Material Master MATMAS IDOC and base unit of measurement

Hi
We are using SAP standard material master IDOC type MATMAS05 to trigger IDOC. Our material master is having base unit of measure as "G". We are not using ISO unit of measurement. But Material master IDOC, segment E1MARM is populating base unit of meaurement (MEINS) as "GRM".
Any idea why IDOC is picking ISO unit of measurement instead of material master base unit of measurement.
Any idea how to send base unit of measurememt as "G" instead of "GRM" in DOC segment.
Thanks
Nilesh

There are ISO codes for country keys, currency keys, units of measure and shipping instructions. According to SAP design guidelines, you should use ISO codes for an IDoc if they are available. When you set up the IDoc, the SAP codes have to be replaced by ISO codes.
http://help.sap.com/printdocu/core/Print46c/en/data/pdf/BCMIDALEPRO/BCMIDALEPRO.pdf

Similar Messages

  • How to maintain space between value and base unit of measure in sapscript

    Hi Guys,
    I am working on an upgradtion project, i have problem like while upgrading from 4.6b to 5.0. i need to main a space between value and base unit of measure. can anyone letme know how to maintain in the form. I mean in sapscript.
    Thanks,
    Yogesh

    There are a couple of ways to handle this,  if you need a bigger space between, you can use tabs in the paragraph format.  Or you can just write the space in between the fields like so.
    ZA  &MSEG-MENGE& &MSEG-MEINS&
    Regards,
    RIch Heilman

  • Views and Base unit of Measure is not coming in Chines Lang

    HI All
    Plz Help me.
    I log-In Chines Server, during MM01 the views are coming in English language instead of chines.
    and  during PO creation The Base unit of Measure is not Coming in Chines Language it is displaying Some number??
    I have maintained Source and taget lag in CUnI..but still Im getting this problem..
    How to solve this plz help..
    Thanks and regards
    Ramesh reddy

    Hi
    Please maintain the translation in the Following Configuration
    Logistics - General->Material Master->Configuring the Material Master->Define Structure of Data Screens for Each Screen Sequence
    Select the Specific Screen Sequence & Maintain the languages
    Similarly please maintain the Translations in the Transaction CUNI for the Base UOM in respective languages
    I hope currently in your system only Language EN is maintained
    Thanks
    Madhav

  • Transfer Material Master (MATMAS) Idoc into Retail  Article Master (ARTMAS)

    I need to transfer data from an SAP 4.7 ERP system that is set up for material masters to a different SAP 6.0 system that is set up as Retail.
    The question is which system should be doing the conversion to the ARTMAS
    Option 1: The outbound IDOC would be a MATMAS05 and it would be recieved and converted on the Retail side to an ARTMAS doc to create the articles. 
    If this is the case do you know how this needs to be set up on the retail side, for this conversion to occur.
    Option 2: Translate the material master and send out an ARTMAS IDOC from the ERP system  In this case I think that we will need a lot of custom code, and the SAP sending box will need to perform conversions that are known only on the retail side.  
    I am not really asking for the exact configuration set up
    What I am looking for is how if other companies are doing this which option is considered the standard/best practice

    Question was never answered we will need to determine how best to do this.

  • Base unit of measure

    Dear Expert
    my query is whenever i add new base unit of measure what are the effect it had on the system , i mean how base unit effect in the back end ...how system process base unit of measurement .
    Regards

    Dear usmfarhan 
    Actually Base unit of Measurement is the UoM which u want to maintiain ur inventory in the system.
    i.e whater u r buying it from vendor ...it might be in Ea or Box or Carton
    And you want to store in KG
    So you can have Additional unit of Measurement and its conversion that can be defined in AMterial master in additional unit of measurement
    Let us say Base UoM is KG and ur Ordering unit is TON
    So u have to define Conversion rule as 1 Ton = 1000 KG in material master.
    ,While changing Base unit of measurement you should make sure that stock should not be there.
    Secondly neither Purchase order for Raw material not Sales order for FG should exist in the system ,Neitehr routing should exist for FG
    Or else system will not allow u to change UoM
    Regds
    shailesh

  • Base Unit of Measure - Day & Hours

    Hi All,
    We are facing a unique problem. We created a material with Base Unit of Measure as "DAY". At the time of MIGO, the FI Document also got posted with Quanity 5.00 and Base Unit of Measure as "DAY".
    However, when we go to the Report Painter Reports in Controlling and see the Quantity; we see 120.00 Hours rather than 5.00 Days and we are unable to figure out because of which settings, system is behaving like this.
    We checked the configuration of Unit of Measure through T. Code CUNI and found everything OK.
    Kindly request you to throw some light on this.
    Thanks,
    Shalin

    i day = 24hrs, system has calculated the 5days and converted into 120hrs.
    please check the Order unit used in PO
    also check the stock keeping unit/issue unit in master
    also check the info record

  • Changing Base Unit Of Measure (Material Master)

    Hi
    1. How to check this? (Any successful changes in material master only took place when there is no open document from SD, PP, MM & FI for that material. )
    2. Base unit of measurement cannot be changed.  The reason being material movement history is there in table - MSEG mainly which otherwise create inconsistency in reporting.  -
    Is this line applicable for current period or previous period in current year or previous period previous year???
    3. There are no existing purchase requisitions, purchase orders, or scheduling agreements for the material. -
    is this means open / pending purchase orders  or the the PO's created in system with respect to material where the GR and IR is already done
    4. You can change the base unit of measure if there is no stock of the material during current and previous period----
    is this means the term " previous preiod" is previous period in the current finacial year   or its applicable for the previous preiod in previous financial year
    5. Post the stock in the previous period to the current period  - -
    how can we do this???
    Vijay

    See this OSS note : especially the last sentence:
    From OSS note 138767
    Within the material master record maintenance, you want to change the base unit of measure (base unit). During the change, the system performs extensive checks in order to avoid inconsistencies in the applications which use the material master.
    In particular, the following checks are performed:
    The base unit must not be defined as an alternative unit of measure for the material
    No International Article Number must be assigned to the base unit
    No proportion/product units must be defined for the material
    No configurable material must be assigned
    The material must not be used as a configurable material
    Stock must neither exist for the previous period nor for the current period
    No physical inventory must be active
    No reservations or dependent requirements must exist for which the deletion indicator is not set
    No planned orders must exist
    No purchase requisitions, purchase orders or scheduling agreements must exist for which the deletion indicator is not set
    No WM transfer requirements, no WM quants or no WM posting change notices must exist
    The material must not be a bill of material
    The material must not be contained in a bill of material
    The material must not be used as a production resource/tool
    The material must not be used in task lists
    No standard cost estimate must exist for the current or future period
    No production orders must exist
    No planned independent requirements must exist
    No run schedule headers must exist
    If the base unit has dimensions, no serial number profile must be assigned
    No sales and distribution documents must exist which have status Not processed or Partially processed.
    Solution
    If necessary, all reasons mentioned above must be eliminated by archiving the objects listed
    1) SAP checks this for you. A new button will appear in MM02 and after you click this button to check the error log, you will see which documents exist.
    2) I have not seen that an existing movement will restrict the change of a BUoM.
    3) No purchase requisitions, purchase orders or scheduling agreements must exist for which the deletion indicator is not set
           it is not caring about GR done or IR done. it telling you that the deletion indicator has to be active. As a deletion indicator can be reset easily, you probably have to archive the documents
    4) the previous period is the period before the current period.
       today we have February, hence the previous period is January.
    5) first make sure your current stock is higher than the stock of the previous period. if it is lower, then you have to create inventory in current period first e.g. with 202 movement with current date.
    Then you issue the previous period stock with 201 movement and previous period date (make sure periods are open in OB52 and MMRV allows posting to previous period).
    Finally you issue the left stock in the current period with 201 and current date.
    Now previous period and current period stock is zero. After the change of the base unit you have to get the stock back into the system
    Edited by: Jürgen L. on Feb 2, 2010 3:58 PM

  • Changing Base Unit Of Measure in Material Master

    Dear All,
                  We need to change the base unit of measure of certain materials who have been assigned inspection plan. We have deleted the material from Inspection Plan and later even the plan. But still the system not allowing to change the BASE UNIT OF MEASURE. The error thrown by the system is : Material is assigned to inspection Plan.
    Please guide in this regard as changing the material for us will be a very cumbersome act.
    Regards

    Hi Rohan,
    Please check 'display errors' in MM02 when you are trying to change the BUoM. It will say what prevents you from doing that.
    Please check:
    http://www.sap-img.com/materials/change-base-unit-of-measure.htm
    BR
    Csaba

  • Base unit of measure is cahnging after creation of material master

    Hi
    I have created a material with material type Raw material with BUM  "Ton" , after save the material, when iam checking the material with display mode, the BUM is changed into "EA",i dont know where the sustem picks the BUM as "EA", kindly suggest where i have to do the configuration settings.
    Thanks

    Hi,
    Have you created the New Material referencing from another material.
    Please check the following links for details. It should be able to answer your queries.
    [Re: can't able to change into alternate UOM]
    [Re: variable order unit]
    [Re: Base Unit of Measure]
    Hope it helps,
    Best regards
    Amit Bakshi
    Edited by: AMIT BAKSHI on Aug 4, 2011 12:44 PM

  • Follow up material with different base unit of measure

    Hi all,
    I have the BOM with material Mat1 as a component. The base unit of measure of Mat1 is KG.
    Is it possible to replace Mat1 with Mat 2 material in MRP once the Mat1 warehouse stock is depleted.
    The base unit of measure of Mat 2 is KGK.
    The required quantity of MAT1 should be recalculated from KG to KGK accordanly unit ratio.
    Please, expain, where does it maintain?
    Thanks,
    Peter

    Hello Peter,
    You can use follow-up setting (set Mat2 as follow-up of Mat1 in MRP 4 view of material master if this follow-up scenario is valid for all BOM) with discontinuation indicator '1', w/o effective-out date. In this case Mat1's stock will run out (no PldOrd, PR, etc) will be created, and from the date, when Mat1's stock runs out, MRP will calculate with Mat2.
    As I told you, according to my best knowledge, you cannot realize this with different base unit of measures. (you have to change the buom of one of the related material masters or create a new material master if you cannot cope with buom-change).
    Follow-up group scenario can also be used but I guess different buoms will be a problem in that case as well.
    Maybe there are better solution but I'm not aware of it...
    BR
    Csaba

  • Material master for Rods and Plates.

    Hi all!
       I need to know the answer for two critical questions in SAP-MM. I have asked this question some time before but have'nt got any replies. Here again i throw the same.
    1. How to maintain material master for Rods of various diameter and length. One thing is sure that ordering unit is 'Kgs' and Basic unit of measure is 'mm'. I have a typical example for this. Say 1kgs=30mm. I am purchasing 1000 kgs (i.e.30000mm). In GRN i can receive the material as a whole stock say 30000mm.
           But eventhough the total length of the stock is 30000mm where can i maintain the breakage.i.e. for example say,
       1000mm - 10 Nos. 2000mm - 5 Nos. 2500mm - 4 Nos.
    some of our friends are saying that we can map this via batch. But even batch is not possible. There is a reason. Say if length is the batch number and basic unit of measure is Nos, then how can you give the conversion between Nos & Kgs in additional data. For example how can i say 1000 kgs = 1 nos or 2 nos. This will be ridiculous then. I can give every dia available into different material codes. Thats not a problem. But how to receive rods in different length. I need the length & numbers combination. Also while issuing the materal after cutting numbers should reduce accordingly.
    2. How to maintain the material master for Plates of various thickness. I think we can use Kgs as ordering unit and Sq.mm as basic unit of measure. How can we map the material issues to production for these kind of materials. We are issuing the material after cutting in 2-D only of various sizes in same material. No 3 domentional cutting is done. I need  the lenght & width to be changed accordingly after issuing. 
    Thanks in advance,
    Regards,
    Raj.

    Hi all!
    I need to know the answer for two critical questions in SAP-MM. I have asked this question some time before but havenu2019t got any replies. Here again I throw the same.
    1. How to maintain material master for Rods of various diameter and length. One thing is sure that ordering unit is 'Kgs' and Basic unit of measure is 'mm'. I have a typical example for this. Say 1kgs=30mm. I am purchasing 1000 kgs (i.e.30000mm). In GRN i can receive the material as a whole stock say 30000mm.
    But even though the total length of the stock is 30000mm where can i maintain the breakage.i.e. for example say,
    1000mm - 10 Nos. 2000mm - 5 Nos. 2500mm - 4 Nos.
    Dear
    ANS:
    First create different material code specific to length so identity of material at store will be their.(with specification at purchasing text tab)
    Now as ur sure with ordering unit keep as kg. (this is at info record level)
    Base UOM will be as MM (material master)
    So now about issue part keep conversion factor as u require and make some standard according ur client .
    some of our friends are saying that we can map this via batch. But even batch is not possible. There is a reason. Say if length is the batch number and basic unit of measure is Nos, then how can you give the conversion between Nos & Kgs in additional data. For example how can i say 1000 kgs = 1 nos or 2 nos. This will be ridiculous then. I can give every dia available into different material codes. Thats not a problem. But how to receive rods in different length. I need the length & numbers combination. Also while issuing the materal after cutting numbers should reduce accordingly.
    2. How to maintain the material master for Plates of various thickness. I think we can use Kgs as ordering unit and Sq.mm as basic unit of measure. How can we map the material issues to production for these kind of materials. We are issuing the material after cutting in 2-D only of various sizes in same material. No 3 domentional cutting is done. I need the lenght & width to be changed accordingly after issuing.
    ANS:
    Dear for this make material master as name with ur spacification and UOM as kg after cutting or processing according to Wight  u can make issue note in the system.
    Name as plate x*y sqr mm
    So ordering as kg
    Issue as kg

  • Base unit of measure is different from Idoc to purchase order toSAP System.

    Hi Gurs,
    vendor send a purchase order for confirmation through EDI, the base unit of measure in the Idoc is PA( Parcel). For this same material the unit of measure in R/3 system is PC.( Piece). I got a error on this.I checked in CUNI, In Unit of measurement ST (PC) is already assigned to  unit PCE in EDI. But i dont want to change the  Conversion.I need this also and I want to create a new conversion ST(PC) is assign to PA( Parcel).
    Please help in this.
    Is it possible to maitainthe ISO-code PA into table Units of Measurement of Dimension?
    Edited by: Vadivel Karalam on Nov 1, 2010 1:13 PM

    Hi,
    You are getting the error because as part of the std ( For ALE/EDI) the unit of measurement that is maintained is PC whereas if you look at another unit of measure that you have mentioned, the std doesn't define anything under the ALE/EDI setup.
    Because of that all the conversions are coming with PC. So pls goto general settings and check unit of measure menu. There for each of your units, there is a section for ALE/EDI, set up the relevant UoM and the issue should get resolved.
    Hope it helps.

  • Maintain pacs in Material Master of 6,8,12 units of EA

    Dear All,
    We have an issue with the Pacs at the moment in the Material Master (MM41) in IS Retail. I have a material with Base Unit of measure as Each (EA). How is it possible to maintain a PAC of 6, 8,12, 20 in the same material master? When we try to create a second pack the system does not allow us to do so.
    Any feedback would be much appreciated.
    George H.

    i think you can create other pack say PAC1 with the conversion at PAC1= 8EA like that and the conversion can be provided in the material amster.

  • Base and alternate unit of measure  - Per PO conversion

    Hi,
    Here is my problem :
    I buy let's say 100 M of Configurable Material A, the weight  Stock unit (KG) is expected 50 .
    Now buy another 100 M of Configurable Material A, the weight  Stock unit (KG) is expected 100 . because of a slightly configuration change.
    I which I can change the conversion between Buying Unit and Stock Unit on the PO itself ( UMREN - UMREZ ) depending on the user input or config changes (feg dependency like we do on sales).
    I didn't find the right zone to unlock these two fields  in the "SPRO  ... Define screen layout at doc level" , and I am not sure it is the right way to reach my goal.

    Hi,
    BASE UOM is the unit of measure which will be used by business to calculate the weight of the goods or rather the Unit of measure in which stocks of the material are managed.
    Say for example I create one bulb. The base UOM is PCE or Piece.
    It means that the Bulb will be referred to as 1 Piece irrespective of its weight.
    So if in the sales order i put 10 PCE of Bulb it means 10 individual unit of the bulb.
    Alternative UOM is the Unit of measure in which quantities can be entered alternatively to the base unit of measure / stockkeeping unit.
    Say for example in our cases; we are selling these bulbs in boxes.
    I BOX = 10 PCE .
    So BOX becomes your alternate UOM.
    The relation is maintained in MARM table via the additional view in the Material Master (MM01/ MM02/ MM03 transaction)
    The relation 1 : 10 is managed by the UMREN UMREZ fields in MARM.
    I hope this is useful for you.
    Regards,
    Ankur Parab

  • Base and alternate unit of measure

    HI,
    can anyone please tell me
    1) what is base unit of measure and alternate unit of measure.
    2) what is the relationship between these two.
    i have one program which currently calculates base unit of measure for all the unit costs and now i need to calculate the alternate unit of measure for all the unit cost
    I heard that relationship of these two will be found in MARM table but i couldnt find it
    Please tell me how do i do achieve it.
    Thanks,
    Ahmed.

    Hi,
    BASE UOM is the unit of measure which will be used by business to calculate the weight of the goods or rather the Unit of measure in which stocks of the material are managed.
    Say for example I create one bulb. The base UOM is PCE or Piece.
    It means that the Bulb will be referred to as 1 Piece irrespective of its weight.
    So if in the sales order i put 10 PCE of Bulb it means 10 individual unit of the bulb.
    Alternative UOM is the Unit of measure in which quantities can be entered alternatively to the base unit of measure / stockkeeping unit.
    Say for example in our cases; we are selling these bulbs in boxes.
    I BOX = 10 PCE .
    So BOX becomes your alternate UOM.
    The relation is maintained in MARM table via the additional view in the Material Master (MM01/ MM02/ MM03 transaction)
    The relation 1 : 10 is managed by the UMREN UMREZ fields in MARM.
    I hope this is useful for you.
    Regards,
    Ankur Parab

Maybe you are looking for

  • [SOLVED] Two finger scroll stopped working

    Since some update of the last days the two finger vertical scroll of my touchpad stopped working. I have created a file with the configuratire which  be found here: https://wiki.archlinux.org/index.php/To - ed_options  but it does not work. With xinp

  • How do I find a adress in the drive or walk mode.

    It seems impossible to make at route in the drive or walk mode, as maps won´t search for any roadnames?

  • How to search for FM

    GM all, Suppose I'm looking for a certain FM how can I search for it in tcode se37?

  • Lost with granting signed applet permissions

    Hi all, My apologies for the cross post, I have incorrectly sent this post to the jre forum but I think it is more specific to the signed aplpet forum.. We need to deploy a very simple applet which sole role is to connect to a domain other than mothe

  • Finding sales employee commission.

    hi experts can any give the answer to this question . 1.how to find the sales employee commission.   in which table we can find commission field.