Material Documents for Unplanned Services?

Dear All
I have created a service entry sheet for services against a PO. In the PO, provision was maintained for unplanned service (maintaining some amount in limits.)
Now, while creating service entry sheet, it has been observed that material document created against planned service only. Although the cost of unplanned service is appearing in services entry sheet but no material document created against unplanned service. The payment section is therefore not allowing payment against unplanned services as no material document appearing in PO history against unplanned service.
Can any one help me out what is the solution.
Regards,
Abdullah

Hi all,
For dispaly of Material Document we have Transaction Code : MB03,
this with the Document No & Year,
like wise for dispaly of Material Document for a date range i want to know the Tranasction Code.
Thanks

Similar Messages

  • Creation of material Documents for RMPM adjustments using BAPI

    Hi
    can any one help me Creation of material Documents for RMPM adjustments using BAPI...
    i should be grateful to you...
    advance thank you
    with regards
    venkat

    You can check MB_CREATE_GOODS_MOVEMENT which has mkpf as inporting parameter.

  • Material Document for Scrap consumption not Found

    Dear Friends
    During order confirmation, molten material / raw material is consumed by 261 MT and dross SH100002 is generated by MT 531 along with the finished product with MT 102. I reversed finished product through 102 MT and Raw material through MT 262. Thus do I need to reverse dross through MT 532, against order?
    When I went to MB51, I found the material document for finished Material production with MT 101 and raw material consumption with MT 261. But in MB51when I tried to find out dross generation with MT 531, I did not get any material document for that particular order no.
    In the production order though total quantity: 88000 and delivered quantity is only 26000. When user is trying to confirm the production order only for 200 units, system is giving the following error message:
    Overdelivery is not permitted (Check entry)
    Message no. RU139
    Diagnosis
    The total yield and scrap confirmed exceeds the overdelivery tolerance defined in the order header.
    Procedure
    You can either
    u2022 reduce the confirmed quantity
    u2022 deactivate the tolerance check during confirmations (customizing),
    u2022 increase the overdelivery tolerance in the order header and then enter the confirmation again
    Please tell me why Material movement of dross/ scrap is not visible and why production order is not getting confirmed
    Thanks
    Chandra

    Chandra,
    When you say te movement is with order confirmation then I assume that it is backflush of the components & byroduct.
    If you do not find the material document in MB51 then it is not posted yet.
    In that case excute T code COGI & process the same.
    Regarding the order confirmation error, kindly check the 'Goods receipt' tab page in the order header.
    The delivery completed indicator must be marked. Unmark the same & save.
    Now try to process the confirmation.
    Anyhthing else please let me know.
    Hope this helps you.
    SmanS

  • Request for any Best Practice document for configuring Service Parameters on CUCM 9.1.1

    Hi Team,
    Could you please send if you have any  Best Practice document for configuring Service Parameters on CUCM 9.1.1. That would really help.
    Thanks,
    Guru

    Hi
    There's no 'best practice' as such, but there are a few that I think should be default:
    Enabling CDR, On-Hook Pickup, CFwdAll Override... but really the settings are specific to the requirements of the deployment.
    Aaron

  • Wrong GL account defaulted for Unplanned services in Service Entry sheet.

    Dear Experts,
    We create a Service PR with Acct asst - K & Item Cat - D, for which we enter Cost center, Order No. & GL account. We maintain it as Unplanned Service with Value Limits. When we create A PO wrt the above PR the GL account is defaulted corretly in PO. But when i enter Service entry sheet for above PO for Unplanned Service . System defaults a different GL account automatically. That differs from the existing one in PR & PO. User posts it directly, since it is done wrt PO without checking. How can the defaults of wrong GL account be avoided for Unplanned Services?
    Thanks & regards
    Chandan

    Hi,
    In Service PO, if some one By mistake Put the wrong G/L but u can change the G/L while SES.
    Educate the SES person to note the proper G/L or assign a release streatgy for SES with give final release authority should check the proper G/l or cost center.
    We have this solution as SAP is not able to reply on this front
    Regards,
    Pardeep Malik

  • How to see the material document for Blocked stock

    Hello Experts
    I having some blocked stock in plant X , How to see the material document for this stock.
    Thanks in Advance
    Prashanth.v
    Edited by: prashanth.venkategowda on Aug 11, 2010 7:38 PM

    which material documents do you want to see?
    Material documents can be found and displayed in MB51 transaction.
    in MMBE you can put the cursor onto your stock line and then choose from menu Environment > material documents and SAP will list all relevant material documents.
    block stock status is not a selection criteria, material number, plant storage location, batch number are selection criterias.
    if you want only documents to block stock, then you need to select by movement type, e.g. 343 and 344 are movements that change status from unrestricted to blocked or vica versa.

  • MATERIAL DOCUMENTS FOR POSTING DATE TCODE ?

    HI ALL,
    CAN SOMEBODY GIVE ME THE MATERIAL
    DOCUMENTS FOR POSTING DATE TRANSACTION CODE.
    THANKS,
    KSR

    Hi all,
    For dispaly of Material Document we have Transaction Code : MB03,
    this with the Document No & Year,
    like wise for dispaly of Material Document for a date range i want to know the Tranasction Code.
    Thanks

  • 'BAPI_GOODSMVT_CREATE' takes more time for creating material document for the 1st time

    Hi Experts,
    I am doing goods movement using BAPI_GOODSMVT_CREATE in my custom code.
    Then there is some functional configuration such that, material documents and TR and TO are getting created.
    Now I need to get TO and TR numbers from LTAK table passing material documnt number and year, which I got from above used BAPI.
    The problem I am facing is very strange.
    Only for the 1st time, I am not finding TR and TO values in LTAK table. And subsequent runs I get entries in LTAK in there is a wait time of 5 seconds after bapi call.
    I have found 'BAPI_GOODSMVT_CREATE' takes more time for creating material document with similar issue, but no solution or explanation.
    Note 838036 says something similar, but it seems obsolete.
    Kindly share your expertise and opinions.
    Thanks,
    Anil

    Hi,
    please check if some of following OSS notes are not valid for your problem:
    [Note 838036 - AFS: Performance issues during GR with ref. to PO|https://service.sap.com/sap/support/notes/838036]
    [Note 391142 - Performance: Goods receipt for inbound delivery|https://service.sap.com/sap/support/notes/391142]
    [Note 1414418 - Goods receipt for customer returns: Various corrections|https://service.sap.com/sap/support/notes/1414418]
    The other idea is not to commit each call, but executing commit of packages e.g. after 1000 BAPI calls.
    But otherwise, I am afraid you can not do a lot about performance of standard BAPI. Maybe there is some customer enhancement which is taking too long inside the BAPI, but this has to be analysed by you. To analyse performance, just execute your program via tr. SE30.
    Regards
    Adrian

  • BAPI_GOODSMVT_CREATE to create a material document for consumable goods

    Hi All,
    I am using a BAPi  (BAPI_GOODSMVT_CREATE) to create a material document using a PO. Please note that the PO contain no material number. It contains short text. The account assignment is being copied in to the MIGO from PO (when i am doing the process manually without BAPI). But when i am using the BAPI at that time i am getting an error as:
    E M7                   036 No goods receipt possible for purchase order 45XXXXXXXXXX 00010 .
    Logically this should not happen as  when i do it manually i am able to post MIGO.
    Under goods movement header i am giving :
    posting date
    doc date
    text
    goods movement code :
    01
    GOODSMVT_ITEM
    plant
    mov type
    po number
    vendor
    line item
    short text
    cost cenrtre
    order no(int ord no)
    mov indicator: B
    GL account
    base unit of measure
    Where i am going wrong?

    Hi Jurgen
    In response to my post where i wrote my observations :
    As you have suggested i have removed the account assignment objects and now i am not getting the error as mentioned in my post but at the same time i notice in export parameters  in the bapi the following things which was not present earlier.
    GOODSMVT_HEADRET                   50000xxxxx2014
    MATERIALDOCUMENT                    50000xxxxx
    MATDOCUMENTYEAR                     2014
    Now another thing is i am not getting any entry in return table.... which i should get. Please note that my test run contains no values(X).
    i think i am near to the solution. Could you suggest any more crucial points i might be missing?"
    for this i found out that there is a way to solve this issue. My concern was why the material document was not updating .  Well this is how SAP behaves.
    To update it we have to run simultaneously another fm " BAPI_TRANSACTION_COMMIT".  This will update it in the mseg table which in turn will reflect it PO history. So my requirement is answered and fulfilled.
    Thank you so much for the replies and cooperation.
    Thank you all.

  • Report- material document for allocation- adding transfers

    Hi!
    Can anyone help me in cretainmg this small report to use for adding transfers to allocation table please?
    Its a small report but somehow I am not reaching the target
    --new block
    Selection Screen:
    Material Document of Original Transfer Posting (101/311): __________ (ZALLOC- ZMBLNR)
    Receiving Plant/S.Loc. Item of Original Transfer Posting (101/311): ____ (ZALLOC- ZZEILE)
    Material Document of Pro-rationed Transfer Posting (901/911): __________ (ZALLOC-ZMBLNR_PRO)
    Receiving Plant/S.Loc. Item of Pro-rationed Transfer Posting (901/911): ____ (ZALLOC- ZZEILE_PRO)
    --end block
    --new block
    Issuing Plant: ____ (ZALLOC-ZWERKS_ISS)
    Issuing Storage Location: ____ (ZALLOC-ZLGORT_ISS)
    Receiving Plant: ____ (ZALLOC-ZWERKS)
    Receiving Storage Location: ____ (ZALLOC-ZLGORT)
    Batch: TRANSFERS (ZALLOC-ZCHARG non-changeable default ‘TRANSFERS’)
    --end block
    Program Flow:-
    - Find the material document lines of the pro-rationed transfer posting. 
    - Check to see if the pro-rationed document is a 901 or a 911 material document.  Display hard error ‘Pro-rationed document item is not a 901 or 911 movement type’
    - Check to make sure that the MSEG-WERKS and LGORT match the receiving plant and storage location ZWERKS and ZLGORT.  Display Hard Error – ‘Provided pro-rationed item plant and storage location does not match the provided receiving plant and storage location.’
    - Check the material document ZMBLNR_PRO and ZZEILE_PRO for MSEG-SHKZG = ‘S’.  Display hard error ‘Item Line is not an Inbound Item into Receiving Facility. Check for correct item line in pro-rationed material document (901/911)’
    - Check to see if this key has already been entered into the ZALLOC table.
    - If it is grab the volume from the item line, populate all fields
    - Use the Posting Date as the date.
    - Insert it into the table.
    - Provide success/error report to show the record entered.
    Basically this updates the allocation table as the recoerds are entered i this report. Kindly help please.
    Thanks
    Aarav

    >
    suresh kumar wrote:
    > Dear All
    >
    >
    >  Thanks For All Replys
    >
    >
    >  BKPF-AWKEY this field stored material document and year but this field is not a key field so we are facing performence issue what can i do?
    >
    >
    >
    > Thanks and Regards
    > Suresh
    Hello Suresh,
    What are the input parameters to the report? May be you can add some fields to the selection-screen like Company Code, Fiscal Year etc.
    Hope this helps.
    BR,
    Suhas

  • User exit for different Material Document for different company code

    Hi,
    We want to have different no. range for Material document (GR) for different compnay code. Presently we have no. range at client level. Can we do with any userexit. If so pls. give the details.
    Regards
    Sai Krishna

    [user exit for generating external serial;
    [BADI MB_DOCUMENT_BADI;
    [user exit or any other enhancements during good receipt;

  • Material type for both service and delivery

    Hai all,
      I there is any material type for which both delivery and service can be carried for the same material.
    Thanks in advance,
    S.Jenibalet

    Hi.,
               DIEN is the itemctegory group for service with delivery & LIES is item category group for service or delivery
    REWARD if helpfull
    Thanks & Regards
    Narayana

  • Exact Material document for particular material with serial number

    Hi,
    One serial number is assigned to material
    and this matreial is having more than one material document numbers. How do i know exact material document assigned for material and serial number combination.

    Try MASE. it hold the last serial number.

  • Fixing automatic printing of material document for goods movement type 101

    Hi experts,
    I have a situation, where I want to fix automatically printing of material documents good receipt and transfer posting related to movement type :
    101- GR for plant XYZW to the printer AB12 with output type WE03 " GR note version 3" Language EN.
    311 - transfer posting plant XYZW to the printer AB12 with output type ZUGT language EN.
    Please provide pointers!!

    Hi Biju,
    Thanks a lot for the information. But I a facing a problem, I have maintained the Plant/Storage/Condition type in OMJ3 with printer also maintained in it.
    But, I am not able to generate output when I am doing MIGO for the Purchase order.
    I have to go MB02, maintain output type 'WE03' and printer-PL56 in the message tab of material document and then only i can see the spool is generated in SP01.
    My output condition type is maintained in MN21, with following parameters; Trans/Event type: WE,  Print Version: 3, Print Item: 6 for output type WE03.
    Moreover, Do I need to maintain the new printer in the printer settings.
    Please help me in getting the material document print output at MIGO only.

  • How to cancel Material document for a Return PO

    Hi,
    I need to cancel a material documet for a retun PO. Can you please tell me how to do it?
    Regards,
    Prasanna.

    Hi,
    If the material document has been created through SD documents.
    For Ex: For an stock transfer between 2 plants using 2 step procedure, Goods Issue document is posted when you complete the shipment in VT02N. This material document can only be reversed using T-code VL09.
    Thanks and Regards,
    Maheshwari

Maybe you are looking for

  • PROCESSO DE RECEBIMENTO E VENDAS COM "GRADE"

    Bom tarde a todos, importamos Mármore em M² e recebemos essa mercadoria convertendo para unidade, mas na forma de "grade", por exemplo: 1000  M² de Marmore X Após a conferência equivale a: 1 chapa de 2 x 2 de mármore x 2 chapas de 3 x 2 de mármore x

  • Snow Leopard Mail color flags

    I am trying to to change the color of flags in Mail (Snow Leopard-OS10.6.8). I keep searching but regardless of my search specs (OS 10.6.8 Snow Leopard) I keep getting results for Lion or above. In one search result someone posted a screen shot showi

  • The type library information for 'TestStand IVI Step Types' was not found (Error code: -18351)

    Hi, I get the error in the message subject when I add an IVI-C step (no matter IVI Power Supply, IVI Dmm or others) and try to edit the step by pressing Ctrl+E (or double-click the step and click "Edit IVI Power Supply" for instance). I have installe

  • Need help installing just-purchased Photoshop Elements 11

    I just bought Photoshop Elements 11 at Costco. I want to install on a Mac with no CD drive. I went to download trial version from Adobe (so I could then upgrade to full, purchased version by entering serial number from the box), but the trial version

  • Removing Incorrect data from .xml files

    How do I remove info in the .xml files. When I 1st got my kit it read my fastest km as 4.55mins/km This is way too fast as my average is 6.00mins/km. Because the info is incorrect I am not getting congratulated by Paula or being able to improve slowl