Material return to store?

hi
i have made a maintenance order and i want to return a component to store.so i have put -1 in the
component quantity and reservation no(movement type 262) is automatically  created.now i want to post the material through mb1a but when i put the reservation number and item and it should adopt automatically,but it does not.but when i am doing through maintenance order it is ok.can anybody explain.
                                                                                regards
                                                                                sanjay

hi sanjay
I think u confused.
see when u issue material from store u first create reservation & then post material to ur order through MB1A or MIGO
But while returning material to store u first return material & then cancel reservation.
so just directly return material to store by MB1A or MIGO with movement type 262.(will be done by store person )
and when u complete order reservation will be automatically deleted.
Hope u understand
Regards,
Prasad

Similar Messages

  • Goods Return to Store against Process Order

    Hi,
    Tell me how to do Goods Return to Store against Process Order
    For E.g.
    Process Order X having Material M1 with Requirement Qty 100 Kg as per BOM specification and Issue Qty using COR6 is also 100 Kg but due to less Consumption 20 Kg is required to be returned to store
    So how to have effect of returned 20 KG against Process Order
    Note : I have used MB1C option for Goods Receipt but it won't make any effect in Process Order
    i.e. Requirement Qty  -   100 KG
         Withdrawn Qty     -    100 KG
    But in MMBE it shows 20 KG after receipt from MB1C
    Kunal

    Hi Vivek,
    I tried as per your given direction but it won't worked
    What I required is for E.g.
    Process Order No 11111
    Material No           Mat-A   
    Batch No              Bat-A
    Storage Loc          PM01
    Requirement Qty which is coming from BOM                        120 KG
    Withdrawl Qty either using COR6 or MB1A (261 mov type)     120 KG
    Consider that Process Order is already confirmed and due to some reason All the materials issued against Process Order has to be returned to Store for another Process Order
    When I used MB1A and entered movement type 262 with storage location PM01 then click on To Order Button to enter Reference : Order and click on Tick Button
    It then displayed only those materials which is not yet issued and required to be issued and automatically Movement Type changed to 261
    Please guide
    Kunal

  • Return to store from production quality

    hi,
    There is a problem , i have a senario suppose some raw material is left in production then we have to return to store , so the stores people check that material
    Inspection plan is already maintained with usages 5 and status 4 (inspection lot is generated when we procure a material from vendor)
    i activate the inspection type  01, 0101, 04,05 and 08, for material ROH1 but when i do the migo with movement type 262, i did not get the inspection lot , please suggest.
    Please suggest
    Regard
    Maashish

    Hi Maashish,
    This is stock transfer inspection (~Type 08).
    1. Check the "Task List Usage" in customisation of Inspection type 08. (Standard SAP has set it as 9)
    Quality Inspection>Inspection Lot Creation> Maintain inspection type
    2. Check your customisation for movement type 262. Is QM activated?
    Quality Inspection>Inspection Lot Creation> Inspection for Goods Movement-->Deactivate Q Insp. for a movement type.
    Hope it works after these corrections/checks.
    Regards,
    Pradeep

  • Material Return Slip for maintenance order

    Hi All,
    During goods issue for a maintenance order, we can take print out of material list (for planned items) and produce the same to stores personnel for issuance of material.
    Is there any similar slip available in system so that a print out can be taken for items to be returned to stores for a maintenance order?
    Thanks in advance and with Best Regards.
    HAPPY NEW YEAR IN ADVANCE !!!
    JK

    The material issue slip will be printed at different locations after releasing the mtc
    set the printer at OID1 .check thro OOCU work flow we can go , but i have not yet worked this scanario.
    According to this work flow after reservation by ur order release  it will print the materials issue at stores end.
    Some industries having the authorisation signature from dept superiors at the time u may go take print out at location to get the sign manually.
    std print form with sap some modifications or abap report will be created for this
    Sry iam not able to give full soln
    We may expect from others
    thenna

  • Reg Material Return Note

    Dear Gurus,
                       here in our client place they want to prepare material return slip (materials returned from production to stores)  as a form. kindly tell me where to assign output type and how to preview the slip before printing. Thank you

    Hi
    Check this out or refer the forum. I took it from the forum only
    1. Maintain the Printer Name in SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Print Control->Gen Settings->Printer Setting
    2. Ensure that in SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Print Control->Gen Settings->Item Print Indicator, 2 stands for return delivery print out
    3. In SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Print Control->Gen Settings->Print Version, maintain Print Version 2
    4. In SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Print Control->Maintain Print Indicator for GI/Transfer Posting Documents
    5. In SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Output Determination->Maintain Output Types, for the Output types WA01,WA02,WA03,WE01, WE02 and WE03, ensure the foll:
    a. Default Values: Dispatch Time is 3 or 4 as per reqmt. and Tr medium is 1
    b. Print Parameter is 7
    6. In SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Output Determination->Printer Det->Pr Det by Pl/StoLoc, maintain the Output device for all your Plants
    7. Go to MN21, for Tr Type WE, Print Version 3, maintain Print Item as 1.
    Now the settings are ready for Printing Material doc
    8. While doing MIGO, ensure that in General Tab, you get "3 Collective Slip" beside the Print Indicator and you tick mark the field.
    9. Now depending on the setting in 5a, the Matl doc is printed. If it is 3, you have to print it using MB90. If it is 4, it is printed immediately

  • EXTRA MATERIAL RETURN

    hi
      when a material is issued to production from stores with ref to a production order,some times there may be a chance that  some material may be unused.this material has to be returned to stores. please give me a suggestion as how this is managed in SAP.
    Thanks & Regards,
    nagraj.s

    hi,
    If the scenerio is to be faced again n again there its better to for BACKFLUSH.....
    Or
    If you wanna be with the same, then you can get back the material via "Return" process from MIGO itself...
    Regards
    Priyanka.P

  • Approval for material return issued against the Work Order

    Hello,
    We are using PM module and issuing materials against the work order.  Many times users are returning the un-used material back to stores.  This un-used material may come back <b>with or without</b> work order reference.  i.e. Sometimes they just return bunch of material but don't know the work order # against it was issued initially.
    We need to control this flow of un-used return material through proper system approval.
    How can do this.
    Thanks,

    Hi,
    In standard SAP There is no approval process to return the material.
    I have one work around , you can create one PM order to return the material & instruct your store people to receive the material only with reference to PM order.
    With out releasing a PM order, system will not allow to post the goods return.
    I hope it may help you.
    Regards,
    Manish

  • SAP Inventory Manager 4.0 (WM 1.0) issue downloading material returns on Goods Receipt

    Hi all,
    We're facing an issue related to GR and material returns, connecting to SAP backend system.
    On this first screen we're using MIGO transaction and you'll see that we have a PO (4200000027) with one material (MATERIAL-1) which has a pending quantity of 298 EA to be received.
    However, on this second screen, you'll see that when the PO gets downloaded to the Agentry client, it shows that only 295 EA are pending and that it shows that 5 EA has been received, while there are no items reversed or returned.
    Finally, when we go to verify the Purchase History for the material using ME23N transaction, you'll see that indeed 5 EA have been received of the material, but also several returns have been made. So, after calculating the difference, the total quantity of items received are 2.
    From this I understand that the SAP IM application has not downloaded the returns, and that is only considering the receipts that have been done. For that reason, it thinks that 295 EA are pending, when in reality it's supposed to be 298 EA.
    Has anyone faced this issue before? Is this a known bug? Am I missing some configuration?
    Thanks for your help
    -Omar

    Omar,
    I'm not aware of any  known issues with respective to calculation of open  quantity which is   quantity ordered - ( Total received ) - Total returned.  In your case it is not working I guess.
    what I would I suggest is to put  a break point on SAP side for Purchase order fetch and check if it is something wrong with calculations.     if it something to do with calculation then please open OSS message with SAP support team  for IM  4.0 product.
    Thanks
    Manju.

  • Material return to vendor ( line rejection)

    Dear MM gurus,
    i have a scenario where material received is accepted at the time of Quality inspection. Same material issued to production but if found faulty has to be returned to vendor. Such line rejection occur daily and at the end of the weak rejection quantity are enough to be sent back to vendor.
    we are using two step process for GR i.e 103 followed by 105. following process does not allow material return through purchase return order i.e 161. creating return delivery via migo with movement type 122 against GRs is not viable as such returns will need reference to around 30 goods receipt for single return delivery creation.
    kindly suggest a solution were return delivery can be created  without reference of GR. Please ask for clarification if information here is insufficient.
    regards
    Avinash

    Hi Avinash,
    Please check the link
    http://help.sap.com/saphelp_470/helpdata/en/a5/63351643a211d189410000e829fbbd/frameset.htm
    Regards,
    Bijoy Kumar

  • Material Return from 542 movement type without purchase order

    HI Expert
    I have a problem regaring material return from vendor through 542 mov type against purchase order.
    when i transfer material to vendor with mov type 541. and after grv if we return material from vendor against purchase order.
    system doesnot allow to return material against purchase order. it allows mov type 542 for returning material from venodr without pruchase order.
    Suppose we have 10 quality for a component to transfer vendor we take grv and issue 5 qty through 543 move type automatically. if we want to take return 5 remaining qty from vendor against purchase order .
    system doesnot allow to return component from vendor against purchase order.
    but allow  to return component from vendor without purchase order.
    vendor stocks becomes less but purchase order still open for open quantity.
    how we could control vendor's returing material with the reference of purchase order after grv.
    with regards
    sanjay agrawal

    HI,
    Are you creating return Po for subcontracting vendor with item category L.?
    we used movement type 541 to send material to vendor ,now you want movement type 542 in system means take back from vendor?
    I don't think so it will make work and make any sense
    why you are not adjust your component with subcontracting adjustment in sap mm
    check following link
    [http://help.sap.com/saphelp_470/helpdata/en/4d/2b908943ad11d189410000e829fbbd/content.htm]
    Regards
    Kailas Ugale

  • Need to create a Store Business document type for material master and store a sharepoint link

    Hello,
    I need to create a Store business document type for material master and store a URL link . How do I do that?( or is there any functionality to upload a document for a  store business document that it will automatically saves to sharepoint?)
    Thanks,
    Ran.

    >
    dhayes12 wrote:
    > A)  When I do the (Material Backflush) MFBF for the 04 type, the Inspection Lot gets created OK.  I then can go into QA32 and assign the correct Inspection Plat by clicking the Inspection Lot button.
    >
    > B)  When I do the MIGO via the Purchase Order (type Z01), it will not create the Lot if I have the Multiple Specs selected in the QM Material Master MM02.  If, I turn off the Multiple Specs in the QM Material Master and create a new PO and MIGO, it will create the Lot, however, it automatically assigns the lot to the wrong Inspection Plan (2nd Plan see above)  I need to be able to select the plan like I can with the 04 type.
    >
    > Is their some setting that can be changed in Config or somewhere that acts the same way as example A above?
    For case A, create insp plan with usage "1- production" If you have one IP with this usage for given material then system will assign Plan to lot automatically. In your case for second plan update usage as 1.
    For case B, system should assign 1st plan make sure for both plan udage is correct. for 1st plan usage should be 5 while 2nd plan usage should be 1. Now if your 1st have status 4 and key date before lot date then system will assign plan auto.
    Thanks!!!

  • HT4914 Itunes match says there's an error and that I Have to exit an then return to store. I do this but the error remains

    Itunes match says there's an error and that I Have to exit an then return to store. I do this but the error remains

    See Troubleshooting issues with iTunes for Windows updates.
    tt2

  • Material Return/Scrap Material from production generate inspection lot

    Hi experts,
    I would like to confirg the following:
    When material return or scrapped material return from production(mvnt type 262), system is required to generate inspection lot.
    How can I config this scenario?
    Thanks!
    Regards,
    Daniel

    The inspection lot origin '05' is assigned to movement type '262'.
    (You can check this in update control at transaction OMJJ.)
    So you have to activate the inspection type '05' or new one.
    But you should be 'careful' because an inspection lot will be create even if other movement like '501'.
    Regards
    Luke

  • Material return slip standard form name

    Hi guru's,
            Any one tell me the standard MATERIAL RETURN SLIP smart form name or sap script?
    With Regards,
    satheesh

    Hello,
    check in smarforms tcode/sMB40* f4  Or TNAPR table....
    Thank u,'
    santhosh

  • Material return challan

    Hi Guru's,
                   I have to make material return challan in smartforms. plz provide detail step by step.
    Thanks & Regards,
    Tekchand
    Edited by: Tekchand on Dec 8, 2011 8:39 AM
    Moderator message : Requirments dumping not allowed, show the work you have already done.  Thread locked.
    Edited by: Vinod Kumar on Dec 8, 2011 1:14 PM

    Hello,,
    usualy subcontractor doesnt return or Cancel the component
    u need to follow following steps-
    TCode-J1IF13.-Complete/Reversal/Recredit- Reverse challan.
    All duties will get reversed.
    TCode-J1IF13 Complete/Reversal/Recredit- Recredit challan.
    All duties will get recredited.
    I  mean first cancel challanJ1IF11check--and cancel the challan and through MIGO cancell Material; document.
    or  As per excise saturatory norms rules u have to sell this material to vendor for this Create Outgoing excise invoice through J1IS.
    Regards
    Mahesh Naik.

Maybe you are looking for

  • Windows 8.1 Update 1 Kiosk Mode difference

    We have a number of stations running modern IE on Windows 8.1 in Kiosk Mode. I ran the in-place upgrade on a few of them to test Windows 8.1 Update 1.  Everything runs fine except that hitting the Windows key 5 times no longer takes you to the login

  • Imovie creations. How can I burn a copy to a disk?

    I have made some movies and slide shows in IMovie and I dont know how to burn copies as a DVD so others can see them. I downloaded MiDVD and is says a small clip is too big I am clueless on my MAC and need help. Thanks Also how can I tell what operat

  • Missing Installation Option

    I have installed AS 10.1.2.0.0 on to my Linux ES4 server. The infrastructure (repository and ID Management) have been installed. When installing the Application Server, I noticed that I only have the first 2 installation options - j2E and Web Cache -

  • Runtime Error while creating Scheduling Agreement

    Hi Gurus While creating scheduling agreement Runtime Errors DYNPRO_NOT_FOUND  is occuring. Pl help. Error Massege is as under : Error in the ABAP Application Program Dynpro does not exist The current ABAP program "SAPLXM06" had to be terminated becau

  • Received an apple id password reset email the night ipod classic was stolen. Coincidence?

    My iPod classic was stolen from my vehicle. The same evening I received an apple id password reset email. Is it possible that the thief initiated the email with just the iPod and maybe my name (as it is on the vehicle registration in my car). There i