales order.
Please help.
Edited by: HJMY on Sep 21, 2011 3:28 AM -
Free goods with material determination
Hi All,
I have i query that for line item A material i need to give free good as X material. But there is the material determination to that particular material X with the material Y.
In this case how the system will redetermine? As of my knowledge as per the SAP standard free goods doesn't entertain any other like BOM, and variant config.
Please let me know the answer please!
Regards
RPSYou can use transaction VBN1 for assigning free goods.
Select discount type as ZFRG.
Select appropriate key combination.
You can restrict the free goods validity using Valid on - Valid To option.
Reward points if answer is useful.
Regards,
Pallavi. -
Shipping point was not determine in the order with material determination.
Hi,
I´m using material determination for my sales order, and i need to determine the Shipping point with storage location configuration. So when I add the material number, the quantity and the storage location the material determination runs and in the second line determined the shipping point it is not filled. Any body knows how can I fix this problem?
Best RegardsHi
The shipping point will be determined on the basis of shipping condition, loading group and the delivering plant.
The storage location dependent shipping point determination is used only in delivery documents and not in sales orders (Assign Shipping Points According to Storage Location).
To activate this you must first Define Rule for Determination of Shipping Point, wherein you can assign the rule to the delivery document only and not to the sales order.
If you say that you are getting the shipping point determined based on the number of the material, the quantity and the storage location entered(though it is not) then here note that you are entering the storage location only to the material entered and not to the material determined. When the system determine the alternate material then the shipping point will be determined on the basis of shipping condition, loading group and the delivering plant as per SAP standard process.
Try by entering the storage location to the material determined and check whether you can get the shipping point or not and let the forum know the result.
Hope this helps you.
Regards
Rajkumar K -
SD Contract with Material Determination - error V1 118 - Material Not liste
We have a contract that was created in Jan 2011. We have a material on the contract that has now has a sub through material determination. Since the original item has item linked to it out process is the add the new item to the bottom of the contract. when we do this we are getting Error 118 - Material is not listed therefore not allowed.
I debugged it and it looks like if the vdatu (req del date) is populated that is used otherwise the create date of the contract is used. The contract was created in Jan however the material determination is only valid from 4/25 going forward.
Has anyone experience this issue? Is there a way around this?
I have searched the forums and haven't found anything like this.
thank you for you help.
MichelleThanks, it is listed, if you enter a new contract with the current date, the material works fine. It is only when we are changing a material with determination on an older contract (created before the determination date) that we have an issue. We are ECC 6.0 pack 15. thanks.
-
Product selection with outcome B
Hi all,
I would like to know which item category and schedule line category to be used if I am using outcome B in material determination functionality.
Can anyone help me with this configuration.
Regards,
BeenaHi,
For product selection with outcome B, The higher level item category is TAX(Non stock item) with schedule line category CX(No inventory mgmt.).
Item category of product selection is TAPS (Std.Item PS) it comes with Schedule line category of PN( Selection without MRP) and PP (Selection with MRP).
These are all standards. If you would like to configure new item & schedule line category that is also possible for particular order type.
Hope, it is useful to you.
Regards,
S.Balaji -
SD-Material determination and the ATP
Hi,
IssueNo:1
we are working with the material determination and the ATP .
1. we have created a reason for substiution in th ovrq as below
Reasn ZATP
Description Autom.mat.selection
Entry
Warn
AvCh dep. X
Strategy
Outcome B
Category
2.we have the material determination as below
Material entered :INT1_AUTOLITE
Alternate materials:
INT1_AUTOLITE
INT1_FRAM
In this we have the INT1_FRAM material marked for the mrp.
3.The above are the config and the master data ,
4.In the above setting the material is replaced as subitem and all the ATP is done correctly as per the checking group and the scope ofthe check
5.When we change the setting for the reason for substiution as below
Reasn ZATP
Description Autom.mat.selection
Entry
Warn
AvCh dep. X
Strategy
Outcome
Category
Note: The change here is the Outcome is changed to blank
6.Now when we do the above configuration change ,the material is getting replaced and the avaialability check is happening but if there is no sufficient stock it is not going to the next material.
It stops at the first alternate itself.
example for this is :
****Materialdetermination master data:
Material entered :INT1_AUTOLITE
Alternate materials:
INT1_AUTOLITE
INT1_FRAM
Stock situation :
INT1_AUTOLITE :5000
INT1_FRAM :5000
When i create a sales order for 7500 for INT1_AUTOLITE it is only confirming 5000 fro the item 10 as material INT1_AUTOLITE it is not going to the next material
This is the core issue we are facing currently.
IssueNo2:
we also find a strange thing.
we have a availabiity check indicator in the V_TVSU ( config table)
SUVFP-Substitution dependent on the availability check
This is not available as a entry option.
why is this so ???
can anyone give a good response.
Reg
satheeshkumarHi,
IssueNo:1
we are working with the material determination and the ATP .
1. we have created a reason for substiution in th ovrq as below
Reasn ZATP
Description Autom.mat.selection
Entry
Warn
AvCh dep. X
Strategy
Outcome B
Category
2.we have the material determination as below
Material entered :INT1_AUTOLITE
Alternate materials:
INT1_AUTOLITE
INT1_FRAM
In this we have the INT1_FRAM material marked for the mrp.
3.The above are the config and the master data ,
4.In the above setting the material is replaced as subitem and all the ATP is done correctly as per the checking group and the scope ofthe check
5.When we change the setting for the reason for substiution as below
Reasn ZATP
Description Autom.mat.selection
Entry
Warn
AvCh dep. X
Strategy
Outcome
Category
Note: The change here is the Outcome is changed to blank
6.Now when we do the above configuration change ,the material is getting replaced and the avaialability check is happening but if there is no sufficient stock it is not going to the next material.
It stops at the first alternate itself.
example for this is :
****Materialdetermination master data:
Material entered :INT1_AUTOLITE
Alternate materials:
INT1_AUTOLITE
INT1_FRAM
Stock situation :
INT1_AUTOLITE :5000
INT1_FRAM :5000
When i create a sales order for 7500 for INT1_AUTOLITE it is only confirming 5000 fro the item 10 as material INT1_AUTOLITE it is not going to the next material
This is the core issue we are facing currently.
IssueNo2:
we also find a strange thing.
we have a availabiity check indicator in the V_TVSU ( config table)
SUVFP-Substitution dependent on the availability check
This is not available as a entry option.
why is this so ???
can anyone give a good response.
Reg
satheeshkumar -
SD Material determination - copy control - print out
Hi Experts,
I'm using material determination for inquiries (AF). In that material determionation it's defined that substitute products will be displayed for selection and the original entered material number will be used for print out.
When I'm creating an offer with reference to that inquiry, I can see the substitute material no. as defined in material determination. But this number is also used for print out, which does't match to the material determanation definition (the original entered material number should have been printed)
The same appears when I'm creating the order with reference to the offer.
Can someone tell me where and why I'm loosing the connection to the material determination?
Thanks
AnjaHI Anja,
check with "substitution reason" in OVRQ
entry coloum and outcome coloum
maintain according to your requirement.
Regards,
Krishna. -
MATERIAL DETERMINATION - PRICING ERROR."
Hi all ,
well, material M1 is substitute by material m2.In OVRQ in OUTCOME selected is " A."
@ va01: main item M1 is displayed along with substitute item , with netvalue as 1000 & item category TAX,subitem m2 is in grey mode with item cat TAPS &net value = 0.
@delivery :main item M1 is displayed in gray mode & substitute item is active for pikcing .
@vf01:main item M1 is displayed ,invoice quantity & net value is zero.
can any one throw light on the error .Hi jerry
say main item material is M1 and sub item material is M2 .
Now as you are doing material determination. system will do delivery and billing for the replaced items
If M1 is the main material and M2 is the sub item material (which is determined through material determination) then in sales order both will trigger but in delivery the main item picking qty will get grayed out and the sub item qty will be picked and the price of the sub item only will come i n the billing and not the price of the main item
so if you want to pick the qty for the main item also then you need to check the box item relavent for picking in delviery item catergory details 0VLP .then you can do delivery but in billing the billing qty will be zero and the net value will also be zero . you can only bill the sub item
Regards
Srinath -
Substitution reason in Material determination
What is the significance of Substitution reason in Material determination.
Are the values of substitution reason linked with other units or is it just a text input/information field?
Regds
NikhilNikhil,
Substitution reason is the thing that controls how the material determination or substitution happens.
Below are the controls that it provides.
--> Throw a warning message before substituting the material
--> Defines the strategy whether product selection should occur automatically in the background or whether the alternative materials should be offered for selection in a dialog box
--> Outcome , How the new material need to be substituted, Whether it should replace the current item or add a new line item in the order.
--> Substitution category, in case of the service item.
You are going to enter this substitution reason in the condition record.
Regards,
Ajai. -
VB11 Material Determination - How to substitute only when ATP fails?
I created a material determination rule with VB11 (A is replaced by B).
However, my intention was to has A replaced by B only when ATP fails in SO....
Now I have A replaced every time....
I tried to create two lines: A=>A, A=>B as alternative, but A is always replaced by A now...
Did I miss anything?
Thank you!Its possible to do this. Please do as below.
Ex: xyz is the main item and abc is the substitution item which needs to be activated only when xyz qty is less)
1. Under VB11 maintain the following records:
For Reason : Z003 (ATP Check)
Material Entered is XYZ and Substitution Materials are XYZ and ABC.
Basically Material XYZ substitutes XYZ and if the qty is less it substitutes ABC.
2. Substitute Reason Settings are as under (SPRO):
Reasn Z003
Description Availability check
Entry
Warn
AvCh dep. X
Strategy
Outcome B
Category
This will work wonderfully...
Hope this helps... -
Retail - article follow up / material determination
Hello,
I would to know the possiblity of material determination / article follow up in Retail scenario.
The material should be substituted with material already maintained for replacement/follow up for the 'sales orders'.
Help on this is really appreciated.
Thanks & regards,
RavishDear Ravish,
Pls elaborate your business scenario and your SAP requirements.
Thanks,
Regards - Muralidhara
Maybe you are looking for
-
Migrate from Lion mac to new maverocs mac
Hi. I tried to migrate the entire content of my Lion macbookpro my new mavericks mbpro. Sadly the migration assistant on the mavericks mbpro says that i need to update my software on the source which is my old Lion mbpro. It is not possible to update
-
Hi, I would like to know how I can get the address from gps coordinates. Example: I have this coordinates: latitude=41.889373 , longitude=12.492438 and I want to receive an answer like this: "Rome, It, Via Nazionale" How do I do this? Thanks P.S. I d
-
Intermediate result between two message mappings
Hi, we have a Scenario with an Interface mapping, which is created from two message mappings. The first one receives the source message and the second one sends the target message. I have a trouble with finding the intermediate result between the two
-
Warcraft won't open... EXC_BAD_ACCESS (SIGBUS)
Warcraft won't open KERNPROTECTIONFAILURE... no idea what to do? Process: World of Warcraft [258] Path: /Applications/World of Warcraft/World of Warcraft.app/Contents/MacOS/World of Warcraft Identifier: com.blizzard.worldofwarcraft Version: 4.0.6 (13
-
Hi there, I'm a little useless when it comes to scripting but I need a self-contained script that simply unlocks all the layers in a current document. I'm using a script that batch exports a folder to RTF (batch_convert.jsxbin) but it's having a few