Material Lead Time

Hello Gurus,
In MRP2 of master data there is the planned delivery time to get the material from external. Do you think, there is in Sap another field for the shipping time. So the shipping time added to the planned delivery time will give me the total delivery time.
Thanks a lot.
JW

JW,
Planned delivery time is the total amount of time it takes from the time you place an order with a vendor, to the time it arrives at your receiving site.  I don't really see how adding some 'shipping' time here makes any sense.  Planned delivery time can be set in the Purchase Info record, by material/plant and vendor.  Or, if there is no purchase info record, then it can be set at the Material/plant level.
There is one additional field that is relevant for PO scheduling, and that is Goods receipt Processing Time, in the Material Master.  This is the amount of time it takes from when the material arrives at your receiving site, to the time the material is actually expected to be received into stock, and available for subsequent processing.  This duration is at the Material/plant  level, and is the same regardless of vendor.
Can you describe the business requirement for having a 'shipping time' field?
Best Regards,
DB49

Similar Messages

  • Lead Time for Purchasing Material & Manufacturing Material

    The query is related to the process of Material Requisition planning.
    I need to know from where exactly the system picks up the lead time for generating Purchase requistions?
    - For purchased material (lead time from placing order to actual recipt of material, time needed for QC checking till its release)
    - For own manufactured material (lead time at each work center in the recipe along with actual time required for a particular process)

    Hi
    for your information for  any material the data for the lead time comes from the material master
    http://help.sap.com/saphelp_46c/helpdata/en/fd/45b7ee9d6411d189b60000e829fbbd/frameset.htm
    if you click on the link you can get the entire process.
    as you can see SAP picks up the deatil from the MRP2 view of the material master.
    hope this  is helpful.
    regards
    Vignesh.

  • Purchase-How could I consider Transit time and lead time in imported mat.

    My doubt refers about master data configuration of imported material.
    My sittuation is :
    Material - Lead Time:  (depend on source)
                   Transit Time: (depend on source)
    My company is responsable to transport all bought material. Besides, I can buy of differents suppliers.
    Considering these rules, It s impossible to fix dates in material master, because material purchase is related with center and not with supplier. By the way, I need to discover other master data to configure it maybe : Inforecord, quotization... Whatever...
    I need to correct this to generate Purchase order with dispatched date of my source against required date of my company after execute MRP.
    I tried to study this scenario but until now I ve not got a solution.
    Probably, you have had it before and can help me.
    I hope your help!
    Thank you!
    Regards!

    Create POs with respect to either PIRs (if you don't need to print out) or Contract/item, both of these are Vendor/material specific so you can set lead times accordingly .  Probably best to use Source List and set requirement in material master too (Purchasing view).
    Regards,
    nick

  • Material report showing lead time & min order quantity?

    Hi,
    Is there a report which I can download which shows by material, the lead time and minimum order quantity?
    Thanks
    Keeley

    We don't have access to any query writing so if it's not possible to get both fields on one table, can I run two reports?
    OR...
    is it possible to change the ME1M report to display/export horizontally in a table type format rather than wrapped?
    Edited by: Keeley B on Sep 23, 2009 7:58 AM

  • Need info about Safety lead time in material master

    Hi,
    Safety lead time in material master is used to bring requirements forward.
    we define this time in terms of days.
    I tried to use this field, but system is not bringing the requirements forward.
    System is planning material as other raw materials.
    The requirement dates for raw materials without safety lead time and with safety lead time are same.
    Can anybody explain, how it works and how we can alalyze the results with example.
    Is there other settings we need to do ?
    Regards,
    Mahesh

    Hi James,
    Thanks for reply.
    I have defined safety lead time, in the MRP 2 view. But still, sytem is not bringing the requirements forward.
    Can you please tell me, is there any other setting I need to do ?
    Regards,
    Mahesh

  • Lead Time for manufacturing and its corresponding Quantity in Material Mast

    Hi all ,
    Do we have any feilds in SAP Material Master
    which are useful for
    1) Lead Time for manufacturing
    2) Manfactured Lead Time Quantity
    if the mateials are produced inhouse.
    thanks
    ksr

    Dear,
    There are no such a fields in material master, But in MRP 3 view you will get theotal replenishment lead time field.
    Which use for the produced in-house if the replenishment lead time is included in the availability check:
    This is nothing but the  in-house production time and, if available, the goods receipt processing time.
    Also refer this link to calculate the in-house production time correctly,
    Total Manufacturing time for assembly
    Regards,
    R.Brahmankar

  • Re: report for lead time of material

    Dear Gurus,
    I just want to know is there report to see the lead time of material. Kindly suggest me which is the t-code available
    Regards,
    Rajashekar

    Hi,
    You can see the lead time in Report- MCE7 (T Code) for material analysis, here yo will get lead time delivery time of material as per Material group, Vendor,purchase Org. If you want to get material number ,after results displayed choose from menu settings > characteristic display > key & description (or just key) , then
    choose from menu settings > column width and extend the length to e.g. 59 (18 material number + space + 40 description)An alternative way is building query  taking into consideration Table MARC. Thanking you.

  • MM Report for Reorder and lead time

    Hi,
    Can anyone suggest me a report that can show information by materail such as min./max. quantity, re-order or safety stock, and replensihment lead time.
    Thanks
    Atif

    you can create the query using MARC or just go se16 adn enter the MARC table and pull the data.\
    Displayed Fields:   8 of   8  Fixed Columns:                2  List Width 0900                                                                               
    Material             Plant  Reorder Point     Safety stock      Min. lot size     Max. lot size     Total RL time Min SafetyStock                                                                               
    MATERIAL            Z001               0.000             0.000         5,000.000       350,000.000   0                       0.000

  • User exit or Badi for changing the lead time in ATP check in VA01/VA02

    Hi All,
    Currently, SAP standard functionality takes up the lead times maintained in material master to create the schedule lines in the sales order in VA01. I am looking for some user exiit/Badi/Enhancement point where I can change the lead time. This is somewhat urgent so any help in this regard is appreciated.
    Regards,
    Sandeep
    Edited by: Sandeep Gaitonde on Sep 1, 2011 9:16 PM

    Hi Sandeep,
    These are the user exits will trigger in va01 .
    SDTRM001 Reschedule schedule lines without a new ATP check
    V45A0001 Determine alternative materials for product selection
    V45A0002 Predefine sold-to party in sales document
    V45A0003 Collector for customer function modulpool MV45A
    V45A0004 Copy packing proposal
    V45E0001 Update the purchase order from the sales order
    V45E0002 Data transfer in procurement elements (PRreq., assembly)
    V45L0001 SD component supplier processing (customer enhancements)
    V45P0001 SD customer function for cross-company code sales
    V45S0001 Update sales document from configuration
    V45S0003 MRP-relevance for incomplete configuration
    V45S0004 Effectivity type in sales order
    V45W0001 SD Service Management: Forward Contract Data to Item
    V46H0001 SD Customer functions for resource-related billing
    V60F0001 SD Billing plan (customer enhancement) diff. to billing plan
    Please check this and post .
    Regards,
    Madhu.

  • Lead time calculation

    Dear Gurus,
                             I want to calculate lead time between purchase order and goods receipt.how to do that???
    Am having some doubts.
    Does the lead time links with
    Planned Delivery Time
    Goods Receipt Processing Time
    Purchasing Processing Time in material master. plz explain???

    Hi,
    If you create PR for a material, using MRP, then the planned delivery time would be picked up from the material master, please note that there is no source maintained yet in the PIR, so obviously that rules out planned delivery time of PIR and Vendor Master( even when u convert this P.R to P.O the planned delivery time will not change and will not be taken from the PIR)
    Now if you directly create a P.O then the planned delivery time of the PIR is picked up , please note this difference.
    I would recommend that you change the planned delivery time in the material, mnake it different from the planned delivery time of the PIR, and then run MRP, You will see that the planned delivery time in the PR would be based on the material planned delivery time.
    Even if you assign source and convert this P.O using ME59 the PDT will not change.
    Then you can try and create a P.O directly with the vendor, here you will notice that the PDT flows from the info record.
    Please let me know if this addresses your concern.
    Regarding your soure list issue, either you can remove the source list mandatory tick in MM or add the vendor whose PIR you are using into ME01, and it will definitely work.
    Regards
    Shailesh
    Edited by: Shailesh Rajan on Jun 30, 2011 7:51 PM

  • Replenishment lead time & Scheduling Agreements - Please help

    Hi,
    I have a few questions & issues in regards to Replenishment lead time & Scheduling Agreements.
    1.     Where are stock requirements & Replenishment lead times configured?
    2.     What is a stock/requirements list?
    3.     What is Replenishment lead time in MD02/MD04?
    4.     Why do negative supply values appear under replenishment lead time in MD02/MD04?
    5.     What are the differences between MD02 & MD04?
    6.     How do you get to the following screen, since I canu2019t get here from MD02 or MD04 (missing buttons and Replenishment lead time information):
    http://i34.tinypic.com/9hl9hz.jpg
    Please help. This is very important.
    Thanks,
    Laura

    Hi Laura,
    The RLT can be set in the Masters Materials.MMR and Also in the Documnet Type Configuration.
    But as per SAP standard Procedure the Prority will be the document type.
    That means the RLT given in the Order document will overseed the RLT given in the MMR.
    Go to material master and select MRP3 view. There see what is maintained for "Strategy group". Now go to OVZG, select this Requirement Class and tick the field "Rq" against this.
    Now go to OVZH, select your Requirement Type and ensure that the above Requirement Class is assigned to your Requirement Type.
    Now create a sale order and check in MD04.
    Hope ethis helps u..
    Cheerzz..
    subbzz..

  • Lead Time recalculation/update

    Hi,
    The requirement in my project is the following:
    I have a lead time for one material of 10 days. After two months I have recieved 2 PO's, one with 14 days and other with 12 days. The new lead time should be 13 days.
    There is any way to calculate this and update the material master?
    Thanks in advance,
    Guiza

    Guilherme,
    WPDTC is the TCode that you run to calculate the planned delivery time.  This transaction is available as of version 4.7.  Currently we are upgrading from 4.7 to ECC 6.0 and it still exists in 6.0.  There is a good description at this link in the SAP Help Library.
    [http://help.sap.com/saphelp_47x200/helpdata/EN/f3/41b53c4d36265ce10000000a114084/frameset.htm|http://help.sap.com/saphelp_47x200/helpdata/EN/f3/41b53c4d36265ce10000000a114084/frameset.htm]
    This program gives you a report of what the planned delivery times are in the info record, material master, vendor, and the calculated PDT based on documents and actual deliveries in the system.  You select the items you wish to change and click the Change Planned Delivery Time button.  You get a pop-up to verify you want to change the values.  Basically, this is a mass change tool for planned delivery time similar to physical inventory transaction MIBC - Set Cycle-Counting Indicator that calculates and changes the material master indicators.
    Hope this helps,
    Paul

  • Production lead time report

    Hi,
    Given below mateiral with their lead time activity
    Material A- Finish (in house prodn)
    100 qty = 10 days
    Low level in BOM
    X- Halb (2 days)
    Y-Roh (10 days)
    Z-Traded goods (2 days)
    Is there any report available which provide the information, if i want to plan mateiral (finish) with what period it is possible to fulfill the customer requirement. Considering all procurement and production activity.
    Regards,
    Rajesh

    Hi Rajesh,
    There is no standard report available for the leading time of FG with BOM multi levels. You can go for a Z report.
    thanks and regards
    Murugesan

  • Lead time Report

    Hi,
    Would like to have a report on Lead time between PO Date & GR date.
    Ideally the report should show the PO Number, Date,Material, Mat. Doc Number & GR Date.
    Though ME80FN shows by clicking the PO history, But our user would like to have in a single line item.
    Is there any other Standard Report  to get the above data?
    Regards,
    Vengat

    Hi,
    There is a standard report that shows the actual average LT compared to the master data definitions. You can also see the details, and even update master data automatically if you want; WPDTC.
    Regards,
    Mario

  • PO Lead Time Standard report

    Hi Experts,
    Do we have Standard report to monitor PO Lead time. (Time taken by Vendor to fulfill the Order)
    Regards,
    Jackie

    Hi,
    You can use the report MC$K to check the delivery date vairance for the vendor with respect to material delivery.
    The delivery date variance is calculated with respect to PO Delivery Date and GR Posting Date.
    To execute the report, the delivery date variance  needs to be defined in transaction code MCFC at Purchasing Org. level.
    Regards,
    Bijoy Kumar

Maybe you are looking for

  • How do I add an electronic signature to a pages document

    how do I add an electronic signature to a pages document?

  • Can't ftp to site in Dreamweaver

    I have just installed Dreamweaver CS4 on a new desktop running Vista. I have set up access to my websites but keep getting an error that access is refused, may lack permissions etc. However, on the same machine I can access my sites using ftp in Inte

  • Script to take screen shots every 30 sec in hidden mode

    set dFolder to "~/Desktop/screencapture/" do shell script ("mkdir -p " & dFolder) repeat 900 times set tTime to do shell script "date +%H%M%S" do shell script ("screencapture " & dFolder & tTime & ".png") -- Capture screen. delay 30 -- Wait for 30 se

  • Select list with Redirect

    Version HTMLDB 2.0.0.00.49 Can you help? New to HTML DB and struggling with Select Lists. I have 3 select lists based on LOVs (SQL Queries). On selecting a value from Select List 1, this filters Select List 2 (Using Select List with Redirect) and on

  • How to increase the width of the Crystal Report

    Hello All How to increase the width of the Crystal report template in the CR designer in .NET 2005 editor ? I need to design a report which has to accomodate more number of columns.So achieve that i need to redesign the report having more width. Crys