Material extension to other plants

Hi,
Is there any easy way to extend material to other plants in
SAP R/3.
Regards,
Fawaz

Sorry I should have been more precise.
For Mass Extension of Material to a plant.....
Has anyone made a Z prog for doing the same....
Regards,
Fawaz

Similar Messages

  • Material extension in different plants

    Sir,
    My Client has 11 plants in india, he wants the same material in all 11 plants hence i suggested to go in mm01 and make an extension. but their view is that as there are 20 to 30 materials added ed every month. this procedure would be time consuming. hence i need way how to maintain same material in all 11 plants simultaneously.
    Regards.

    Hi,
    Use   LSMW or BDC to extend these materials and also using tcode: MM50
    Please refer the below links.
    mass extension
    Mass Extension of Materials to various Plants
    material extension
    Hope its helps you.
    Thanks

  • Material Issued from other Plants

    Hi All,
    I have 2 question here.
    I have created a STPO with delivery date say 12.09.2009 from my plant ABC to the Plant XYZ and 140 qty, For this XYZ plant has issued material on 15.09.2009 around 100 qty.,
    Now I am looking for the report ME2W to find out what are all the materials has supplied by other plant till 14.09.2009.
    but as per the report ME2W it is having I/P option as delivery date, so if i put delivery date between 01.09.2009 to 14.09.2009, it is showing  all the material which is issued on after 14.09.2009 also as i have put the delivery date and also it is checking as per delivery date.
    Question:
    1. How to get these reports ie., materials issued as per issued date or posting date not as per delivery date or not as per material code---- any transaction available for this.
    2. one more i come across here in STPO is that, if i create 100 qty of PO but it is allowing to issue more than the PO qty, say if i create Po with 100 Qty but other plant can issue more than 100 ie.,>100.
    Is thr any settings available to make such the system should not allow to issue more than the PO qty.
    Please help me out on this.
    Regards,
    Nagaraj S
    Edited by: Nagaraj  S on Oct 1, 2009 2:52 PM

    Dear Vidya Dewangan ,
    I have checked MB5B, it is not for the requirment what i want.
    See this report or MB51 would works with only 2 plants where within which these ST can occur.What in my scenario we have more than 2 plants, See i will clearly expalin the situatin -
    Thr are 3 plants-  Plant A,Plant B, Plant C.
    ST happens b/w A and B, A & C, B& C and Visa versa.
    Now I want to know what are all the ST happens between Plant A and Plant B, where Plant A has supplied some material  to plant B on some day(ie., 351 on posting day),say i dont know material i know only the dates.I cant use MB51, is thr any other report i can get.
    Pls help me out.
    Regards,
    Nagaraj S

  • Extend material master in other plants

    Hi there,
    I have 5 plants, one of them (e.g. Plant P001) is the main distributor for supplying all the materials for the rest. I´m using valuation at plant level.
    When I create a new material, I do it initially in the main plant and I have to extend it to the rest of the plants.
    My doubt is, there is a way to extend the material to other plants automatically including the sales views?
    I would like to minimize the possibilities of errors for manual entry, for example, enter the average cost of the material, which have to be the same for all plants.
    Thanks in advance,
    Mairo.

    Hi
    Please find below web links for information and procedure for Legacy system migration workbench
    link:[http://www.sap-img.com/sap-data-migration.htm]
    link:[http://www.sap-basis-abap.com/sapgeneral/step-by-step-legacy-system-migration-workbench-lsmw.htm]
    link:[http://www.sapdb.info/wp-content/uploads/2008/08/lsmw.pdf]
    Hope this help
    Regards
    Vikrant

  • Bom & Material  update into others plant automatically

    Hi Experts
    How it is possible to extend in a simple way into other plant .
    suppose i am creating one BOM in Plant A and want to extend into B,C,D,E simultaneously .
    and also easiest way to Extend Material with one plant to another plant with minimum effort by user.
    Rgds
    Pankaj Agarwal

    Hi,
    It is not possible to update automatically in standard SAP.
    Either you can go for custom program or use standard LSMW object for extending the master data in the other plants
    As usual, the same template what ever used for Material and BOM creation initially can be used.
    Thanks
    Ram Vepuri

  • Production at other plant

    I have created sales order for material X. In Material BOm of X there is material y with special procurement 80 ( production from other plant ) in line item of Bom.
    When I do MRP MD01 in first plant  then system does not create planned order for material y in other plant.
    But when i do MD50 then system creates planned order in other plant.
    Also when production is completed in other plant for material Y then it does not built stock in First plant but it creates sales order stock in other plant.

    Mayuresh,
    Sorry for the very late reply. I do not think you need to built stock of Y in the first plant. You can just do good issue of Y (in stock in 2nd plant) to the production order of X (the first plant). 
    If you need to have stock of Y in first plant then you will need to manually do a plant to plant transfer posting goods movement.
    Hope this helps. If you have additional questions please come back.
    Thanks,
    Ram

  • Good receipt for job work from other plant

    Dear Experts:
    1.Material Received from Other Plant for job work with challan and how to bring the Material into Stock at receiving plant.
    The same material stock number available in this plant also.
    Regards,
    Sridhar.N

    Hi,
    You could use serial number concept or bacth managment here to separate within the material code.
    Regards

  • Problem in material extension- material is blocked for one or more plant

    Hi,
    I am extending material from one plant to another plant but when i reach in accounting 1 deta system shows error material is blocked for one or more plant.
    Message no. M3562
    Diagnosis
    You wanted to make a change in the material master record which requires that the master record is blocked in all plants.
    A change of this kind includes, for example, the entry of a valuation type that allows single batch valuation, or changing of the batch management requirement if the batches have a cross-plant definition in your system.
    System Response
    The change required cannot be made until the material can be blocked by the current transaction in all plants
    How to solve it. Please guide me..

    Hi Nitesh,
    From the error desc it appears you are making a change that has an impact on more than one plant. probably while extending you are trying to change a value for the new plant where the extension is being made.
    make sure if this change is needed, its blocked in the plants for the field which has a diff value. you might have to modify the value of the field causing diff across the other plants also to make it uniform.
    regards
    sadhu kishore

  • Extension of MIC/code-group/selected set to other plants

    Hi Experts,
                     In any plant even if we do not extend the MICs, groups and selected sets, we can go ahead with result recording and usage decision if we can include the MIC/selected set, etc. from some other plant in the inspection plan. Is it therefore necessary to extend these parameters to all plants in the landscape ? Experts please suggest if there is any other reason for extension.
    Best regards
    Sm.

    No.  The plan is assigned automatically.  If the only assignment is to the central plan then the central plan will be picked automatically.
    When  you go into the material assignment you enter in the plant Id for the material being assigned.
    If material 1000023 is in plants 1000, 1001, 10002 and 1003 and you create the plan in plant 1000 you would then have 4 assignment in the plan assignment area of the plan.
    1  1000 1000023
    1  1001 1000023
    1  1002 1000023
    1  1003 1000023
    (1 is the group counter)
    The automatic search for the plan is not limited to plans in the plant of the inspectiion lot.
    FF

  • Restrict PO creation as material blck for quality reason in other plant

    Hi QM Experts,
    one material (say MAT-1) in maintained in  two plants (Say- X & Y).
    qm in procurement active in material for both the plants.
    created two Q-info records with material MAT-1, vendor ( Say- V-1). one info record for plant X & other for plant Y.
    while creating PO for material -( MAT-1)  in plant X, system giving error- material blocked for quality reason.
    even though in Q-info record for plant X, material is not blocked . it is blocked in Q-info record of plant Y.
    why system looking for plant Y, even when we are trying to create PO in plant X for same material and vendor.
    please guide on same,
    Thanks & Regards,
    Roshan
    Edited by: roshan s on Dec 16, 2011 6:29 AM

    hi,
    Please check ur Q-info of Mat-1 V1 and X properly and please also check ur material master in X, whethere some control key is defined in QM in Procurement or Not. If any control key is there than chcek the settings of that control key and as per ur requirement remove it .
    regards

  • How to restrict other plant material assigned to SA BOM explosion

    Dear Experts
    One of our client havea issue of assigning wrong material to the scheduling agreement BOM explosion.
    Actually there are two different plant code one for manufacturing plant and another one trading.Subcontractor activity will be carried out in trading plant , but users assigning the BOM components from manufacturing plant material.
    So they are sending material to vendor from manufacturing plant and receiving material to trading plant.But finance guy don't want do like that.
    How to restrict other material (material not part of SA plant)assignment to SA BOM explosion
    Thanks in advance
    Regards
    SS

    Thanks for your reply.
    In BOM creation CS01 , if plant is differ from header to line item system will give error message M3 351
    "Material &&&&&& not maintained in plant &&&&".
    Like that i want to make it in ME38 BOM explosion also.If plant is differ from scheduling agreement line item to BOM line item system should give error message.
    For the above scenario I need the solution
    SS

  • Sale wrt STO of raw material from a manufacturing plant to other plant

    Hi Gurus,
    My scenario is that, I have procured a raw material for PLANT A. At the time of procurement it  hits RG23A PART1 AND RG23A PART2 registers. Now I want to sell this raw material without any value addition to other PLANT B of the same company code.
    Here the excise requirement is that at the time of delivery it should hit RG23A PAR1 AND PART2 and should not hit RG1 register.
    i request you to pls guide me how to execute this process in SAP so that it satisfies excise requirements.
    Thanks and Regards
    ujwal

    Seems you need new mov type- ( in place of 641)
    is this requirement is only for Raw material STO??
    Generally , even when you do STO for Raw Material,as per excise it should hit RG1- Not sure,why you want it to be posted in RG23A reg.

  • BAPI - To extend material to other plants (z program).

    Dear Friends,
    Please help to know the relevant BAPI can be used for below requirement:
    Material created one plant (Plant1).
    Same has to be extended to other plants (Plant2 & Plant3). Including price and all other data as is needs to be extended. I need to create u2018zu2019 transaction. Please help to know the correct BAPI that I can use.
    Thanks in advance for your help.
    Best regards,
    Lainel.

    Dear Wolfgang Valtin,
    You are right.
    Tested, Working fine.
    Thank you verymuch for your help.
    Resolved my query. Given points- 10.
    Thanks & Regards,
    Lainel.

  • Material Extension

    Hi All,
    I want to know how to extend a material to different plants using BAPI_STANDARDMATERIAL_CREATE.
    i tried but i don't know how t o give the material to extend and to give the plants, it would be great if someone can help.
    Thanks
    Malinda Wellawa

    Try using BAPI_MATERIAL_MAINTAINDATA_RT for material extension (retail).
    Try using BAPI_MATERIAL_SAVEREPLICA for Mass Maintenance of Material Data.
    Thanks,
    Balaji

  • Different Material Types in different Plants

    Hi,
    I have 2 Plant under a Company Code. A material being produced in plant A has to be sent to Plant B for further processing. I would like to maintain single material master for both the plants, but different Material Types. Material has to be treated as Finished Goods in Plant A and Raw Material at Plant B. Could any one please let me know how I can MAP it in SAP.
    Regards,
    Nagaraja Achar.

    Hi,
    For the Same material Code you can not maintain two material types in two plants..
    But you can make a Z* mat type with all the relevant views of FG & ROH..
    For Plant 1 it will have all the views
    and for Plant 2 extend only the ROH relevant views...
    Thx
    Raju

Maybe you are looking for

  • TS1538 HELP! My Iphone 4 is still not syncing with my itunes!!

    I use my windows 8 laptop, and I don't know what else to do. Is there anyway I could fix it? I tried EVERYTHING in tech support. I've tried: Different cords Reseting settings Reinstalling itunes Restarting computer Checking AMD & etc. Apple support h

  • Error while running report..

    Hi, We use 9iAS on linux and while running one report , we get this error: REP-0177: Error while running in remote server REP-300: date format is too long for internal buffer (sign(decode( ==> trunc(imp.tnr_matu_date), When i run the same report on m

  • What is the best virus software for mac

    I currently do not have Virus Protection for my Mac, what is recommmended?

  • AppCrash when searching library in 12.1.1.4

    Win7 english x64 ultimate fully patched cpu: i7-4770K mem: 16GB DDR3 disks: various SSDs from 64-512GB, no mechanical drives non-Unicode programs set to English (US) I just reinstalled iTunes hoping it would help, but any time I search my library, I

  • Where to modify code to format data

    I am using BC4J and am pulling a date from the database. I want to just display the date in a custom format. Where do I do this at? This date will also be inputed by the user to insert into the database. I am using Data Tags, but would prefer to use