Material document cannot be processed ( Message no. M7130 )

Hi all.
Recurring inspection lot is created automatically through tcode QA07.
But i will cancel the recurring inspection. it is stock relevant, because i cann't cancel directly from QA02> function> cacel inspection lot. So i was reversed the materials document which created when the inspection lot makes automatically through tcode MBST.
And i make the error message.
Material document cannot be processed
Message no. M7130
Diagnosis
This material document was generated through the posting of a physical inventory document, a delivery via Shipping, or some other automatic movement (such as an order confirmation in PP or a usage decision in QM) and cannot be processed with this function.
System Response
In this transaction, the system can only cancel a material document if the latter was created using an Inventory Management transaction.
Procedure
Cancel the material document in the component that created the document.
You can only reverse the goods movement created through the posting of a physical inventory document by carrying out a new physical inventory for the relevant material. You can reverse a delivery effected via Shipping using transaction VL09.
How to reverse the materials document??

what do you actually want to cancel? it looks like your inspection lot  and the usage decision is done. What was the result of this usage decision? and how do you want it to be?
As you already know, a movement created from Q-module cannot be cancelled in MM with MBST.
so you need another movement created from QM module to make a transfer posting into the opposite direction.
Maybe it is easier for you to create a new inspection lot manually and process another usage decision, than going thru a cancellation process.

Similar Messages

  • Material document cannot be processed in MBST trasanction

    Hi,
    We want to cancel a Material Document Number 4906026157/2010, but system is giving an error message:
    Material document cannot be processed
    Message no. M7130
    Scenerio: - User rejected the material by 122 mvmt. for rework on this material, after that material is not showing in MMBE.
    When are doing now MBST, showing above mentioned error.
    Plz guide..

    Please check the documentation of the error:
    Diagnosis
    This material document was generated through the posting of a physical inventory document, a delivery via Shipping, or some other automatic movement (such as an order confirmation in PP or a usage decision in QM) and cannot be processed with this function.
    System response
    In this transaction, the system can only cancel a material document if the latter was created using an Inventory Management transaction.
    Procedure
    Cancel the material document in the component that created the document.
    You can only reverse the goods movement created through the posting of a physical inventory document by carrying out a new physical inventory for the relevant material. You can reverse a delivery effected via Shipping using transaction VL09.
    Here please check whether by any of the above process this has got created or not?
    Regards,
    Indranil

  • Material document cannot be processed Error

    Hello,
    I have issue regarding the material document posting.
    Scenario: Discrete manufaturing
    1. Production order is created for A  177 PC and Operation wise confirmation is done with auto GR.
    2. The stock A 174 PC is issued to other production orders.
    3. Cancellation of confirmation CO13 is done for 177 PC since the stock is not available it has thrown error to COGI.
    4. The error entry is deleted by the user in COGI.
    5. Now they want to post the confirmation with 174 PC and 3 PC scrap.
    But the problem is am not able to cancel the docuement which is posted intially for 177 PC since the error entry is deleted for 102 mvt.
    I tried MBST and MIGO also not able to cancel the document.
    How to go about on this issue. Pls let me know.
    Thanks and Regards,
    Satish

    Satish,
    I hope while cancelling the operation with CO13, the cacellation has been taken place as the entry has been passed to COGI.
    In this case you need to work around the solution
    First of all cancel the material document of issue of the 174 pcs of A to another porduction order.
    Now post an entry of 177 with movement type 102 with reference to the order in MB31.
    In the production order replace the auto GR key with non auto GR key.
    Carry out confirmation with confirmed quantity as 174 & scrap as 3.
    Now in MB31 carry out GR against the order with movement type 101.
    I hope this would work.
    Try it out & revert.
    SmanS

  • 1 Document cannot be Processed error in E-recruiting

    Hello Experts,
    We are facing an error when executing an activity for rejection of a candidate. On click of the 'Preview' link, the system displays an error message that '1 document cannot be processed'.
    However, the surprising thing is that we do not get the error for Invite to interview activity (which is 'qualifying event' activity coupled with 'invitation' activity). But, we ONLY get the error for rejection activity (which is 'status change' activity coupled with 'invitation' activity). The system always looks for interface 'HRRCF_CS_IT_APPL_INVITATION' from table and we have not changed SAP standard config in T77RCF_DOC_CAT.
    Also, we tried replicating the issue for rejection activity mentioned above using SAP standard activities and letters. We coupled 'qualifying event' with 'invitation' activity. But still, the system throws the same error...
    Any inputs would be of great help!!!
    Thanks and Regards,
    Sri.

    Satish,
    I hope while cancelling the operation with CO13, the cacellation has been taken place as the entry has been passed to COGI.
    In this case you need to work around the solution
    First of all cancel the material document of issue of the 174 pcs of A to another porduction order.
    Now post an entry of 177 with movement type 102 with reference to the order in MB31.
    In the production order replace the auto GR key with non auto GR key.
    Carry out confirmation with confirmed quantity as 174 & scrap as 3.
    Now in MB31 carry out GR against the order with movement type 101.
    I hope this would work.
    Try it out & revert.
    SmanS

  • The volume for documents cannot be found message

    Similar threads didn't quite yield the results I was hoping for, so I thought I would give this a shot. I am getting a "the volume for documents cannot be found" message when I click on my Documents folder in the lefthand column of a Finder window. I do not have the same problem with movies or music. However, when I click on the Documents folder in my Home menu, my documents are all there. Searches reveal that they are there as well. The only change I made to my computer prior to this computer was turning on FileVault. I have turned it off, but this has not resolved the issue. Neither has simply dragging the folder on the right to the icon on the left. I'm glad that my documents aren't gone, but can anyone advise as to how I can make my computer recognize this?
    Thanks!

    Hi Erin, and a warm welcome to the forums!
    Do you mean the Documents in the Sidbar of the Finder Window?
    If that is the case, then drag the one that doesn't work, off to the left of the Sidebar, it'll go poof, then locate your Document folder and drag that to the Sidebar, but not on top of another icon there, as that'll move it to that location... Perhaps this is how it got lost in the first place?

  • Documents cannot be processed when requester has left the company

    Dear Gurus,
    We are working on SRM 7 and we would need to be advised for the followig.
    We are facing an issue when users leave the company, if they where requestor for some documents, this documents cannot be processed anymore. Error "The attributes of other user are incosistent or not defined. See transaction PPOMA_BBP".
    Currently these user are deassigned from the PPOMA and a standard interface update the field "valid to" in the BUT100 when they leave the company.
    We tried to assign again them to the PPOMA. But the error has not been solved. Maybe that value "valid to" in BUT100 should be maintened in a different way.
    We are using HR and standard interfases as far as i know.
    Could you please advise regarding the best option to use in these cases of SRM.
    Thank in advance for your support.
    Best Regards,
    Valentino

    Hi Valentino,
    I have seen this error many times, the user was probably deleted from the SRM system and so no subsequent actions can be taken on open documents linked to this user.
    The SRM system behaves like this
    In Standalone scenario:
    SRM system is standalone system not connected with HR system
    If we try to delete the user locally the system will check is there any
    open documents if any open document exists
    then the system won't allow to delete the
    users which inturn won't delete the associated business partner
    relationship.
    So the user as well as the business partner relationship (BUT050 ,
    BUT052) won't be deleted.
    SRM with HR Replication scenario:
    All the users are maintained in HR system and the HR system is the
    leading system.
    If the employee leaves the organisation, from HR side the requirement is
    that the user has to
    be deleted immediately. So here we can't check whether the user has open
    documents in child system (i.e, SRM system), even if
    we check and block the deletion of user in HR, from HR side this is not
    acceptable from HR the user should be removed immediately. If the user
    is deleted or delimited in HR side when the user is replicated to SRM
    system the BP relationship will be deleted this is the reason that the
    open documents could not be processed.
    So the please follow either of these options,
    1. Before deleting a user from HR make sure that all the open documents
    are completed or assigned to some other
    active requestor / recipient.
    2. All the open documents associated to the deleted business partner or
    user should be archived.
    3. If the user is deleted in HR before closing the documents and still
    want to access the open documents of the deleted user / Business Partner
    they can use the Z Report which will replace the deleted Business
    Partner with active business partner.
    I have attached the report Z_change_pguid_002_new.txt please use
    this report to replace the deleted Business partner with the active
    business partner.
    Follow the below link to access the report
    Link: https://sapmats-de.sap-ag.de/download/download.cgi?id=PCPPQKH3C5TRAY16GAV67F9S5I4IAPA1D0DB8ES456Y1GU4XT1
    Hope I have been of help to you,
    Kind Regards,
    Matthew

  • I'm getting a "Document Cannot Be Opened" message when trying to open a recent document - any ideas?

    When I try to open a recent document in Pages, I get a "Document Cannot Be Opened" message.
    Also, it just clocks when I try to create a new doc.

    A search of this forum for the message turns up this thread. Does it help?
    https://discussions.apple.com/message/15988208#15988208

  • BAPI_GOODSMVT_CREATE Material Document Posting against Process Order

    Dear Experts,
                        I want to post more than one documents from BAPI "BAPI_GOODSMVT_CREATE". It is working fine for GR(gmcode = 02) 101 Mvt. type. But the problem is that when there is a GI (gmcode = 03), serial numbers document comes; it display an error as " Content of order 1000400: 40000134 transferred to interface (IMSEG)".
    My Question is that: Is this a correct BAPI for serial numbers assigned materials, OR I should use another bapi for these serial number materials.
    Will you please let me know the name of the BAPI which I should use in this regards.
    ***** I am using BAPI_GOODSMVT_CREATE as follows for Process Orders:::::
        CALL FUNCTION 'BAPI_GOODSMVT_CREATE'
          EXPORTING
            goodsmvt_header               = gmhead
            goodsmvt_code                 = gmcode
    *   TESTRUN                       = ' '
    *   GOODSMVT_REF_EWM              =
    * IMPORTING
    *   GOODSMVT_HEADRET              =
    *   MATERIALDOCUMENT              =
    *   MATDOCUMENTYEAR               =
          TABLES
            goodsmvt_item                 = fitab "bapi_itab
            goodsmvt_serialnumber         = itab_serials
            return                        = errmsg
    *   GOODSMVT_SERV_PART_DATA       =
    *   EXTENSIONIN                   =
    Thanks,
    Sohail

    The function is intended to create a single document , Here is an excerpt from the FM documentation :
    Functionality
    You can use this method to create a material document for a goods movement.
    You can only create one material document each time you call up the method.
    You can use a simulation function before posting the goods movement to check how the data is updated in the database. The standard system is configured so that the goods movement is posted immediately, without prior simulation.

  • Certain Material Document cannot enter Spool

    Hi everyone,
    I am facing problem with printing. There are several material documents that cannot enter spool when I printed that. The problem is only certain material documents that cannot go into spool, in my case material document for GI SCRAP. Other material documents run well. Is there any relation between material document type and printing settings? Does anybody have solution or advice for this problem?
    Thank You

    Hi,
    Check the following link it will certainly help you
    GR document not printing in MB90
    Or simply :
    1.Go to OMB5 maintain entry against movement type 551.
    2.Go to OMJ3 Assign the printer to WA01/WA03 output type with combination of Plant + Storage location
    3. Go to OLMB-> Output determination ->Assign forms and programs here assign against (WA01/WA03)
    4.Maintain the condition record in MN21 or NACE for individual slips or collective slips(WA01/WA03 )
    After doing the these  steps you need to select the print button when you are doing MB1A or  MIGO_GI and select the slip types like individual or collective(WA01/WA03 )
    And you can take print out in MB90
    Edited by: redriver on Dec 10, 2011 4:33 AM

  • The requested session cannot be processed message no. 00309

    I have made background process at 'FAGL_FC_VAL - Foreign Currency Valuation' for valuating AR, AP at May 31st.
    The session was created but have not be processed.
    So I tried to release and delete session, but it couldn't be released and deleted.
    How can I make it released to be able to delete or be processed successfully?

    Hello,
    You can go to transaction SM35 and release these batch-input
    session. Then the status will be changed from "In background" back to
    "New" and you can process it again.
    In order to process it again, you may try to release the session,
    please see SAP note 12222.
    Then reprocess the session in foreground in Expert mode and with
    Extended log options selected.
    Regards,
    David

  • Unable to create excise invoice against the Material document

    Hi experts,
    Unable to create excise invoice against the Material document in J1IEX transaction.
    Material document is generated through quality management which movement type is 105.
    error message :
    Material document cannot be processed
    Message no. M7130
    Thanks
    SAP MM

    Steps to do GR along with excise,
    1.Capture excise invoice using J1IEX.
    2. Refer excise invoice no. in MIGO(SAP not recommends to post excise invoice against 105 mvmt against blocked stock)
    3. Post excise invoice using J1IEX

  • Solar01 "Message no. SOLAR_DOC020" The document cannot be edited

    Hi!
    I am configuring the business processes via SOLAR01 and receive the error "The document cannot be edited" Message no. SOLAR_DOC020.
    It is also not possible to load the templates.
    <b>Has anyone experience by solving this problem or some useful SAP note?</b>
    Thank you very much!
    regards

    Hi!
    I think it does not connection with the GUI version, because I cannot edit the Word-documents in the transaction SOLAR01.
    I can edit .txt-files, but I cannot edit the .doc-documentas.
    I have SAP GUI 7.10
    Thank you!

  • Material Document Output Message

    Hi
    I cutomize the Mat.Doc Output Message WE01 to ZE01.
    In OMJ3 I already removed the WE01 for the new plant.
    However still in the Plant#2000 material document picks up both message
    Where else i should remove ?
    Thanks
    MM

    Hi Garapati 
    Output WE01 is already in use at other plants (ex; 1000) using different forms.
    ZE01 which is to be used for plant 2000.
    So, I can't delete in Output Determination or NACE/T.
    I thought if I dont maintain the WE01 output type in OMJ3 for Plant 2000, suppose to not appear and only appear the ZE01.
    But now both appears.
    Rgds
    MM

  • Error while cancelling the material document.

    HI,
    while cancellation of material document thru MIGO screen getting error
    Deficit of PU IR quantity 20.000 EA
    Message no. M7021
    Diagnosis
    Shortfall below the specified stock level or quantity amounting to 20.000 EA.
    Diagnosis
    Shortfall below the specified stock level or quantity amounting to 20.000 EA.
    The invoice of material document has been process thru ERS.....so no way we can cancel the invoice.
    waht is  the exact process to cancel this document which furher use ERS for invoice verification.
    thanks.....

    Hi Ayaan,
    You need to set the indicator against the movement type 102 under the following path :
    SPRO>Materials Management>Inventory Management and Physical Inventory>Goods Receipt>For GR-Based IV, Reversal of GR Despite Invoice
    Once set , try reversing the material document . This will work .
    Regards
    Ramesh Ch

  • Need an IDOC EDI STEPS for material document(MB03)

    HI ALL,
    i need an IDOC for material document. For example, user in SAP make material document (t-code MIGO or MB11), then automatical is downloading outbound IDOC, which contain information about material document.HOW TO PROCESS IT THROUGH EDI .GIVE THE STEPS.

    like below you can do your settings
    The EDI Configuration required to be done for Transfering IDoc to non SAP System is.
    1. First of all, we need to identify the Transaction Data which is required to be Transfered to external System.(Ex: Sales Order Data or Shipment Data or Delivery Related Data).
    2. Secondly, Identify the IDoc Type & Message Type. IDoc Type can be found in Transaction WE30 & Message Type Can be explored in Transaction WE81.
    3. After that, assign the IDoc Type to Message Type in WE82.
    4. Identify the Selection Program (Outbound) which is generally a Function Module in the Form of IDOC_OUTPUT_<Message Type>. Example, if the Message Type is ORDERS, the FM will be IDOC_OUTPUT_ORDERS.
    5. Assign the Function Module to a Process Code in WE41 (Process Code for Outbound).
    6. Configure Port Definitions in WE21 for which the RFC destinations are to be maintained in Transaction SM59.
    7. Maintain Partner Profiles for the Outbound Message Processing in WE20.
    8. Last, but not the Least, we need to Focus Mainly on Message Control Configuration which is nothing but maintaining the Output Type for the Outbound IDoc to be Triggered for the Sales Order Application or Delivery Application.
    i. In Message Control Configuration, we'll maintain
    a. Condition Tables
    b. Access Sequences
    c. Output Types
    ii. To Create the above elements, we can go to SPRO Transaction and do the same depending on the Application Area such as Sales / Shipping / Logistics Execution etc.
    iii. For Output Types & Access Sequences, we can go to the Transaction NACE or VK01 in which we'll maintain the Output Types / Access Sequences & Condition Records.
    Please note that all the above steps may not be needed if we are using some of the Standard Elements provided by SAP such as Message Type, Process Code, IDoc Type & Selection Program as many of the Standard SAP Applications have their own Elements for different Application Areas.
    For example, if you want to send an Order Confirmation IDoc when the Sales Order is saved, you can use the Message Type ORDRSP, IDoc Type ORDERS05 & Selection Program as IDOC_OUTPUT_ORDRSP.
    However, Message Control Configuration is the Key Factor and is required for all the Applications as per the Customer's / Client's Requirements.

Maybe you are looking for

  • How to change Work order status ?

    Hi, I am using an ABAP program to change the user status of a work order to "CLOP" , This is like IW32 , Here Which function module I can use to do this ? Thank you for your help. Thanks

  • Lightroom encountered an error when reading a catalog file and needs to quit.

    Since I installed Snow Leopard, I keep getting this error. LR restarts and the catalog is fine, but I leave it running and come back an hour or so later and there is the same error. I verified the file system on my USB drive and it is fine. It is a b

  • Snow Leopard Mac Mini install

    I have a 2006 intel Mac Mini 10.4 and I have the Snow Leopard Install dvd in it and it has been 3 hours installing. Is this normal?

  • Domain Value Mapping with Text file

    Hai, I have done the Domain value mapping with the xml file to xml file and it is working fine. But in the case of Text file to Text file it is not working i.e. If the citiname is the first field it is domain value mapping and working fine. INPUT: Er

  • Meet an error in InfoView when CR Server in Windows and Websphere in Linux.

    Hi Expert, I installed the Crystal Reports Server  XI R2 in Windows 2003, and deployed the desktop.war and other war files on Websphere 6.1 in linux. And in InfoView through Websphere to view a report with parameter that connect to Oracle, after inpu