Material master -costing view 1 & 2

Hi
Some users could not able to view the costing 1 & 2 screens in material master
Thanks
Madhav

Hi,
That is either because the views have not been created for those materials (Use MM01 to create them for the existing materials) or the views have not been "switched on" in config for the material type being used.
Steve B

Similar Messages

  • Material master - accounting view 1

    Hi experts,
    I forgot to mention the standard price in accounting 1 view before saving a newly created material and now the field appears greyed out when I try to enter the value in MM02. Is it possible to fix this issue?
    Thank you very much for your time.

    Hi Sethuraman,
    If Price control for the material is maintained as V, then using MR21 price can be maintained. In your case price control is 'S' Standard price hence standard cost estimate to be run for updating the standard price in material master.
    Below is the procedure to do standard cost estimate and update the standard price in materials master:
    Prerequsites:
    BOM and Routing Master data.
    Rates in KP26 for Activity Types for the combination of cost center and activity types in the restective period.
    Procedure:
    Go to tcode CK11N - Ente the Material number, Plant, Costing Variant and Costing Version and press enter twice.
    Material wise and activity wise cost details will be displayed. If any error are there click on error log for rectifying the same.
    Click on SAVE for saving the cost estimate.
    Now you need to mark and release the cost estimate. Go to tcode CK24. Enter the period and year. Eg; Current month - 3 and 2014.
    Enter the company code, plant and material number. Un check  Test run.
    Click on Marking Allowance. Another screen will come -Select the company code another pop up will come -enter the costing variant and SAVE. Come back and click on the execute button on previous screen. Message will be displayed as " materals cost estimates were updated succesfully". Come back to initial screen.
    Click on Release on application tool bar. Then click on Execute button. System will display the message as 'Price Document updated". Come back.
    Now Go to Material Master - Acounting view standard price gets updated.
    Thanks & Regards,
    Ramagiri

  • Material Master Classification view

    Hi all,
    I have some doubt in Material Master Classification view.
    I want to know the Database Table name in which the field Class Number
    is  stored.
    I know that these tables are stored in the stucture ( RMCLF
    )  during creation of material master.
    Thanks in advance

    KLART is for Class Type & not for Class number ...
    also i need the table where i can see it ...
    Thanks in advance

  • Interactive ALV to report to get into Material Master Sales View

    Hi,
    I want to know way to get into Material master Sales view from an Interactive ALV report.
    In the output we have (custom report for Sales) the Sales Order item information. If the user double clicks on the material, it should directly goes to the Material Master Sales org 1 view. I can able to get to MM03 initial screen to display the list of views, but it would be better we can use the Plant, Sales Org and plant info from Sales Item to get into the material master Sales view.
    I checked that this functionality is there in the standard code. If you double click on the material in Purchase order display(ME23N) from the item level, it is directly getting into Material Master Purchasing view. Is there a way to achieve this.
    Your suggestions would be appreciated with points. Thanks!

    Hello,
    Yes, it's possible using the CALL TRANSACTION command with the addition AND SKIP FIRST SCREEN. The only thing that you need is to fill the fields from the first screen (SET PARAMETER command).
    DATA: carrid TYPE spfli-carrid,
          connid TYPE spfli-connid.
    SET PARAMETER ID: 'CAR' FIELD carrid,
                      'CON' FIELD connid.
    CALL TRANSACTION 'FLIGHT_TA' AND SKIP FIRST SCREEN.
    Regards.

  • Material Group field is Missing in Material Master - Purchasing view ?

    Hai Experts,
                      I want to configure to bring back Material Group field is Missing in Material Master - Purchasing view.  It is mandatory to Create & save a master. I cant save a master in sandbox. Need Help..

    I make all field as Optional & Create master successfully.. Thanks.. I even verfied in J1ID Master for assesable value &  Chapter ID Combination.. But in Cenvat Determination Field,  How i can set Default Indicator for Modvat "tick" & how can i set Excise Intimation Date also.
    I checked Material Master in mm03 [ Display].
    I clicked More & Pre Vals. option in  Foreign Trade Import.
    For More, It shows this error.
    Record 21 MORE  does not exist in table T133E
    Message no. M3748
    For Pre vals., It shows this error.
    Record 21 J1PR  does not exist in table T133E
    Message no. M3748
    Kindly guide me..
    Thanks & Regards
    Swetha

  • In material master costing 1 tab i want to maintain by default as origin

    Hello,
    i want to maintain in material master costing 1 tab  by default material orgin field has been check where  i do these settings to mainatin
    sudarshan

    hello Vijay
    this shoulb be applicable for all materials and when i creating the material master the field material orging should be selected as default where i can do these settings to get as default in Material master
    Thanks in advance for your reply
    sudarshan.

  • Batch Determination in SD - Need for Material Master Classification View

    Hi!
    Is it mandatory to have the classification view of the material maintained to enable expiry date based batch determination at delivery creation?
    I have configured BD for the delivery. When testing with a material for which the classification view is maintained, the batch is determined. When testing with a material for which the classification view is <b>not</b> maintained, the batch is not determined.
    Appreciate that this may seem like a strange question given what the testing shows but I am working with a colleague who is adamant that the classification view on the material master is not required.
    Any casting votes would be much appreciated and rewarded accordingly. Thanks, Duncan

    Classification of batches is mandatory if you want to use the batch determination feature.
    source: http://help.sap.com/saphelp_erp2005/helpdata/en/4d/2b8bd043ad11d189410000e829fbbd/frameset.htm

  • Material Master MRP View not be created till Basiv View is created

    Hello All,
    I need an information where i would like to know if an MRP view in a Material master can be restricted without the creation of the Basic View. Basically an MRP view is getting created even though the Basic View of material master is not there and it needs to be stopped.
    Thanks for your inputs.
    Ismail

    Dear Syed ,
    If you want to prevent end users update other material master views , you can apply the concept of SAP note 545380 - FAQ: Authorizations material master , with this you will not more problem with this kind of problem.
    Hope this can help you.
    Please let me know if my thinking about your question is correct.
    best regards,
    Carlos Moçatto

  • Usage of 'Average Inspection Duration' in the Material Master QM view?

    Hi,
    facing user requirements that you should be able to consider the QM stock in the ATP calculations in a special way, I want to have some feedback re the usage of this Material Master field. The user actually would like to have the parts available in the Sales Order scheduling line after a specific number of days, when having run the ATP job. The ATP Config is set to include QM stock in the run (and they do not want to change that), so presently the system promise deliveries in the SO, but it can not be done! Nice solution should have been the for instance set a delivery after the planned number of days for inspection as set in the MM QM view! The only usage I have seen so far of this field is that the planend insp date range is visibale alike in tr code QA32, but that is more admin info, not causing hands-on effects.
    So two questions:
    What hands-on effect does this MM QM field entry have in R/3?
    Any suggestion how to solve this user wish re ATP logic??
    Best regards / Roland

    Set all the parameters for certificate creation
    QM in procurement&#61664; define keys for certificate processing
    <b>Certificate type</b> will define the following controls
    Certificate for each PO/GR item
    Check on – certificate check required
    Set control w/o certificate FIELD  as E
    Enhanced cert processing – tick on.
    DO the GR with certicate received – no
    See the status of insp lot CTCM- certificate conf missing
    But you cannot do GR as it is disaloowed
    Proceed as below
    Goto QC51 and give PO and item no and click ok
    Select the appropriate line and click copy
    Here you change the certificate status that 5 i.e. certificate field and inspected, mention the certificate date and save
    Now see the status of insp lot – CROK- certificate receipt confirmed.
    Now do UD, it will go through.

  • Help required in Material master new view extension

    Hi,
    I have created one additional view for matrial master , i have added few custom fields in that i am able to save the records. but i am facing problem if i use already used fields in other views  in my view  and it is saying "Maintenance status of field  MARA-ZZKDES" does not correspond to status of screen L" . What i have to done to recity this error. here MARA-ZZKDES used in my view and also some other view.
    i read in stnd program documentation in that  it is mentioned like "If you copy fields from another standard subscreen to a new screen, you must also copy the relevant modules and any directly relevant fields together with their modules." even after copying the modules also it is throwing same abend message.
    Please Help me in this regard.
    Thanks,
    Satish

    Hi
    We need to create a text which is material and plant (or shipping point) specific. We could not find any standard solution for our requirement and we are now considering to extend the material master with a new tab. This tab would be similar as purchase order text but plant-specific.
    In our first tests, we could create a new tab and add new screens to it (copied form PO-text). At the moment, the texts are still taken over from PO-text and disregarding the plant. How should we proceed from here?

  • Add a field in Material Master-QM view

    The requirement is as...
    Create a field on the QM view of the material master MM01.  The field will be a check box.
    F1 help on this field should say “ Select ******** ”.
    Is there any BADI or any other way to achieve this?

    Hello Sumanth,
    For material master there is no concept like BADI. You will have to follow certain steps to do this.
    SPRO->Logistic General->material master->configuring material master->create program for customised screen.
    Execute this which will create a function group for you ZMGD1(say). Goto to SE80 select MGD1 function group, open screen section, select 3000 screen and right click, chose option of copy. In popup in the TO section enter ur SAPLZMGD1 screen 9001. this will copy the screen 3000 to 9001 in ZMGD1. Now goto screen painter and delete all the unwanted fields from the screen and create check box field. Save and activate. Now for processing in PBO u will have to have do as follows...
    PBO..
      MODULE BEZEICHNUNGEN_LESEN.
      module move_data_checkbox. <- created new
      MODULE SET_DATEN_SUB.
    has to be between BEZEICHNUNGEN_LESEN & SET_DATEN_SUB
    similarly for PAI same thing follows.
    Now go back to customising and goto Define structure of data screen for each screen seq. Select the seq which is most probably 01. click on data screen. Select the Quality screen and click on subscreen and here u overwrite an entry with 0001.
    01 20 4 SAPLZMGD1 9001.
    Save and try creating a material.

  • IDOC: Material master data views

    I create a material with an IDOC. The IDOC only contains basic data (i.e: segments E1MARAM and E1MAKTM).
    However when I look at the material in MM03, I see all the data views.
    Is this do to missing config in SPRO -> Material master configuration
    I just want views that have data from IDOC

    Hi,
    You can check the partner profile for that partner.As my understanding in your case reduced idoc is created  and that is used in the partner profile.May be that reduced idoc contains only the basic data segment only.
    Thanks and regards,
    shyla

  • Material master classification view mandatory

    Hi All,
    Can we make classification view required for any material creation using MM01. 
    We want the user to maintain a value in the classification view before the user is allowed to save and create a new material. 
    Any help would be greatly appreciated

    Hi SAP friends,
    I found a solution to this problem.
    Use the user exit EXIT_SAPLMGMU_001.  Call the function module MAIN_PARAMETER_GET to get the PSTAT (maintenance status) during material master creation.  If PSTAT does not have a 'C' value, then it means the classification view was not maintained.
    To check further if a class type and a class was maintained in the view itself, call the function module CLAP_DDB_ALLOCATION_FR_BUFFER.  Pass the value 'MARA' to the PTABLE parameter and the corresponding CLASSTYPE (could be '022', as is my case) and the I_CLASS ('FIFO_BATCH' in my case).  This function module will return the T_ALLOCATIONS table.  If the table is blank, it means no class type and class were maintained.
    Then you can just display the appropriate error message.
    Hope this helps.
    Aileen

  • Material Master workflow views

    I have a material master workflow which determines the views of material number. Configuration is there for several warehouses and getting warehouse view extension for all warehouses. My question is how do I avoid workflow for certain warehouses? Please note I don't want to remove/change configuration, it is needed in near future.
    Thank you,
    Nagarajan

    Hi,
    My question is how do I avoid workflow for certain warehouses?
    Please note I don't want to remove/change configuration, it is needed in near future.
    So I hope you are trying to start the workflow by making use of events, if this is true then there will be an entry maintained in the txn SWE2.I think the best way to handle is to make use of the Check Function module, This is beacuse I am not sure whether you would be able to get the warehouse information in a BOR Business object,
    So try to create a check function module and map this function module against the entry in the SWE2 txn. There you would be having the flexibility write your own validations, and later in future if you want to either include or exclude the validation you can do it easily...
    The main purpose of the check function module is to do this kind of validations and validate the event.... IF you feel that the workflow should not receive the event then raise a exception in the check function module this makes sure that the workflow wont trigger for that specific warehouses.
    Regards
    Pavan

  • Material Master - classification view - URGENT

    I am coding a proxy for Material master creation. I have done for all the views except for Classification view. Can any one tell me how to start coding for this view.
    Thanks,
    -Naveen.

    Try function module CLFM_OBJECT_CLASSIFICATION. You cannot do a BDC for it. You can also try standard programs  RCCLBI03, RCCLBI02 or RCCLBI03 but they may not be relevant in your case.

Maybe you are looking for

  • Satellite C855D-S5302 problem with win8

    I recently bought new Satellite C855D-S5302 after retiring my 12 year old Satellite after excellent service. BUT this new one comes with Windows 8 installed and that is just not cutting it for me. Often when moving the cursor to the left, the charms

  • MessageId missing in SOAP message header

    I am trying to execute a SAP (IDoc) -> XI -> SAP (ABAP Proxy). The SAP machines are 6.2, the XI machine is 6.4. I have generated and tested the ABAP proxy, works without issue. Per previous threads I also tested the message mapping in the repository,

  • Cannot preview or print other than single photo, want mult preview/print

    i download from nikon d90, see photos in organizer, can edit, share but cannot print multiple prints, 4x3.5 or 4x4x5 or preview them which i can do with single prints of any size.  this is new problem in last 3 weeks, was working great prior to this.

  • Why can't i get Skype app on iPhone 4s

    Hi My mum gave me her old iPhone 4s.  It's the first time I've had a smart phone so I am a bit new to it.  I tried to download Skype for iPhone, but it said my phone couldn't have it.  I had the same with BBC Radio iPlayer.  Some apps say I don't hav

  • AICS3, How to curve a block of text

    I'm still using AICS3, but I hope someone can help me anyway. I'm creating a file that will eventually go to a sign shop to have vinyl letters cut. These letters are being adhered to the surface of a cone (I work in a museum: I'm always doing stuff l