Material Ledger Valuation

Is it possible to have 2 or more standard prices for a single material e.g. one price for imported material and one for in-house produced material. If it is possible then what will be the effect of this when material ledger is activated?

Hi,
Yes we can use more than one standard price for a single material by using split valuation.
You can use split valuation with Material Ledger:
Assume that two valuation types are required.
Valuation Type-1 for imported material
Valuation Type-2 for in-house produced material
Material master price control =S for Valuation Type-1,
Material master price control =S for Valuation Type-2,
Material master price control =V without valuation type (header level).
Price determination indicator = 3 for header as well as each valuation type.
Good receipts and Goods Issue will happen for each valuation type.
At month end after Actual Costing Run. the material valuation will happen:
Header level (weighted MAV of both the valuation types)
For Val type-1(weighted MAV of this valuation type only)
For Val type-2(weighted MAV of this valuation type only)
Price variances of valuation type will be carry forward to next level, if this product is consumed at next level.
You can find the Actual costs at each valuation type level in MM03 or CKM3 or CKM3N.
Hope the above example provides some inputs to you.
Please check and confirm.
Thanks and Regards
Binoj M D

Similar Messages

  • Material ledger is not active in valuation area C002

    Dear All,
    I have a Scheduling Agreement for a material 'A' with Vendor 'V' with diff prices with validity dates, I did the GR & when i am posting the invoice thro' miro, system is throwing error as above Material ledger is not active in valuation area C002 Why should I activate the material ledger here ? Pls suggest how can i solve this ?
    regds,
    Kallu

    Hi
    For a Particular material, Material Ledger is active or not? Can be checked in Accountig view of Material Master.
    Why we need Material Ledger?
    A fundamental task of the material ledger is carrying inventories in multiple currencies and/or
    valuations.
    Material inventory values are normally carried by the SAP system in one currency. The material
    ledger component enables the R/3 System to carry inventory values in two additional
    currencies/valuations. Therefore, all goods movements in the material ledger are performed in up
    to 3 currencies or valuations. Currency amounts are translated into foreign currencies at
    historical exchange rates directly at the time of posting. Businesses such as those in highinflation
    countries can therefore carry their inventories in a more stable currency (such as US
    dollars). This reveals inflationary effects on inventory values.
    If you use transfer prices to represent value flows in your company in different
    valuation views, you must use the material ledger. This allows you to carry your
    inventories in three different valuations (legal valuation, valuation for reporting
    purposes, and profit center valuation).
    Before activating the material ledger, make sure you know which currencies and valuations
    you want to use, because you cannot go back and change the setting.
    Activating the material ledger is a prerequisite for using multiple valuations.
    Thanks
    Raman

  • Material ledger is not active in valuation area S001

    Dear All,
    I have created a Scheduling Agreement & did the GR. When I am doing invoice posting system is throwing error as Material ledger is not active in valuation area S001
    What might be wrong here ? For same material if I create PO then everything is working fine. Problem is only with SA.
    regds,
    CB

    Hi,
    Please check your Material Ledger Activation  setting for the Valuation AreaC002 in T-code OMX1. The Check box for the ML activation against the Valuation Area-S001 may be ticked.  After activation/ticking this box, T-code CKMSTART was not executed to complete the ML activation.  If you want the activation of Material Ledger, you have to run T-code CKMSTART to complete this ML activation or Otherwise uncheck this box.  I hope this step will resolve your issue.
    Regards
    appalas

  • Valuation area not yet productive with material ledger

    While doing goods receipt at MB1C,i got the below error:
    The description of the error is given below
    Valuation area XXX2 not yet productive with material ledger
    Message no. C+020
    Diagnosis
    The material ledger has been activated for the valuation area but material data has not yet been converted in this valuation area.
    Procedure for System Administration
    If you want to work with the material ledger, choose Accounting -> Controlling -> Actual Costing/Material Ledger -> Utilities -> Production Startup.
    There you can convert the data for the material ledger by following the instructions in the online documentation.
    Note
    Setting the material ledger to productive cannot be undone.
    See also:
    Actual Costing/Material Ledger in the SAP Library.
    The implementation guide for Actual Costing/Material Ledger.
    Can you kindly suggest me how to fix this error.
    Regards
    Sabera

    Hi Sabera,
    The Valuation Area is not activated for your material ledger. Go to SAP Access>>Accounting>>Controlling>>product cost controlling>>Actual Costing>>environment>>Production Start up>>Set Valuation area as productive.
    If you already activated Valution area in to Productive Statge.
    Then go to T.Code OMX1 and for your valuation area XXX2 tick the ML activation box.
    the error wont come
    regards
    srikanth

  • Material Ledger Functionality with Non Valuated Sales Order Stock

    We are in the process of setting up Make To Order (MTO) with Non Valuated Sales Order Stock. We currently use the Material Ledger in our other businesses that use Process Orders.
    Does the Material Ledger functionality support MTO with Non Valuated Sales Order Stock? I have been testing this and have not yet figured out how to get ML postings. We are using production orders that settle to sales orders. We do not bring this into inventory, the costs reside on the sales order.
    If this functionality does exist, I would assume I need to configure the Material Update Structure but I cannot find any documentation on this.
    Any help would be appreciated.
    Regards,
    Greg

    Hi Greg,
    no, material ledger will not be able to calculate and allocate actual costs for the sales order in the scenario you describe. It would of course, if you used the valuated sales order stock.
    Generally SAP sees in the valuated sales order stocks (avaliable since 3,1 or something) a great improvement and no real reason to use still the non-valuated scenario.
    best regards,
                          Udo

  • Material Ledger Conversion in a Parallel Valuation Scenario

    Hi All,
    I'm working in a scenario where the Material Ledger is already active (without multiple currencies - in other words, with the local currency).
    We would like to activate parallel valuation introducing a new currency type (group currency).
    We have already read SAP Note 120380 - "Subsequent activation of multiple valuation approaches" where the preservation of ML historical data would involve a SAP intervention.
    It is not clear which kind of activities SAP should do in order to preserve ML historical data, i.e. which kind of data should be involved in a potential ML conversion data process.
    Any help will be GREATLY appreciated.
    Regards, ALDO26X1

    Hi Udo,
    first of all thanks very much for your answer.
    As described in the note 120380 we are in the following scenario:
    The ML is already active (without multiple currencies - in other words, with the local currency)
    B) You now require historical data: In this scenario, you must set a new currency key in the ML tables. The fields are filled as start
    values with the posted transaction data in local currency (depending on the currency, either transferred or translated). This procedure is
    very complicated and can be carried out on a project basis only. Contact SAP if you want to do this.
    Unfortunately it is not clear which kind of impacts this procedure would have on the actual data and which are the new values introduced (only stock values in the new group currency for MM periods?).
    Thanks for you cooperation.
    Kind regards, ALDO26X1

  • 3 valuations in Material ledger

    Hi,
    My client's requirement is as follows:
    1) Legal valuation has to be in Local currency but on Actual Costing
    2) Profit Center Valuation in Local currency but on standard costing - same as Group valuation
    3) Group Valuation in Group currency in standard costing - Group valuation
    Is this possible when, Actual costing Material ledger implemented?
    I imagin, Legal valuation field in Material Master will be updated by periodic unit price when we run CKMLCP.  Then Profit center valuation field in the Material Master will be updated when we run CK40N in standard costing PC valuation costing run.  Then again we will run ck40n in standard costing for Group valuation to update Group valuation in Material Master.
    If my client opts to run ck40n for legal valuation, then he should also be able to mark and release standard cost new price, in Legal valuation field of material master and actual costing will not release standard price for new period.
    The requirement is typically complicated, as my client wants to maintain his Global template, though one country comes under actual costing requirement.
    I would like to dig out answers from real time experience please.
    Cheers,
    Ashok

    I can give you some information but not everything.  I have gone through the deployment of material ledger using 3 valuations, but not the ones you are using.  We used Local, Group and Group at Group.  All 3 are at actual costing.  What this means is that the local currency is the currency in the country where the plant exists.  The group valuation is a straight conversion to US dollars from the local currency based on the currency conversion tables M and P rates.  Note that both of these first two currencies can include intercompany profit if reflected on the transferring sales order between companies.  The Group at Group is the US dollar conversion without the intercompany profit.  We find this works for our business.
    The other thing about material ledger is that you need to have a standard cost estimate so that material ledger can keep track of the cos component structure.  The way it works is as follows:
    Say the standard estimate shows labor=$100, materials=$200 and overhead=$300 for a total cost of $600.  All transactions in the month using this material use the $600 standard.  Now, when material ledger is run at month end, the PUP (periodc unit price) is calculated and let us assume the PUP values are labor=$150, materials=$250, overhead=$350 for a total PUP of $750.  Material ledger already has tables with the details of the standard components against every transaction.  Now it will apply the remaining adjustments totalling $150 to the proper cost components for COPA purposes.  This is pushed to COPA using transaction KE27.  Think of it like this...Actual cost is equal to standard ($600) plus/minus variances ($150). 
    Therefore, you always should have a standard cost estimate when using material ledger.  At least that is my usage and understanding.  I hope I provided useful information for you in some way.
    David

  • Alternative valuation run methodolgy for material ledger

    Hi Experts
    Does someone can explain me how to customize alternative valuation run in SAP and how to use it.
    Do I have to run it from CKMLCPAVR or from CKMLCP.
    Can I run for same plant and same period the AVR in CKMLCP ?
    On the screen of CKMLCPAVR I don't have nothing in Creat Cost estimate ??
    THanks and regards
    Djamel

    Hi Djamel ,
    1. Purpose of Material Ledger Run (CKMLCP) is to calculate actual cost of the product .. and you can update material master with actual cost ( optional step).SAP uses weighted average methord when calculating actual cost.
    2. Purpose of Alternate Valuation Run (CKMLCPAVR) is to have a actual cost for analysis purpose . You can use weighted average methord or use can use FIFO , LIFO valuation methord also  . Ifd you want to use LIFO/FIFO methord .. you have to configure LIFO/FIFO customization and use the standard BADI give in the SPRO menu .
    3. CKMLCP and CKMLCPAVR have no depencies and you can run that for same plant .. or you can run anyone of them . Both the purposes are different .
    4. On the screen of CKMLCPAVR I don't have nothing in Creat Cost estimate ?? Implement SAP Note 659447 - No process steps in AVR cockpit ... it will solve your issues .
    5. For CKMLCP.. OBYC settings are as per transaction key "BSX" ... OSS Note : 908737 - Post Closing in Material Ledger
    6. CKMLCPAVR -- OBYC settings are as per transaction key "BSD " .. as if required manual entry has to be done to have actual costs . So , inventory account must have manual updation tick in GL master
    7. To sum -up... OBYC settings you have to do for CKMLCPAVR and any valuation approach you use other than default SAP weighted avergae methord ( LIFO or FIFO)
    Hope it clarifies ... Do revert bac for any further clarifications..
    Regards
    Sarada

  • Error Message :Valuation area 1000 not yet productive with material ledger

    Dear Floks,
    I need some clarification to get rid of this error message and move further.
    While saving the PGI I am facing the follwoing error message: "Valuation area 1000 not yet productive with material ledger----
    The material ledger has been activated for the valuation area but
    material data has not yet been converted in theis valuation area."
    Plese respond with the solutions ASAP.
    Thanks in advance.
    Regards
    ANGKS

    Hello Padmaja,
    You will to check the following before activation the Val.area
    1) OMX1: Check if ML is active against the plant IF NOT
    2) Use tcode CKMSTART - Enter Val area - EXECUTE.
    Regards,
    Manoj Reddy

  • Valuation area HDQF not yet productive with material ledger

    Dear all,
    When i PGI, there is an error: Valuation area HDQF not yet productive with material ledger.
    Pls help me to resolved.
    Thanks & Regards,

    Hi Quang,
    Please run CKMSTART tcode and give that plant no(HDQF). Execute the process and then click on Confirm button in the dialog box.
    Hope this helps.
    Rgds,
    Antima

  • FIFO Valuation with Material Ledger !

    Hi, 
    How do we accomplish FIFO Valuation using Material Ledger ?
    We have activated the Material Ledger, with Single - Level Determination; Standard Price S.  On execution of Single-Level Price Determination, we get the Periodic Unit Price -- which is the Weighted Average Price for the Receipts for the period involved.
    I came across SAP Forums, which claim that Material Ledger is the FIFO Valuation on real-time basis. However, this doesn't seem to be true. The Goods Issued are assigned the Periodic Unit Price (calculated above -- i.e the Weighted Average Price ).
    In addition, we have Configured the FIFO Balance Sheet Valuation Procedure, through the MM menu. The FIFO Value for the Material is giving weird results. Adding the total Inventory for all the Receipts till date and over-riding the period selection for Single Receipts.  For monthly receipts, the system just gives the Weighted Average Price again.
    The Business is expecting the FIFO valution for the Inventory Balance on Monthly Basis. ( We are using Material Ledger, so that we can roll-up this FIFO Valuation  of the Raw Material ito Gross up into the Finished Product
    -- Thanks

    Hi Kenny ,
    BASIC STEPS THAT CAN BE FOLLOWED FOR  ENDING INVENTORY VALUATION :
    Ending Inventory is valued  as per FIFO calculated through following steps:
         Run the price calculation (Txn: KSII) u2013 check that all      auxiliary Cost centers are zero
         Run Txn:MRF3 (summarization of documents for the      FIFO calculation.)
         Run MRF1 (calculation of FIFO)
         Check if the FIFO calc. is correct via MR35
    After ML run the ending inventory value should be equal to the value in MR35 and so balance amount not yet loaded to ending inventory through FIFO valuation is posted to consumption
    Exception: If total receipts for a period is less than ending inventory quantity .In this case the EI is valued at weighted average
    Please check wether the steps have been properly followed and the execption doesnot exists..
    Also, hope your Price Determination is "3" and price control is "S" in Material Master..
    Regards
    Sarada

  • Material Ledger with Split Valuation Type 'X' with FIFO

    Hi,
       The requirement from the customer is to have Raw Material, Intermediary and Finished Products valued at Actuals and on a FIFO basis. According to me, this is possible only if we activate Material Ledger, have batch split valuation u2018Xu2019 as the valuation type and have a batch search strategy which does a FIFO. Are there any technical issues with this solution? Or is there a better solution? Is any organisation ever using this solution for a similar requirement? As an extension of this requirement, how does commodity trading companies running in SAP handle their inventory and COGS valuation?
    Thanks and Regards
    Shivram.

    Hi,
    Using Material Ledger with batch management and split valuation of each batch ("X") leads to most aaccurate FIFO valuation result, however, depending on how many material and batch the customer has, huge number of materials will be processed and it will affect the performance issues. You should check the number and expected period-end time frame scheduling at least.
    Financial responsible tell you to need this kind of solution (detailed FIFO calculation)?
    They usualy needs to get simple FIFO valuation, meaning they don't care each individual logistic material movement as FIFO, but only care of periodic FIFO. I know, it depends on Finacial responsibes or their auditors, so it's also not general.
    Please double-check the new FIFO valuation function for Material Ledger with using Periodic Closing and AVR. Some information is in SAP Note 1431829 and 1247053. Related transactions are there, CKLMBB_xxxx under Actual Costing/Material Ledger -> Balance Sheet Valuation Procedures. I couldn't find any official documents for Material Ledger + FIFO valuation (like Release Notes).
    Hope this will be an additional option to yours.
    Best regards, Takashi

  • 0COPC_C04 : Material Ledger Inactive for valuation area

    I ran RSA3 for 0CO_PC_ACT_02 and 0CO_PC_ACT_05 and I get 1000 records respectively. I ran the info package to load this data into BW to 0COPC_C04 . I am getting a message in the status tab " Job termination in the source system". When I look at the job log , it says " Material ledger not active for abcd Valuation area".
    SO I went to OMX1 and I beleive that a while back there was a change to do company code valuation , which got changes to plant valuation ,so this is what I see in the screen:
    Valuation area = 0001
    Company Code = abcd
    Price Det. = 3
    and there is this one records which shows :
    Valuation area = abcd
    Company code = abcd
    Price determination = 3
    and it is not check marked under ML Act . This is only in the dev box , it was fixed in QA and Prod. But never fixed in Dev.
    I am not sure , what to do , also I am not sure if this is what is causing the problem.
    Thanks

    Can some one guide me?
    Thanks

  • GR/IR account problem with material ledger

    Hi,
    I just found an issue as effect of material ledger implementation.
    after the material ledger is active, when we post a transaction in foreign currency (invoice receipt), the LC 2 amount of GR/IR account is somehow different from the document amount, and the difference is transferred into Material price difference account that we maintain in OBYC - PRD transaction.
    because of this, the LC2 amount of  GR/IR account can't be cleared.
    any suggestion, please?
    thanks,
    Nasikhin

    hi,
    It will affect your valuation for the document, which are still open..
    You shd run this only after closing all documents and completing whole MM cycle..
    Once this is run, you can't go back and make settlements...
    So, beware...
    Regards
    Priyanka.P

  • Cost of goods manufactured vs COGS+ Material ledger

    Hi Experts,
    My company is implenting Material Ledger. They want to see the actual cost of goods manufactured. We are able to develop the actual cost of goods sold in COPA. The required report is to show:
    1- Direct material used at standard + variances (price + usage) to give the actual.
    2- Direct labor (standard + variances = Actual)
    3- Manufacturing overhead ( standard + variances = Actual)
    Attached excel file is showing the requirement.
    Your guidance to develop this report by any means (Report painter, BI, other).
    Regards
    Ahmed Zain Hassan

    Hi Ahmed / Ajay.
    1. In order reports KKO0, you dont see the revaluation of ML, as you said Consumption and Activities are revaluated at  Material level, and as far as i know, theres no way to add  records that represent the revaluation.
    2. The easy way to have a Order Report revaluated at actual cost is with LIS(Logistic InfoSys), creating a Z infostructure (eg copy lis S027) that store consumption and activity QTY, and a user exit  that read the actual cost of consumed materials (depending if this is V, S2, S3) and activities and revaluate. In LIS, there are standard way to "re-post" or repopulate the infostructures. This LIS can be reported with the standard functions (ReportPainter, quers on SQ01), or create a Z tcode that show the info stored in the way you want. Problem: Not all know how to customize LIS, and also you need code in the exit.
    3.  In my country (Peru), there are lots of companies that develop a Z Kardex valuated at actual cost (because, is a legal requirement), and also create Zprograms that calculate the order at actual cost (indeed, i create this reports twice). Its a bit complex, but not impossible and depends on custo EG if you have multiple valuations, you need to write code in order to get the infor for this specific valuations.
    4. About COPA, you can post to copa the Actual Cost Component Split calculated by ML. In this CCS, you can identify the Labor, Direct Materials, and overheads.  You have 2 options, You can post the delta to the original field or have an aditional field that store the difference. This stuff is done in KE27, i see 1 example in the SCN (i guess i bookmarked). Its important to understand you dont have the detail of the delta per consumed material, just an agregated value.
    Here is the link
    http://wiki.scn.sap.com/wiki/display/ERPFI/KE27+Periodic+Valuation
    5. There is a new ML DrillDown report functionality. Indeed, i couldnt spend time analizing the solution (my test system is with EHP5 and dont plant to upload the OSS), but i guess this is the future. You can look for info with tcode KKML0 in the marketplace, also check this oss 1639462 - ERP accelerators: enhancements in ML drilldown reporting
    My questions:
    What you want?
    + Order Report, i mean Cost detaild per Order? The Actual CCS por order?
    + Material Report? I mean, the monthly average of a Fert, and its CCS ?
    + a PA Report, that show Sales (Incomes), and Costs per matiral , split by Direct, Labor and OverHead?
    Arturo.

Maybe you are looking for

  • How can I delete Mac files from my windows boot?

    My OS is corrupt and I'm trying to reinstall Maverik, but ran out of space. Is there a way to delete Mac files from my Windows BootCamp?

  • Can I install windows on a RAID hard drive?

    Hi, I recently purchased a used macPro. This mac pro had a raid set so 4 1TB hard drives were created to make one 4 GB partition. This made the raid utility pop up frequently saying there was something wrong so I just broke the RAID set and tried to

  • Active Directory Changes have causes users to loose access to Projects they are set as contributor too.

    Hello, We recently had an employee of our helpdesk delete (by accident) and recreate a number of Active Directory user profiles.  The profiles were created exactly like they were before, but now those users are not able to access the projects in TFS

  • Rolling contract and increased charges

    Hi, just started another 12 month contract (I only realised this when I logged on today).  And I also see there is a price rise set for 28th April.  Can I use this as an excuse to leave early? I'm on  Unlimited Evening & Weekend Plan at no extra cost

  • PAL NTSC Switching of Component Output

    Hi, I just purchased a ATV in the US an brought it back to Europe where I am hocking it up to an older TV using the component otput. The cabeling is correct and I am not using a composite entry nore cable. The problem however is that the picture only