Material Master - Standard Price

Please suggest - how to change(update) the "Standard Price" of the material in Accounting view of the Material Master ?

Hi,
(do reward if this is useful)
Price Update:
In the R/3 menu go to the screen view by the following path:
Accounting-Controlling-Product Cost Controlling -
Product Cost Planning MaterialCosting----
Price update
     On the Price Update: Mark Standard Price Screen, choose Other Prices.
   The Other Price Update: Release Other Prices screen appears.
Enter data to restrict the cost estimates whose results you want to copy to the Material master
In the Update Prices in Material Master Record group box, set the Commercial Price 1 checkbox.
Choose Execute (F8) to carry out the update.
On the Price Update screen, the system provides a short log for the test run. The log contains green traffic lights and the message “Of 1 materials, 1 cost estimates were updated successfully.”
Choose Back until you get to the Price Update: Release Other Prices selection screen.
Use the same selection parameters as in the test run for the price release. Scroll down to the bottom of the screen. Deselect the Test Run indicator in the Processing Options group box.
Update the prices in update mode and choose Back.
Call up transaction MM03 and check that the prices have been updated in material master C10150.
The lowest value is determined in inventory costing when the prices are updated in the material master record. The system compares the valuation price according to price control for the current period or previous period with the costing result. If the valuation price is lower, this price is updated, rather than the value determined in inventory costing, as the tax or commercial price.
Result
Commercial price 1 has been updated in the Accounting 1 view in the material master.
<b><<<PLEASE REWARD POINTS IF THIS IS USEFUL>>>
</b>
Regards
AK

Similar Messages

  • How can i update material master standard price.

    Hi Everyone,
    i would like to know if there is any way i can update my MM Std Price everytime i make any purchase.
    I.e i have std price 40, but next time when i make PO and update Inforec for 70 so i want this 70 also take effect in my material master. Is any expert can tell me about this functionality or any alternate. would be great help
    Ali

    If you are using std prices then these do not vary unless someone is manually changing them (or using a program to do this). That is the main point of std prices, they do not change unless you change them yourself.
    MAP and standard prices are used in material master and it has nothing to do with price with which you will sell your customer.
    MAP and Standard prices will just hit you inventory account and COGS account once you will do PGI.
    I am assuming that you are talking about the price at which you sell to your customer.The easy way of tracking changing prices is that you can make them manual conditions and based on your information you can put them manually in your sales order.
    It is not recommended to change standard price constantly. At this period end, modify the standard price in material Master & continue.
    This can be a regulr activity at period ends, say every month end or quater end or half yearly or yearly. In general it is prctices on yearly basis, but as per the requirement you can consider the period.
    Just go throught the links given below
    http://www.sap-img.com/materials/purchasing-tips.htm
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/MMIVMVAL/MMIVMVAL.pdf
    Primarily, You cannot maintain both Standard Price & MAP. You can maintain only one of it.
    It is recommended that standard price should not be changed at randomly, but as a policy, if required, it should be changed at period end, say monthly, quaterly, Half-yearly or yearly.
    You can also check out transaction CK40N
    reward points if it helps
    regards
    Biju

  • Material master standard price exchange rate in accouting view

    Hi
    Our company code local currency is MXN
    When i goto material master/Accounting 1 view i can see material standard cost in MXN and USD
    which exchange rate does SAP uses, where is is defined in config
    it is not using exchange rate type M
    Thanks
    Edited by: Sasi nagireddy on Nov 30, 2011 7:53 AM

    Hi Sasi,
    The currency in material master will be by default the Co.Cd currency as per your FI configs. Local currencies can be defined as per requirement which you can utilize for various purposes including valuations. The exchange rates which your FI consultant has defined will be prevalent as per OBBS and OB08. Check with your FI person to help  you resolve this issue.
    Follow this link for better info..
    http://wiki.sdn.sap.com/wiki/display/ERPSCM/MM-IV-GF-CUR+Currency
    Regards
    Shiva

  • Material valuation(standard price issue)

    Hi Gurus,
    We have some issue in material master record accounting1 view.The standard price for the period 1 of 2010,period 2 of 2010 is showing the value of 1000 correctly.but where as coming to material valuation table(MBEW)it is showing as the value of "1".But where as coming to material ledger the standard price is showing as 1000 correctly.due to the inconsistency data between material valuation and material ledger the system is not allowing to post any transactions.Suggest on this issue.
    Thanks in advance
    Jana

    Hi Janardhan,
    The Material Valuation Table MBEW will be updated, if  you have completed both Marked and Released activities for  the Material through t-code-CK40N for Mass Materials or CK11N and CK24 for Individual Materials. As per your data, in your case this was completed and price was updated for 01  and 02-2010 periods. If you run CK40N-Standard Cost Estimate for Legal/Group/Profit Center valuation and completed till  u201CMarking of Priceu201D i.e., but not executed the activity u201CRelease priceu201D.  It may be for period 03-2010, the Material Master>Accounting view will be updated with standard price and also Material Master>Future Price field will be updated with u201CMarked Priceu201D, but Current Price/Previous Standard Price  fields will show earlier values. Till you u201CRelease the Priceu201D through t-codes CK40N or CK24, this differences will continue. At the start of March 2010 period, if you u201CRelease the priceu201D, all the fields in Material Master will be updated with relevant Current/Previous Standard Price fields. I hope this will clear your doubts.  If you need more clarity in this regard, please let me know.
    Regards
    appalas
    Edited by: appalas on Feb 28, 2010 1:11 PM

  • Accounting Entry for Material has Standard Price

    Hi,
    If Material has standard price option, what is the accounting entry for the time of Direct Goods Receipt and from the production.
    Material Value is : Rs. 100/-
    Purchased value is : 90/-
    from production : 110/-
    Thanks in advance

    Hi,
    In STO, material posting with price valuated from issuing plant price. In your case, the transportation cost, you can capture to separate G/L account and pay to transport vendor.(In STO , one plant is vendor and another plant is customer, so a third party vendor involved for material transfer)
    OR else use separate own Custom Condition Type  with Special Condition Category instead of condition type P101 which have Condition Category "G", only responsible to pick  the internal price
    Regards,
    Biju K

  • Cost Run for Raw Material taking Standard Price instead of Moving Price

    Hi all,
    We ran a material costimate with normal components FG>SFG>RM.  The RM price Control is set to
    V (Moving Average Price) and for SFG & FG it is S(Std. Price).  After we run CK11N, the price for
    RM in Material Master changes as per Moving Price.  We found that the RM Component is
    costed based on Standard Price and not on the previous cost run Moving Average Price.  After
    certain period, if we again do cost run, the sytem is again picking up the standard price for costing
    not the revised Moving Price.  We have checked the Valuation Variant in the Costing Variant, where the strategy given is 1. Moving Average Price 2. Standard Price.  We also tried to change the
    sequence as 1. Price as per Purchase Info Record 2. Moving Average Price and 3. Standard Price and
    also 1. Standard Price and 2. Moving Average Price.  Our requirement is when we run the cost estimate the raw material has to pick the price of previous moving price stored in the Material Master.  Kindly tell us where to set the indicator.
    Thanks,
    Sadashivan

    Hi Srikanth,
    Problem solved.  I checked the sequence in Valuation Variant and modified in Valuation Variant for Plant which I have not set previously and now the system is working correctly.
    Thanks,
    Sadashivan

  • In material master standerd price field not updating in group currency

    In material master accounting 1 tab, under price and values  table. standerd price is not updating in group currency.
    Can you sugest me how to resolve this issue

    Hi,
    As per My Knowledge,Wht ever currency is assigned as company code currency , tht will only be updated in Material Master as Per standard.
    Thanks
    Goutam

  • Donot Cost Field in Material Master when Price indicator is S & V

    Hello,
    Could somebody please explain me the impact of selecting the field "Donot Cost" in the Costing Tab of the material master. What would be the impact if the Price indicator is S or V.
    Is the material not included in the costing analysis for the project if this field is ticked
    Thanks,
    Lavanya

    Hi Lavanya,
    The Do Not Cost indicator denotes whether the material is to be costed while cost run i.e. while executing ck40n. If the indicator is set, the material is excluded from selection and no BOM and Routing of the same will be exploded. It means you cannot create material cost estimate (with or without quantity structure).
    Price Indicator controls the movement of the material and its valuation.
    If the Price Indicator is S and the Do not Cost indicator is active, the standard price of the material will never get updated.
    Regards,
    Divraj Agarwal

  • Material master valuation price from S to V

    Hi,
    is there a way to change from price S to V in material master ?
    How can I do it if FI department decide to change valuation from S to V ?
    Regards

    is there a way to change from price S to V in material master ?
    How can I do it if FI department decide to change valuation from S to V ?
    Hi
    First you can do your stock for that material as zero.
    And also close or delete all the respective documents like PO,GR...etc.
    Then only you can able to change the price from S to V
    Regards,
    Rahul

  • Material and standard price.

    Hi,
    could be a material managed without any standard price ?
    Best regards

    Hi,
    If I understand ur question, then answer is "YES".Like you procure non-valuated goods. Not required any valuation class or price control in accounting views.
    If helpful then reward.
    Regards,
    Biju K

  • Material Master Standard Reports Required

    Hi
    Our requirement is to know the list of standard reports of material master which should show the datas in the material master various views of respective filed values.
    We dont want the same from Table. Based on the reply we can decide that we have to go for new filed config in material master (or) we can use the std material master reports.
    Vijay

    Hi
    There is no standrad report availabe for this purpose. Te basic reason might be, each view is quite independent and and the particulars to be filled changes from client to client based upon business processes and  it might not be possible and assume that in material master  certain field  will be common for each client. More over  each screen will have many fields hidden than it might be shown and what we do we activate them based upon client requirement, for example In sales view Material Group fields. What you need is tio develope a customised report because you must have filled in master dat fields based upon your own requirements. 
    Regards

  • Standard price comes from material master

    Dear All
    How to get Material master standard  price into purchase order instead of Purchase Info record.without creation P.R
    best regrads
    R.T

    Hi,
    That can be possible.. Pl go throgh the below process..
    IMG- MM- Purchasing - Conditions- Define price determination process-
    Define condition type- Select ur condition type(PBXX or PB00)- In condition there is option "Cond.Category"  here put T or S.
    Then create PO system automaticaly pick ur MAV or standard price from Material master.
    Arun

  • Report on difference between PO price and Material standard price

    Hi,
    We need a report on Purchase price difference, which is report showing Open PO price & Material standard price, if there is a price difference
    This need to be run every day to avoid buyer changing price at PO level unless there is a valid reason
    Similarly difference if any between Schedule agreement price & Material master standard price
    Please help

    Hi,
    There is no standard report available for this.
    You need to develop one.
    Considering your requirement, it can be achieved with a query as well provided you do not need complex functionality out of the report.
    Hope this helps.

  • IDOC message type use for standard price ALE

    Hi,
    Does anyone know what is the best way to send material master standard price data from one SAP box to another SAP box?
    ex. SAP box A will send standard price data to SAP box B, and the way to update the standard price data in SAP box B, can be done with what method?
    I am thinking to use ALE, to send stanard price data and then trigger a MR21 transaction is the receiving box to update price. Does anyone know what IDOC message type I should use to transfer standard price data?  thx.

    Hi
    I think the IDOC type will MATMAS01.
    Thanks
    Deepak

  • Process will not be created with zero standard prices in material master

    Hi,
    I have two type of material;
    1.     In process material say A1
    2.     Finished Goods say B1
    Both materials price control are standard price.  I do not run costing. So , after creation of material master , standerd price has to update through MR21 in the account1 tab before start production .
    Suppose, if I forget to update standard price in material master and prepared process order, it will carry zero value of production cost.
    Hence, I want to restrict the creation of process order with zero standard prices in the material master.
    In order words, as long as standard price will not be updated after creation of the material master, user will not be allowed to create process order, if wrongly try, system will give message u201Cwith zero standard price creation of process order will not be allowedu201D.
    Please let me know either standard configuration or name of User exit or Badi.
    Regards,
    Amit

    Hi,
    You need to use BADI: workorder_update.
    Method: At release.
    check MBEW-STPRS field in the code ..and flag error and reject error if STPRS = 0.
    Regards,
    Santosh Sarda

Maybe you are looking for

  • Text Elements in BI 7

    Hi, We currently have a report in BW 3.5 which contains a text element which in turn displays the value of the variable that the user chose in the selection screen of a report. In BI 7.0 I have found the text item but when I try to display a variable

  • Fonts not showing correctly in Muse designmode

    Working with webfont Lato this shows sort of Times Itallic on design mode. In preview mode and on the web it is showing correctly. I saw multiple fonts exhibit this problem. Anyone familiar with this and found a solution?

  • Determine number of lines of multiline container in ccBPM

    Hi guys, during my process a loop over a multiline element and send each entry to SAP backend. After shipment of the message the process waits for some time, to prevent problems caused by parallel messages in the backend. At the moment I use a block

  • Show 'Text' Document contents  instead of using Document Links

    I have a requirement from my customer that requires comments to be stored and display both on the planning layout and display instantly in query. I am aware that documents which type other than text is stored in BIN form, so my first approach is just

  • Batch convert Binary to Text

    Environment: Forms version 10.1.2.2.0 Red Hat Enterprise Linux AS release 4 (Nahant update2) Problem: How to convert Forms Binary to text format from Linux command line. This must be the same result as choosing File=>Administration=>Object List Repor