Material no. creation problem

1) the material no. created in c-folder should match with the material no. created in r/3. but in our case it showing diff material no. for same material..

Hi Amit,
what I knew is that the material created in cFolders is not the same as the material created in the R/3 System. So, from my point of view the number for the cFolders-material should not be the same as for the R/3-material.
Best regards,
Christoph

Similar Messages

  • Material master creation problem in sales org views

    Hi
    I have faced problem while creating material master
    In mm01 >then select the org views basic data1&2 , sales org data1&2, purchaing, accounting and costing views >thanclick org levels> here enter the plant , stor loc, sales org & dist.chanel >then enter fill the all fields and save this is original procedure
    but problem occured at ... in org levels without dist.chan ( only enter plant ,sales org stor loc ) also system goes to sales org data-2
    in our development system .. in select sales org 1& 2 ... system should ask sales ogr &dist,chanel at org ..level scren ..if we does't ente dist.ch .. system does't allow the material master...actually like this in production system also worked  earler....but now our production system not worked like this procedure ...
    pls ..guide me to solve this issue any one
    regards
    sesidhar

    hi
    we have 1  sales org ,4 dist.chanel and 1 plant
    4 distbution channels are also assigned to sales org and plant
    but problem is ..when create material amster ...if select the select views sales orgdata 1,2 and sales gnerael plant data
    than press enter ... here system ask the palnt (mandatory), sales org(mandatory) and dist channel9optional).in production sysstem....
    plant          1000
    sale org     zosd
    DC             .........(BLANK)
    IF press enter system allow  to ... sales org data 2
    if DC ....(BLANK) System does 't allow to next screen sales org data 2
    how can i change this optional to mandatory in DC

  • Problem during material variant creation

    Hi Guys,
    I am trying to create material variant in MM01. I entered configurable material let's say DESKTOP. nOw i have partial variant scenario so instead of entering all 30 characteristics i need to enter only 3 characteristics.These 3 charcteristics based on which partial matching will happen in sale document.
    My requirement is as out of 30 , TEN chars. are maintained as required entry. So system is asking me to enter all 10 required chars. in material master which my scnario don't want.But the same is required in Sales document.
    How to remove this required entry in case of  material master creation and keep required entry in sales order or quotation?
    Regds

    Hi,
    You can decide whether it is mandatory to assign a value to a characteristic on the basis of transaction code.
    You must use [selection condition|http://help.sap.com/saphelp_erp60/helpdata/en/92/58d455417011d189ec0000e81ddfac/frameset.htm] which calls the [user-defined function|http://help.sap.com/saphelp_erp60/helpdata/en/92/58d455417011d189ec0000e81ddfac/frameset.htm]. In function you need to analyze sy-tcode and raise the predefined exception FAIL for those when you don't want to assign a value to a characteristic (e.g. mm01, mm02). Contact your ABAP team to create such a function.
    Don't tick the characteristic as required entry in class definition but assign this selection condition to this characteristic in class.
    Regards,
    Alexander

  • Default material code during material master creation

    Dear All,
               While I am trying to create any material in MM01 screen , system automatically takes a material code .So I have to remove that code from there then put my desired material code and then proceed .
                I want to know why system takes that perticular  code during material code creation .I want to remove it permanently .
                Please suggest what I have to do ?
    Regards
    Abhijit Das

    Dear Abhijit,
    Material Number range & Internal or external number range setting is done in SPRO under
    Logistic General>material master>basic setting>material type>Define number range for a perticular material type.
    Now if u want to have your own desired code go on above path,Select your material type & tick for external number range & give range of external number( interval).
    This will solve your problem,
    Vivek

  • Authorization control on material reservation creation and change (MB21 & M

    Hi Friends
    Please help me to find a solution on Authorization control on material reservation creation and change (MB21 & MB23).
    Client looking for a control over end user on those T.Code s but not at T.Code level;
    Client looking for control either based on "Storage location" and/or u201CProduct hierarchyu201D.
    More specifically, user A and B both can Create/Change MR but user A only can do it for the MR which related to storage location say YY while B authorized for storage location ZZ
    Thanks in advance.

    Hello Partha,
    Only available Standard SAP Authorization Objects, related to Reservations, are M_MRES_BWA (Reservations: Movement Type) & M_MRES_WWA (Reservations: Plant) where you can maintain authorizations based on Movement Type & Plant respectively and hence seggested enhancement.
    You can use Tcode-SUIM to search for Basis authorization details i.e. Roles defined for specific transaction/authorization object / profiles.
    Revert if any further info required.
    Regards,
    Anup

  • Cideon / Autocad 2007 / Material BOM Creation from autocad

    Hi,
    we are using Cideon integration for AutoCad 2007 & SAP ERP communication. DIR's in DMS are created from AutoCad drawings via SAP menu.
    We want to create Material & Material BOM from AutoCad but we cannot see any option present in SAP menu. We can just create Header Material from SAP menu in AutoCad, no BOM option. What steps should be taken to enable material & bom creation from AutoCad SAP menu.
    Thanks
    Edited by: Rob Burbank on Oct 22, 2010 3:56 PM

    Moderator message - Welcome to SCN
    Please read [Rules of Engagement|https://wiki.sdn.sap.com/wiki/display/HOME/RulesofEngagement], How to post code in SCN, and some things NOT to do... and [Asking Good Questions in the Forums to get Good Answers|/people/rob.burbank/blog/2010/05/12/asking-good-questions-in-the-forums-to-get-good-answers] before posting again.
    In particular, offering points is against forum rules
    Rob

  • Approval for Material Master Creation !

    Dear All ,
    My requirement is to have approval process for Material master. is it possible.?
    My Client is expecting approval process same like PO ( release strategy )
    Is there any standard approval  process for every masters which are  created as part of MM transactions.
    Can it  be achieved by means of any workflow.?
    Thanks
    Jinoy

    Hi,
    Yes it can be achieved by Work flow & also through the Enterprise Portal development.
    If you have Workflow consultant you can take a help in setting up the approval for Material master creation.
    If you want high fund & centralization of Material master you can go for EP development but Cost & effort will be on higher side.
    Discuss with your Workflow consultant he will help you.
    rgds
    gsc

  • Material Master creation workflow

    Hi everyone....
    Last week I went on the BIT601 training course and I'm now tryinig to create my first workflow for material master creation, so please forgive my rather noobish questions. I think this must be a common workflow but I'm sure every company has a different process.
    My process is as follows:
    - User creates basic data view for material master in MM01.
    - Workflow is triggered when material is saved.
    - Work item arrives in inbox of master data enigneer who completes all material master views.
    - Mail is sent to workflow initiator to inform that material is complete.
    - End of workflow
    I have defined the start event CREATED from business object BUS1001006 in my workflow definition. I have defined a standard task for the first step in my workflow using bus object BUS1001006 with method Create. The workflow starts correctly however ...
    My question is how do I get the material number to pull through to my first step? I am assuming I need to setup some binding to pull the material number into the workflow container? 
    Can someone please point in the right direction.
    Many thanks,
    Neil

    wow, thanks for the super quick reply Rob!
    I figured it must be some binding I had not done.
    So ... I go to my Start events in my workflow header, I see I have only the "auto-generated" binding i.e. EVTCREATOR > WFINITIAOR ....
    now, I see EVTOBJECT as a possible container object from the event side of the window (left hand side) but what do I link it too? I was kinda expecting to see my business object as a possible container object in the workflow side of the screen (right hand side).
    I really hope that makes sense... If I understand correctly, the idea is to link the event object to the business object container element ... but if thats the case why can't I see my business object in the workflow side of the binding window?
    Many thanks for taking the time to help a noob
    [edit] ... I may have partially answered my own question ... I think I need to define the properties of my business object in my workflow container element such that its is an input field? ...
    I'm going home now... will carry on with this in the morning.
    Edited by: Neil Ward on Oct 4, 2010 6:17 PM

  • Workflow to approve Material Master creation

    Dear all,
    I would like to create workflow to approve Material Master creation as below:
    When Material is created -> Check & Approval (Yes) -> Material is active
                           -> Check & Approval (No)   -> Material is inactive
    How can I do that?
    Could you pls help me to solve this?
    Thanks,
    CH

    Hi,
    Before designing the workflow, you need to find what is the business object and what is the event which gets triggered when material master is created... you can do that using event trace....
    1. SWELS - switch on trace
    2. Create material
    3. SWEL - check trace to find which event is fired
    This will give you business object name..
    Now start building workflow using SWDD... Go thru basic steps for designing workflow...

  • User Exits / BADIs triggered during the Material document creation

    Hi Experts,
    Can anybody tell me the User Exits / BADIs /Possibilities that can be triggered during the Material Document Creation which can be used to update the Equipment Master User Statuses.
    Thanks,
    Sangeeta.

    Hey Sangeeta,
      Try these User Exit's
    MGA00001  Material Master (Industry): Checks and Enhancements
    MGA00002  Material Master (Industry): Number Assignment
    MGA00003  Material Master (Industry and Retail): Number Display
    Using Enhancement MGA00001 (Function Exit : EXIT_SAPLMGMU_001 ) you can validate & Change your Material Document Number.
    Badi's
    BADI_EAN_SYSTEMATIC
    BADI_GTIN_VARIANT
    BADI_MAT_F_SPEC_SEL
    BADI_MATERIAL_CHECK
    BADI_MATERIAL_OD
    BADI_MATERIAL_OD
    BADI_MATERIAL_REF
    BADI_MATNR_CHECK_PVS
    BADI_MM_MATNR
    BADI_MM_MATNR
    CDT_CHECK_MATERIAL
    MG_MASS_NEWSEG
    MG_MASS_NEWSEG
    WRF_DISCONT_FACT_E
    Note: This is for transaction code MM01, MM02 & MM03.
    Regards,
    Saravanan M

  • Standard Adobe Form for SAP Material Master Creation

    Hi,
    Did SAP develop standard adobe interactive form for Material Master Creation?
    I heard SAP delivered standard forms for Customer Master and Vendor Master. I am not sure about Material Master Form. If any one knows about Adobe Forms for Material Master... please rerply.
    Thanks in advance.

    Check yourself here:
    List of SAP standard Adobe forms: Go to http://service.sap.com/erp  (SAP ERP) -> Media Library - SAP ERP Overview -> Detailed information cross ERP -> Adobe Forms for SAP ERP
    Standard programs: Standard program for Adobe forms
    Regards Otto

  • Problem with BAPI of Material Master creation

    Hi,
    I am creating material master(mm01) through BAPI_MATERIAL_SAVEDATA.
    Program is working fine but when i m checking in MM03 to display uploaded data through BAPI, i cant able to see material which i created to through BAPI but i can see in MARA table.
    i dont know wht is the problem ?
    can anybody let me know abt this ?

    then u are not committing the work.
    flow will be like this
    call ' BAPI'
    if return[] is initial.
    commit work.
    else.
    endif.
    Regards
    peram

  • Problem in Material master creation

    when iam creating material master, in sales view1 maintained Tax claassification. After saving the master record the Tax classification is disappearing.
    could any one know the solution? please help me.

    Hi Preveen,
    Use the following path in Customizing for Sales:                            
        -> Functions -> Taxes -> Tax by country                                     
    If sequence value 0 is defined for a country, change it to 1.               
    If other tax categories are defined for the same country, increase the sequence value for all tax categories of this country by 1.             
    Important: If materials exist for which tax data has already been  maintained in the country in question, this tax data must be  checked and, where necessary, modified using the "Change material" function.  (Note that tax data is saved in table                MLAN for each material and country.)                                                                               
    Regards,
    Mauro

  • Process order creation problem

    I am creating a process order . while creating the process order system is throwing error as Auto batch numbering not set up for material type XXXX in plant xxxx . System is not allowing to create process order.
    How to resolve the issue.

    Check in CORW   and switch off batch creation  to isolate the problem if needed.   Also see whether you have any batch managed compoents   for which you have set master data for automatic batch determination.
    There is no setting for material types and plant for batch.  May be the error message is not correct.  What is the message number?

  • Materialized view creation taking long time

    Hi All,
    We are creating a dimensional OLAP model with the Materialized views. In that we are having 7 dimensions and 1 fact table. I have created all the dimensions with the materialized views with out any problem. But when im trying to create my Fact materialized view it is running for 14 hours and is still running. I'm waiting to see when it will complete. The select statement in the Fact MV returns only 19 records and that too in seconds. But when i use the same select statement for MV creation it is taking a long time. I dont know how long it gonna take. How can i reduce this long running time. Mean while my fact MV is having nearly 15 joins with other physical tables and dimensions.
    Thanks in advance,
    Karthick

    Hi all,
    Thanks for your reply..
    I think i dint clearly mention my problem..
    The select statement for the MV will return 19 records. But when im trying to create the MV it is taking quite a long time. it ran for >14 hours but still it dint create a MV. Why is it happening like this? Is it possible to increase the performance.
    Thanks,
    Karthick

Maybe you are looking for

  • Satellite A300-202 - External display turned a strange color

    Hi, I have a Satellite A300-202 with a ATI Mobility Radeon HD 3650, and after upgrade from vista to windows 7, my external display turned a strange color, seemed to lose the red color. Never show the white color, in which should show the white color

  • How to use classes of packages in flex mx:Script/ or mxml/

    Hi.I am just learning Flex using Flex Builder 3 facing one problem, Suppose I declare one package with name alert.as package import mx.controls.Alert; public class alert public function alertBtn() Alert("Hello btn 1"); Now in want to use the function

  • Urgent - Messages in "To Be delivered" status

    Hi XI ers, We have around 150 messages in "To Be delivered" status. Tried resending a couple of them but no sucess. When tried to resend a message, it gives message 2 Audit log entries in MDT (Message Display Tool). The first entry is "Try to fail th

  • Values not updating in Condition records

    Hi All, Small question for you all - We have a condition record for TAX (ZVAT) this has three access sequences on it, one of these feilds for access is the HT (OIHANTYP), Nowe the problem is when HT = 01 then Vat should be calculated at the correct r

  • Customisation for PO Release (different Values for different Doc Types)

    Dear Experts, I need to configure for PO release procedure where in the Characteristics would be Plant (2 Plants), Doc Type (3 types - Standard PO, Imports PO & Capital PO) and Value (2 stage release: 0-100000 & >100000 INR for Std PO, 0-200000 & >20