Material Ledger

Hi Experts,
I have activated Material Ledger and Actual Costing. After that I tried to do the “Production Startup of Mat. Ledger” (Set Valuation Areas as Productive – CKMSTART) I am getting below error.
Cost component structure for period 007 / 2014 in plant XXXX not found
Message no. MLCCS003
Diagnosis
No cost component structure was found in valuation 2 for period 007 / 2014 in plant XXXX.
I checked the Cost component structure and observed that Cost Component Structure is active and assigned to Plant via Company Code.
I ran the transaction “Display of ML-Relevant Customizing settings – CKM9”. I noticed that it is mentioned that “Currency and Valuation profile” is not active. I have created the Currency and Valuation profile TP01 and have assigned the Currency type 30 and 10 to it.
Please suggest.
Thanks and Regards,
Sudhir Harale

Hi Experts,
I deselected the "Actual Cost Component Split Active" check box and observed that “Production Startup of Mat. Ledger (CKMSTART)” is getting executed without error.
But I don’t know the impact of deactivating the "Actual Cost Component Split Active".
Please give your valuable advice.
Thanks for help.
Regards,
Sudhir Harale

Similar Messages

  • Material ledger is not active in valuation area C002

    Dear All,
    I have a Scheduling Agreement for a material 'A' with Vendor 'V' with diff prices with validity dates, I did the GR & when i am posting the invoice thro' miro, system is throwing error as above Material ledger is not active in valuation area C002 Why should I activate the material ledger here ? Pls suggest how can i solve this ?
    regds,
    Kallu

    Hi
    For a Particular material, Material Ledger is active or not? Can be checked in Accountig view of Material Master.
    Why we need Material Ledger?
    A fundamental task of the material ledger is carrying inventories in multiple currencies and/or
    valuations.
    Material inventory values are normally carried by the SAP system in one currency. The material
    ledger component enables the R/3 System to carry inventory values in two additional
    currencies/valuations. Therefore, all goods movements in the material ledger are performed in up
    to 3 currencies or valuations. Currency amounts are translated into foreign currencies at
    historical exchange rates directly at the time of posting. Businesses such as those in highinflation
    countries can therefore carry their inventories in a more stable currency (such as US
    dollars). This reveals inflationary effects on inventory values.
    If you use transfer prices to represent value flows in your company in different
    valuation views, you must use the material ledger. This allows you to carry your
    inventories in three different valuations (legal valuation, valuation for reporting
    purposes, and profit center valuation).
    Before activating the material ledger, make sure you know which currencies and valuations
    you want to use, because you cannot go back and change the setting.
    Activating the material ledger is a prerequisite for using multiple valuations.
    Thanks
    Raman

  • Material ledger is not active in valuation area S001

    Dear All,
    I have created a Scheduling Agreement & did the GR. When I am doing invoice posting system is throwing error as Material ledger is not active in valuation area S001
    What might be wrong here ? For same material if I create PO then everything is working fine. Problem is only with SA.
    regds,
    CB

    Hi,
    Please check your Material Ledger Activation  setting for the Valuation AreaC002 in T-code OMX1. The Check box for the ML activation against the Valuation Area-S001 may be ticked.  After activation/ticking this box, T-code CKMSTART was not executed to complete the ML activation.  If you want the activation of Material Ledger, you have to run T-code CKMSTART to complete this ML activation or Otherwise uncheck this box.  I hope this step will resolve your issue.
    Regards
    appalas

  • General  Ledger Special Ledger out of balance *URGENT* Material Ledger???

    We've activated Material Ledger in a company code in Jan'07.
    Accounting document created because of 102 Movement type FI document looks fine but in Special Ledger document dollars against Group currency are posted to Price Difference account? This is not happening for all 102movement type documents but i couldn't establish the pattern! Any help would be highly appreciated.
    Some background: 
    Company code and Controlling Area both got USD as main currency.
    This problem is sporadic and with 102 movement type only.
    Materials causing issue got Price control 'S' and Price determination '2"

    Hi Raghu,
    Probably I am mistaken; I was talking about SPL field movements and user exits used there. you can check that through transaction GCB2 where ledger is assigned to a company code and then u can drill down to activity and field movement assigned to the activity and can find if a user exit is used to post to a price difference account.
    Let me know if I am talking about relevant stuff here. If it is with SPL then I can help u more.
    Thanks,
    Kumar

  • GR/IR account problem with material ledger

    Hi,
    I just found an issue as effect of material ledger implementation.
    after the material ledger is active, when we post a transaction in foreign currency (invoice receipt), the LC 2 amount of GR/IR account is somehow different from the document amount, and the difference is transferred into Material price difference account that we maintain in OBYC - PRD transaction.
    because of this, the LC2 amount of  GR/IR account can't be cleared.
    any suggestion, please?
    thanks,
    Nasikhin

    hi,
    It will affect your valuation for the document, which are still open..
    You shd run this only after closing all documents and completing whole MM cycle..
    Once this is run, you can't go back and make settlements...
    So, beware...
    Regards
    Priyanka.P

  • Material Ledger Unit Of Measurement different from Material Master

    Dear Team,
    In my client, there is a difference between unit visible in CKM3N and MM03. The base unit of measurement in MM03 is MT. Other than that, there are some other units maintained (not M3) in additional data tab in material master. In CKM3N, the visible unit is M3. M3 is not present anywhere in MM03.
    Why would such unit flow in material ledger table? (CKMLPP has unit M3). Please advise.
    One more observation is that when there is some price change document in Material Ledger, the proper UoM (MT) is being captured. Only in the basic price determination structure visible unit for each head is M3. Please check the attached screen shot.
    Any help would be appreciated.
    Thanks.
    Jay Shah.

    Hi..
    Refer to Data Inconsistency of BUOM in Material Ledger Tables

  • Material Ledger - confirmation in different months

    Hi Gurus,
    I have a problem as follows:
    We are using material ledger for actual costing. When we post partial confirmation for a production order in period t, goods receipt and goods issue is posted for period t. However, in some cases, confirmation is posted although one material has not arrived at the factory yet and that material is not assembled on the finished product in period t, but it is assembled in period t+1. In this case, when we close material ledger, we receive an error as "there are nondistributed rows" in transaction CKM3. How can I solve this problem either in logistics side or financial side?
    Thanks and cheers,
    Fatih Zenginer

    Hi Faith,
    Are you familiar with transaction CKMVFM - Value Flow Monitor? You can analyze Not Distributed differences with this transaction. The price limiter is the key.
    Thanks,
    Greg

  • Valuation area not yet productive with material ledger

    While doing goods receipt at MB1C,i got the below error:
    The description of the error is given below
    Valuation area XXX2 not yet productive with material ledger
    Message no. C+020
    Diagnosis
    The material ledger has been activated for the valuation area but material data has not yet been converted in this valuation area.
    Procedure for System Administration
    If you want to work with the material ledger, choose Accounting -> Controlling -> Actual Costing/Material Ledger -> Utilities -> Production Startup.
    There you can convert the data for the material ledger by following the instructions in the online documentation.
    Note
    Setting the material ledger to productive cannot be undone.
    See also:
    Actual Costing/Material Ledger in the SAP Library.
    The implementation guide for Actual Costing/Material Ledger.
    Can you kindly suggest me how to fix this error.
    Regards
    Sabera

    Hi Sabera,
    The Valuation Area is not activated for your material ledger. Go to SAP Access>>Accounting>>Controlling>>product cost controlling>>Actual Costing>>environment>>Production Start up>>Set Valuation area as productive.
    If you already activated Valution area in to Productive Statge.
    Then go to T.Code OMX1 and for your valuation area XXX2 tick the ML activation box.
    the error wont come
    regards
    srikanth

  • Material ledger Tables

    Dear All,
    Issue: Not able to post Good receipt due to the error that material does not exit.
    Background:  we have activated user exit in material master for material type ZROH and assigned a internal number range to it in MMNR. this user exit will append the material group mentioned during master creation in the internal code generated by system.
    example PPMM is the material group and the internal code generated by system is 122222 so when we save the material in mm01 our material code is PPMM122222.
    we are trying to do GR by 501 and now the material ledger function module is truncating PPMM from the material code and its trying to post document with 1222222. which then goes into error that material does not exist.
    Analysis: I have checked in the MARA/MARC the material code is PPMM1222222.  but i guess in some table whcih is relevant for material ledger system has stored internal material number 1222222.
    So I am looking for tables or solution for this isssue

    Hi Expert,
    Please refer the SAP Standard Material Ledger Tables:
    The following tables contain data that can appear in the material ledger documents:
    Table - MLHD - Material Ledger Document: Header
    Table - MLIT- Material Ledger Document: Items
    Table - MLPP - Material Ledger Document: Posting Periods and Quantities
    Table - MLPPF - Material Ledger Document: Field Groups (Posting Periods and Quantities)
    Table - MLCR - Material Ledger Document: Currencies and Values
    Table - MLCRF - Material Ledger Document: Field Groups (Currencies and Values)
    Table - MLCRP - Material Ledger Document: Price Change (Currencies, Prices)
    Table - MLMST - Material Ledger Document: Costing Run Header Data
    Regards,
    GK
    SAP

  • Issue with Standard Cost estimates / Material Ledger

    Background:
    We have been using SAP for the last 5 years with Material Ledger active. Due to a number of reasons, we have not revised its standard cost estimates from 2001 till now. This means that at month end, we do not mark and release prices as recommended, nor do we mark prices and use dynamic release.
    What Happened:
    A new material called PFSW3 was made. This is a FERT. Before production
    could start my team released the standard cost estimate for this material. Production was now able to proceed without problem. Then, when the time came to sell the material (VF02), SAP again raised the error 'cost estimate not found'. On checking the standard price in MM03, we discovered that the future cost estimate was missing. So we created and marked a new cost estimate in the middle of February 2007.
    Problem:
    When the first sale took place, SAP released the marked cost estimate and posted a Price Change document to adjust for the new standard cost. I understand this was due to dynamic release. Now, when month end came, the system settled all the production orders of material PFSW3 but did not do multi level costing on it.
    Internal Investigation:
    My team has determined that the material PFSW3 has price determination 2 set by mistake. All our other production materials (HALB and FERT) are
    set to price determination 3 in the material master (accounting view).
    Questions:
    To sum this situation up,
    we need to know why the material PFSW3 was not marked closed in its period status (CKM3) at the time of closing through CKMLCP?
    What are the implications of not closing this material in Feb 2007 (current period status is showing 'Quantities and values entered')?
    How can we close this material this month?
    The future cost estimate is again missing for PFSW3 in March 2007 and I
    fear we are going to face more problems as this material is sold to customers.
    Please respond this is an urgent issue.

    Dear Shumyl,
    Please, have a look at Note 645083 - Material period status set to "Closing Entry Completed" that might help to closing your material in previous period.
    Hope it will be useful.
    Regards,
    Flaviano.

  • VPRS Cost in Material Ledger

    hi all,
    i have some problem here.
    we use 2 local currency. first local currency is IDR, and second local currency is USD.
    our client use material ledger, so in material master accounting 1, we maintain 2 value of inventory (in IDR and USD)
    let say we create material XXX (using standard price)  in 01 jan 2011 , with IDR value 1,000,000. the system will convert to USD with exchange rate in 01 jan 2011 (which is 10,000). so the USD value will be 1,000,000/10,000  = 100 USD.
    then in 10 january 2011, Sales order is created for material XXX with document currency USD .
    cond type VPRS get 1,000,000 IDR and covert to doc Curr (USD) with exchange rate in 10 jan 2011 (which is 9,000).
    so the VPRS value in USD will be 1,000,000/9,000 = 111,11 USD.
    by this case, the VPRS value in sales order is DIFFERENT with value in Material Master. it also become a problem when we want to see PROFIT MARGIN.
    can  cond type VPRS get the correct USD value according to Material Master?
    thanks.
    Best Regard,
    Hendry

    Please check the following notes which may help you
    a)  Note 547570 - FAQ: VPRS in pricing
    b)  Note 640692 - Currency conversion VPRS
    c)  Note 1365939 - VPRS logic and Customizing settings in SD
    thanks
    G. Lakshmipathi

  • Cost of goods manufactured vs COGS+ Material ledger

    Hi Experts,
    My company is implenting Material Ledger. They want to see the actual cost of goods manufactured. We are able to develop the actual cost of goods sold in COPA. The required report is to show:
    1- Direct material used at standard + variances (price + usage) to give the actual.
    2- Direct labor (standard + variances = Actual)
    3- Manufacturing overhead ( standard + variances = Actual)
    Attached excel file is showing the requirement.
    Your guidance to develop this report by any means (Report painter, BI, other).
    Regards
    Ahmed Zain Hassan

    Hi Ahmed / Ajay.
    1. In order reports KKO0, you dont see the revaluation of ML, as you said Consumption and Activities are revaluated at  Material level, and as far as i know, theres no way to add  records that represent the revaluation.
    2. The easy way to have a Order Report revaluated at actual cost is with LIS(Logistic InfoSys), creating a Z infostructure (eg copy lis S027) that store consumption and activity QTY, and a user exit  that read the actual cost of consumed materials (depending if this is V, S2, S3) and activities and revaluate. In LIS, there are standard way to "re-post" or repopulate the infostructures. This LIS can be reported with the standard functions (ReportPainter, quers on SQ01), or create a Z tcode that show the info stored in the way you want. Problem: Not all know how to customize LIS, and also you need code in the exit.
    3.  In my country (Peru), there are lots of companies that develop a Z Kardex valuated at actual cost (because, is a legal requirement), and also create Zprograms that calculate the order at actual cost (indeed, i create this reports twice). Its a bit complex, but not impossible and depends on custo EG if you have multiple valuations, you need to write code in order to get the infor for this specific valuations.
    4. About COPA, you can post to copa the Actual Cost Component Split calculated by ML. In this CCS, you can identify the Labor, Direct Materials, and overheads.  You have 2 options, You can post the delta to the original field or have an aditional field that store the difference. This stuff is done in KE27, i see 1 example in the SCN (i guess i bookmarked). Its important to understand you dont have the detail of the delta per consumed material, just an agregated value.
    Here is the link
    http://wiki.scn.sap.com/wiki/display/ERPFI/KE27+Periodic+Valuation
    5. There is a new ML DrillDown report functionality. Indeed, i couldnt spend time analizing the solution (my test system is with EHP5 and dont plant to upload the OSS), but i guess this is the future. You can look for info with tcode KKML0 in the marketplace, also check this oss 1639462 - ERP accelerators: enhancements in ML drilldown reporting
    My questions:
    What you want?
    + Order Report, i mean Cost detaild per Order? The Actual CCS por order?
    + Material Report? I mean, the monthly average of a Fert, and its CCS ?
    + a PA Report, that show Sales (Incomes), and Costs per matiral , split by Direct, Labor and OverHead?
    Arturo.

  • Automatic creation of  a Material Ledger document

    Hi,
    I need to automatically create a Material Ledger document with reference to a material and split valuation code, there are BAPI or Function that may I use?
    Thanks
    Gianmario Belotti

    Hi,
    First of all you should maintain transaction OMS2 to allow quantity & value update for the material type & valuation area
    otherwise it is not relevant for material ledger.
    Regarding how you have to activate the split valuation for a material, please keep in mind the following:
    if no valuation category has been assigned to a material (MBEW-BWTTY is blank), and you wish to assign multiple valuation
    categories (split valuation) to this material, then the material must not have linked documents and the stock must be zero for both
    the current and previous periods.
    If you make an attempt to assign a valuation category for this material, error message M3194 will be raised.
    Please check the attached note 30656 concerning limitations associated with changing the valuation category.
    Please also check note 155874, which outlines what must be performed in order to change the valuation category.
    regards
    Waman

  • Material Ledger activation at Company Code Level

    Hi All,
    I have a requirement where Material Ledger need to be activated at Company level and not at single Plant Level. We are about to implement ML and would like to have periodic unit price calculated at company code level  (e.g. 1 material, 4 plants, 1 company = 1 periodic unit price).
    I went through the customization , it only refers to Plant level (Valuation area level)
    Could anybody throw light on this.
    Regards
    Barbara

    Hi,
    What is the valuation level?
    If the valuation is at plant level you can maintain different views at different plants of these company codes.
    If only name is different i think you would do better with the same material code, and if you still want to differentiate please create two different materials
    Regards,
    Prithviraj
    Edited by: Prithviraj Talekar on Feb 11, 2009 5:25 AM

  • Material Ledger,Revaluation Production Cost Center ,Standard Cost

    Hi, I have a problem with  revaluation of production cost centers.
    Firstly,  production cost center expenses are settled via activity types onto the production order at the end of the period. However,  CKMLCP revaluate cost centers after the settlement because of using standard price. So cost centers at the end of the period have some amount.
    As a result we can not find  actual price for production orders.
    If I use standard cost in order to consume on cost centers, material ledger revaluates again this cost centers. I dont want this condition. Because this cost center is settled to other cost object before closing.  
    Thanks.
    Message was edited by:
            Ergul Taslacioglu

    Hi
    Go to the following path in SPRO:
    Controlling -> Product Cost Controlling -> Actual Costing/Material Ledger -> Actual Costing -> Activate Actual  Costing. Double-click on "Actiavte Actual Costing" and change the indicator from "2" to "1".

  • Parallel currency in company code require material ledger activation

    Hello,
    I have a requirement where the company is using parallel currency in NEWGL concept with two different currencies INR and USD.
    I want to have a clarification whether I Need to activate Material ledger with parallel currency.
    1. Company is using parallel currency with only one legal valuation view.
    2. There is no requirement for product costing in the company.
    Can the balance in general ledger can be seen in both currency for inventory balances.
    Awaiting for your inputs
    Thanks

    If you don't need parallel currency at present, there's no need to configure it. Why should that be a problem, as long as your Business needs are not relevant to using a parallel currency?
    I suspect your actual query is details regarding the future problems that you might face when, faced by changed Business scenarios, you are forced to introduce parallel currency at a future date
    If my suspicion is correct, I suggest you look at SAP Note 39919. It's an old note - but one that I've found contains quite relevant tips and tricks about introducing parallel currency in a productive environment.
    Remember to assign points if found useful.
    Regards,
    Gulshan

Maybe you are looking for

  • Problem with anchored objects in file from CS4

    I opened, in CS5, a file which was done in CS4 and discovered all my anchored objects were gone! Analising the document, I understood they were there, but in a kind of mask ("Illustrator style") but in a text frame, which is odd, I think. I show here

  • How to export & import interface type data object to memory

    Hi experts, My greetings to all. we have came across a situation where we need to pass interface type data object to memory and import same from memory. DATA context TYPE REF TO if_timecontext. its not possible with regular export statement. is their

  • Poststep callback in process model

    I have a gui that relies on my running a poststep callback after each step. I want to place it in my process model for the parallel model, but it appears to be an engine callback. Is there a way to place poststep operations in the process model so I

  • HT201302 How save photos from iPad to a USB

    How can I save the photos from my IPad into USB

  • Undo_management=Manual

    Hi We are performing system refresh from PRD system to another TST system. Our PRD system currently running on oracle 9i ECC 5.0 and HP-UX platform..we have installed new ECC 5.0 system with oracle 9i as TST system. But our PRD system is having UNDO_