Material Master Unit Of Measurement Changes Clarification

Hi
We have a material master with base unit of measurement as FT in basic data 1 view.
For this we have already some purchsing documents like PO's and PR's
But currently we dont have any open PO (or) PR and stock in system.
Still we could not change the base unit of measurement from FT to M..
Why?
Vijay

Hello All,
The error shows some of PR's and PO's numbers.
when i check the material in table MBEWH i can see some of the stocks for previous period like year 2009 and the period 06 and some of the previous year like 2008 and 2007 also having some stocks.
Now advise.
Vijay

Similar Messages

  • Automatically pick material master unit of measure conversion to routing

    I maintain finish goods conversion factor in material master u201CAdditional Data: Unit of measureu201D as M to KG and basic unit of measure for finish good in material master is in KG.
    I attached multiple operations for the finish goods material in routing.
    Some operations base unit of measure is M and others its KG.
    I want to pick material master unit of measure conversion automatically when Iu2019m creating routing for the finish good material in ca01. (Unit of measure conversion for header and operation of the operation)
    Can anyone letme know the SAP configuration for this.

    Hi!,
    Please expalin about the purpose of this requirement, because when you will create a order using that routing, at that time system will definately do the unit conversion automatically.
    Regards,
    Uday

  • Material Ledger Unit Of Measurement different from Material Master

    Dear Team,
    In my client, there is a difference between unit visible in CKM3N and MM03. The base unit of measurement in MM03 is MT. Other than that, there are some other units maintained (not M3) in additional data tab in material master. In CKM3N, the visible unit is M3. M3 is not present anywhere in MM03.
    Why would such unit flow in material ledger table? (CKMLPP has unit M3). Please advise.
    One more observation is that when there is some price change document in Material Ledger, the proper UoM (MT) is being captured. Only in the basic price determination structure visible unit for each head is M3. Please check the attached screen shot.
    Any help would be appreciated.
    Thanks.
    Jay Shah.

    Hi..
    Refer to Data Inconsistency of BUOM in Material Ledger Tables

  • Unit of measure changed in BOM not reflected in Production order

    We noticed the following problem in one of our production order.
    1. We have a bom component having a unit of measure MT.
    2. A planned order already exists for this header material.
    3. We changed the unit of masure in the same BOM component to KG.
    4. We processed the production order and did confirmations and did auto GR.( Value 20 times high)
    5. The cost at GR is very high , although the material consumption is considering the changed unit of measure KG.
    Any possible solution to this problem,
    Thanks,
    Manohar

    All steps suggested including read PP master data , rerun MRP and generate a new planned order and then convert to a new production order, have been done but the effect at 101 remains same with high actual costs.
    The production order is acocunt-assigned to a WBS.
    In table QBEW , the standard price is updated as very high. We havs S as price control in header material master.
    May be , some one has some idea about how the standard price in Table QBEW gets updated. What is the source for this standard price which gets updated on doing GR ( It comes to project stock and we see the standard price being very high and so the actual cost is very high)
    Thanks,
    Manohar

  • Material's Unit of Measurment differentin  Con & Rec due to Prd Process ?

    Hi
      We got some byproduct due to the production. So we are planned we will take qty in m2 & stock maintain in kg, because this is child material of another one product, so that time we consumption book in kg wise only u2026.
    Finally we want:
          Received: M2
          Stock Maintain & Consumed: kg
      If u have any solution, kindly explain step by stepu2026
    I hope defiantly u resolved my problemu2026..
    Regards
    Porsee

    Dear Porselvan ,
                     You can resolved it by using alternate unit of measurement.
    Now there is two way:-
    1. Take KG as Base Unit Of Measurement then Go to work scheduling View & take unit of issue as M2 as well as you put it asks conversion with KG (How much m2 in one KG) and  it will make all movement posting By M2 but stock will be keep in KG which will be your Base unit of measurement. For consuming in kG u can put Unit KG in BOM of respective article.
    2.  Take KG as Base Unit Of Measurement then Go to work scheduling View & take Production unit as M2 as soon as you put it asks conversion with KG (How much m2 in one KG) and  due to it Production will happen in M2 remaining all things happen in KG.
               For both these condition you can make movement any of unit which both you given by manual changing but automatically it propose unit as i explained.
    Regards.........Rakesh Saxena

  • Service Master - Unit of Measure

    Hi all -
    had a question about services and alternate unit of measure. On a service master, its not possible to specify alternate UoM (like we do in material master). What is the process to say create a service in minutes and create a PO in hours ?
    any help would be appreciated.
    thanks

    Hi,
    In service master we cant able to maintaint the AUM,
    But the service maintainnsce on hourly or daily we have to decide.
    Regards,
    Andra.

  • Item Unit of Measure Change

    We have some items that already have purchase orders, but we need to change their unit of measure for the future. It will not let us change the UOM field since there are already associated transactions, but is there a way around this through the DTW or SQL tables?

    Hi Aaron,
    Technically, it is possible by creating a new Form with a Matrix to save UoMs and convert them into multiple different factors.
    In existing B1,you can create a UDF in the Item Master and maintain conversion factors which is editable. When you are using the OITM, Items per Base Unit field, call the UDF UID. It should solve your issue.
    Regards
    Sudatta Mohanty

  • Component material costing (Unit of Measure conversion) is not working at S

    Hi,
    Unit of Measure conversion factor (Value) is not working for component materials at Sales order level costing, but the same conversion factor is working fine at Standard cost estimation level.
    Example:
    Conversion Factor for Raw materials (Procurement in Tones, Consumption in Each)
    1 Ton (Rs.1000) = 10 Each (per Each u2013 Rs.100)
    For Manufacturing of 1 pc FG is required 1 each Raw material
    Issue: At sales Order level - Raw material costing is calculated at u201CTonu201D price u2013 Rs.1000 instead of u201CEachu201D price u2013 Rs.100. 
    Regards
    Nagesh

    Hi,
    Pricing (unit conversion) is done different for MM and SD process.
    MM has decided to use the old process which determines the values out of T006. There you have the conversion factors which are used in PO. If you create a sales order or billing document the determination will be different as the material master will be read.
    regards
    Waman

  • Create Material Master Views in mass-change

    Dear All,
    We have to add a additional view to the material master of some products.
    Is this possible to do as a mass change (ex. MM17) or have we to do it with transaction SCAT/ MASS?
    Do you know an other solution?
    Thank you.
    Best regards,
    Thomas

    Hi,
    Use
    LSMW using standard SAP provided RMDATIND program- check with ABAPer - You can extend all views or you can pick and choose selected views.
    or
    BDC scripts - If u have only 1/2 views extended use this.
    Mass change doesn't help.
    Hope this helps

  • Material condition unit of measure not allowed

    Hello Friends,
    I am facing error of material XXXX condition ZPPL unit of measure SFT not allowed while creating the  opportunity in CRM
    Kindly note that I have defined a new UoM in ERP and for this new UoM the sales created perfectly in ERP, i have checked the netweaver settings for ISO codes and UoMs in CRM and they are fine...
    Please help me with this

    Did you ever find the solution for this?  I am getting the same warning message and have no idea why it is defaulting 'ST'.

  • Production order should reflect material master changes

    Dear PP Gurus,
    After creation of production order I make changes in material master of FG (Base UOM = EA & Order UOM = MT) & also gave conversion in additional data. Now I want that this changes should reflect in production order. How can it possible. Please guide me.
    Jayesh P. Narvankar
    SAP PP

    Dear ,
    However Any changes to PP master Date -BOM/Routing/Production Version can be update either through Read PP Master Data
    in CO02-Function-Read PP Master data .If there is any changes in FG material Master Unit of Measure , then it will flow thourgh PP-Master data  and will be updated accoreingly when you call the read pp master data function .
    This is possible in SAP Standard process  for Production Order If your Change Management Active .
    Regards
    JH

  • Report for Units of measurement for Material

    Hi
    Is there any report to extract the alterante unit of measurements for materials in a plant.
    Thanks

    Hi,
    Please use the below table,
    Related to Materials:
    MARA - Material Master: General data
    MAKT - Material Master: Description
    *MARM - Material Master: Unit of Measure*
    MAPE - Material master: Export control file 
    MARC - Material master: Plant data
    MARD - Material master: Storage location 
    MAST - Material link to BOM
    MBEW - Material valuation
    MLGN u2013 Material Master: WM Inventory
    MLGT u2013 Material Master: WM Inventory type
    MDIP - Material: MRP profiles (field contents) 
    MKOP - Consignment price segment (old versions of SAP)
    EBEW - Valuation of sales order stock
    QBEW - Valuation of project stock
    MVER u2013 Material Master: Consumption <Plant>
    DVER u2013 Material Master: Consumption <MRP Area>
    MVKE u2013 Material Master: Sales <Sales Org, Distr Ch>
    MLAN - Material Master: Tax indicator
    MARC - Material Master: Plant data
    MAPR u2013 Material Master: Forecast
    MARD u2013 Material Master: Storage Location
    MCH1 u2013 Material Master: X Plant Batches
    MCHA u2013 Material Master: Batches
    MCHB u2013 Material Master: Batch Stock
    MDMA - MRP Area data
    DBVM - MRP Planning File Entry: MRP Area
    MOFF - Outstanding Material Master Records (Maintenance status)
    MARCH - Material Master C Segment: History
    MARDH - Material Master Storage Location Segment: History
    MBEWH - Material Valuation: History
    MCHBH - Batch Stocks: History
    MKOLH - Special Stocks from Vendor: History
    MSCAH - Sales Order Stock at Vendor: History
    MSKAH - Sales Order Stock: History
    MSKUH - Special Stocks at Customer: History
    MSLBH - Special Stocks at Vendor: History
    MSPRH - Project Stock: History
    MSSAH - Total Sales Order Stocks: History
    MSSQH - Total Project Stocks: History
    Regards,
    Mohd Ali.

  • Getting an error in CIF Inbound queue:"Only 0 decimal places are permitted for unit of measure PC"

    Hi,
    I am getting an error in CIF Inbound queue (function: CIF_ORDER_INBOUND_30A). The error text says "Only 0 decimal places are permitted for unit of measure PC".
    Can anyone point out the solution to resolve this error? It would be a big help for me as I am new to APO and so getting difficult to find a clue for it.
    Thanks.
    Regards
    Mansi

    Hi Mansi,
    Please check the cif queue you will get the order number from that order number you can find out material code. Then check the material master unit of measure in MM03 you have used some alternative unit of measure and system is unable to convert order to  alternative unit of measure because of decimal setting. If you go to CUNI and check the unit if measure PC it is not permitted for decimal places. If you need decimal than change the UoMof Material and use diff UoM or allow the decimal for PC which is not good practice.
    Regards,
    R.Brahmankar

  • Third party purchase unit of measure issue.

    Hi Friend,
    I have created sales order for third party process unit of measure in sales order is in Meter  qty is 3.7 mater.
    But PR & PO id created in the unit of measure Piece i.e. 3.7 pieces.
    GR is already done for qty 3 pieces. Now when user is trying to do GR for qty 0.7 pieces we are getting error message serial number management allows only whole number.
    How can I do GR for this. Also I want to know what setting I need to do to have PO in unit of measure M i.e. Mater.
    Thanks,
    Kiran

    Its all about your material master unit of measure.
    In Material master - Basic data 1 view - Base Unit of measure will be picked in PR.
    In Material master - Purchasing - order Unit  will be picked in PO (If blank, then base unit of measure)
    In Material master - Sales Organization 1 - Sales unit will be picked in Sales Order.
    And for your error message, please search in SCN, you will get many thread regarding the error.
    Regards
    Dev

  • Not able to change UOM in material master for a material

    Hi all ,
    I have a issue with changing of the UOM in the material master , IN MMO2  after changing the UOM , in Display error , its showing the error as : The base unit of
                                         The reasons for
                                         Manual  reservation
                                         Reserv.No   , Item - No data
                                         Purchase order  - 30017056  , Item 1 - 1
    There is no stock in the previous as well as current period , and deleted the PR , still i am not able to change
    Please help urgently
    Thanks in Advance
    Neha

    Hi Satyajit,
    Please look at OSS  Note 1069560 - Data inconsistencies: Activating integration. models in parallel, if this helps you.
    Since  Gross data of material is in the basic view, it is common across plants , whereas, IMs are normally designed to have material masters at plant level.
    We may have same material in different IMs with different  plants. Therefore changes of the basic view fields are then contained in multiple IMs.  SAP advises to have a larger IM or sequential activation of IMs.
    I hope this will  help you .
    Regards
    Datta

Maybe you are looking for

  • Export to Excel '07 doesn't run the formatting Macro

    I've searched Metalink for more information on this topic, but haven't anything usefiul. Has anyone run into this? We're on 10gR2 (10.1.2.2) Appreciate any help anyone could throw my way. Brent

  • Manually turning off iMac G5 Display

    Hi, I've been searching around and haven't been able to find an answer to this. I have my computer set to turn on the screen saver after 5 minutes of inactivity and turn off the display after 15 minutes of inactivity, and I like it that way. My compu

  • To restart

    hello all, i have a problem in keyListener , i want to restart my system by using java program . i have an idea that is : get the keycode of ctrl+alt+del using that we can restart the system .but my idea not work .pls help me by sent code. [email pro

  • Why external CD/dvd unit not detected?

    Mac Mini / Lion Last time I connected this same external CD/DVD player it was to install Office 2011 and it was detected, and I was able to proceed with install. Now, I just want to browse a data CD and it won't even detect the unit. I tried to reboo

  • Trace file

    When we perform this command : Alter database backup controlfile to trace; It generates the necessary command to recreate the control file. My question is, does this command create control file reuse database "db_name" NORESETLOGS ARCHIVELOG ... etc