Material replication from ECC to SRM

Dear SRM 7.0 Experts,
We are implementimg SRM 7.0 and we are trying to execute the Initial Load of materials into SRM 7 from ECC. We have completed all the Middleware settings and all the customising required for material replication. Whe we run the initial load (tcode R3AS) and select the first object DNL_CUST_BASIS3, it runs but the status remains "Running" in R3AM1. There is no errors in SMQ1as the entry runs and completes and therefore disappears. There is no errors recorded in SMW0 or SLG1 either. What could be the problem?
I checked in SMQ1 & SMQ2 as well, but there is no entries here for the object DNL_CUST_BASIS3. what we can do to resolve the issue ?
Regds,
Cb

Have you checked the outbound queue in backend R/3 system  ?
Have you defined the additional user in CRMCONSUM table apart from the CRM user? 
Verify and, if necessary, change or insert entries in tables CRMCONSUM and CRMRFCPAR as
described in SAP Note 430980. See also SAP Note 720819.
Hope this helps you.
Regards
Abhijeet

Similar Messages

  • Material Replication from ECC to SRM 7.0

    Hi Experts,
    I am working on Extended classic scenario SRM 7.0 with ECC 6.0, I have created the Material Group and Master data in ECC system. While doing replication via R3AS i am getting the following error msg( I have applied Note 720819 & 330401in ECC ).
    Errors:
    Hierarchy for material types does not exist
    (Before materials are imported from the ERP system, the material types from the  ERP system must exist as categories in CRM/EBP. When the Customizing object DNL_CUST_PROD1 is imported, the material types are imported automatically and created under the category MAT in the category hierarchy R3PRODSTYP (product subtype).)
    MATERIAL: Object will not be loaded
    Pl do the needful.
    Regards
    Mohan

    Hi  Pl check whether you follwed these steps are not.
    Hi find below for the product cat
    Steps to create the product category in SRM:
    1) Create MM material groups in ECC client. This will create a transport. Go to SRM Tcode R3AS and select the object u201CDNL_CUST_PROD1u201D from the list and run it. You can monitor the job using R3AM1 in SRM. This will bring the material group into SRM. This can be seen in TCode u201CCOMM_HIERARCHYu201D in SRM.
    2) Once it is done. Go to IMG in SRM and go to path SRM> SRM server> Cross app biz settings> Account aassigmnet> Define GL code for Acc *** Cat and Prod Cat. Maintain the GL code against this prod cat for all the account assignment codes. This is client specific setting and need to be done in every client by opening it. This GL code is given in the form in ticket.
    3) Do a test and check if the product category is available for procurement in SC.
    Regards,
    Satish

  • Delivery address replication from ECC to SRM

    Hello All
    We are onboarding a punch-out vendor in SRM. The Vendor said that they won't read the delivery address sent by us in the PO output, but would rather pre-store all the delivery addresses and their codes.
    The code would be auto read & this way they can ship immediately with just 1 day lead time.
    We are using classic scenario and noticed that when the PO is created in the backend, it always creates a new address number each time  , even for the same address.
    We are mulling about a process where the Ship to address would be created in ECC and replicated to SRM , with the same number as ECC.
    So my question is :
    1) Is it possible to replicate the Addresses from ECC to SRM using any report or ALE?If yes what is the process for the same.
    2) Can we maintain the number range of the Ship to address object in SRM as external, so that ECC and SRM has the same #s.
    Thanks
    Kedar

    Hi Kedar,
    1) Is it possible to replicate the Addresses from ECC to SRM using any report or ALE?If yes what is the process for the same.
    Ans : You can create delivery address in SRM from ECC by creating a Report and Utilizing RFC function module to read address
    data from ECC and creating the same in SRM through FM BBP_BUPA_ADDRESS_ADD [i hope the FM  is correct as i do not have the system now].
    I dont know of any standard interface though ....
    2) Can we maintain the number range of the Ship to address object in SRM as external, so that ECC and SRM has the same #s.
    Ans : Does not  look possible to be .. since there are amny type of addresses in the system all uses the same internal number range.  You can utilize some of unused field in delivery address to store the address number of ECC system like  Building code , Street_suppl 3 etc ...
    However i suggest do not make things complex and keep it simple.
    Cheers
    Iftekhar Alam

  • Questions regarding HR Org Structure replication from ECC to SRM

    Hi Experts ,
    We have SRM7.0 ( SP08) with ECC6 ( Ehp4) having Classic Scenario .
    I managed to replicate entire  HR Org Structure  from ECC system to SRM system.  I replicated O (Organization), S( Postion) and P ( Person), which successfully created O, S and CP in SRM with BP for O and US...Refered Note 934372, 312090, 550055 and help link on SDN./wiki.....etc
    Now I have below questions in mind.
    1. In SRM we requiers Org unit for Company Code, Purchase Organization and Purchase Group...which we set  in FUNCTION tab for the requiered Org Unit with Checkbox and value of it and Logical system.....but in HR Org strcuture we do not have such Org Unit....so how to manage/create such these Org Units ( i.e.Company Code, Purchase Organization and Purchase Group ) ?...
    Do I need to create these Org unit manually in SRM in PPOSA_BBP ? If yes, can I create these Org Unit above or between these replicated HR Org Units  or I need to created it separtly in paralllel to these HR replicated Org Units?
    2. If above I do, then what will impact on the delta /change replication from HR integraion ?
    3. In ECC HR org Structure there are hundres of employee, out of that I just wanted to send the Postion ( we have postion based security  in HR) whom only SRM Role had assigned . How it can be acheived ?
    Will appricaite detail reply/suggestions
    Thanks
    NAP

    Hi ,
    Initially when I repliacted P of HR Org Struture it sucessfully craeted BP in SRM  and was CP in Org Structure.
    But suddenly , what happned don;t know, when I replicating Employees (P) in SRM , it is assigning  to respective Postion (S), but BP is not creating in SRM  and in the USERS_GEN  for this User, its postion and ORg Unit to whom it assigned is giving  below error
    Determination of connections to object 'BP' of 'CP' '00000015' failed
    Message no. BBP_UM_UI036
    I checked all this as per Note 550055, 934372..etc....checked respetcive setting in table T77S0...I checked address alos....but no any clue......IDoC in SRM posting sucessfully....
    Can anyone please suggest what should be the cause and solution of it ?
    Thanks
    NAP

  • Material Replication from ECC 6.0 to SRM 7.0 (PPS)

    Hi,
    I am working on SRM 7.0 (PPS) classic senerio and ECC 6.0.
    I am trying for delta download regarding Product Masters but i m not able to get success.
    ERROR "Exception condition "GUIDFOR_LOGSYS_CHANGED" rais"_
    Please help.
    Sumit.

    Hi,
    This is because the Log system entry in your ECC system has been changed after the first time it was setup.
    Kindly refer note 765018 to resolve your error.
    Regards,
    Nikhil

  • Problems during material replication from SRM 5.0 to ECC 6.0

    Hello all,
    I tried to replicate material master from ECC to SRM but i am not successful.
    System can able to replicate all the product categories but not the material.
    System showing the process is done and it is showing green light when i drilldown.
    Can any one ever had experienced such a problem?
    Thank you
    mahesh

    Hi
    <b><u>Please go through this -></u></b>
    <b>Note 884208 - Unusable Middleware objects are provided</b>
    <b>Note 872533 - FAQ - Middleware</b>
    <u>As mentioned in SAP OSS note 872533, DNL_CUST_BASIS3 is obsolete, therefore, Please skip the download of the object DNL_CUST_BASIS3 and continue with DNL_CUST_PROD0, DNL_CUST_PROD1 and MATERIAL.</u>
    Following OSS note 872533, DNL_CUST_BASIS3 is obsolete.(Though OSS note mention DNL_CUST BASIS3 is obsolete for SRM 5.0, However, this customizing object does help in synchronizing the UOM from R/3 to SRM.)
    However, it seems to still work in SRM50...
    <u>Related link -></u>
    Re: UNIT OF MEASAUREMENT
    As an alternative :
    For ISO codes synchronisation, you can go to transaction CUNI -> ISO and then select "utilities" -> "adjustment".
    A pop-up will be displayed to select the backend code
    Do let me know.
    Regards
    - Atul

  • Material Group Replication from ECC

    Dear SRMers,
    System Landscape : ECC 6.0 and SRM 5.0.
    I am doing a material group replication from  ECC to SRM using the DNL_CUST_PROD1 customizing object. Before the replication ECC  was trying to confirm the target RFC destination(SRM) by prompting a logon. I logged in as myself and  the system gave a CALL_FUNCTION_OPEN_ERROR.
    I defined the CRM Consumer as SRM in the CRM middleware parameters..
    My question is do we need to define the User SRM in SU01 and when ECC tries to confirm the target RFC destination, do we need to login as the SRM User ?
    Points will be rewarded for answers.
    Thanks in advance,
    Bob

    Hi,
    The RFC user which you define in the SRM RFC detsination has to be obviously as SU01 user in SRM.Also the RFC user need to have SAP_ALL and SAP_NEW profile attached.See note 642202 for details.
    Also Check:
    http://help.sap.com/saphelp_erp2005vp/helpdata/en/84/d3eb4190966024e10000000a1550b0/frameset.htm
    BR,
    Disha.
    Pls reward points for useful answers.

  • Replicating authorization roles via HR replication from ECC 6 to SRM 5.0

    Hi,
    I'm interested in knowing whether anyone has used the distribution model to copy roles (AG objects) between ECC 6 and SRM 5.0.
    Someone said that it's possible so I would like to validate that statement as I don't know whether it is possible and practical.
    If you have any knowledge or experience could you please share it?
    Regards,
    Jerry

    Hello Yann,
    I was told that it can be done but I don't know enough about the HR replication process to acknowledge or challenge, hence the question.
    Are you implying that it's not possible or simply that it's not done?
    I had an earlier post regarding assigning roles to positions in SRM Replicating authorization roles via HR replication from ECC 6 to SRM 5.0 that you replied to but never replied to my subsequent question. It can be done because one of my other clients is doing it. We're however unable to get it work at my current client's site. Do you have any experience with this subject?
    Regards,
    Jerry

  • Replication of hierarchical levels labels from ECC to SRM

    Hi Gurus!
    I am working on SRM 5.0 in Classic scenario and ECC 6.
    We are trying to replicate data from ECC to SRM in order to retrieve the same organisational structure as the one existing in ECC in SRM.
    We succeed in replicating hierarchical levels from ECC to SRM, indeed we retrieve data of infotype 0001 employee subgroup in table HRP5581-PERSK. But we did not retrieve labels of those subgroups?
    Have we missed to customize a filter in tx BD64 in ECC? Or the problem is just that data replication does not send hierarchical levels labels from ECC to SRM?
    Please help!!
    Thanks a lot.
    Regards,
    Morgane Chevallier

    Hello all!!
    Any idea on the subject??
    Please help!
    Regards,
    morgane

  • Replication of Material Changes from ECC to CRM

    Hi All,
    I had selected deregistration for R3A* queue from the queue list using tcode SMQR. From that time I am unable to see the material master replications from ECC to CRM.
    So, again I selected registration for R3A* queue from the SMQR. Even now I am unable see the replications.
    Please can any one help me.

    Hi
    Do you get any sysfail in the inboud queue (and / or a dump in st22)?
    Do you get any errored bodcs?
    If yes which error message ID and Number?
    Best regards
    Christophe

  • Vendor and Material Replication from ECC6 Ehp7 to SRM7.0

    Hi Experts,
                  I am facing an issue with replicating Material and Vendor Master from ECC to SRM system.
    ECC system - ECC6.0 Ehp 7 &  SRM system - SRM7.0
    Middleware setting is done as per Note 720819 and performed the object like DNL_CUST_BASIS3 , DNL_CUST_PROD0, DNL_CUST_PROD1 and found Sucess in SRM R3AM1.
    Errors :
    1. Material Replication Error in SMW01
    Mat. for Initial Download: Table not supported by function
    Alternative units of measure are inconsistent; correct the values  COM_PRODUCT_UNIT  COMM_PR_UNIT
    Alternative units of measure are inconsistent; correct the values
    Validation error occurred: Module COM_PRODUCT_MAT_VALIDATE, BDoc type PRODUCT_MAT.
    2. Vendor Replication Error in BBPGETVD
    Backend systems with Release 740 are not supported
    Message no. BBP_BUPA002
    What are all the compatabilty issues will be faced connecting SAP ECC6 Ehp7 with SRM7.0? Can any one list down.
    Please Suggest the valuable comments to resolve the problem as earliest.
    Thanks & Regards,
    Ramprakash N

    Dear Ramprakash,
    Please check below URL for #1.
    Alternative units of measure are inconsistent; correct the values in SMW01
    Please find the following note which might help you for issue #2.
    1313972
    1349825
    1372175
    Thanks
    Shuvrajyoti

  • Transfer of non-valuated materials from ECC to SRM

    I kindly request your help with an issue that I am facing.
    The scenario is as follows :
    1. There is a non valuated material X (material type UNBW).
    2. MRP run happens and generates a PR with account assignment U.
    3. Transfer report BBP_EXTREQ_TRANSFER is executed in order to transfer the PR to SRM.
    4. The PR reaches SRM, but the SC is not created instead in SLG1 there is an error thrown, "No account assignment exist. Enter an account assignment".
    5. In the backend now If I try to change the PR i get the error " 6Q204 (Procurement profile 36 cannot be changed).
    Is this scenario supported ?? i,e, transfer of non-valuated materials from ECC to SRM.
    Kindly let me know if you have any idea on this.

    Hi,
    As per your query you have not determind accounts assignment. Please do these activity.
    Please see the below link.
    http://help.sap.com/saphelp_srm30/helpdata/en/a9/cde93a2876a81ae10000000a11402f/content.htm
    Regards,
    Anil

  • How can we replicate UOM from ECC to SRM.

    Hi ,
    In ECC I have assign ISO code against the UOM.
    I have replicate ISO code from ECC to SRM. But unable replicate UOM.
    How can we replicate UOM from ECC to SRM?
    Thanks with regards
    Sachin

    Hi Sachin,
    UOM are uploaded in SRM through object DNL_CUST_BASIS3. It's part of master data replication.
    You should refer following link, it will give you idea how to load mentioned object in SRM:
    MASTER DATA REPLICATION: SETTINGS
    I hope it helps.
    Regards,

  • Material Updates from ECC to CRM

    Hi Experts,
    We recently had application of Enhancement Pack4 on our ECC system. After the application EHP4 pack, we have started getting some material updates from ECC to CRM. And those updates are failing in CRM as we do not have any material set up in CRM. Due to these failed updates, lot of dumps are getting created in CRM. So can u please advice where/how in ECC i can restrict these updates to go to CRM. Any help in this will be highly appreciable.
    Regards
    Charitha

    Hello Charitha,
    In txnn:R3AC4 of CRM , check INACTIVE flag for object MATERIAL (and any other objects whose data is not required in CRM)
    for your RFC destination (ECC).
    This would prevent any automatic data flow for this object from R/3 to CRM.
    Hope this helps!
    Best Regards,
    Shanthala Kudva.

  • Transfer Data from ECC to SRM

    Hi ,
    I'm trying to transfer data from ECC to SRM for creating bid document ( Function : BBP_PD_BID_CREATE ). After transferring the data I want to get the data back to ECC ( I need bid document number to write on delivery document's field ). What's the best way to do this ?
    Regards.

    Hi vinit ,
    I've written code to call 'BBP_PD_BID_CREATE' in ECC. But ECC and SRM have different structures. So i am not sure how i can define data to send SRM.
    Here is my code in ECC program
    CALL FUNCTION 'BBP_PD_BID_CREATE' IN BACKGROUND TASK
       DESTINATION 'XXX'
       IMPORTING
         I_REF_GUID    =
         I_BAPIMODE    =
         I_PARK        =
         I_SAVE        =
         I_TESTRUN     =
         I_HEADER      = I_HEADER ?
         IT_ATTACH     =
         IT_DYN_ATTR   =
         IT_CONDITIONS =
        EXPORTING
          E_HEADER      = E_HEADER ?
          ET_ATTACH     =
          ET_DYN_ATTR   =
          ET_CONDITIONS =
        TABLES
           I_ITEM        =
           I_PARTNER     =
           I_LONGTEXT    =
           I_SDLN        =
           I_ORGDATA     =
           I_HCF         =
           I_ICF         =
           I_TOL         =
           I_WEIGHT      =
           IT_EXCHRATE   =
           E_ITEM        =
           E_PARTNER     =
           E_LONGTEXT    =
           E_SDLN        =
           E_ORGDATA     =
           E_HCF         =
           E_ICF         =

Maybe you are looking for

  • Dynamic Export table of a function Module

    Hi Friends, I have a requirement where fields of  Export table of my function Module is dynamic. It is like the Fields to be expoerted by the Function Module would be stored in a seperate Z table The Z table would contain the records as follows . Tab

  • ISE Guest Portal

    Hello Everyone Is it possible to have a WLC 4402 and a WLC 5508 working with the Guest portal of the ISE at the same time? I know that for the WLC 5508, it works fine and i can implement this as CWA, but for the WLC 4402? i read something about chang

  • Best Practices for Text That Changes During Sequence?

    I have been using creating videos like the one here, in which text shows up every so often over the scene: Making The Walking Dead Pinball Machine - YouTube Thus far, I've been creating a title, duplicating it for each time the text changes, and load

  • Could I capture a programme I've recorded on my Sky box?

    I would like to make a copy and send it, via email/web, to a relative abroad (the BBC's iplayer, where one can watch previously aired shows, does not work outside of the U.K.). I know that traditionally one would record a DVD, but I'd like to utilise

  • Do you backup your iMovie Events folder?

    I don't because it's huge, and I figure, I could always just re-import the original AVCHD footage. For example, my Events folder is 1.1TB and it would cripple my Time Machine backup disk. I do backup my iMovie and iDVD Projects, however. A few questi