Material Purchase Requisition with WBS from Projects

Hi ;
As per our client requirement we need to create Material Purchase Requisition  with WBS Element  Material .Can Some one send me the procedure .
Thanks in Advance ;
Joydeep Mukherjee

HI Joydeep,
This is not possible in PS via CJ20N transaction to create material PR without activities. This is standard SAP restriction, i guess this cannot be changed.
You can use ME51N by account assigning to Project / WBS element, then system will allow you to create.
This is kind of two different functionalities we have to create PR for WBS element / Project / Network.
Regards
Terence

Similar Messages

  • Purchase Requisition with mat-nr and without mat-nr

    Hi,
    if I create a Purchase Requisition with a material number it will be transfered into the EPRTRANS,
    but if I create a Purchase Requisition without a materialnumber (only with account assignment)
    then it will be not transfered into EPRTRANS .
    Do you have an idea why this strange behaivour happens.
    Maybe there must be made some changes in Function Module BBP_EPRTRANS_MAINTAIN ?
    Regards
    ilhan

    in order to perform a Purchase Requisition-Upload from R/3 Backend system into another system there
    are several steps necessary.
    When I am creating a Purchase Requisition at the Backend regarding a valid material-number,
    the Purchase Requisition will be automatically inserted into the table EPRTRANS.
    But not in case of if you create a Purchase Requisition without a Material-Numnber.
    e.g. Purchase Requisition with free text and account assignment.
    Function Module BBP_EPRTRANS_MAINTAIN is reposible for transfering of Purchase Requisition
    into table EPRTRANS.
    I need these PR in the EPRTRANS in order to perform the report BBP_EXTREQ_TRANSFER finally.
    It trnasfers all Purchase Requisition from EPRTTANS to the external system.
    I hope it clarifys some of the confusion .
    regds
    ertas

  • Copy purchase requisition with me51n

    Hi,
    I have a problem when I want copy a purchase requisition in me51n.
    I have two documents types in specific and I use a variant of transaction who fixed the document type.
    I execute me51N
    I search a purchase requisition with other types.
    I do a drag & drop to copy the purchase requisition.
    But in the first copy, there is a document type present on header level was copied and in the second copy it is a document type comes from reference that is copied.
    I want for the first copy, the document type comes from reference in the copy.
    What am I doing ?
    Thanks.

    in order to perform a Purchase Requisition-Upload from R/3 Backend system into another system there
    are several steps necessary.
    When I am creating a Purchase Requisition at the Backend regarding a valid material-number,
    the Purchase Requisition will be automatically inserted into the table EPRTRANS.
    But not in case of if you create a Purchase Requisition without a Material-Numnber.
    e.g. Purchase Requisition with free text and account assignment.
    Function Module BBP_EPRTRANS_MAINTAIN is reposible for transfering of Purchase Requisition
    into table EPRTRANS.
    I need these PR in the EPRTRANS in order to perform the report BBP_EXTREQ_TRANSFER finally.
    It trnasfers all Purchase Requisition from EPRTTANS to the external system.
    I hope it clarifys some of the confusion .
    regds
    ertas

  • Creation of Purchase requisition with reference to Contract documents

    Dear All
    I am not able to create the Purchase requisition with reference to Contract documents, in outline agreement field if I enter the contract document number which is already existing it is not copying the details, again I have to enter all the details like Plant, Material, document type, Qty etc.  Even after selecting the PR document type as RV for outline agreement also it is not coping. Kindly let me know that can we not able to give reference of Contract number in this outline agreement field to create Purchase requisition.
    regards
    Dhanu

    1.Logistics--Materials Management--Purchasing ---Purchase Requisition --Follow-on functions --- Assign and Process
    2.ME57
    3.Select the Assigned Purchase Requisitions checkbox if you also want to see requisitions already assigned, and choose Execute.
    4.On the Assign and Process Purchase Requisitions screen, select the requisition lines for your material.
    5.Choose Assign Manually if the info record already exists.
    6.On the pop-up Assign Source of Supply Manually dialog box, make the following entries:
    Agreement     46XXXXX            Agmt item     10          
    7.Choose Assign Source of Supply.
    For assign the source of supply, you can also choose Assign Automatically (only if not already assigned by MRP due to existing source list). If more than one source exists, select the contract in the Source Overview for Purchase Requisition 100XXXXX window and confirm with Enter.
    When assigning a source, make sure to select the contract.
    8.Choose Save.
    9.Select the line item, and then choose Assignments Overview (SHIFT+F5).
    10.On the Assign and Process Requisitions: Overview of Assignments screen, select the line below Vendor (you can only select one at a time), then choose Process Assignment.
    11.On the Process Assignment: Create PO window, check and make sure the Order Type (NB), Purchasing Group and Purch. Organization fields then choose Continue (Enter) to confirm.
    12.On the Create Purchase Order screen, select the requisition in the Document Overview section and choose Adopt in the left part of the Document Overview screen.
    13.Choose Save.

  • Purchase requisition creation (STO) from Sales order

    Hi Gurus,
    Read the following scenario:
    Sales order is created with delivery plant A. No stock on plant A.
    Purchase requisition is created from plant B to plant A (intra-company flow or stock transfer order).
    Problem is that the purchase requisition needs a price. It is not logical because intra-company flow (stock transfer in same company flow) is like a stock transfer without purchasing. So in my mind, I don't have to maintain price.
    Also if I use ME27 to create manually STO between both plants, price is not asked.
    Other question is: is it possible to create directly a purchase order when sales order creation (and not purchase requisition, newt convert into PO)?
    Many thanks.
    Stéphane

    Hi Stéphane Vituret, Did you manage to find a solution for this. I have a similar problem as well.
    Please find the scenario below.
    Cusotmer places order of Mat-XX to Company A. The Company A creates PO to Company B. Company B delivers to Company A and then invoices Company A. Company A receives the goods into own stocks. Now the Company A delivers to the customer from its own stocks and then invoices Customer.
    I decide to go ahead with the Individual Purchase order solution and since the Company A is buying from Comapny B, I decided to integrate the Cross Company STO flow in the procurement part. Hence the flow in SAP is like;
    Cusotmer placese order to Company A
    Comapny A creates a Individual Purchase order type Sales order. So the Item category is TAB.
    This sales order generates a PR. PR is conveted into a CC_STO as thenvendor is Plant B in this case . Now this STO appears in the delivery due list of plant B.
    Now I genreate the delivery to move stocks from plant B(of co.cd B) to Plant A(of co.cd A).
    Here is the problem. I am not able to do PGI as the system checks for "sales order" stock at plant B and throws error
    "Sales order stock 36637 000010 does not exist". This should not be the case as the stocks should get attached to the sales order only when recieved into Plant A. Hence system should not check for "sales order stock" at plantB while trying to deliver from Plant B to Plant A.
    Lets take a normal IPO scenario.
    CusotmerA places order of Mat-A to Company A. This sales order generates a PR. The Company A converts the PR into a std.PO to external vendor. The PO from the sales order will have a account assignment "M- Ind. cust. w/o KD-CO". The stocks will be received into Plant with spl indicator "E" while GR (MIGO). Now the system ensures that this stock can only be delivered against the particular sales order. Thus the stock procured for the customerA is delivered to customerA and not consumed by anybody else. In this case there is only one delivery involved, in SAP, which is 601 mvmt type from the Plant A.
    However if the vendor becomes another Plant (Plant B) belonging to another company code then there are two deliveries involved in the SAP system one with mvmt type 643, from Plant B to Pant A, and the second with 601 from Plant A to the customer. Hence the system should check if the stocks are attached with a spl indicator only during the second delivery of 601 mvmt type. I am facing a problem because the system does it for the first delivery itself. If you know the answer please do let me know. I really appreciate it. Thanks a lot in advance.

  • Purchase requisition with Item Category – L creation via Maintenance orders (Plant Maintenance)

    Hi Guru’s,
    I have a scenario where purchase requisition with Item Category – L (subcontract External) for Repair items (Storeroom Process) need to get generated with Item category-L.This requirement is to MAP in my system.
    I am aware that purchase requisition can be created with reference to maintenance orders.
    Can anybody through some light on the integration between PM and MM.
    If creation of purchase requisition is possible via maintenance orders then please explain me with detailed steps both configurations and master data so that I can able to replicate the same as per business requirement.
    I look forward to the expert’s response.
    Regards,
    Kumar

    Hi Kumar.S
    You have to installed DIMP 6.0, and activated the business function Refurbishment and Subcontracting (LOG_EAM_ROTSUB) and Serial Numbers in Purchasing (LOG_MM_SERNO) .
    Please check the below link:
    http://scn.sap.com/thread/1956895
    Hope it will help you to resolve your issue.
    Regards,
    Ritesh

  • How To Restrict Users To Only Create Purchase Requisitions with Item Catalog?

    Hi, everyone 
    Please help me, 
    How To Restrict Users To Only Create Purchase Requisitions with Item Catalog? is it possible? 
    Regards,   Manuel

    Hi Steenie Norman
    First click on the text item ---> Tools ---> Property Pallete ---->
    and change the Keyboard State to Local Only also this Depend in your OS
    hope this useful ....
    Regards
    Mohammed

  • Delete purchase requisition with item category Subcontracting

    Hi all,
    I need to delete a purchase requisition with item category = L (subcontracting).
    I am using already BAPI_REQUISITION_DELETE to delete other purchase requisitions but for the subcontracting it doest not work. In fact in the BAPI code you can see:
    Requisitions with dependent reservations won't be processed
        IF xeban-pstyp EQ 3 AND xeban-rsnum NE space.
    So I am looking for other BAPI but I don't find any to delete this kind of requisitions. Do you know any way to do that or I have to do a batch input?
    Thx,
    Manel

    Hi Manel,
    I am using BAPI_PO_CHANGE to set EBAN_EBAKZ, however in most of the cases error thrown as "Instance PO Number of object type  could not be changed".
    Could you please help on this?
    Thanks,
    Murali

  • Purchase requisition with MRP controller

    Hi everybody, I need support because I have to control during purchase requisition to block users with specific MRP controller.
    I mean, user A only have permission to create purchase requisition with MRP controller Z and user B only have permission to create purchase requisition with MRP controller Y.
    Thanks for all the ASAP cooperation.
    Regards.

    Hi Mitra,
    You will find your answer here.
    MRP controller for PR document type
    Do let me know if it helped, as I might have to explore this option for an upcoming requirement.
    Thanks
    Shailesh

  • Purchase Requisition with wrong purchasing group - release strategy

    Hello
    There is a lot questions about release strategies but I cannot find answer.
    I have release strategy based on:
    - Plant
    - Purchasing Group
    If I create Purchase Requisition with right purchasing group release strategy is assigned to PR item.
    When use wrong purchasing group - release strategy is not assigned.
    How to easy set control – if user use wrong purchasing group system automatically set one strategy which not allow to create purchase order.
    There is too many plants (150) and purchasing groups (60) to create all combinations in strategy. So I cannot do that.
    Maybe there is some useful user-exit?
    I use SAP ECC 6.0
    My problem occurred because SAP allow to create PO with reference to PR which have no assigned strategy.
    Thanks in advance for help
    Arek

    Yes it is solution
    But as I wrote before – there is too many incorrect combination.
    Example
    PG A1, A2, A3, A4…. A50
    Pl 2200, PG A1 – OK
    Pl 2200, PG A2 – OK
    Pl 2200, PG A3..50 NOK
    For this example I have to set 48 combinations (strategy with S).
    I noticed that I would have to set about 200 strategies. Client don’t want accept it.
    You wrote – “set up one unique strategy”. How? As I know I need 200 strategies (or there is something I don’t know
    Kind regards
    Arek

  • "Material purchase requisition" not allowed (Use Status PROV, object TM0000

    Hello Gurus,
    I am getting the following message every time I enter a material in the sales order. The material entered requires a Purchase Requisition (PR) to be created when it is entered in the order. We have done Configuration thru Order Status Profile that will prevent PR creation at time of Order creation. 
    The message is as follows:
    "Material purchase requisition" not allowed (Use
    Status PROV, object TM0000000001VB)
    Solution requested: We do not want to see this message appearing so many times. Can you pl let me know if there is a way to avoid this.
    Thank you
    Vasavi

    Hi Vasavi,
    I am not talking about the po check above that one tab like check purchse order no in this feild keep emty and also below that enter po number also keep un check
    and also please check when you creating sales order beside po date one tab is availble check any data in default that
    that tab name is display doc header details in that tab purchase order tab in that any infirmation is default check that also
    Hope this will helps you
    Prem

  • Purchase requisition with out material master - options

    Hi experts
    I wish to establish a control in Purchase requisition that, when the user enters item with out material master record (only enters text), system should give  a pop for decision options yes or no.
    Please let me know the userexit useful to map this while saving the document.
    regards
    marias

    Hi
    This userexit is specifically for Customers' Own Data in Purchase Requisition. we need to provide data. My scenario does not involve entry of new data and to verify the PR item data already entered.
    regards
    marias

  • MRP split purchase requisition with same date

    Hi guru
    When I run MRP, if there are more requirements for the same material with same date, the system creates one purchase requisition grouping requirements.
    So, if I have two requirements of 3 and 2 pieces for material A, with date 18042015, the system creates one purchase requisition of 5 pieces
    I tried to use a BADI in order to split purchase requistion and have in this case a purchase requisition of 3 pieces and another one of 2 pieces but maybe I wrong something because MRP works wrong.
    Is there anyone that could give some tips about this request? Is there anyone that had same problem?
    Thanks
    Regards
    Raffaele

    Hi,
    Hope your BAdI is working now.
    MD51 is used for project. It creates replenishment orders against a WBS element. After this, you can run MD01 which will create replenishment order by material/plant level.
    If you have a question related to PS, maybe you can post your thread in this space:
    SAP Project Systems (SAP PS)
    Kind Regards,
    Mariano

  • Creation of Purchase Requisition with Sale order

    Hi,
    I have a scenario where I need to create a Purchase requisiton for the requirement from the sale order (like the Third party sale order).
    I have done the required configurations to create the Purchase requisition.
    My Sale order has three line items and each line item has different Item category and schedule line category.
    I have configured different Purchase requisition document types for every schedule line.
    When sales order is saved, I need seperate Purchase requisition since the PR document type are different for every schedule line.
    But system creates only 1 PR with multiple lines. It picks the PR doucment type assigned to the schedule line category of 1st line item in the sale order.
    How can I get different PR for different doucment type in a single Sale order?
    Regards

    This can is happening b'coz at your sale order only one I cat is determining by default.
    So, determine diff I cat with diff desired the sch lines cat in the doc.
    Say,
    maintain, I Cat determination(VOV4)
    Sales Order(VOV8) - I Cat Group(material- MM02) - I Cat(VOV7)
    ZTPS - ZTA1 - ZTA1
    ZTPS - ZTA2 - ZTA2
    ZTPS - ZTA3 - ZTA3
    and also check.
    I Cat (VOV7) - Sch Line Cat (VOV6)
    ZTA1 - Z1
    ZTA2 - Z2
    ZTA3 - Z3
    Hope this can assist you in understanding.
    Thanks & Regards
    JP

  • SRM creates purchase requisition with wrong functional area

    Hi,
    We face the situation that we have postings to wrong functional Areas. These postings belong to a PO related GR. The PO originates  to a purchase Requisition. The functional area is can see there iw wrong, too. This seems the initial problem. If I create a PR using the same cost center and account it derives the correct funtional area. The PR is created out of SRM.
    We upgraded this year to EhP6 and it seems the issues started shortly after.
    Any idea how to correct?
    Thanks
    Exberliner

    Hi,
    Hope your BAdI is working now.
    MD51 is used for project. It creates replenishment orders against a WBS element. After this, you can run MD01 which will create replenishment order by material/plant level.
    If you have a question related to PS, maybe you can post your thread in this space:
    SAP Project Systems (SAP PS)
    Kind Regards,
    Mariano

Maybe you are looking for

  • Virtual PC not compitable for intel-based Mac?

    I saw that on the Mactopia website. I just bought a new Macbook with 1GB Ram and 80 GB Harddrive. I think that it is intel based and I am planning to purchase a copy of Virtual PC 7 but then i went to Mactopia and read: "Note: Virtual PC does not run

  • Changing the override file via command line arguments

    Is there a way to change name of the file Coherence uses to override coherence-config.xml via a command line argument? I'd like to specify different override filenames in different environments.

  • [WLST] how to set targets when creating a queue

    Hi all, I'm using WLS 10 and this is my WLST script: def createUniformDistributedQueue(destinationName, jndiDestination, jmsModuleName, managedServers): print '#### ready to create ' + destinationName path = '/JMSSystemResources/' + jmsModuleName + '

  • Using placed/named instances inside another movieclip

    I'm trying to be good and make all my movieclips linked to a class file, but I'd still like the convenience of placing and naming other instances instead of having to declare a variable, instantiating it and addChild-ing it in the class file. Is this

  • Paper Tray

    Now after just posting a note about having problem with printing individual envelopes, I try to get paper tray back in and cant get tray in.  I am totally disgusted with this printer.  I had a 7410 all in one for 9 years and it was the greatest.  Unf