Material number changed after purchase order released

Hi Experts
Please we are experiencing this behavior in our system.
A purchase order for a specific material number is created and released, after this we can change the material number and its plant ¿is this a standard and right be way of SAP?
Thank for your help
JM

Hi,
You can design your process as the business demand.You can set Release Indicator 1 in designing Release procedure for  PO , where release Indicator 1 is used for purchasing document cannot be changed/Change not allowed after release.
Regards,
Biju K

Similar Messages

  • Batch number change after Process order release

    Hi all,
    I would like to know if it is possible to change the batch number after that the process order has been released.
    Actually, the field is grey and not editable anymore.
    Is it customizing?
    Thanks in advance,
    Giovanni

    hi
    if the Batch numbers are generated while releasing the Process order. you cannot change the Batch number. (it will have inconsistency of data)

  • Change in Purchase Order Release Strategy Values

    Dear All,
    I am in process of changing Purchase Order release strategy values.
    I have following release strategy -
                           Current Value                  (Proposed Value)
    Level 1 -         Upto INR 0.1 Mn               (Proposed value - Upto 1.0 Mn)
    Level 2 -         From 0.11 Mn to 0.5 Mn   (Proposed Value - From 1.01 Mn to 5.00 Mn)
    Level 3 -         From 0.51 Mn to 1.0 Mn   (Proposed Value - From 5.01 Mn to 10.0 Mn)
    Level 4 -         Above 1.0 Mn                  (Proposed Value - Above 10.0 Mn)
    My questions are -
    1) Will this change affect the existing Purchase Orders (already created) which are not yet released?
    2) Will this change affect the existing Purchase Orders (already created) which are released?
    3) Are there any risk factors?
    Can you pl. put light on above questions?
    Regards,
    Prashant Kolhatkar

    Hi,
    Actually, what you had given is not enough to determine if the existing PO will be impacted or not
    If you are just changing the classification but not changing the number of release level of the release code in the release strategy, the partial released PO will not be impacted unless there's PO changes. PO that are released will definitely not be impacted unless there are changed.
    In general, after a release strategy is determined for PO, SAP will retrieve the latest list of release code of that release strategy for display for that PO. If this list never change (mean you only change classification of the release strategy), then they will not be apparent to the user. But if this list change (you add new release code, replace existing release code or remove release code), then you will see some discrepency on screen as you will only see the modified list of release code and not the old list of release code
    Hope this help

  • BOM change after Purchase order creation

    Dear all
    My client requirement is an error message should appear when the end users are trying to change the BOM after the purchase order creation for the BOM items and the system should allow the BOM change only after the PO cancellation.
    Please throw some light
    regards
    Kumar

    Dear Kumar,
    Do you mean to say user's should not be allowed to change hte BOM items in a purchase order?or should not be allowed to change a
    BOM,if there are some purchase orders for the same material?
    If your requirement is to restrict the BOM change of a material using T code CS02,after purchase order creation,I dont think its
    possible.
    Please explain your problem little more in detail.
    Regards
    Mangalraj.S

  • Idoc will trigger after purchase order release workflow

    Hi Workflow Guru,
    I have a requirement to configure Purchase Order release workflow. I am configure the same its working fine, but my client requirement is when the purchase order finaly release one IDOC will be trigger and the document will send to other system. We have  PI for Interface.
    I want to add new activity step in my workflow template to trigger a Idoc after final release.
    Please give me a idea , how to do this.
    Thanks in advance.
    Regards,
    Ranjan

    Hello,
    Use the standard IDoc LOIPRO01. Have a look at program RCCLORD. use it in the method of the business object you are using.
    You'll need to configure the idocs and partner profiles as normal.
    Regards,
    Kiran Telur

  • Why the missing parts list changed after Pro.order released

    I open a pro.order before released ,then I do the availability check get a missing parts list, this list including less parts than the missing parts after pro.order released ,why does it caused?which configuration caused?
    Thanks,
    Helai

    Hi Lai,
    You can do Material Availability check at the two stage of Production / Process Orders.
    - First is to control (Check Missing Part) at the time of Order Creation.
      T.code is OPJK - Select order type and Business Transaction -1 at the time of Order Creation
    - Second is to control(Check Missing Part) at the of Order Relase.
      T.code is OPJK - Select order type and Business Transaction - 2 at the time of Order release.
    So it may possible that you have assign different checking group or checks to the above both stages , that's why you got different result regarding missing parts during above both stages.
    Regards,
    Dhaval

  • How to block changes in purchase order after purchase release

    Dear all
    Can u please tell us how to block any changes in purchase order after purchase order is released...
    (We don't want any line items addition or quantity addition or any changes once purchase order is released..)We wanted this for a particular purchase order type only
    Regards
    Sudha

    Dear Sudha
    Yes it is possible to confiquire your system insuch a way where once if the PO  gets final relase then it cannot be changed.Only possiblity that will be available for the user to make chanegs in PO is possible when the final release is to be reset and then make the changes.
    Release Indicator: specicfies whether the PO documents is blocked or can be processed for the follow functions.
    You can define the release indicators you need for your release procedure:
    •The Released indicator is used to specify whether messages (PO documents in output format) may be transmitted for a purchase order with this indicator.
    •The Changeability indicator shows the effect of changes to the PO (a change to a PO may require a new release strategy to be determined, for instance).
    •By means of the Value change indicator, you can specify that the release strategy is to be re-started if a PO is changed and the value of a PO item thereby increases by a certain percentage (e.g. 10%). Set the Changeability indicator to "4 - Changeable, new release in case of new strategy or value change" or "6 - Changeable, new release in case of new strategy or value change/outputted" and enter a percentage in the Value change field.
    And after that you can specify release statuese where you can specify which release indicator/status a PO is to have after having been released via a certain release code.
    and after release simulation .
    Test for the PO change after final release System will not allow you tomake changes by giving the message that the release  indicator doesnot allow you make the changes in PO.
    Regards
    Sunny

  • ERP - SD Sales orders with billing plan (material number change appear)

    Sales and Distribution.
    Regarding sales orders with billing plan.
    We create the sales order and create billing plan at header or item level.
    We issue down payment request(s) upon receipt of sales order.
    Often during the life time of the sales order one or more of the material numbers are changed after the down payment request(s) has been issued and paid by the client.
    Our issue is that prior to changing the material number in the sales order we have to reverse the payment(s), reverse the down payment request(s) and after the material number change re-issue the down payment request(s) and register the payment again.
    We wish to find a solution avoiding all the reversals.
    If you have a similar situation please inform how to handle material number change in the sales orders with billing plan.
    Best regards
    Lise

    Dear Consultor SD ,
    There is no setting to create the invoice based on schedule line.
    What you can possibly do is create multiple deliveries based on the schedule line and
    then invoice the individual deliveries.
    If you want system to split the deliveries based on schedule line, then you will have to include Schedule line also
    in the COMBINATION REQUIREMENT in VTLA.
    Thanks & Regards,
    Hegal K Charles

  • How to change material component for a Purchase Order?

    How to change material component for a Purchase Order?
    I need FM .
    PLEASE help

    Dear ,
    Create PO with item category L....There in Item detail you will get tab for material.
    There click in component Button, it will take you to the component screen there you can assign and deassign components.
    Hope this helps.
    Regards
    Utsav

  • Release have to be retrigger if any body changes the purchase order

    Hi all,
    Actually my requirement is.....once a PO is released by a purchasing group.....and later any body  have changed the  purchasing group in  the same PO release should be retrigger how to configure this.
    Regards,
    Bhargav...

    Go to SPRO > Materials Management > Purchasing > Purchase Order > Release Procedure for Purchase Orders > Define Release Procedure for Purchase Orders > Release indicator
    Select the release indicator for the final release.
    Once you are there, make "Chgable" = 6 and "% Value change" needs to be "blank".
    Hope this helps.

  • Problem in Purchase Order Release Workflow

    Hello Experts,
       I am working in a workflow for releasing PO.In this workflow I have created just one activity step type to release a purchase order.Here I have taken PO(BUS2012) object as input parameter.In the activity step type I am using a custom task(TS99900011).In this task I have used BUS2012 as Business Object and SINGLERELEASE as method.Here I have used 3 terminating events of BUS2012 object.They are Released, Reset and significantly changed. I have just copied the standard task (TS20000166).
      Now my activity step has four outcomes.We can see them in Outcomes tab.
    1.Purchase Order Released(Cgy:External Events)
    2.Not Used(Cgy:External Events)
    3.Purchase Order Changed Significantly(Cgy:External Events)
    4.Processing obsolete(Cgy:Internal Events).
    I have set agent assignment as user Manas.
    Now, when I am testing the workflow with a valid PO number as input the work item goes to my inbox for release the PO as expected.There I can release or reject the PO.But while saving after releasing or rejecting the PO the work item still remains in Workspace Inbox.Any of the four outcomes is not appropriate for the activity.
      Can anybody suggest any solution to overcome the situation.
    Are the external events are really helpful in developing workflow activity?Please suggest.

    Hi Manas,
    There is one option, where you can stop the workitem and even entire workflow.
    Use Fork for parllel processing
    Have a Wait step with BUS2105-Significantlychanged event and outcome to the end of workflow.
    Thanks,
    Sudhir.

  • Purchase order release workflow - urgent

    Hi friends
    When iam creating purchase order it trigger the workflow WS20000075 for releasing purchase order in that purpose what can i do..
    How can i set the Agents
    How can i trigger the events - i think in that purpose using pftc we trigger the workflow.. so i need clear steps from beginning onwards..
    my exact requirement
    once i create purchase order, the workflow will be triggered..
    after that the mail goes to the approver.. if he/she click that mail purchase order release statement want to be open.. after that he/she release purchase order it will goes to the next level..anyone give the step by step procedure..for that
    Thanks
    Gowrishankar

    yes prabakar.. but iam confused..
    You can get step by step workflow for PO using standard workflow
    Release of Purchase Order :WS20000075
    And for two levels of approvals you have to configure in SPRO the path is
    Purchase Order:
    SPRO> Material Management->Purchasing->/Purchase order-->Release procedure ---> Procedure with classification ---> set up procedure with classification ---> double click on Release strategies and Workflow.
    If you don't know about this configuration, you have to confirm with your MM consultant.
    after finish this iam triggering events using pftc
    in that pftc iam choosing business object bus 2012 for po release..
    i think thats enuf..
    After that it is possible to trigger workflow.. when iam create purchase order..
    Thanks
    Gowrishankar

  • Problem with purchase order release strategy

    Hi Guru's
        i am dealing with problem of  service purchase order release strategy , when i making the service  po ,  i am not giving any over fulfillment tolerance  ,  after release & making Service entry sheet of PO ,   when i go to the change mode and change
      over fulfillment tolerance say 90%  , system allow me to make , and not applying release  strategy again  ,  so  there can be a miss use of this Scenario ,  so is there any possibility that release strategy , will appear again when change the tolerance ,
    0r  any other idea from your side , to avoid this ,
      your suggestions are really always helpful to me ,  please guide me for this also
    Thanks & regards
    Neha

    Hi Neha,
    A reset of the release strategy only takes place if
    -  the changeability of the release indicator is set to '4' in
       case of a purchase requisition and '4' or '6' in case of
       another purchasing document (purchase order, request for
       quotation, contract, scheduling agreement),
    -  the document is still subject to the previous release
       strategy,
    -  the new TOTAL NET ORDER VALUE is higher than the old one.
    The total net order value is linked to CEKKO-GNETW for a purchase order,
    CEBAN-GSWRT for a purchase requisition item-wise release and CEBAN-GFWRT
    for a purchase requisition overall release.
    If you have maintained a Tolerance for value changes during release
    (V_161S-TLFAE), the release strategy is reset when the value of the
    document is higher than the percentage you have specified and if the
    document is still subject to the previous release strategy.
    Review the SAP note 365604 and 493900 for more
    information about Release strategy.
    Regards,
    Ashwini.

  • User Exit for Purchase Order Release Strategy

    Hi,
    I am a little new to this, how do I search for a user exit for purchase order release strategy (TCode ME29N).
    Thanks in advance.
    Mick

    Hi
    Check the following Exits and BADI for Pur Requisition
    Enhancement
    MEVME001 WE default quantity calc. and over/ underdelivery tolerance
    MM06E001 User exits for EDI inbound and outbound purchasing documents
    MM06E003 Number range and document number
    MM06E004 Control import data screens in purchase order
    MM06E005 Customer fields in purchasing document
    MM06E007 Change document for requisitions upon conversion into PO
    MM06E008 Monitoring of contr. target value in case of release orders
    MM06E009 Relevant texts for "Texts exist" indicator
    MM06E010 Field selection for vendor address
    MM06E011 Activate PReq Block
    MMAL0001 ALE source list distribution: Outbound processing
    MMAL0002 ALE source list distribution: Inbound processing
    MMAL0003 ALE purcasing info record distribution: Outbound processing
    MMAL0004 ALE purchasing info record distribution: Inbound processing
    MMDA0001 Default delivery addresses
    MMFAB001 User exit for generation of release order
    MRFLB001 Control Items for Contract Release Order
    AMPL0001 User subscreen for additional data on AMPL
    LMEDR001 Enhancements to print program
    LMELA002 Adopt batch no. from shipping notification when posting a GR
    LMELA010 Inbound shipping notification: Transfer item data from IDOC
    LMEQR001 User exit for source determination
    LMEXF001 Conditions in Purchasing Documents Without Invoice Receipt
    LWSUS001 Customer-Specific Source Determination in Retail
    M06B0001 Role determination for purchase requisition release
    M06B0002 Changes to comm. structure for purchase requisition release
    M06B0003 Number range and document number
    MEQUERY1 Enhancement to Document Overview ME21N/ME51N
    MELAB001 Gen. forecast delivery schedules: Transfer schedule implem.
    MEFLD004 Determine earliest delivery date f. check w. GR (only PO)
    MEETA001 Define schedule line type (backlog, immed. req., preview)
    ME590001 Grouping of requsitions for PO split in ME59
    M06E0005 Role determination for release of purchasing documents
    M06E0004 Changes to communication structure for release purch. doc.
    M06B0005 Changes to comm. structure for overall release of requisn.
    M06B0004 Number range and document number
    Business Add-in
    ME_PROCESS_REQ_CUST Enhancements for Processing Enjoy PReqs: Customer
    ME_PROCESS_REQ Enhancements for Processing Enjoy PReqs: Internal
    ME_PROCESS_PO_CUST Enhancements for Processing Enjoy Purchase Order: Customer
    ME_PROCESS_PO Enhancements for Processing Enjoy Purchase Order: Intern.
    ME_PROCESS_COMP Processing of Component Default Data at Time of GR: Custome
    ME_PO_SC_SRV BAdI: Service Tab Page for Subcontracting
    ME_PO_PRICING_CUST Enhancements to Price Determination: Customer
    ME_PO_PRICING Enhancements to Price Determination: Internal
    ME_INFOREC_SEND Capture/Send Purchase Info Record Changes - Internal Use
    ME_HOLD_PO Hold Enjoy Purchase Orders: Activation/Deactivation
    ME_GUI_PO_CUST Customer's Own Screens in Enjoy Purchase Order
    ME_FIELDSTATUS_STOCK FM Account Assignment Behavior for Stock PR/PO
    ME_DP_CLEARING Clearing (Offsetting) of Down Payments and Payment Requests
    ME_PURCHDOC_POSTED Purchasing Document Posted
    SMOD_MRFLB001 Control Items for Contract Release Order
    EXTENSION_US_TAXES Extended Tax Calculation with Additional Data
    ARC_MM_EKKO_WRITE BAdI: Enhancement of Scope of Archiving (MM_EKKO)
    ARC_MM_EKKO_CHECK BAdI: Enhancement of Archivability Check (MM_EKKO)
    MM_EDI_DESADV_IN Supplementation of Delivery Interface from Purchase Order
    MM_DELIVERY_ADDR_SAP Determination of Delivery Address
    ME_WRF_STD_DNG PO Controlling Reminder: Extension to Standard Reminder
    ME_TRIGGER_ATP Triggers New ATP for Changes in EKKO, EKPO, EKPV
    ME_TRF_RULE_CUST_OFF BADI for Deactivation of Field T161V-REVFE
    ME_TAX_FROM_ADDRESS Tax jurisdiction code taken from address
    ME_REQ_POSTED Purchase Requisition Posted
    ME_REQ_OI_EXT Commitment Update in the Case of External Requisitions
    ME_RELEASE_CREATE BAdI: Release Creation for Sched.Agrmts with Release Docu.
    ME_DEFINE_CALCTYPE Control of Pricing Type: Additional Fields
    ME_CHANGE_OUTTAB Enrich ALV Output Table in Purchasing
    ME_CHANGE_CHARACTER Customer-Specific Characteristics for Product Allocation
    ME_CCP_DEL_DURATION Calc. of Delivery Duration in CCP Process (Not in Standard)
    ME_CCP_BESWK_AUTH_CH BAdI for authorization checks for procuring plant
    ME_CCP_ACTIVE_CHECK BAdI to check whether CCP process is active
    ME_BSART_DET Change document type for automatically generated POs
    ME_BAPI_PR_CREATE_02
    ME_BAPI_PR_CREATE_01
    ME_BAPI_PO_CREATE_02
    ME_BAPI_PO_CREATE_01
    ME_BADI_DISPLAY_DOC BAdI for Internal Control of Transaction to be Invoked
    ME_ACTV_CANCEL_PO BAdI for Activating the Cancel Function at Header Level
    MEGUI_LAYOUT BAdI for Enjoy Purchasing GUI
    ME_CHECK_ALL_ITEMS Run Through Items Again in the Event of Changes in EKKO
    ME_COMMTMNT_REQ_RE_C Check of Commitment Relevance of Purchase Requisitions
    ME_COMMTMNT_REQ_RELE Check of Commitment Relevance of Purchase Requisitions
    ME_COMMTMNT_PO_REL_C Check for Commitment-Relevance of Purchase Orders
    ME_COMMTMNT_PO_RELEV Check for Commitment-Relevance of Purchase Orders
    ME_COMMITMENT_STO_CH BadI for checking if commitments for STOs are active
    ME_COMMITMENT_RETURN Commitment for return item
    ME_CIP_REF_CHAR Enables Reference Characteristics in Purchasing
    ME_CIP_ALLOW_CHANGE Configuration in Purchasing: Changeability Control
    ME_CIN_MM06EFKO Copy PO data for use by Country version India
    ME_CIN_LEINRF2V BADI for LEINRF03 excise_invoice_details
    ME_CIN_LEINRF2R BADI for CIN India - Delivery charges
    ME_CHECK_SOURCES Additional Checks in Source Determination/Checking
    ME_CHECK_OA Check BAdI for Contracts
    Reward points if useful
    Rgds,
    Naren

  • Creating  workflow for purchase order release.

    Hi friends
    I want step by step detail about creation of workflow for purchase order release..
    After release purchase order it will goes to the two level of approval..
    after that the workflow should be completed...
    how can i develope the workflow for that scenario..
    Thanks
    Gowrishankar

    Hi Gowrishankar,
    You can get step by step workflow for PO using standard workflow
    <b>Release of Purchase Order :WS20000075</b>
    And for two levels of approvals you have to configure in SPRO the path is
    Purchase Order:
    SPRO> Material Management->Purchasing->/Purchase order-->Release procedure ---> Procedure with classification ---> set up procedure with classification ---> double click on Release strategies and Workflow.
    If you don't know about this configuration, you have to confirm with your MM consultant.
    Thanks and Regards,
    Prabhakar Dharmala

Maybe you are looking for

  • Real Racing 3 showing space error

    Hi,       When i start Real Racing 3 in my iPhone it is showing atleast 103 MB space should be available error and closes. But i have enough space in my iPhone. Please let me know what could be the issue.

  • Access a data file within a jar package

    hello, everyone I got a problem in locating a data file packaged in jar file. For example, in foo.jar there is a data file with the directory path "d1/d2/data.log". In the command line, I want to access that data file by making it as an input to the

  • HDMI video not supporting on nokia n8

    Hi Team, My H/S is Nokia N8,No doubt about the performance,however have downloaded HDMI video but not working.. Can I know what format would be working and what format shall I download

  • Combobox as Datagrid Item editor

    Hi there, i'm trying to use a combobox as an itemEditor for a datagridcolumn, and i'm having some difficulties in doing this. I'm using the code below to define the column, so far so good the itemeditor appears and selects the item accordingly to the

  • Sales Opportunities Activity